CN101277230A - Method and device for statistic of layering flow - Google Patents

Method and device for statistic of layering flow Download PDF

Info

Publication number
CN101277230A
CN101277230A CNA2008101046115A CN200810104611A CN101277230A CN 101277230 A CN101277230 A CN 101277230A CN A2008101046115 A CNA2008101046115 A CN A2008101046115A CN 200810104611 A CN200810104611 A CN 200810104611A CN 101277230 A CN101277230 A CN 101277230A
Authority
CN
China
Prior art keywords
traffic statistics
statistics
statistic
anterior layer
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101046115A
Other languages
Chinese (zh)
Other versions
CN101277230B (en
Inventor
张晓益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Su Normal University Semiconductor Materials and Equipment Research Institute Pizhou Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN2008101046115A priority Critical patent/CN101277230B/en
Publication of CN101277230A publication Critical patent/CN101277230A/en
Application granted granted Critical
Publication of CN101277230B publication Critical patent/CN101277230B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a hierarchical flow statistic method and device which belongs to the data communication field. The method includes steps: processing flow statistic to current layer in flow statistic layer divided in advance, and recording statistic data in current layer; when flow statistic satisfied with next layer of current layer starting strategy, processing flow statistic to next layer of current layer, and recording statistic data of next layer of current layer. The device includes: a first statistic module, a first trigger module and a second statistic module. The method provided by the invention divides flow statistic layer according with standard from coarse to fine, sets flow statistic strategy to flow statistic layer respectively, processes flow statistic layer-by-layer according with set flow statistic strategy, realizes processing flow statistic according with need, and preferable ensures balance between equipment cost and flow precise statistic.

