CN101298565A - Dry quenching boiler entrance area pouring process - Google Patents

Dry quenching boiler entrance area pouring process Download PDF

Info

Publication number
CN101298565A
CN101298565A CNA2008101240134A CN200810124013A CN101298565A CN 101298565 A CN101298565 A CN 101298565A CN A2008101240134 A CNA2008101240134 A CN A2008101240134A CN 200810124013 A CN200810124013 A CN 200810124013A CN 101298565 A CN101298565 A CN 101298565A
Authority
CN
China
Prior art keywords
bricks
boiler
zone
stones
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101240134A
Other languages
Chinese (zh)
Other versions
CN101298565B (en
Inventor
杨桦
徐兴福
郑军
吴俊�
王立俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Iron and Steel United Co Ltd
Original Assignee
Nanjing Iron and Steel United Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Iron and Steel United Co Ltd filed Critical Nanjing Iron and Steel United Co Ltd
Priority to CN2008101240134A priority Critical patent/CN101298565B/en
Publication of CN101298565A publication Critical patent/CN101298565A/en
Application granted granted Critical
Publication of CN101298565B publication Critical patent/CN101298565B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention pertains to the technical field of coking dry quenching, and relates to the pouring technology of the inlet area of a dry quenching boiler, wherein, the upper part of the area is an arch dome roof structure and the lower part is a square structure. Adopting the same bricks of the dome roof of a one-time deduster to build the dome roof near the one-time deduster, the brick type is 140 ton special bricks for dry quenching, and the brick No. is GAM2807. An expansion joint area is built by using GN53-Y108a, GN53-S110a bricks, and a side near the boiler is built by using GAM2807 bricks, 8 rows of the bricks are required totally with the side walls on the two sides built by using standard clay bricks, the part connected regularly with the boiler area is built with bricks, while the irregular area is treated by using thermal insulation pouring material. The invention resolves the problem of difficult pouring material shedding, ensures the thermal insulation of the area and the normal running of ash removing operation, and is favorable for the stabilized operation of the whole dry quenching boiler.

