CN101285307A - Technology for building thin concrete underground diaphragm wall with widen type water jetting method - Google Patents

Technology for building thin concrete underground diaphragm wall with widen type water jetting method Download PDF

Info

Publication number
CN101285307A
CN101285307A CNA2008100285316A CN200810028531A CN101285307A CN 101285307 A CN101285307 A CN 101285307A CN A2008100285316 A CNA2008100285316 A CN A2008100285316A CN 200810028531 A CN200810028531 A CN 200810028531A CN 101285307 A CN101285307 A CN 101285307A
Authority
CN
China
Prior art keywords
phase
groove
wall section
wall
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100285316A
Other languages
Chinese (zh)
Other versions
CN100543240C (en
Inventor
陈春光
赵资钦
刘联伟
黄伟瑜
唐捷朗
杨双泉
赖小江
唐武兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuantian Engineering Co Ltd
Guangdong Construction Engineering Group Co Ltd
Original Assignee
Guangdong Yuantian Engineering Co Ltd
Guangdong Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yuantian Engineering Co Ltd, Guangdong Construction Engineering Group Co Ltd filed Critical Guangdong Yuantian Engineering Co Ltd
Priority to CNB2008100285316A priority Critical patent/CN100543240C/en
Publication of CN101285307A publication Critical patent/CN101285307A/en
Application granted granted Critical
Publication of CN100543240C publication Critical patent/CN100543240C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the architectural engineering technical field, providing technique for building a thin wall concrete underground diaphragm wall by a guide enlargement type water injection groove forming method, wherein a guide enlargement type water injection groove forming method is used in the construction of the second-phase groove section; besides a tank, a water inlet pipe, a slag pumping pipe, an injection assembly and a knife assembly which are also adopted in a conventional water injection groove forming machine, the guide enlargement type water injection groove forming machine is characterized by comprising groove enlargement knives and guide blocks arranged on both ends of the tank, wherein two groove enlargement knives and guide blocks on each end form a reverse V shape, and simultaneously transverse nozzles are also arranged; a second-phase groove opening formed is provided with an enlargement end part on the periphery of the first-phase wall section, thereby making the second-phase wall section have an groove-shaped enlargement end and end heads of the first-phase wall section of the diaphragm wall inserted in grooves of end heads of the second-phase wall section of the diaphragm wall for forming a groove-typed connection. The technique turns the common planar tap joint between the first-phase wall section and the second--phase wall section into the groove-typed connection, which obviously improves the impermeability of connectors; the groove forming machine of the invention is accurate in forming grooves and can ensure the unbiased connection between the second--phase wall section and the first-phase wall section, thereby improving the overall strength and impermeability of the wall body.