Description

A kind of method and apparatus of statistic of layering flow
Technical field
The present invention relates to data communication field, particularly a kind of method and apparatus of statistic of layering flow.
Background technology
Along with network more and more is dissolved in people's work and the life, network capacity is increasing, it is more and more higher to connect complexity, based on commerce and security needs, operator and network management designer more and more pay close attention to the detailed traffic conditions of equipment, and data communication products arises at the historic moment based on the flow information statistical technique of interface.In addition, optimize existing network, network is carried out performance optimization in order rationally to adjust, also must be based on detailed network traffic information.Especially in recent years, the outburst of virus and network security accident had higher requirement also for network management, network operation, and the ANOMALOUS VARIATIONS of network traffics can be used as the main means of identification of network security problem.
Along with enriching constantly of network application, the interface that data communications equipment is supported is except as Ethernet (Ethernet) interface, GigaEthernet (gigabit Ethernet) interface and ATM (Asynchronous Transfer Mode, asynchronous transfer mode) pure physical interface such as interface, also can on the physical interface basis, derive logic interfacing, for example on the Ethernet interface, derive the Ethernet sub-interface.Some data communications equipment is supported in creates 1024 Ethernet sub-interfaces under the Ethernet interface, at this moment, need equipment that these sub-interfaces are done traffic statistics respectively.
Needs along with the network fine-grained management, the a plurality of VLAN of transmission (Virtual Local AreaNetwork on an Ethernet interface, VLAN) during message, need count data on flows, and the sum of the VLAN message that Ethernet interface may transmit can reach 4094 by each VLAN message of this interface.Can make the number space of the VLAN of Ethernet interface extend to 4094*4094 and use the QinQ technology, this is a very large numeral.
The objects of statistics of prior art is generally all fixed, for example support main interface is carried out traffic statistics, support is to PVC (Permanent Virtual Circuit, PVC) carries out traffic statistics etc., support still is that classification such as broadcasting packet is come collection of statistical data to every kind of objects of statistics according to unicast message, multicast message, and generally only provides and enable, go to enable the most basic control device like this.When the network maintenance staff needs the traffic statistics data of certain object, if the equipment support is carried out traffic statistics to this kind object, the network maintenance staff just issues an order to equipment so, enable the traffic statistics of this object, equipment begins this object is carried out traffic statistics, assigns the order that this object is stopped traffic statistics until the network maintenance staff.
The inventor studies the back to prior art and finds: on the one hand, in the prior art flow being added up can only be by manual operation, for example want sub-interface is carried out traffic statistics, need artificial input enable command to begin, want to stop the traffic statistics of sub-interface, also need artificial input to go enable command just can stop, the cost of labor height.If want to catch the exception flow of network of the burst of sub-interface, then need the flow of the sub-interface of all main interfaces is added up, to avoid omission, at this moment need memory devices such as a large amount of internal memories or chip register, thereby significantly improve equipment cost.On the other hand, the continuous development of network makes traffic statistics no longer be confined to the physical interface of fixing, also no longer be confined to several message classifications, do statistics at a large amount of interfaces and statistics classification, also need memory devices such as a large amount of internal memories or chip register, this also makes the cost of equipment significantly improve.
Summary of the invention
In order to realize the statistics that becomes more meticulous to flow, the embodiment of the invention provides a kind of method and apparatus of statistic of layering flow.Described technical scheme is as follows:
A kind of method of statistic of layering flow, described method comprises:
The anterior layer of working as in the traffic statistics level of dividing is in advance carried out traffic statistics, and record is when the statistics of anterior layer;
When the traffic statistics of satisfying described following one deck when anterior layer begin strategy, described following one deck when anterior layer is carried out traffic statistics, write down the described statistics of working as following one deck of anterior layer.
A kind of device of statistic of layering flow, described device comprises:
First statistical module is used for the traffic statistics level divided in advance carried out traffic statistics when anterior layer;
First trigger module is used for triggering second statistical module when the traffic statistics of satisfying described following one deck when anterior layer begin strategy;
Described second statistical module is used under the triggering of described first trigger module, and described following one deck when anterior layer is carried out traffic statistics.
The described technical scheme of the embodiment of the invention is divided the traffic statistics level according to standard from coarse to fine, to the inferior traffic statistics strategy that is provided with respectively of flow statistics layer, successively carry out traffic statistics according to the traffic statistics strategy that is provided with, realized carrying out traffic statistics automatically according to demand, changed and relied on the method for manually carrying out traffic statistics in the prior art, reduce cost of labor, guaranteed the balance between the meticulous statistics of equipment cost and flow.
Description of drawings
Fig. 1 is the schematic diagram of the division traffic statistics level that provides of the embodiment of the invention;
Fig. 2 is the schematic diagram that the another kind that provides of the embodiment of the invention is divided the traffic statistics level;
Fig. 3 is the flow chart of a kind of statistic of layering flow method of providing of the embodiment of the invention;
Fig. 4 is the structure chart of a kind of statistic of layering flow device of providing of the embodiment of the invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, embodiment of the present invention is described further in detail below in conjunction with accompanying drawing.
The embodiment of the invention provides a kind of method of traffic statistics, and this method is successively carried out traffic statistics according to default statistics strategy according to standard from coarse to fine, can reduce cost of labor, realizes the meticulous statistics of flow under the situation that does not increase equipment cost.As shown in Figure 1, the concrete steps of present embodiment are as follows:
