CN101286178A - 电力自动化系统中实时数据库的多域组多断面的实现方法 - Google Patents

电力自动化系统中实时数据库的多域组多断面的实现方法 Download PDF

Info

Publication number
CN101286178A
CN101286178A CNA2008101146541A CN200810114654A CN101286178A CN 101286178 A CN101286178 A CN 101286178A CN A2008101146541 A CNA2008101146541 A CN A2008101146541A CN 200810114654 A CN200810114654 A CN 200810114654A CN 101286178 A CN101286178 A CN 101286178A
Authority
CN
China
Prior art keywords
data
section
real
group
territory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101146541A
Other languages
English (en)
Other versions
CN101286178B (zh
Inventor
葛亮
朱建
杨长府
王立鼎
於建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
Beijing Sifang Engineering Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN2008101146541A priority Critical patent/CN101286178B/zh
Publication of CN101286178A publication Critical patent/CN101286178A/zh
Application granted granted Critical
Publication of CN101286178B publication Critical patent/CN101286178B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种电力自动化系统中实时数据库的多域组多断面(section)的实现方法。电力自动化系统实时数据包括多种类型数据,每种类型数据组成一个断面(section)。实时数据库中每个表由一个或多个域组组成,每个域组包含一个或一个以上的域。每个断面可以包含一个或一个以上的域组。该方法能方便而高效地管理上述的类型数据,能快速地实现各种类型数据之间的切换,并支持动态增加或删除域组和断面。本发明有效解决了电力自动化系统中实时数据库在各种应用类型数据之间迅速切换问题,实现了静态参数在各种应用中共享,节省了内存资源。该方法可作为提高电力自动化系统实时性、节省内存资源的一种重要解决方案。