Description

Widen type water jetting method is built the thin concrete underground diaphragm wall technology
Technical field
The present invention relates to construction engineering technical field, especially build the thin diaphragm wall technology.
Background technology
Thin concrete underground diaphragm wall (hereinafter to be referred as " thin wall ") is meant a kind of diaphragm wall that its thickness is thin with respect to common diaphragm wall.Because plurality of advantages such as thin wall has good seepage-proof property, quick construction, reduce investment outlay, thereby in recent years many water conservancies and environment-friendly engineering, replaced common diaphragm wall, as the dyke seepage control that impervious wall is used for rivers, lake, reservoir reinforce, engineerings such as groundwater environment pollution control and the discarded underground antiseepage processing of landfill yard of rubbish.Can affirm that along with approaching the full-fledged of wall building technology, its application will be more and more widely.At present, build grooving (pore-creating) method that approaches the wall employing and mainly contain water jetting, grab bucket method, Churn drill method etc.Wherein, water jetting has more advantage at aspects such as work efficiency, energy-saving and environmental protection than additive method, thus in Jiangxi of China, more this technology that adopted in area such as Fujian, Beijing, Guangdong.
The basic principle that water jetting is built thin wall technology is: the jet assembly that high pressure slurry pump is delivered to water under high pressure in the capstan engine through water inlet pipe also penetrates by the vertical nozzle of the row of one on it, forms high-speed jet the stratum is cut.Meanwhile, the capstan engine generation impact force that pumps under the drive of main winch is by being arranged at the further die-cut stratum of cutter of capstan engine bottom outer rim.Thereby earth formation is damaged to form under the double action of jet and cutter and has the flat cylindricality slotted eye of setting size.Mixed to form water and soil slag slurry by jet and the die-cut dregs that gets off of cutter with water, under the effect of the impact of capstan engine and jet, be the state of rolling, utilize sand pump to extract the slag slurry out slotted eye through dreg-drawing pipe.Along with capstan engine drilling depth progressively, continue from the aperture to slotted eye supply slurry coat method and keep enough slurry face elevation to stablize slotted eye.Slotted eye carries out hole clearly after reaching projected depth, and clear hole finishes and in time adopts the catheterized reperfusion concrete, thereby builds up unit wall section.Separate the second stage of groove section during construction, elder generation's construction first phase groove section, treat to carry out the second stage of groove section construction again after adjacent two sections first phase wall section concretes reach certain intensity, the first phase wall section that the second stage of wall section of building up is adjacent with the left and right sides fuses, and a plurality of one, the second stage of unit wall section overlaps mutually and is linked to be complete concrete continuous wall.Fig. 1 is that groove section sequence of construction and body of wall form schematic diagram.
Thin wall thickness degree is generally 220mm~500mm, unit wall segment length 2~2.8m, and the degree of depth can reach 40m.Because body of wall is thin, the degree of depth is big, very easily fissure of displacement overlap joint between the generating unit wall section causes anti-seepage effect not reach the situation of requirement.Therefore, guarantee that the verticality and the dimensional accuracy of each unit wall section of building up is most important.At present, the design vertical precision (gradient) of domestic state-of-the-art water injection process for building wall machine is 1/300.That is to say, if the dark 30m of wall, wall thickness 300mm, grooving gradient are 1/300, the designing requirement of wall section size conforms, so in the dark bottom of 30m, the overlap joint thickness of adjacent wall section may have only 100mm, if have some link precision to fail to reach requirement in the construction process in addition, the wall section just take place probably overlap mass defects such as bad.This shows that thin wall quality seriously is limited by the technology status and the technical level of operators of grooving equipment.How to adopt an effective measure guarantees the overlap joint quality of wall section, has been that numerous engineers and technicians made great efforts the difficult problem explored always for it since the water injection process for building wall technology was come out.Effectively break through this difficult problem, will open incomparable wide popularization and application space for the thin wall building technology of water jetting.
Summary of the invention
The objective of the invention is to propose a kind of widen type water jetting method and build the thin concrete underground diaphragm wall technology, it can solve the articulation issues of the second stage of wall section and first phase wall section, guaranteeing that the second stage of wall section does not have to depart from first phase wall section is connected, and improves the quality of thin concrete underground diaphragm wall greatly.
Purpose of the present invention adopts following technical scheme to realize:
Widen type water jetting method is built the thin concrete underground diaphragm wall technology, carries out the pore-creating of first phase groove section successively, first phase wall section becomes wall, the pore-creating of the second stage of groove section, the second stage of wall section to become four steps of wall, and the phase section is divided and job practices is undertaken by prior art.