101: the level of dividing traffic statistics according to standard from coarse to fine.
According to the needs of different traffic statistics, the level of division is different again, specifically comprises:
First kind, carry out the level of traffic statistics according to the logical relation of interface itself and divide.As shown in Figure 2, the ground floor that carries out traffic statistics is physical interfaces such as Ethernet (Ethernet) interface, GigaEthernet (gigabit Ethernet) interface or atm interface, is called main interface; Sub-interface is created in the main interface support, and this sub-interface is as the second layer; At atm interface, after creating atm sub-interface, also be supported in and create PVC on the atm sub-interface, this PVC is the 3rd layer.
Second kind, carry out the level of traffic statistics according to the statistics classification and divide.As shown in Figure 3, ground floor is still physical interfaces such as Ethernet interface, GigaEthernet interface or atm interface, is called main interface; Can dispose VLAN Trunk (trunk) on the main interface is the second layer, and the expression main interface can be by a plurality of vlan traffics, according to the VLAN under VLAN Tag (label) the identification message; The 3rd layer is the QinQ flow, is used to discern the user who sends message, and this QinQ has two-layer VLAN Tag, and outer VLAN tag is represented the subnet at place usually, and inner VLAN tag is represented concrete user.
The third carries out the level of traffic statistics and divides according to type of service.Ground floor is still physical interfaces such as Ethernet interface, GigaEthernet interface or atm interface, is called main interface; When carrying out flow monitoring at IPTV content supplier, the second layer can be the traffic statistics of distinguishing particular content provider, promptly carries out traffic statistics by content supplier; The actual total bandwidth that takies when certain content supplier is during greater than the bandwidth of renting to operator, need count on content supplier which channel is provided, whether the flow size of channel number or some channel exceeds hiring agreement, and promptly distinguish the traffic statistics of concrete channel according to the 3rd layer this moment.
Several division methods of the level of traffic statistics have below simply been introduced, in the practical application, be not limited to above-mentioned three kinds of division methods, and each division methods is not limited to concrete two levels or three levels, but can carries out more multi-layered time division as required.The level of traffic statistics is many more, helps more objects of statistics is carried out refinement, thereby helps the traffic statistics that become more meticulous more.
102: each layer is provided with concrete traffic statistics strategy.
At the atm interface in the atm network, the level of traffic statistics can be divided into main interface as first level, sub-interface as second level, PVC as the 3rd level.At different levels the traffic statistics strategy is set:
The first, carry out traffic statistics according to the size of flow.The strategy that begins and stop at the traffic statistics of the flow set sub-interface of main interface, the strategy that this laminar flow amount statistics beginning of PVC is set and stops at sub-interface.For example, the threshold value that main interface is set is that 10 megabits (can be 5 megabits in the practical application, 7 megabits or other numerical value), when the flow of main interface surpasses 10 megabits, begin sub-interface is carried out traffic statistics, surpass certain hour, for example 10 seconds (in the practical application when the flow of main interface is lower than 10 megabits, can be 5 seconds, 7 seconds or other numerical value) time, stop sub-interface being carried out traffic statistics; At each sub-interface the traffic statistics strategy of PVC is set, for example, 10 sub-interfaces is arranged under the main interface, the threshold value of each sub-interface is 1 megabit.When the flow of one of them sub-interface surpasses 1 megabit, begin the PVC under this interface is carried out traffic statistics; Surpass certain hour when the flow of this sub-interface is lower than 1 megabit, when for example 6 seconds (in the practical application, can be 5 seconds, 7 seconds or other numerical value), stop the PVC this interface is under carried out traffic statistics, and discharge the statistics resource, need in order to follow-up statistics.In addition, also can when sub-interface is begun to carry out traffic statistics, stop main interface being carried out traffic statistics, send the statistics of record, discharge the statistics resource; In like manner, also can when PVC is begun to carry out traffic statistics, stop sub-interface being carried out traffic statistics, send the statistics of record, discharge the statistics resource.That is to say when the following one deck when anterior layer is begun to carry out traffic statistics, stop to send the statistics of record, discharge the statistics resource, to make full use of the statistics resource to carrying out traffic statistics when anterior layer.
The second, carry out traffic statistics according to Preset Time.At main interface timer is set, when timer expiry, begins sub-interface is carried out traffic statistics, after sub-interface is carried out traffic statistics reaching certain hour, stop timer, promptly stop sub-interface being carried out traffic statistics.At each sub-interface timer is set, when the timer expiry of some sub-interfaces, begin the PVC under this sub-interface is carried out traffic statistics, after this sub-interface carried out traffic statistics reaching certain hour, stop timer, promptly stop the PVC under this sub-interface is carried out traffic statistics,, cause system's instability in order to avoid cause frequent shake.
Concrete, at main interface a timer is set, when this timer expiry (for example length of timer is 5 seconds or other numerical value), begin sub-interface is carried out traffic statistics.When sub-interface being carried out traffic statistics reach 5 seconds, stop sub-interface being carried out traffic statistics.Correspondingly, be provided with at each sub-interface a timer is set respectively, when the timer expiry (for example, length of timer is 6 seconds or other numerical value) of some sub-interfaces, begin the PVC under this sub-interface is carried out traffic statistics; Reached certain hour for example 6 seconds when the PVC under this sub-interface being carried out traffic statistics, stop the PVC under this interface is carried out traffic statistics.Starting at a little of the timer of each sub-interface can be staggered as required, in order to avoid cause the resource anxiety.In addition, for length of timer irregular duration is set as required.In addition, also can when sub-interface is begun to carry out traffic statistics, stop main interface being carried out traffic statistics, send the statistics of record, discharge the statistics resource; In like manner, also can when PVC is begun to carry out traffic statistics, stop sub-interface being carried out traffic statistics, send the statistics of record, discharge the statistics resource.That is to say when the following one deck when anterior layer is begun to carry out traffic statistics, stop to send the statistics of record, discharge the statistics resource, to make full use of the statistics resource to carrying out traffic statistics when anterior layer.