Description

电力自动化系统中实时数据库的多域组多断面的实现方法
技术领域
本发明涉及电力自动化系统中实时库性能的技术领域,尤其涉及一种电力自动化系统中实时数据库的多域组多断面(section)的实现方法。
背景技术
在现代化的社会中,电力系统是保障国民经济正常运行的重要基础设施,电力系统的大面积停电故障将直接对人民生活、国民经济产生直接的重大影响。电力自动化系统(包括数据采集与监控SCADA/能量管理EMS/配电管理DMS/调度员培训仿真DTS/电能计量TMR/管理信息系统MIS/广域动态测量系统WAMS/电厂监控SIS/变电站自动化SAS等等),是电力系统的重要组成部分,是对电力系统进行分析、监控、调度、管理的重要手段。尤其是随着计算机技术、通信技术、自动化水平的不断提高,电力自动化系统对电力系统安全、稳定、经济运行的重要性越来越明显。
在现有电力自动化主站系统中,关键设备、关键节点的计算机必须配置很大的内存来满足实时数据库的需要,同时为了提高存储速度,不同的应用类型数据需要建立不同的实时数据库,一个数据库存储电力自动化的采集数据,一个数据库存储电力自动化的应用数据。对于不同的应用,需要克隆与之对应数据库。
现有电力自动化主站系统的实时数据库具有以下明显的缺点:
1.关键设备、关键节点的计算机必须配置很大的内存;
2.对于每个不同的应用,都需克隆与之对应的实时数据库,以保证实时数据的完整性,这种方式使得内存中保存有多份相同的电力系统的静态参数等各种应用需要的原始数据,浪费很大的内存空间;
3.克隆数据库之间来回切换的操作复杂且耗时,严重限制了电力自动化系统中各种应用的计算速度。
发明内容
本发明的目的是为了克服现有技术中存在的上述缺陷,提出了一种电力自动化系统中实时数据库的多域组多断面(section)的实现方法。所述的方法是通过如下的技术方案实现的,所述的方法包括:
在每个电力自动化系统中,都运行着一个实时数据库,用来管理电力自动化系统中海量的实时数据;
所述的实时数据库运行于电力自动化主站系统的计算机内存中;
所述的实时数据包括电力系统的静态参数、电力自动化系统的采集数据和各种应用计算的结果数据等多种类型数据;
所述实时数据库定义一个或多个域组,每个域组包含一个或一个以上的域,每个域包含一种不同的类型数据;
定义多个断面section,将所述的每种类型数据组成一个断面(section);
所述的实时数据库定义多域组多断面来存储和管理实时数据,多域组多断面能方便而高效地管理实时数据,能快速地实现各种类型数据之间的切换,提高系统的性能;
所述的实时数据库支持动态增加或删除域组和断面;
所述的电力系统的静态参数包括描述电力系统元件(发电机、变压器、线路等)特性的数据;
所述的电力自动化的采集数据包括数据采集与监控SCADA的数据、电能计量TMR的数据和广域动态测量系统WAMS的数据;
所述的各种应用计算的结果数据包括能量管理系统EMS中状态估计的结果数据、潮流计算的结果数据或负荷预测的结果数据,调度员培训仿真DTS的数据等;
所述的一个断面可以对应电力系统的静态参数,可以对应数据采集与监控SCADA的数据,可以对应能量管理系统EMS状态估计的结果数据等;
所述的多域组多断面的方法是一种建立实时数据库的方法。在建立实时数据库时,可以定义多张表,每张表定义一个或多个域组,每个域组包含一个或一个以上的域。根据不同类型的数据,定义不同的断面,每个断面可以包含一个或一个以上的域组。在同一个表中不同断面的数据可以进行快速地切换,提高系统的性能;
所述的实时数据库支持动态增加或删除域组和断面,可以根据需要动态地增加域组,减少域组,增加断面,删除断面;
所述的不同表的域组名可以相同也可以不同,不同断面中的域名可以相同也可以不同。
本发明提出的电力自动化系统实时数据库的多域组多断面(section)的实现方法,有效解决了电力自动化主站系统中的实时数据库在各中应用类型数据之间迅速切换的问题。同时避免了传统克隆数据库方式下的内存资源浪费、克隆数据库之间来回切换的复杂且耗时的缺点。电力自动化系统实时数据库的多域组多断面(section)可以作为提高电力自动化主站系统实时性的一种重要解决方案。
附图说明
图1是本发明方法使用的多域组多断面构成示意图。
具体实施方式
图1是本发明方法使用的多域组多断面构成示意图。如图1所示,电力自动化主站系统中的实时数据库定义多张表,表A为其中的一张,其中表A可以定义域组a、域组b、域组c等多个域组,域组a可定义域1、域2、......、域n,域组b可定义域1、域2、......,域组c可定义域1、域2、......,域组m可定义域......,域组n可定义域......。
如图1所示,断面(section)1由域组a组成,对应于一种类型数据,如电力系统的静态参数,断面(section)2由域组2和域组m组成,对应于一种类型数据,如电力自动化系统的采集数据,断面(section)3由域组3和域组n组成,对应于一种类型数据,如电力自动化系统能量管理(EMS)中状态估计的结果数据。
电力自动化系统的应用只需打开一张表,就能得到计算所需的原始数据,同时可以将计算结果数据存放在同一张表的另一个断面中,避免了克隆数据库的方式,节省内存,提高系统速度。
本发明提出的一种电力自动化系统中实时数据库的多域组多断面(section)的实现方法。所述的方法是通过如下的技术方案实现的,所述的方法包括:
在每个电力自动化系统中,都运行着一个实时数据库,用来管理电力自动化系统中海量的实时数据;
所述的实时数据库运行于电力自动化主站系统的计算机内存中;
所述的实时数据包括电力系统的静态参数、电力自动化系统的采集数据和各种应用计算的结果数据等多种类型数据;
所述的每种类型数据组成一个断面(section);
所述的实时数据库定义多域组多断面来存储和管理实时数据,多域组多断面能方便而高效地管理实时数据,能快速地实现各种类型数据之间的切换,提高系统的性能;
所述的实时数据库支持动态增加或删除域组和断面;
所述的电力系统的静态参数包括描述电力系统元件(发电机、变压器、线路等)特性的数据;
所述的电力自动化的采集数据包括数据采集与监控SCADA的数据、电能计量TMR的数据和广域动态测量系统WAMS的数据;
所述的各种应用计算的结果数据包括能量管理系统EMS中状态估计的结果数据、潮流计算的结果数据或负荷预测的结果数据,调度员培训仿真DTS的数据等;
所述的一个断面可以对应电力系统的静态参数,可以对应数据采集与监控SCADA的数据,可以对应能量管理系统EMS状态估计的结果数据等;
所述的多域组多断面的方法是一种建立实时数据库的方法。在建立实时数据库时,可以定义多张表,每张表定义一个或多个域组,每个域组包含一个或一个以上的域。根据不同类型的数据,定义不同的断面,每个断面可以包含一个或一个以上的域组。在同一个表中不同断面的数据可以进行快速地切换,提高系统的性能;
所述的实时数据库支持动态增加或删除域组和断面,可以根据需要动态地增加域组,减少域组,增加断面,删除断面;
所述的不同表的域组名可以相同也可以不同,不同断面中的域名可以相同也可以不同。
所述的实现方法可实现于电力调度自动化系统、电力配电自动化系统、变电站自动化系统、电厂电气监控自动化系统等电力自动化主站系统中。
综上所述,本发明的方法是在现有技术基础上,针对现有技术应用领域的不足,提供一种电力自动化系统中实时数据库的多域组多断面(section)的实现方法,有关克隆数据库等都是现有技术,这里不再重复。本发明的实现方法在于实时数据库多域组多断面的建库方法,其方法的具体技术方案由本发明的权利要求所限定。