Description

Dry quenching boiler entrance area pouring process
Technical field
The invention belongs to coking Dry Quenching Technology field, is dry quenching boiler entrance area pouring process specifically.
Background technology
Dry Quenching Technology is a technology of carrying out comprehensive utilization of energy from external concentrated red Jiao of processing who introduces when the 1980s, Baosteel's First-stage Construction was built, through the main Design Research Unit of domestic coking industry---the digestion and the absorption of Zhongye Coke Resistance Engineering Technology Co., Ltd, carried out autonomous innovation.
Red Jiao of high temperature enters dried putting out in the stove, carries out thermal exchange with the low temperature rare gas element, satisfies processing requirement through the coke after the heat exchange and discharges the dried stove that puts out by the coke discharging device.And the rare gas element that has absorbed the coke sensible heat separates and enters disposable dust remover from the dried stove chute that puts out, through entering the boiler for producing steam generating behind the gravitational dust collection.Enter secondary filter again through rare gas element after the heat exchange and go further dedusting, satisfy entering the dried stove that puts out once more after the processing requirement and recycle.
Dry quenching boiler entrance area, disposable dust remover and boiler connecting portion are flexible coupling by adopting expansion joint, and the disconnected thermal recovery mould material in associated joint is carried out heat insulation.But because this domain structure complexity, difficulty of construction is big, and the disposable dust remover side that is connected with expansion joint and the mould material of boiler side very easily drop, and influence the air communication mistake.Particularly after heat insulating casting material dropped, this regional steel construction was very fast rubescent, causes the steel construction strength degradation, influences the normal operation of dry coke quenching, and then influenced the dry coke quenching generating, stopped work when serious.In the prior art, disposable dust remover top adopts clay brick to build by laying bricks or stones, and it is prefabricated in advance that expansion joint adopts two kinds of mould material to carry out, and adopts the light thermal-insulation mould material in the inner part, and the anti-mould material of washing away of heavy is adopted in the outside, is aided with the stainless steel raising intensity of pressganging able-bodied men.Expansion joint and disposable dust remover and boiler connecting portion are beaten the anti-mould material of washing away by prefabricated placenta.The actual use very fast appearance in this zone is unusual, and mould material comes off, and expansion joint is rubescent, meets the water shrinkage cracking, brings very big influence to production.Because factor affecting such as expanding, shrink, wash away causes this zone mould material very easily to come off, and influences the dried stove ordinary production of putting out, and directly causes the dry coke quenching under-capacity operation, reduce the burnt generated energy of ton.
Summary of the invention
The objective of the invention is to propose a kind of mould material that solves and drop, be beneficial to whole dried steady running of putting out stove, can reduce the dry coke quenching repair time, improve the dry quenching boiler entrance area pouring process of dry coke quenching generated energy.
Purpose of the present invention can be achieved through the following technical solutions:
Dry quenching boiler entrance area pouring process, dry quenching boiler entrance area top are the arc vault construction, and the bottom is a square structure, comprise three parts: disposable dust remover zone, expansion joint zone and boiler zone comprise following operation:
(1) in the disposable dust remover zone, adopt the brick the same to build by laying bricks or stones by the disposable dust remover vault with the used brick of disposable dust remover vault, disposable dust remover zone and expansion joint zone connecting portion number for 140 tons of dry coke quenching special bricks of GAM2807 carry out building by laying bricks or stones by row, are built three rows with brick by laying bricks or stones altogether;
(2) in the expansion joint zone, carry out building by laying bricks or stones, build four rows altogether by laying bricks or stones by row with brick number 75 tons of dry coke quenching special bricks for GN53-Y108a or GN53-S110a;
(3) in the boiler zone, by boiler side with brick number for 140 tons of dry coke quenching special bricks of GAM2807 carry out building by laying bricks or stones by row, build 8 altogether by laying bricks or stones and arrange;
(4) in the boiler zone, the both sides side wall is built 30 layers by laying bricks or stones with the standard clay brick;
(5) in the boiler zone, the regular domain that is connected with boiler is built by laying bricks or stones for 75 tons of dry coke quenching special bricks of GN53-Y108a or GN53-S110a with brick number, and irregular area is poured into a mould with heat insulating casting material.
More than in each operation, brickwork joint is 1~3mm.
Advantage of the present invention is: 1. the invention solves the difficult problem that the dry quenching boiler entrance area mould material comes off; 2. the present invention has guaranteed the heat insulation effect of dry quenching boiler entrance area; 3. guarantee normally carrying out of ash discharge operation, helped whole dried steady running of putting out stove; 4. by strengthening the structural adjustment of dry quenching boiler entrance area, prolonged the work-ing life of anti-material, compared over and must take sfgd. in three months, the anti-material in this zone can extend to 6 months work-ing life; 5. guaranteed dried normal operation of putting out stove, improved the dried generated energy that puts out stove, by reducing by 10 days maintenance in 1 year, correspondingly calculated with regard to the generated energy that increases by 10 days, annual direct benefit is: ten thousand yuan of 10*12000*24*0.52=149.76; 6. driedly put out the normal operation of stove and can effectively improve coke quality, reduce blast furnace coke ratio, the reduction ratio reaches 2%, press 340 days duration of service of dry coke quenching year, 2400 yuan in ton coke, 400 kilograms of blast furnace coke ratios, 1,500,000 tons of measuring and calculating of annual output iron, ten thousand yuan of year direct economic benefit: 10/340*400*0.02*150*10000/1000*2400=84.7.
Embodiment
Embodiment one
Dry quenching boiler entrance area pouring process, dry quenching boiler entrance area top are the arc vault construction, and the bottom is a square structure, comprise three parts: disposable dust remover zone, expansion joint zone and boiler zone comprise following operation:
(1) in the disposable dust remover zone, adopt the brick the same to build by laying bricks or stones by the disposable dust remover vault with the used brick of disposable dust remover vault, used brick can be that brick number is 140 tons of dry coke quenching special bricks of GAM2807, disposable dust remover zone and expansion joint zone connecting portion carry out building by laying bricks or stones by row for 140 tons of dry coke quenching special bricks of GAM2807 with brick number, build three rows altogether by laying bricks or stones, brickwork joint is 1mm;
(2) in the expansion joint zone, number for 75 tons of dry coke quenching special bricks of GN53-Y108a carry out building by laying bricks or stones by row, build four rows with brick altogether by laying bricks or stones, brickwork joint is 2mm;
(3) in the boiler zone, by boiler side with brick number for 140 tons of dry coke quenching special bricks of GAM2807 carry out building by laying bricks or stones by row, build 8 altogether by laying bricks or stones and arrange, brickwork joint is 1mm;
(4) in the boiler zone, the both sides side wall is built 30 layers by laying bricks or stones with the standard clay brick, and brickwork joint is 2mm;
(5) in the boiler zone, the regular domain that is connected with boiler number is built by laying bricks or stones for 75 tons of dry coke quenching special bricks of GN53-Y108a with brick, and brickwork joint is 2mm, and irregular area is poured into a mould with heat insulating casting material.
Embodiment two
Dry quenching boiler entrance area pouring process, dry quenching boiler entrance area top are the arc vault construction, and the bottom is a square structure, comprise three parts: disposable dust remover zone, expansion joint zone and boiler zone comprise following operation:
(1) in the disposable dust remover zone, adopt the brick the same to build by laying bricks or stones by the disposable dust remover vault with the used brick of disposable dust remover vault, used brick can be that brick number is 140 tons of dry coke quenching special bricks of GAM2807, disposable dust remover zone and expansion joint zone connecting portion carry out building by laying bricks or stones by row for 140 tons of dry coke quenching special bricks of GAM2807 with brick number, build three rows altogether by laying bricks or stones, brickwork joint is 2mm;
(2) in the expansion joint zone, carry out building by laying bricks or stones by row with brick number 75 tons of dry coke quenching special bricks for GN53-Y108a or GN53-S110a, build four rows altogether by laying bricks or stones, brickwork joint is 1mm;
(3) in the boiler zone, by boiler side with brick number for 140 tons of dry coke quenching special bricks of GAM2807 carry out building by laying bricks or stones by row, build 8 altogether by laying bricks or stones and arrange, brickwork joint is 3mm;
(4) in the boiler zone, the both sides side wall is built 30 layers by laying bricks or stones with the standard clay brick, and brickwork joint is 2mm;
(5) in the boiler zone, the regular domain that is connected with boiler is built by laying bricks or stones for 75 tons of dry coke quenching special bricks of GN53-Y108a or GN53-S110a with brick number, and brickwork joint is 3mm, and irregular area is poured into a mould with heat insulating casting material.
The present invention can also have other embodiment, and the technical scheme that equal replacement of all employings or equivalent transformation form all drops within the scope of protection of present invention.