More than be two kinds of traffic statistics strategies that carry out traffic statistics, in the practical application, be not limited to above-mentioned two kinds of strategies.
103: carry out traffic statistics to working as anterior layer, and record is when the traffic statistics data of anterior layer.
104:, then begin the following one deck when anterior layer is carried out traffic statistics, and the traffic statistics data of following one deck of anterior layer worked as in record when satisfying when the traffic statistics of following one deck of anterior layer begin strategy.
As optional step, system can stop the following one deck when anterior layer is carried out traffic statistics, to make full use of the statistics resource when beginning that the following one deck when anterior layer carried out traffic statistics.
105: satisfy when the traffic statistics of following one deck of anterior layer stop strategy, then stop the following one deck when anterior layer is carried out traffic statistics, and record is when the traffic statistics data of following one deck of anterior layer, and with the record the traffic statistics data send to device log or Network Management Equipment, discharge the statistics resource, need in order to follow-up traffic statistics.
Carry out traffic statistics at the level division of first kind of traffic statistics in the step 101 and be example, concrete, user's open system, system carries out traffic statistics to main interface under default situations, writes down the data on flows of this main interface.
When the main interface flow satisfies in the step 102 traffic statistics to sub-interface and begins strategy, sub-interface is carried out traffic statistics, write down the data on flows of this sub-interface.As optional step, system can stop main interface being carried out traffic statistics, to make full use of the statistics resource when beginning that sub-interface carried out traffic statistics.
When the flow of main interface satisfies in the step 102 traffic statistics to sub-interface and stops strategy, stop sub-interface being carried out traffic statistics, the data on flows of statistics is charged to device log or be sent to the Network Management Equipment preservation, discharge the statistics resource, need in order to follow-up traffic statistics.
In like manner, the group interface flow satisfies in the step 102 traffic statistics to PVC when beginning strategy, and the PVC of this sub-interface is carried out traffic statistics, writes down the data on flows of this PVC; When the flow of sub-interface satisfies in the step 102 traffic statistics to PVC and stops strategy, stop the flow of the PVC of this sub-interface is added up, the data on flows of statistics is charged to device log or be sent to the Network Management Equipment preservation, discharge the statistics resource, need in order to follow-up traffic statistics.
The embodiment of the invention is to divide at the level of first kind of traffic statistics in the step 101 that to carry out traffic statistics be example, and the basic principle of carrying out traffic statistics at the division of other traffic statistics level is similar, repeats no more.
Be to enable in the prior art by the network maintenance staff is manual, go to enable the control device lack of wisdomization of the traffic statistics of some object, the cost of labor height, if in order to obtain various abnormal flow data, then need to open the traffic statistics function of used object, omit in order to avoid statistics occurs, this makes equipment cost improve.The continuous development of network simultaneously makes traffic statistics no longer be confined to the physical interface of fixing, also no longer be confined to the concentrated messages classification, do statistics at a large amount of interfaces and statistics classification, need memory devices such as a large amount of internal memories or chip register, this also makes the cost of equipment significantly improve.The embodiment of the invention is divided the traffic statistics level according to standard from coarse to fine, at first to carrying out traffic statistics when anterior layer, when satisfying when next laminar flow amount statistics of anterior layer begins strategy, begins the following one deck when anterior layer is carried out traffic statistics; When satisfying when next laminar flow amount statistics of anterior layer stops strategy, stop that the following one deck when anterior layer is carried out traffic statistics and carry out traffic statistics, and discharge the statistics resource.Because the embodiment of the invention is successively to carry out traffic statistics as required, can reach the purpose that reduces the statistics resource.Simultaneously, the following one deck when anterior layer is carried out can discharging the statistics resource when traffic statistics are carried out in traffic statistics stopping, helping to utilize to greatest extent the statistics resource.In addition,, do not need manually to enable and go to enable, can reduce cost of labor owing to be that system carries out traffic statistics automatically.
To sum up, help on the basis that does not increase the existing equipment cost, to have realized to carry out traffic statistics as required automatically, guaranteed the balance between the meticulous statistics of equipment cost and flow better, reduced cost of labor by the described technical scheme of the embodiment of the invention.
The embodiment of the invention provides a kind of device of statistic of layering flow, its as shown in Figure 4, this device comprises:
First statistical module is used for the traffic statistics level divided in advance carried out traffic statistics when anterior layer;
First trigger module is used for triggering second statistical module when satisfying when the traffic statistics of following one deck of anterior layer begin strategy;
Described second statistical module is used under the triggering of first trigger module, and the following one deck when anterior layer is carried out traffic statistics.
Further, this device also comprises:
Second trigger module is used for triggering second statistical module and stopping the following one deck when anterior layer is carried out traffic statistics when satisfying when the traffic statistics of following one deck of anterior layer stop strategy, and discharges and add up resource.
Further, this device also comprises:
The 3rd trigger module is used for triggering sending module as a result when second statistical module stops that the following one deck when anterior layer carried out traffic statistics;
Sending module sends to information storing device with the traffic statistics data of second statistical module as a result.
Further, this device also comprises:
The 4th trigger module is used for when second statistical module carries out traffic statistics to the following one deck when anterior layer, triggers first statistical module and stops current laminar flow amount statistics.
Concrete, under the default situations, first statistical module is to carrying out traffic statistics when anterior layer.