Claims (6)

1、一种电力自动化系统中实时数据库的多域组多断面的实现方法,其特征在于,所述的方法包括:
在每个电力自动化系统中,都运行着一个实时数据库,用来管理电力自动化系统中海量的实时数据;
所述的实时数据库运行于电力自动化主站系统的计算机内存中;
所述的实时数据包括电力系统的静态参数、电力自动化系统的采集数据和各种应用计算的结果数据多种类型数据;
所述实时数据库定义一个或多个域组,每个域组包含一个或一个以上的域,每个域包含一种不同的类型数据;
定义多个断面section,将所述的同种类型数据的域组组成一个断面section;
所述的实时数据库支持动态增加或删除域组和断面;
所述的实时数据库通过上述定义多域组和多断面来存储和管理实时数据,避免了不同类型数据切换时克隆数据库造成的大量冗余数据,能快速地实现各种类型数据之间的切换,提高系统的性能。
2、根据权利要求1所述的方法,其特征在于,所述的电力系统的静态参数为描述电力系统元件特性的数据,所述电力系统元件包括发电机、变压器、线路以及其它电力系统元件;
所述的电力自动化的采集数据包括数据采集与监控SCADA的数据、电能计量TMR的数据和广域动态测量系统WAMS的数据以及其它的电力系统采集数据;
所述的各种应用计算的结果数据包括能量管理系统EMS中状态估计的结果数据、潮流计算的结果数据或负荷预测的结果数据,调度员培训仿真DTS的数据以及其它的应用计算结果数据。
3、根据权利要求1或2所述的方法,其特征在于,所述的多个断面分别对应电力系统的静态参数、对应数据采集与监控SCADA的数据、对应能量管理系统EMS状态估计的结果数据。
4、根据权利要求1所述的方法,其特征在于,所述的多域组多断面的方法是一种建立实时数据库的方法,在建立实时数据库时,定义多张表,每张表定义一个或多个域组,每个域组包含一个或一个以上的域;根据不同的类型数据,定义不同的断面,每个断面可以包含一个或一个以上的域组;在同一个表中不同断面的数据可以进行快速地切换,提高系统的性能。
5、根据权利要求1或4所述的方法,其特征在于,所述的实时数据库支持动态增加或删除域组和断面,可以根据需要动态地增加域组,减少域组,增加断面,删除断面。
6、根据权利要求4所述的方法,其特征在于,所述的不同表的域组名可以相同也可以不同,不同断面section中的域名可以相同也可以不同。
CN2008101146541A 2008-06-06 2008-06-06 电力自动化系统中实时数据库的多域组多断面的实现方法 Active CN101286178B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101146541A CN101286178B (zh) 2008-06-06 2008-06-06 电力自动化系统中实时数据库的多域组多断面的实现方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101146541A CN101286178B (zh) 2008-06-06 2008-06-06 电力自动化系统中实时数据库的多域组多断面的实现方法