In first phase groove section pore-creating step, adopt the pore-creating of plain edition jetting capstan engine; Make to form and have flat cylindricality first phase slotted eye;
Become in the wall step to make in first phase wall section and form flat cylindricality first phase wall section by existing job practices concrete perfusion in the first phase slotted eye;
In the second stage of groove section pore-creating step, adopt the pore-creating of widen type water jetting device; Make and form flat cylindricality second phase slotted eye with bellend;
Become in the wall step to make in the second stage of wall section and form flat cylindricality second phase wall section with bellend by existing job practices concrete perfusion in the second stage of slotted eye;
It is characterized in that: the bellend of flat cylindricality second phase slotted eye partly is positioned at periphery, first phase wall section termination, and the second stage of wall section that forms behind the concrete perfusion has the groove shaped bellend, and the interior insertion slot type that forms of groove that the second stage of wall section termination is inserted in first phase wall section termination connects.
Described widen type water jetting technology adopts special thin diaphragm wall jetting capstan engine to realize, this jetting capstan engine is the transformation of existing jetting capstan engine, its structure composition includes casing, water inlet pipe, dreg-drawing pipe, jet assembly and cutting tool assembly, jet assembly and cutting tool assembly are located at bottom half, the end of water inlet pipe is connected with jet assembly, the dreg-drawing pipe mouth of pipe opens wide down, its end places bottom half, the side, two ends of casing is provided with wire brush, the casing top is provided with suspension ring and guide peg, it is characterized in that: add in tank ends and expand the groove cutter, expand the oblique casing of groove cutter and stretch out certain-length outward, two of every end are expanded the groove cutter and form " eight " font layout.
Prioritization scheme is to expand the groove cutter to be installed on tank ends by upper/lower positions, and tank ends is equipped with by top and expands the guide pad that corresponding two groups of " eight " fonts of groove cutter are arranged.
Jet assembly increases the horizontal nozzle in two ends.
This capstan engine is exclusively used in the formation of the second stage of slotted eye, during operation, the capstan engine two ends are expanded the groove cutter and are cut the soil body in advance, be the open expansion groove of " eight " font cutter and slightly put in and stick first phase wall section end to first phase wall section, in the second stage of groove section pore forming process, utilize the die-cut effect of expanding the groove cutter to enlarge the slotted eye width of connecting portion, and corner cut is carried out in first phase wall section end repair the conformation of rules that makes its formation band chamfering, meanwhile open jetting function and make capstan engine follow-up pore-creating, the horizontal nozzle at capstan engine two ends and wire brush are cleaned cleaning to first phase wall section end.Along with whole capstan engine enters soil layer, guide pad begins to play a role, and it is that guide way plays guiding, positioning action to capstan engine with first phase wall section, the guiding capstan engine to depth direction drilling depth until satisfying degree of depth requirement.Formed the second stage of slotted eye has the expansion termination, and this bellend head part is positioned at periphery, first phase wall section termination.
After the second stage of slotted eye with expansion termination has been arranged, become the second stage of wall section that concrete perfusion just can form the expansion termination with band groove in the wall step, realized that the insertion slot type that insert in the groove of the second stage of wall section termination first phase wall section termination connects in the second stage of wall section.
With existing thin concrete underground diaphragm wall technology contrast, the present invention has following substantive distinguishing features and marked improvement:
With one, the second stage of wall section become the insertion slot type connection by the common planar overlap joint, enlarged the entity volume and the overlap joint area of joint, prolonged seepage paths greatly, significantly improved the anti-permeability performance of joint.
2. lead expansion formula capstan engine with the first phase wall section of and arranged on left and right sides as guide way, formed the second stage of slotted eye can be guaranteed that the second stage of wall section does not have to depart from first phase wall section and be connected, avoided owing to one, the second stage of wall section generation perpendicularity deviation or dislocation cause overlapping bad may, guarantee the continuity of body of wall, improved the bulk strength and the impervious reliability of body of wall.
3. when the second stage of groove section is constructed, the expansion groove cutter of leading on the expansion formula capstan engine carries out top-down finishing to the form of first phase wall section end, excises water caltrop and ledge on it, forms the conformation of rules of band chamfering, improve the connection effect of wall section, guaranteed the total quality of diaphragm wall body of wall.
4. lead in the expansion formula capstan engine drilling depth process, the wire brush that is installed on its side, two ends pumps with capstan engine, assisting down of horizontal injection stream, has effectively removed the mud skin and the impurity of first phase wall section end face, has improved the compactness of joint.