Whether first trigger module determines to notify second statistical module to begin the following one deck when anterior layer is carried out traffic statistics according to predetermined strategy, for example first trigger module is collected the data on flows of first statistical module counts, if the data on flows of collecting surpasses default threshold value (for example 10 megabits), then notify second statistical module to begin the following one deck when anterior layer is carried out traffic statistics; Or first trigger module whether detect timer (for example duration is 30 seconds) overtime, if during super timer, then notify second statistical module to begin the following one deck of working as anterior layer is carried out traffic statistics.
Whether second trigger module determines to notify second statistical module to stop the following one deck when anterior layer is carried out traffic statistics according to predetermined strategy, for example, second trigger module is collected the data on flows of first statistical module counts, after if the data on flows of collecting is lower than default threshold value (for example 10 megabits) certain hour (for example 5 seconds), then notify second statistical module to stop the following one deck when anterior layer is carried out traffic statistics, and discharge the statistics resource; Or second trigger module whether detect timer (for example duration is 30 seconds) overtime, if during super timer, then notify second statistical module to stop the following one deck when anterior layer is carried out traffic statistics, and discharge and add up resource.
Whether the 3rd trigger module detects second statistical module stops the following one deck when anterior layer is carried out traffic statistics, stop carrying out traffic statistics if the 3rd trigger module detects second statistical module, then trigger sending module as a result the traffic statistics data of second statistical module are sent to information storing device when following one deck of anterior layer.
Whether the 4th trigger module detects second statistical module begins the following one deck when anterior layer is carried out traffic statistics, begin the following one deck when anterior layer is carried out traffic statistics if detect second statistical module, then notify first statistical module to stop current laminar flow amount statistics.
The described technical scheme of the embodiment of the invention is divided the traffic statistics level according to standard from coarse to fine, to the inferior traffic statistics strategy that is provided with respectively of flow statistics layer, successively carry out traffic statistics according to the traffic statistics strategy that is provided with, realized carrying out traffic statistics automatically according to demand, changed and relied on the method for manually carrying out traffic statistics in the prior art, reduce cost of labor, guaranteed the balance between the meticulous statistics of equipment cost and flow.
All or part of content in the technical scheme that above embodiment provides can realize that its software program is stored in the storage medium that can read by software programming, storage medium for example: the hard disk in the computer, CD or floppy disk.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, within the spirit and principles in the present invention not all, any modification of being done, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1, a kind of method of statistic of layering flow is characterized in that, described method comprises:
The anterior layer of working as in the traffic statistics level of dividing is in advance carried out traffic statistics, and record is when the statistics of anterior layer;
When the traffic statistics of satisfying described following one deck when anterior layer begin strategy, described following one deck when anterior layer is carried out traffic statistics, write down the described statistics of working as following one deck of anterior layer.
2, the method for statistic of layering flow as claimed in claim 1 is characterized in that, described method also comprises:
When the traffic statistics of satisfying described following one deck when anterior layer stop strategy, described following one deck when anterior layer is stopped traffic statistics.
3, the method for statistic of layering flow as claimed in claim 2 is characterized in that, described method also comprises: comprise after the described step that described following one deck when anterior layer is stopped traffic statistics:
The statistics that sends record is to information storing device, and release statistics resource.
4, the method for statistic of layering flow as claimed in claim 1 is characterized in that, also comprises after the described step of described following one deck when anterior layer being carried out traffic statistics:
The described anterior layer of working as is stopped traffic statistics, and the statistics that sends record is to information storing device, and release statistics resource.
5, a kind of device of statistic of layering flow is characterized in that, described device comprises:
First statistical module is used for the traffic statistics level divided in advance carried out traffic statistics when anterior layer;
First trigger module is used for triggering second statistical module when the traffic statistics of satisfying described following one deck when anterior layer begin strategy;
Described second statistical module is used under the triggering of described first trigger module, and described following one deck when anterior layer is carried out traffic statistics.
6, the device of statistic of layering flow as claimed in claim 5 is characterized in that, described device also comprises:
Second trigger module is used for when the traffic statistics of satisfying described following one deck when anterior layer stop strategy, triggers described second statistical module and stops described following one deck when anterior layer is carried out traffic statistics, and discharge the statistics resource.
7, the device of statistic of layering flow as claimed in claim 6 is characterized in that, described device also comprises:
The 3rd trigger module is used for triggering sending module as a result when described second statistical module stops that described following one deck when anterior layer carried out traffic statistics;
Described sending module as a result sends to information storing device with the traffic statistics data of described second statistical module.
8, the device of statistic of layering flow as claimed in claim 5, it is characterized in that, described device also comprises: the 4th trigger module, be used for when described second statistical module carries out traffic statistics to described following one deck when anterior layer, trigger described first statistical module and stop current laminar flow amount statistics.
CN2008101046115A 2008-04-22 2008-04-22 Method and device for statistic of layering flow Expired - Fee Related CN101277230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101046115A CN101277230B (en) 2008-04-22 2008-04-22 Method and device for statistic of layering flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101046115A CN101277230B (en) 2008-04-22 2008-04-22 Method and device for statistic of layering flow

