CN101270610A - Template early-dismantling device - Google Patents

Template early-dismantling device Download PDF

Info

Publication number
CN101270610A
CN101270610A CNA200810111801XA CN200810111801A CN101270610A CN 101270610 A CN101270610 A CN 101270610A CN A200810111801X A CNA200810111801X A CN A200810111801XA CN 200810111801 A CN200810111801 A CN 200810111801A CN 101270610 A CN101270610 A CN 101270610A
Authority
CN
China
Prior art keywords
carriage
female
screwed pipe
supporting plate
regulate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200810111801XA
Other languages
Chinese (zh)
Other versions
CN101270610B (en
Inventor
成志全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200810111801XA priority Critical patent/CN101270610B/en
Publication of CN101270610A publication Critical patent/CN101270610A/en
Application granted granted Critical
Publication of CN101270610B publication Critical patent/CN101270610B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention belongs to a template early-dismounting device which mainly consists of an adjusting screwed conduit, a splint rod, a bracket, a bracket adjusting nut, a top plate adjusting nut and an upper blocking bolt; the outer surrounding wall of the adjusting screwed conduit is an outer thread for the screw arrangement of the bracket adjusting nut and the top plate adjusting nut; the side of the adjusting screwed conduit is provided with a penetrated longitudinal conduit ferrule; one end of the adjusting screwed conduit is provided with a socket that be inserted by a scaffold tube; the outer thread part is provided with the bracket, the bracket adjusting nut, the upper blocking bolt and the top plate adjusting nut in turn from up to down; the invention can adjust the height of a plate and a beam formwork at any time according to operation requirements and has the advantages of simple structure, convenient use and operation, time and labor saving, safety and reliability, high commonality, convenient checking, easy mounting and dismounting.