Claims (2)

1. dry quenching boiler entrance area pouring process, described dry quenching boiler entrance area top is the arc vault construction, the bottom is a square structure, comprises three parts: disposable dust remover zone, expansion joint zone and boiler zone is characterized in that: comprise following operation:
(1) in the described disposable dust remover zone, adopt the brick the same to build by laying bricks or stones by the disposable dust remover vault with the used brick of disposable dust remover vault, disposable dust remover zone and expansion joint zone connecting portion number for 140 tons of dry coke quenching special bricks of GAM2807 carry out building by laying bricks or stones by row, are built three rows with brick by laying bricks or stones altogether;
(2) in the described expansion joint zone, carry out building by laying bricks or stones, build four rows altogether by laying bricks or stones by row with brick number 75 tons of dry coke quenching special bricks for GN53-Y108a or GN53-S110a;
(3) in the described boiler zone, by boiler side with brick number for 140 tons of dry coke quenching special bricks of GAM2807 carry out building by laying bricks or stones by row, build 8 altogether by laying bricks or stones and arrange;
(4) in the described boiler zone, the both sides side wall is built 30 layers by laying bricks or stones with the standard clay brick;
(5) in the described boiler zone, the regular domain that is connected with boiler number is built by laying bricks or stones for 75 tons of dry coke quenching special bricks of GN53-Y108a or GN53-S110a with brick, and irregular area is poured into a mould with heat insulating casting material.
2. dry quenching boiler entrance area pouring process as claimed in claim 1 is characterized in that: in each operation, brickwork joint is 1~3mm.
CN2008101240134A 2008-06-18 2008-06-18 Dry quenching boiler entrance area pouring process Expired - Fee Related CN101298565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101240134A CN101298565B (en) 2008-06-18 2008-06-18 Dry quenching boiler entrance area pouring process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101240134A CN101298565B (en) 2008-06-18 2008-06-18 Dry quenching boiler entrance area pouring process

Publications (2)

Publication Number Publication Date
CN101298565A true CN101298565A (en) 2008-11-05
CN101298565B CN101298565B (en) 2011-08-24

Family

ID=40078524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101240134A Expired - Fee Related CN101298565B (en) 2008-06-18 2008-06-18 Dry quenching boiler entrance area pouring process

Country Status (1)

Country Link
CN (1) CN101298565B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101928575A (en) * 2009-06-19 2010-12-29 中冶成工上海五冶建设有限公司 Dry quenching laying method
CN101948697A (en) * 2010-09-25 2011-01-19 中国十九冶集团有限公司武汉分公司 Novel method for building slope air course of coke dry quenching furnace
CN102161590A (en) * 2010-02-24 2011-08-24 山东鲁耐窑业有限责任公司 Mullite-andalusite product for key position of dry quenching device and preparation method thereof
CN101671569B (en) * 2009-09-28 2012-09-05 山东钢铁股份有限公司 Integral casting construction process of dry quenching furnace
CN102732272A (en) * 2012-07-05 2012-10-17 安阳钢铁股份有限公司 Expansion joint of coke dry quenching chamber recycle gas outlet