5. the drilling depth operation of leading expansion formula capstan engine in fact also is a testing process, can check the verticality and the dimensional accuracy of first phase wall section from its drilling depth situation, find the defective that first phase wall section may exist early, be convenient in time adopt remedial measures, guarantee thin wall quality.
6. lead expansion formula capstan engine and can make multiple patterns such as linear pattern or arc according to actual needs,, be convenient to build arc, broken line shape, the thin wall of polygon to satisfy the concrete needs of different engineerings.
Description of drawings:
Fig. 1 underground continuous wall groove segment sequence of construction and body of wall form schematic diagram;
Fig. 2 diaphragm wall building technology of the present invention process chart;
The common jetting capstan engine of Fig. 3 structural representation;
The common jetting capstan engine of Fig. 4 structure vertical view;
Fig. 5 widen type water jetting device of the present invention structural representation;
Fig. 6 widen type water jetting device of the present invention structure vertical view;
Fig. 7 is of the present invention when leading the operation of expansion formula capstan engine and the relative position schematic diagram of first phase wall section;
Of the present invention one, the second stage of wall section connection diagram of Fig. 8.
The specific embodiment
Embodiment one
With reference to figure 5 and Fig. 6, implementing key technology of the present invention is to use a kind of widen type water jetting device, the structure of this jetting capstan engine as shown in Figure 5 and Figure 6, be to form by the transformation of existing common jetting capstan engine (as Fig. 3 and Fig. 4), it includes casing 1, water inlet pipe 4, dreg-drawing pipe 5, jet assembly 2 and cutting tool assembly 3, jet assembly 2 and cutting tool assembly 3 are located at bottom half, the end of water inlet pipe 4 is connected with jet assembly 2, dreg-drawing pipe 5 mouths of pipe open wide down, its end places casing 1 bottom, the side, two ends of casing 1 is provided with wire brush 9, casing 1 top is provided with suspension ring 6 and guide peg 11, it is characterized in that: add at casing 1 two ends and expand groove cutter 8, expand groove cutter 8 oblique casings and stretch out certain-length outward, two of every end are expanded groove cutter 8 and form " eight " font layout.The expansion groove cutter 8 of present embodiment is installed on casing 1 two ends by upper/lower positions, and casing 1 two ends are equipped with by top and expand the guide pad 7 that groove cutter 8 corresponding two groups of " eight " fonts are arranged; Jet assembly 2 increases the horizontal nozzle 21 in two ends, and arrow is represented jet water course or taken out the slag direction among the figure.
Embodiment two
With reference to figure 1, Fig. 2, Fig. 3 and Fig. 4, the widen type water jetting method that the present invention proposes is built the thin concrete underground diaphragm wall technology, carry out the pore-creating of first phase groove section successively, first phase wall section becomes wall, the pore-creating of the second stage of groove section, the second stage of wall section to become four steps of wall, its phase section is divided and job practices is carried out (as Fig. 1 and Fig. 2) by prior art
In first phase groove section pore-creating step, adopt plain edition jetting capstan engine (as Fig. 3 and Fig. 4) pore-creating; Make to form and have flat cylindricality first phase slotted eye;
Become in the wall step to make in first phase wall section and form flat cylindricality first phase wall section 10 by existing job practices concrete perfusion in the first phase slotted eye;
In the second stage of groove section pore-creating step, adopt widen type water jetting device (as Fig. 5 and Fig. 6) pore-creating (as Fig. 7); Make to form the flat cylindricality second phase slotted eye 20 ' (as Fig. 8) with bellend, the bellend part 201 ' of flat cylindricality second phase slotted eye 20 ' is positioned at 101 peripheries, first phase wall section termination;
Become in the wall step to make by existing job practices concrete perfusion in the second stage of slotted eye 20 ' in the second stage of wall section to form the second stage of wall section 20 of the flat cylindricality with bellend, the bellend 201 of the second stage of wall section 20 has groove,
The interior insertion slot type that forms of groove that the second stage of wall section bellend 201 is inserted in first phase wall section 10 terminations 101 of formed thin diaphragm wall connects (as shown in Figure 8).
This widen type water jetting device of describing among the embodiment one is used for the formation of the second stage of slotted eye, in conjunction with reference to figure 5, Fig. 6 and Fig. 7, during operation, the expansion groove cutter 8 at capstan engine two ends is cut the soil body in advance, be the open expansion groove of " eight " font cutter 8 and slightly put in and stick first phase wall section 10 ends to first phase wall section 10, in the second stage of groove section pore forming process, utilize the die-cut effect of expanding groove cutter 8 to enlarge the slotted eye width of connecting portion, and corner cut is carried out in first phase wall section 10 ends repair the conformation of rules that makes its formation band chamfering, meanwhile open jetting function and make capstan engine follow-up pore-creating, cleaning is cleaned in the horizontal nozzle 21 at capstan engine two ends and 9 pairs of first phase walls of wire brush section, 10 ends.Along with whole capstan engine enters soil layer, guide pad 7 begins to play a role, and it is that guide way plays guiding, positioning action to capstan engine with first phase wall section 10, the guiding capstan engine to depth direction drilling depth until satisfying degree of depth requirement.