Publications (2)

Publication Number Publication Date
CN101286178A true CN101286178A (zh) 2008-10-15
CN101286178B CN101286178B (zh) 2010-06-09

Family

ID=40058381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101146541A Active CN101286178B (zh) 2008-06-06 2008-06-06 电力自动化系统中实时数据库的多域组多断面的实现方法

Country Status (1)

Country Link
CN (1) CN101286178B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101534021B (zh) * 2009-04-27 2010-11-10 北京四方继保自动化股份有限公司 应用于电力自动化系统中的多态数据采集及处理方法
CN101958547A (zh) * 2010-10-29 2011-01-26 国电南瑞科技股份有限公司 电力调度自动化系统分布式数据采集分区热备方法
CN101976842A (zh) * 2010-10-29 2011-02-16 清华大学 基于电气分区的关键断面自动获取方法
CN102496072A (zh) * 2011-12-19 2012-06-13 国电南瑞科技股份有限公司 智能变电站分布式状态估计系统
CN103399545A (zh) * 2013-07-29 2013-11-20 北京四方继保自动化股份有限公司 一种用于分布式控制系统的实时库管理模块
CN104242259A (zh) * 2014-06-16 2014-12-24 北京四方继保自动化股份有限公司 一种配电网故障断面增量存储方法
CN104573366A (zh) * 2015-01-09 2015-04-29 云南电力调度控制中心 一种基于电力负荷积分计算的电量数据核对方法
CN104656053A (zh) * 2015-03-02 2015-05-27 国网重庆市电力公司电力科学研究院 电能计量装置状态估计方法及系统
CN107066597A (zh) * 2017-04-19 2017-08-18 国家电网公司 一种电网故障后评价报告生成方法及系统
CN110134832A (zh) * 2019-04-23 2019-08-16 南京南瑞继保电气有限公司 一种地铁pscada系统中设备数据量测方法及设备

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6516326B1 (en) * 2000-10-30 2003-02-04 Stone And Webster Consultants, Inc. System and method for integrating electrical power grid and related data from various proprietary raw data formats into a single maintainable electrically connected database
CN1797385A (zh) * 2004-12-24 2006-07-05 许继集团有限公司 一种电力自动化系统通用管理平台系统及其实现方法与开发方法
CN100416562C (zh) * 2004-12-24 2008-09-03 许继集团有限公司 一种电力自动化系统实时数据库管理系统及其实现方法
CN100458791C (zh) * 2006-12-26 2009-02-04 中国南方电网有限责任公司 电力系统多区域网络模型拼接方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101534021B (zh) * 2009-04-27 2010-11-10 北京四方继保自动化股份有限公司 应用于电力自动化系统中的多态数据采集及处理方法
CN101958547A (zh) * 2010-10-29 2011-01-26 国电南瑞科技股份有限公司 电力调度自动化系统分布式数据采集分区热备方法
CN101976842A (zh) * 2010-10-29 2011-02-16 清华大学 基于电气分区的关键断面自动获取方法
CN102496072A (zh) * 2011-12-19 2012-06-13 国电南瑞科技股份有限公司 智能变电站分布式状态估计系统
CN103399545A (zh) * 2013-07-29 2013-11-20 北京四方继保自动化股份有限公司 一种用于分布式控制系统的实时库管理模块
CN103399545B (zh) * 2013-07-29 2015-09-02 北京四方继保自动化股份有限公司 一种用于分布式控制系统的实时库管理模块
CN104242259A (zh) * 2014-06-16 2014-12-24 北京四方继保自动化股份有限公司 一种配电网故障断面增量存储方法
CN104242259B (zh) * 2014-06-16 2017-05-10 北京四方继保自动化股份有限公司 一种配电网故障断面增量存储方法
CN104573366A (zh) * 2015-01-09 2015-04-29 云南电力调度控制中心 一种基于电力负荷积分计算的电量数据核对方法
CN104656053A (zh) * 2015-03-02 2015-05-27 国网重庆市电力公司电力科学研究院 电能计量装置状态估计方法及系统
CN107066597A (zh) * 2017-04-19 2017-08-18 国家电网公司 一种电网故障后评价报告生成方法及系统
CN110134832A (zh) * 2019-04-23 2019-08-16 南京南瑞继保电气有限公司 一种地铁pscada系统中设备数据量测方法及设备