Description

Template early-dismantling device
Technical field
The invention belongs to a kind of template early-dismantling device, be used for the realm of building construction.
Background technology
At present, traditional in-situ casting reinforced concrete floor, the formwork way of beam generally prop up at steel pipe and fastener and insert U type jacking on the support of taking, and U type jacking upper support master is stupefied, on set up inferior stupefied and template.Such braced structures is removed lack of standardization, the lattice size is difficult for guaranteeing, inconvenience operates, waste time and energy, function singleness, the material input amount is big, outside construction effect and economic effect are not good, the more important thing is the height of flexible modulation U type jacking as required, the formwork of floor, beam is up to the standard.For this reason, the inventor once designed the two adjustable multi-functional early-dismantling devices of a kind of assembly type, by column, adjust and to remove mother, lift plate and the stay bolt bar is formed, though can regulate the height of U type jacking, but adjustment complex structure, when especially on carriage, having beam to exist, can not arbitrarily adjust and remove mother, in fact can not reach any adjusting and be positioned at the plate on the carriage, the height of beam formwork.
On the other hand, U type jacking is with when the traditional scaffold support system of builing industry is connected, and is too loaded down with trivial details, often also need be provided with the set bolt that supports U type jacking on the scaffold and just can use.This traditional carriage has the raw material of expending big, heavy, carry installation, construction labour intensity is big, construction is wasted time and energy, efficiency of construction is low and speed is slow, and complex structure and stressed not good shortcoming are simultaneously after support system or scaffold foundation, can't reach any adjusting and be positioned at the plate on the carriage, the height of beam formwork, cause very big harm to building safety.
Summary of the invention
The objective of the invention is to design a kind of template early-dismantling device, can press the height that action need is adjusted plate, beam formwork at any time, have simple in structurely, uses easy to operately, time saving and energy saving, safe and reliable, highly versatile is convenient to inspection, the advantage that is easy to mount and dismount.For this reason, the present invention by:
Regulate screwed pipe, periphery wall is for transferring mother and top board to regulate the external screw thread that female spiral shell is established for carriage, regulate the screwed pipe side and be provided with the vertical guide groove that runs through, regulate screwed pipe one end and be provided with the interface that can insert scaffold tube, it is female that external thread part is provided with carriage from top to bottom successively, carriage transfers mother, upper clamping plug and top board to regulate;
The supporting plate bar, in a tubular form, the one end is inserted in to be regulated in the screwed pipe, and spacing distance is provided with at least two snib holes that connect the supporting plate bar on the supporting plate bar lower end, is positioned at the other end of regulating the outer supporting plate bar of screwed pipe and is installed with supporting plate;
Carriage, carriage is provided with socket, and carriage is set in by socket and regulates on the screwed pipe;
Carriage is transferred female, is arranged on the adjusting screwed pipe of carriage lower end, and carriage transfers female upper end to hold the carriage lower end;
Top board is regulated female, is arranged in carriage and transfers on the adjusting screwed pipe of female lower end, is used for top card upper clamping plug;
Upper clamping plug, from be positioned at the guide groove extrapolation of regulating female upside start going to a nursery on the plate stem corresponding snib hole and fixedly the supporting plate bar regulate top board on the screwed pipe regulate female on.The said structure design has reached purpose of the present invention.
Advantage of the present invention is can be at any time to adjust the height of plate, beam formwork by action need, has simple in structurely, uses easy to operately, time saving and energy saving, safe and reliable, and highly versatile is convenient to inspection, the advantage that is easy to mount and dismount.Also have assembling flexibly, take conveniently, adapts to widely, accelerating construction progress and operating efficiency reduce the material input significantly, the reduction operating expenses.
Description of drawings
Fig. 1 is the structural representation of user mode of the present invention
Fig. 2 is an adjusting screwed pipe structural representation of the present invention
Fig. 3 is the structural representation that supporting plate bar of the present invention and top board are regulated female position
Fig. 4 is that top board of the present invention is regulated the parent structure schematic diagram
Fig. 5 is a carrier structure schematic diagram of the present invention
Fig. 6 transfers the parent structure schematic diagram for carriage of the present invention
Fig. 7 is supporting plate bar structural representation of the present invention
Specific embodiments
To shown in Figure 7, a kind of template early-dismantling device is mainly formed by regulating screwed pipe, supporting plate and supporting plate bar, comprises as lower member as Fig. 1:
Regulate screwed pipe 9, periphery wall is for transferring mother 4 and top board to regulate the external screw thread that female 7 spiral shells are established for carriage, regulate the screwed pipe side and be provided with the vertical guide groove 5 that runs through, the effect of this guide groove is to keep supplying down snib to move along guide groove, regulate screwed pipe one end and be provided with the interface 10 that can insert scaffold tube, it is female that external thread part is provided with carriage 3 from top to bottom successively, carriage transfers mother, upper clamping plug 6 and top board to regulate.
Supporting plate bar 2, in a tubular form, the one end is inserted in to be regulated in the screwed pipe, spacing distance is provided with at least two snib holes 21 that connect the supporting plate bar on the supporting plate bar lower end, usually just in time be positioned at top board in the time of should making any two snibs insert the snib hole and regulate female upper and lower side, be positioned at the other end of regulating the outer supporting plate bar of screwed pipe and be installed with supporting plate 1.
Carriage, carriage are provided with socket 31, and carriage is set in by socket and regulates on the screwed pipe.
Carriage is transferred female, is arranged on the adjusting screwed pipe of carriage lower end, and carriage transfers female upper end to hold the carriage lower end.
Top board is regulated female, is arranged in carriage and transfers on the adjusting screwed pipe of female lower end, is used for top card upper clamping plug, and reaches the effect that holds, regulates the supporting plate bar by snib up and down.
Upper clamping plug, from be positioned at the guide groove extrapolation of regulating female upside start going to a nursery on the plate stem corresponding snib hole and fixedly the supporting plate bar regulate top board on the screwed pipe regulate female on.
Obviously, if when holding template on the supporting plate bar, its template gravity withstands on and regulates the top board that screwed pipe is spirally connected and regulates on the mother by upper clamping plug, rotate top board adjusting mother this moment and can adjust the height that holds template on the supporting plate bar up and down, but consider because the out-of-flatness of template may cause no template gravity on this supporting plate bar.Therefore, on described adjusting screwed pipe, also can be provided with from being positioned at top board and regulate the following snib 8 that inserts corresponding snib hole outside the guide groove of female downside, be used for adjusting the supporting plate bar downwards.
Described carriage is transferred female two side ends to be provided with and is rotated the accent mother handle 41 that this carriage is transferred mother, and rotation is transferred female handle to drive carriage accent mother and moved up and down along the threaded portion of regulating screwed pipe, and adjustable bracket is at the height of regulating on the screwed pipe.Described top board is regulated mother and is provided with the handle 71 that this top board of rotation is regulated mother, and its effect is used to rotate top board and regulates female.Described snib up and down can be provided with hold-down nut, and its effect is to prevent that snib comes off in guide groove up and down.
During use, interface of the present invention is inserted in scaffold tube 11 upper ends or directly is supported on the scaffold support system, be used for beam, the post of support shuttering on supporting plate and the carriage.When need adjusting the template height, when adjustment is positioned at template on the supporting plate as needs, only needs to rotate top board and regulate the moving snib up and down of master tape and in guide groove, move up and down, can drive the supporting plate bar and make supporting plate on it drive template to move up and down, finish adjusting.If as when need adjusting the template that is positioned on the carriage, only need rotating bracket to transfer moving its of master tape to move up and down along regulating screwed pipe, can drive carriage the template on it is moved up and down, finish adjusting.Owing to regulate action and all be positioned at the carriage lower end for two, therefore be not subjected to the supporting plate and the beam of carriage upper support template, the influence of post, can press the height that action need is adjusted plate, beam formwork at any time.
In a word, the present invention can press the height that action need is adjusted plate, beam formwork at any time, have simple in structure, Use easy to operately, time saving and energy saving, safe and reliable, highly versatile is convenient to check, is easy to mount and dismount Advantage. Also have assembling flexibly, take conveniently, adapt to wide, significantly accelerating construction progress and work Efficient reduces material and drops into, and reduces operating expenses.