Claims (3)

1. widen type water jetting method is built the thin concrete underground diaphragm wall technology, carries out the pore-creating of first phase groove section successively, first phase wall section becomes wall, the pore-creating of the second stage of groove section, the second stage of wall section to become four steps of wall, and the phase section is divided and job practices is undertaken by prior art.
In first phase groove section pore-creating step, adopt the pore-creating of plain edition jetting capstan engine; Make to form and have flat cylindricality first phase slotted eye;
Become in the wall step to make in first phase wall section and form flat cylindricality first phase wall section by existing job practices concrete perfusion in the first phase slotted eye;
In the second stage of groove section pore-creating step, adopt the pore-creating of widen type water jetting device; Make and form flat cylindricality second phase slotted eye with bellend;
Become in the wall step to make in the second stage of wall section and form flat cylindricality second phase wall section with bellend by existing job practices concrete perfusion in the second stage of slotted eye;
It is characterized in that: the bellend of flat cylindricality second phase slotted eye partly is positioned at periphery, first phase wall section termination, and the second stage of wall section that forms behind the concrete perfusion has the groove shaped bellend, and the interior insertion slot type that forms of groove that the second stage of wall section termination is inserted in first phase wall section termination connects.
2. thin diaphragm wall jetting capstan engine, described jetting capstan engine includes casing, water inlet pipe, dreg-drawing pipe, jet assembly and cutting tool assembly, jet assembly and cutting tool assembly are located at bottom half, the end of water inlet pipe is connected with jet assembly, the dreg-drawing pipe mouth of pipe opens wide down, its end places bottom half, the side, two ends of casing is provided with wire brush, the casing top is provided with suspension ring and guide peg, it is characterized in that: tank ends is equipped with and expands the groove cutter, expand the oblique casing of groove cutter and stretch out certain-length outward, two of every end are expanded the groove cutter and form " eight " font layout.
3. thin diaphragm wall jetting capstan engine as claimed in claim 2, it is characterized in that: expand the groove cutter and be installed on tank ends by upper/lower positions, tank ends is equipped with by top and expands the guide pad that corresponding two groups of " eight " fonts of groove cutter are arranged, jet assembly increases the horizontal nozzle in two ends.
CNB2008100285316A 2008-06-04 2008-06-04 Build the method for thin concrete underground diaphragm wall Active CN100543240C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008100285316A CN100543240C (en) 2008-06-04 2008-06-04 Build the method for thin concrete underground diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008100285316A CN100543240C (en) 2008-06-04 2008-06-04 Build the method for thin concrete underground diaphragm wall

Publications (2)

Publication Number Publication Date
CN101285307A true CN101285307A (en) 2008-10-15
CN100543240C CN100543240C (en) 2009-09-23

Family

ID=40057698

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100285316A Active CN100543240C (en) 2008-06-04 2008-06-04 Build the method for thin concrete underground diaphragm wall

Country Status (1)

Country Link
CN (1) CN100543240C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182217A (en) * 2011-01-24 2011-09-14 张永忠 Tongue and groove joint saw tools
CN102619246A (en) * 2012-04-18 2012-08-01 张永忠 Impact groove expander
CN107700475A (en) * 2017-11-16 2018-02-16 浙江杰立建设集团有限公司 A kind of assembly concrete continuous underground wall structure and construction technology
CN108265703A (en) * 2018-02-12 2018-07-10 江苏地龙重型机械有限公司 A kind of cutter arrangement for the seamless chute forming machine of thin-walled diaphragm wall
CN108978754A (en) * 2018-07-05 2018-12-11 河南黄河河务局焦作黄河河务局 A kind of continuous trough forming system and the method that continuous subterranean wall is built using it
CN109469046A (en) * 2018-12-27 2019-03-15 重庆长征重工有限责任公司 The deeply narrow foundation excavation slip casting integration apparatus of bar shaped