Also Published As

Publication number Publication date
CN101286178B (zh) 2010-06-09

Similar Documents

Publication Publication Date Title
CN101286178B (zh) 电力自动化系统中实时数据库的多域组多断面的实现方法
CN103427417B (zh) 基于多源信息融合的配电网故障处理方法
CN109873499B (zh) 智能配电台区管理终端
CN102290811B (zh) 对事故预案和运行方式进行评估的方法
CN102722764A (zh) 一体化电网优化辅助决策分析系统
CN104992307B (zh) 一种配电网风险协同管控系统
Zhou et al. An overview on distribution automation system
Jadhav et al. Technical challenges for development of smart grid in India
CN105046573A (zh) 一种面向电力规划的电力系统网损评估方法
Bie et al. Smart Grid in China: a promising solution to China’s energy and environmental issues
Song et al. A new method for processing and application of wide area measurement big data in a power system
Liu et al. Design and application of new power load management system
Wu et al. Distribution network topology modelling and automatic mapping based on CIM and GIS
CN105426615A (zh) 智能变电站电源监测管理体系智能电子设备的建模方法
Xu et al. Optimization of distribution network topology based on CIM model
CN111859585A (zh) 一种输配协同的设备承载能力计算方法及系统
Qin et al. The data sharing platform system of electrical main wiring based on the results of 3D digital GIM
Yu et al. Study on the dynamic optimal allocation of distribution network switches considering the uncertainty of source-network-load
Zhang et al. Implementation of Distribution Network Integrated Blackout Management Platform Based on Business Central Platform
Yao et al. Based on the integration of power grid topology model of distribution network fault analysis applications
Su et al. Design and Implementation of Function of Automatic Modeling Based on United Distribution Networks in New-generation Distribution Automation System
Yao et al. Key technologies of coordination and optimization dispatching for UHV AC&DC transmission network
Deng et al. Topology analysis and modeling for smart distribution network based on complicated equipments
Riedl et al. ICT enablers for smart energy
Chunmin et al. Analysis on automation of electric power systems based on GIS

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ge Liang

Inventor after: Zhu Jian

Inventor after: Yang Changfu

Inventor after: Wang Liding

Inventor after: Wu Jianlin

Inventor before: Ge Liang

Inventor before: Zhu Jian

Inventor before: Yang Changfu

Inventor before: Wang Liding

Inventor before: Wu Jianlin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GE LIANG ZHU JIAN YANG ZHANGFU WANG LIDING YU JIANLIN TO: GE LIANG ZHU JIAN YANG CHANGFU WANG LIDING YU JIANLIN

TR01 Transfer of patent right

Effective date of registration: 20171219

Address after: 100085 Beijing city on the base of the information industry on the street, No. four, No. 9, Haidian District

Co-patentee after: Beijing Sifang Jibao Engineering Technology Co., Ltd.

Patentee after: Beijing Sifang Jibao Automation Co., Ltd.

Address before: 100085 Beijing city on the base of the information industry on the street, No. four, No. 9, Haidian District

Patentee before: Beijing Sifang Jibao Automation Co., Ltd.

TR01 Transfer of patent right