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282044A (en) * 1999-03-31 2000-10-10 Nippon Steel Corp Inner cylinder brick-laid structure of coke dry quenching facility
CN2506641Y (en) * 2001-08-24 2002-08-21 张维田 Dry quenched coke oven body
JP4838619B2 (en) * 2006-04-04 2011-12-14 黒崎播磨株式会社 Alumina-silica brick for CDQ
CN201031215Y (en) * 2007-05-10 2008-03-05 武汉钢铁(集团)公司 Forked chute of coke dry quenching boiler once dust-cleaning equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101928575A (en) * 2009-06-19 2010-12-29 中冶成工上海五冶建设有限公司 Dry quenching laying method
CN101928575B (en) * 2009-06-19 2014-10-01 五冶集团上海有限公司 Dry quenching laying method
CN101671569B (en) * 2009-09-28 2012-09-05 山东钢铁股份有限公司 Integral casting construction process of dry quenching furnace
CN102161590A (en) * 2010-02-24 2011-08-24 山东鲁耐窑业有限责任公司 Mullite-andalusite product for key position of dry quenching device and preparation method thereof
CN102161590B (en) * 2010-02-24 2013-09-04 山东耐材集团鲁耐窑业有限公司 Mullite-andalusite product for key position of dry quenching device and preparation method thereof
CN101948697A (en) * 2010-09-25 2011-01-19 中国十九冶集团有限公司武汉分公司 Novel method for building slope air course of coke dry quenching furnace
CN102732272A (en) * 2012-07-05 2012-10-17 安阳钢铁股份有限公司 Expansion joint of coke dry quenching chamber recycle gas outlet

Also Published As

Publication number Publication date
CN101298565B (en) 2011-08-24

Similar Documents

Publication Publication Date Title
CN101298565B (en) Dry quenching boiler entrance area pouring process
CN102424753B (en) Method for repairing bricks at bottom of carbonization chamber of large coke oven
CN205295431U (en) Two of thick copper of copper concentrate continuous production links stove device
CN103509566B (en) Overhaul construction method of double chute position of dry quenching furnace
CN115615188B (en) Oxygen-enriched double-chamber molten pool smelting side-blown furnace and method for extracting iron and quenching molten steel slag
CN105542800B (en) Coke dry quenching furnace liner overhaul construction method
CN105002371A (en) Process for producing anode copper by adoption of four connected furnaces
CN101907298A (en) Hot repair method of port tongue arch of coal-burning glass furnace
CN201395572Y (en) Chute bracket of CDQ furnace
CN104532015A (en) Double-furnace blister copper continuous converting process
CN201553701U (en) Coke dry quenching oven housing with novel structure
CN101709222A (en) Dry quenching furnace shell with novel structure
CN203923089U (en) A kind of large-scale tamping coke furnace
CN204224518U (en) Expansion joint is imported and exported in cork dry quenching disposable dedusting
CN107906971B (en) High, medium and low waste heat recycling system for solidification heat of blast furnace ore slag
CN104560065B (en) False corbel bracket and using method thereof during examining and repairing corbel bricks in dry quenching chute
CN2595807Y (en) Vertical continuous coking furnace
CN1249201C (en) Vertical automatic cokery with cold loading and cold discharge
CN201031215Y (en) Forked chute of coke dry quenching boiler once dust-cleaning equipment
CN211823858U (en) Fused magnesium lump cooling and waste heat recovery system
CN209512486U (en) A kind of new shaft type furnace furnace structure
CN204255075U (en) Wind vanadophosphoric ferric ore deposit being carried out to ferrovanadium separation melts formula smelting furnace
CN203432294U (en) Energy-saving improved wide-cross-section sintered brick tunnel kiln
CN106546098A (en) A kind of vanadium-nitrogen alloy sintering kiln
CN2506641Y (en) Dry quenched coke oven body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NANJING NANGANG INDUSTRY DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: NANJING UNITE STEEL CO., LTD.

Effective date: 20091218

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20091218

Address after: Liuhe District of Nanjing City, Jiangsu Province, xiejiadian post encoding: 210035

Applicant after: Nanjing Iron & Steel United Co., Ltd.

Address before: Liuhe District of Nanjing City, Jiangsu Province, xiejiadian post encoding: 210035

Applicant before: Nanjing Iron & Steel United Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824

Termination date: 20160618

CF01 Termination of patent right due to non-payment of annual fee