Publications (2)

Publication Number Publication Date
CN101277230A true CN101277230A (en) 2008-10-01
CN101277230B CN101277230B (en) 2010-11-10

Family

ID=39996264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101046115A Expired - Fee Related CN101277230B (en) 2008-04-22 2008-04-22 Method and device for statistic of layering flow

Country Status (1)

Country Link
CN (1) CN101277230B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102497385A (en) * 2011-12-31 2012-06-13 曙光信息产业股份有限公司 Network traffic auditing method and auditing system
WO2014180204A1 (en) * 2013-10-08 2014-11-13 中兴通讯股份有限公司 Customer premise equipment and method for independently counting traffic
CN106161481A (en) * 2016-09-28 2016-11-23 联信摩贝软件(北京)有限公司 A kind of mobile terminal physical button isolation safe module takes precautions against the device of security risk
CN106911538A (en) * 2017-04-24 2017-06-30 新华三技术有限公司 Flow statistical method and device
CN108076068A (en) * 2017-12-27 2018-05-25 新华三技术有限公司 A kind of anti-attack method and device
CN108616399A (en) * 2018-05-09 2018-10-02 北京神州绿盟信息安全科技股份有限公司 A kind of message statistical method and device
CN112638005A (en) * 2020-12-29 2021-04-09 张晓益 Distributed street lamp control device and system based on Internet of vehicles

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102497385B (en) * 2011-12-31 2015-09-16 曙光信息产业股份有限公司 A kind of network traffics auditing method and auditing system
CN102497385A (en) * 2011-12-31 2012-06-13 曙光信息产业股份有限公司 Network traffic auditing method and auditing system
WO2014180204A1 (en) * 2013-10-08 2014-11-13 中兴通讯股份有限公司 Customer premise equipment and method for independently counting traffic
CN106161481A (en) * 2016-09-28 2016-11-23 联信摩贝软件(北京)有限公司 A kind of mobile terminal physical button isolation safe module takes precautions against the device of security risk
CN106161481B (en) * 2016-09-28 2019-08-30 联信摩贝软件(北京)有限公司 A kind of device of mobile terminal physical button isolation safe module prevention security risk
CN106911538A (en) * 2017-04-24 2017-06-30 新华三技术有限公司 Flow statistical method and device
CN106911538B (en) * 2017-04-24 2019-11-12 新华三技术有限公司 Flow statistical method and device
CN108076068B (en) * 2017-12-27 2021-05-07 新华三技术有限公司 Anti-attack method and device
CN108076068A (en) * 2017-12-27 2018-05-25 新华三技术有限公司 A kind of anti-attack method and device
CN108616399A (en) * 2018-05-09 2018-10-02 北京神州绿盟信息安全科技股份有限公司 A kind of message statistical method and device
CN108616399B (en) * 2018-05-09 2021-02-12 北京神州绿盟信息安全科技股份有限公司 Message statistical method and device
CN112638005A (en) * 2020-12-29 2021-04-09 张晓益 Distributed street lamp control device and system based on Internet of vehicles
CN112638005B (en) * 2020-12-29 2023-11-03 张晓益 Distributed street lamp control device and system based on Internet of vehicles

Also Published As

Publication number Publication date
CN101277230B (en) 2010-11-10

Similar Documents

Publication Publication Date Title
CN101277230B (en) Method and device for statistic of layering flow
CN102088363B (en) Alarm processing method and system
CN103259743B (en) The method and device of output flow control based on token bucket
CN102420776B (en) Method and system for dynamically regulating portal resource allocation threshold value
US6014384A (en) Method for controlling data traffic in an ATM network
CA2247683C (en) Method of an apparatus for virtual link management
CN104487989B (en) Autonomous network sentry
CN101005437B (en) Method and system for realizing heap virtual local area network
CN103067224B (en) The methods, devices and systems that flow-based traffic monitoring is relevant
US8649270B2 (en) Dynamic network configuration
CN101478527A (en) Bandwidth allocation method and routing equipment
CN101056274B (en) A time division traffic management method and device
WO2009054978A1 (en) Priority-aware hierarchical communication traffic scheduling
CN101272310A (en) Ethernet looped network automatic protection rotation method and device
CN106506395A (en) A kind of business stream scheduling method and device
DE112006002912T5 (en) Management of on-chip queues in switched networks
CN103380612A (en) Network communication node comprising a plurality of processors for processing layers of communication and associated node
CN103095717A (en) Method and network equipment preventing media access control (MAC) address table from overflowing and attacking
JPH11122260A (en) Communication controller and its method
CN102622291A (en) Method and system for monitoring processes
CN103634223A (en) Network service flow based dynamic control transmission method and device
CN104160735A (en) Packet processing method, forwarder, packet processing device and packet processing system
CN102594669A (en) Data message processing method, device and equipment
CN103001828A (en) Message statistical method and device and network device based on data flow
CN1917477B (en) Method and device of preventing interference of flow control frames

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201208

Address after: Unit 2414-2416, main building, no.371, Wushan Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen

Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd.

Effective date of registration: 20201208

Address after: 221300 No. 88 Liaohe West Road, Pizhou Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee after: SU Normal University Semiconductor Materials and Equipment Research Institute (Pizhou) Co.,Ltd.

Address before: Unit 2414-2416, main building, no.371, Wushan Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: GUANGDONG GAOHANG INTELLECTUAL PROPERTY OPERATION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101110

Termination date: 20200422