Claims (5)

1, a kind of template early-dismantling device is mainly formed by regulating screwed pipe, supporting plate and supporting plate bar, it is characterized in that:
Regulate screwed pipe, periphery wall is for transferring mother and top board to regulate the external screw thread that female spiral shell is established for carriage, regulate the screwed pipe side and be provided with the vertical guide groove that runs through, regulate screwed pipe one end and be provided with the interface that can insert scaffold tube, it is female that external thread part is provided with carriage from top to bottom successively, carriage transfers mother, upper clamping plug and top board to regulate;
The supporting plate bar, in a tubular form, the one end is inserted in to be regulated in the screwed pipe, and spacing distance is provided with at least two snib holes that connect the supporting plate bar on the supporting plate bar lower end, is positioned at the other end of regulating the outer supporting plate bar of screwed pipe and is installed with supporting plate;
Carriage, carriage is provided with socket, and carriage is set in by socket and regulates on the screwed pipe;
Carriage is transferred female, is arranged on the adjusting screwed pipe of carriage lower end, and carriage transfers female upper end to hold the carriage lower end;
Top board is regulated female, is arranged in carriage and transfers on the adjusting screwed pipe of female lower end, is used for top card upper clamping plug;
Upper clamping plug, from be positioned at the guide groove extrapolation of regulating female upside start going to a nursery on the plate stem corresponding snib hole and fixedly the supporting plate bar regulate top board on the screwed pipe regulate female on.
2, by the described template early-dismantling device of claim 1, it is characterized in that: also can be provided with on the described adjusting screwed pipe from being positioned at top board and regulate the following snib that inserts corresponding snib hole outside the guide groove of female downside.
3, by the described template early-dismantling device of claim 1, it is characterized in that: described carriage is transferred female two side ends to be provided with and is rotated the female handle of accent that this carriage is transferred mother.
4, by the described template early-dismantling device of claim 1, it is characterized in that: described top board is regulated mother and is provided with the handle that this top board of rotation is regulated mother.
5, by the described template early-dismantling device of claim 1, it is characterized in that: described snib up and down can be provided with hold-down nut.
CN200810111801XA 2008-05-19 2008-05-19 Template early-dismantling device Expired - Fee Related CN101270610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810111801XA CN101270610B (en) 2008-05-19 2008-05-19 Template early-dismantling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810111801XA CN101270610B (en) 2008-05-19 2008-05-19 Template early-dismantling device

Publications (2)

Publication Number Publication Date
CN101270610A true CN101270610A (en) 2008-09-24
CN101270610B CN101270610B (en) 2011-06-22

Family

ID=40004812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810111801XA Expired - Fee Related CN101270610B (en) 2008-05-19 2008-05-19 Template early-dismantling device

Country Status (1)

Country Link
CN (1) CN101270610B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101852013A (en) * 2010-05-19 2010-10-06 山东德建集团有限公司 Truss end connecting device and use method
CN101591973B (en) * 2009-06-25 2010-12-08 李斌 Early-demounting template system applied to building containing beam, plate and column structure on floor slab
CN102587647A (en) * 2012-03-19 2012-07-18 山东普瑞玛模板有限公司 Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN102661040A (en) * 2012-05-28 2012-09-12 东南大学 Combined early-disassembly template device
CN102953543A (en) * 2011-08-29 2013-03-06 宋永胜 Multi-positioning groove rapid dismounting device
CN103195241A (en) * 2013-04-18 2013-07-10 深圳市广胜达建筑工程有限公司 Early removal support device for constructional engineering
CN107355073A (en) * 2017-08-30 2017-11-17 云南工程建设总承包公司 A kind of wooden model early tears support meanss and its construction and application method open
CN108756223A (en) * 2018-07-28 2018-11-06 上海宝冶集团有限公司 A kind of combined type early-dismantling device
CN109057322A (en) * 2018-09-29 2018-12-21 广东锐良塑料模板支撑有限公司 A kind of cast-in-place concrete early-dismantling formwork system and its construction method
CN110145514A (en) * 2019-05-15 2019-08-20 深汕特别合作区磐汩新材料有限公司 A kind of branch fastener of turnable installation

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591973B (en) * 2009-06-25 2010-12-08 李斌 Early-demounting template system applied to building containing beam, plate and column structure on floor slab
CN101852013B (en) * 2010-05-19 2011-03-23 山东德建集团有限公司 Truss end connecting device and use method
CN101852013A (en) * 2010-05-19 2010-10-06 山东德建集团有限公司 Truss end connecting device and use method
CN102953543A (en) * 2011-08-29 2013-03-06 宋永胜 Multi-positioning groove rapid dismounting device
CN102587647B (en) * 2012-03-19 2014-12-31 山东普瑞玛模板有限公司 Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN102587647A (en) * 2012-03-19 2012-07-18 山东普瑞玛模板有限公司 Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN102661040A (en) * 2012-05-28 2012-09-12 东南大学 Combined early-disassembly template device
CN102661040B (en) * 2012-05-28 2014-06-11 东南大学 Combined early-disassembly template device
CN103195241A (en) * 2013-04-18 2013-07-10 深圳市广胜达建筑工程有限公司 Early removal support device for constructional engineering
CN103195241B (en) * 2013-04-18 2014-04-02 深圳市广胜达建筑工程有限公司 Early removal support device for constructional engineering
CN107355073A (en) * 2017-08-30 2017-11-17 云南工程建设总承包公司 A kind of wooden model early tears support meanss and its construction and application method open
CN108756223A (en) * 2018-07-28 2018-11-06 上海宝冶集团有限公司 A kind of combined type early-dismantling device
CN109057322A (en) * 2018-09-29 2018-12-21 广东锐良塑料模板支撑有限公司 A kind of cast-in-place concrete early-dismantling formwork system and its construction method
CN110145514A (en) * 2019-05-15 2019-08-20 深汕特别合作区磐汩新材料有限公司 A kind of branch fastener of turnable installation
CN110145514B (en) * 2019-05-15 2024-04-26 深圳市磐汩新材料有限公司 Support head capable of being installed in turnover mode

Also Published As

Publication number Publication date
CN101270610B (en) 2011-06-22

Similar Documents

Publication Publication Date Title
CN101270610B (en) Template early-dismantling device
CN201003287Y (en) Template support frame
CN201217944Y (en) Early dismantling column head of template
CN201424810Y (en) Supporting head of concrete molding board
CN2799740Y (en) Assembling bis-adjustable multifunctional early-demolishment device
CN203905472U (en) Adjustable stand column support
CN202055524U (en) Early-disassembly template support head for various template main beams
CN203834941U (en) Socket-type keyway-type early-dismounting device for building template
CN203188623U (en) Adjustable engineering template supporting fixture
CN206513763U (en) Para-seismic support y type connecting elements
CN216045790U (en) Auxiliary device for pipeline installation and connection
CN202073297U (en) Auxiliary lifting device for drilling of electric hammer
CN208763436U (en) A kind of PC component supporting apparatus
CN206752552U (en) It is easy to formwork erection and the screw-type ditch cable duct chassis of form removal
CN209192912U (en) A kind of generator maintenance shift unit
CN105019648A (en) Socket-type keyway-type early dismounting device for building template
CN203769307U (en) Early-removal adjustable ejection rod device for building formwork
CN102352607A (en) Full water stopping side wall template system
CN102310475A (en) Height and width adjustable fast-dismounting top supported premoulding device
CN216344298U (en) Quick supporting device for pipeline installation butt joint
CN104032941B (en) Layering elevating scaffold
CN106193600A (en) A kind of steel pipe scaffold early tears component open
CN221066219U (en) Adjustable supporting device for manufacturing electrolytic tank shell
CN220245386U (en) Detachable platform of tower crane
CN204402035U (en) Shear wall template support structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110622

Termination date: 20130519