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182217A (en) * 2011-01-24 2011-09-14 张永忠 Tongue and groove joint saw tools
CN102182217B (en) * 2011-01-24 2014-11-19 项敬来 Tongue and groove joint saw tools
CN102619246A (en) * 2012-04-18 2012-08-01 张永忠 Impact groove expander
CN102619246B (en) * 2012-04-18 2014-07-30 国网浙江余姚市供电公司 Impact groove expander
CN107700475A (en) * 2017-11-16 2018-02-16 浙江杰立建设集团有限公司 A kind of assembly concrete continuous underground wall structure and construction technology
CN108265703A (en) * 2018-02-12 2018-07-10 江苏地龙重型机械有限公司 A kind of cutter arrangement for the seamless chute forming machine of thin-walled diaphragm wall
CN108265703B (en) * 2018-02-12 2024-02-23 江苏地龙重型机械有限公司 Cutter device for seamless grooving machine of thin-wall continuous wall
CN108978754A (en) * 2018-07-05 2018-12-11 河南黄河河务局焦作黄河河务局 A kind of continuous trough forming system and the method that continuous subterranean wall is built using it
CN109469046A (en) * 2018-12-27 2019-03-15 重庆长征重工有限责任公司 The deeply narrow foundation excavation slip casting integration apparatus of bar shaped
CN109469046B (en) * 2018-12-27 2024-01-16 重庆长征重工有限责任公司 Strip deep and narrow foundation excavation grouting integrated equipment

Also Published As

Publication number Publication date
CN100543240C (en) 2009-09-23

Similar Documents

Publication Publication Date Title
CN100543240C (en) Build the method for thin concrete underground diaphragm wall
CN104563099A (en) Porous pipe method large-diameter high-pressure jet grouting pile construction method
CN201221088Y (en) Enlarging type water jet groover used in thin wall underground continuous wall construction
CN105649070A (en) Triangular pile and rectangular pile inserting wall forming device
CN201395793Y (en) Long spiral high-pressure spraying mud injecting stirring pile-forming device
CN111676954A (en) Locking type high polymer anti-seepage wall forming groove plate and construction method
CN105422016B (en) One kind drilling cleaning system and method for cleaning
CN108301769B (en) A kind of RW type horizontal well construction method and its drilling tool used
CN104612137A (en) Perforated pipe method super-deep, fast, and super-large diameter high pressure chemical churning pile construction method
CN112796659A (en) Static comb-shaped drilling device and method
CN108978754A (en) A kind of continuous trough forming system and the method that continuous subterranean wall is built using it
CN111455982A (en) Static pressure hole-leading pile sinking construction method for monitoring ultra-thick pebble sand layer by laser
CN109610454A (en) A kind of underground obstacle barrier clearing device and its construction method
CN105804648A (en) Y-shaped plugging blocking wall manufacturing equipment
CN202645526U (en) Jet flow sand blasting cracking device
CN209724227U (en) The double high-pressure stirring-spraying piles of reducing
CN207878472U (en) Solid matter step type rotary digging pile supporting system
CN115405270A (en) Optimization method for water injection parameters of bedding drilling hole after mechanical reaming and permeability increasing
CN114483160B (en) Gas extraction method for connecting roadway
CN113774970B (en) Cast-in-place pile socketed section defect repairing construction method
CN115637973A (en) Long pile casing sleeve-free rotary excavating hard cutting secant pile hole forming construction process
CN100595392C (en) Disposal pore-forming and rotary-spraying construction equipment and method in horizontal rotary-spraying construction
CN113235581A (en) Construction method of double-liquid rapid-hardening high-pressure jet grouting pile
CN205477555U (en) Nearly well ground tape processing unit based on rotating particle sprays
JP4107337B2 (en) Multi-axis composite stirring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant