CN101254835B - Plant fibre pallet equipped with reinforced rib and preparation method thereof - Google Patents

Plant fibre pallet equipped with reinforced rib and preparation method thereof Download PDF

Info

Publication number
CN101254835B
CN101254835B CN2008100184620A CN200810018462A CN101254835B CN 101254835 B CN101254835 B CN 101254835B CN 2008100184620 A CN2008100184620 A CN 2008100184620A CN 200810018462 A CN200810018462 A CN 200810018462A CN 101254835 B CN101254835 B CN 101254835B
Authority
CN
China
Prior art keywords
reinforced rib
pallet
bar
net trellis
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100184620A
Other languages
Chinese (zh)
Other versions
CN101254835A (en
Inventor
李苏扬
李宁娜
Original Assignee
张翠兰
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张翠兰 filed Critical 张翠兰
Priority to CN2008100184620A priority Critical patent/CN101254835B/en
Publication of CN101254835A publication Critical patent/CN101254835A/en
Application granted granted Critical
Publication of CN101254835B publication Critical patent/CN101254835B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W90/00Enabling technologies or technologies with a potential or indirect contribution to greenhouse gas [GHG] emissions mitigation
    • Y02W90/10Bio-packaging, e.g. packing containers made from renewable resources or bio-plastics

Abstract

The invention discloses a plant fiber pallet with a stiffener and the preparation method thereof. The plant fiber pallet comprises a pallet board and a pallet supporting foot, and is characterized in that a stiffener is bonded in the pallet board. The stiffener is a chip or a rod made of bamboo or wood, or a chip or a rod made of metal material. With a stiffener bonded in the interface layer of the pallet board and no increased thickness of the board, the bearing capacity of the board is increased by one time or more and the board can not be deformed and enjoys a long service life. With the adoption of bamboo chip, the stiffener has a rich resource, lower cost and higher toughness.

Description

Be provided with plant fiber tray of reinforced rib and preparation method thereof
Technical field:
The present invention relates to pallet that a kind of storage, logistics use and preparation method thereof.
Background technology:
Goods is in storage, stacking, transportation, and pallet has become one of main instrument.The plant fiber tray that appeared on the market in recent years, can realize recirculation, recycling, the percent recovery because of it and can reach 100%, have simultaneously low cost, hang down advantages such as polluting, need not to fumigate processing, be subject to the popular welcome of industry, to bear pressure little but plant fiber tray exists plate, yielding defective.
Summary of the invention:
The technical problem to be solved in the present invention provides a kind of plant fiber tray that is provided with reinforced rib, in the situation that do not increase plant fiber tray plate thickness, plate is not born pressure greatly, can not be out of shape.
Another technical matters that the present invention will solve provides the preparation method of this pallet.
The present invention is achieved through the following technical solutions:
Be provided with the plant fiber tray of reinforced rib, comprise pallet plate, tray support pin, characteristics are to be bonded with reinforced rib in the pallet plate.
Described reinforced rib is sheet or the bar of bamboo and wood sheet or bar or metallic material.
Be provided with the preparation method of the plant fiber tray of reinforced rib, may further comprise the steps:
(a) with sheet or the bar of bamboo and wood or metal material, put and be the plane net trellis, be provided with the connecting bore that is complementary in the place of being stacked in twos at it, with pin or bolt penetration hole captive joint, pin or bolt shank protrude from the same face of plane net trellis, the 0.5-1.5 that its length that protrudes from this face approximately is the forming disk plate thickness is (mainly be for be supported in plate die cavity basal surface, after plate was shaped, reinforced rib can be positioned at roughly midway location of plate upper and lower surface) doubly;
Or with sheet or the bar of bamboo and wood or metal material, put and be the plane net trellis, twine with metal filament at the place of being stacked in twos, the metal filament two ends are wound in bar in the same face of plane net trellis, and protruding from latticed plane, the 0.5-1.5 that its length that protrudes from this face approximately is the forming disk plate thickness is (the protrusion effect is the same) doubly;
Or with sheet or the bar of bamboo and wood or metal material, put and be the plane net trellis, stick with glue the knot (reinforced rib of making of this kind method at the place of being stacked in twos, in the pallet preparation process, be dosed to a half, reinforced rib is positioned on the material plane, and then continue reinforced);
(b) reinforced rib that step (a) is made, this that bar arranged placed facing to plate die cavity basal surface;
(c) with vegetable fibre and glue in 60-90: the 10-40 ratio mixes, material is packed in the plate die cavity of step (b), reinforced complete can the compacting, pressure is 25-65 kilogram/Cm 2, and at 120-180 degree heat preservation solidification stopped heating after 3-15 minute, get final product the demoulding.
The present invention compared with prior art has following obvious advantage:
(1) the present invention is bonded with reinforced rib at pallet plate interlayer, in the situation that do not increase plate thickness, the holding capacity of plate is more than doubled than former plate, and plate can be out of shape long service life.
(2) reinforced rib among the present invention is selected bamboo chip, and material source is abundant, cheap, have higher toughness.
(3) pallet of the present invention, simple in structure, easy to make.
Description of drawings:
Fig. 1 is partial schematic sectional view of the present invention.
The specific embodiment:
As shown in Figure 1, be provided with the plant fiber tray of reinforced rib, comprise pallet plate 1, tray support pin 2, in pallet plate 1, be bonded with reinforced rib 3.
Still as shown in Figure 1, described reinforced rib 3 roughly is positioned in the middle of the pallet plate upper and lower surface, is the plane net trellis, be stacked in twos the place at the plane net trellis, be provided with the connecting bore that is complementary, bolt 4 perforation captive joints, bolt shank protrudes from the another side (diagram is not provided) of plane net trellis.Reinforced rib is selected bamboo chip in the present embodiment.
Be provided with the preparation method of the plant fiber tray of reinforced rib, may further comprise the steps:
(a) bamboo chip is put be the plane net trellis, the plane net trellis be stacked in twos the place, be provided with the connecting bore that is complementary, use the bolt penetration hole captive joint, bolt shank protrudes from the same face of plane net trellis, and its length that protrudes from this face approximately is 1/2nd of forming disk plate thickness;
(b) reinforced rib that step (a) is made, this that abutting stem arranged placed facing to plate die cavity basal surface;
(c) with vegetable fibre and glue in 60-90: the 10-40 ratio mixes, material is packed in the plate die cavity of step (b), reinforced complete can the compacting, pressure is 25-65 kilogram/Cm 2, and at 150 degree heat preservation solidification stopped heating after 6 minutes, get final product the demoulding.

Claims (1)

1. be provided with the plant fiber tray of reinforced rib, comprise pallet plate, tray support pin, it is characterized in that: be bonded with reinforced rib in the pallet plate, described reinforced rib roughly is positioned in the middle of the pallet plate upper and lower surface, is the plane net trellis; Described reinforced rib is sheet or the bar of bamboo and wood sheet or metal material;
Be prepared from by following steps:
(a) with sheet or the bar of bamboo and wood or metal material, put and be the plane net trellis, be provided with the connecting bore that is complementary in the place of being stacked in twos at it, with pin or bolt penetration hole captive joint, pin or bolt shank protrude from the same face of plane net trellis, and the 0.5-1.5 that its length that protrudes from this face approximately is the forming disk plate thickness doubly;
Or with sheet or the bar of bamboo and wood or metal material, put and be the plane net trellis, twine with metal filament being stacked the place in twos, the metal filament two ends are wound in bar in the same face of plane net trellis, and protruding from latticed plane, the 0.5-1.5 that its length that protrudes from this face approximately is the forming disk plate thickness is doubly;
(b) reinforced rib that step (a) is made, this that abutting stem arranged placed facing to plate die cavity basal surface;
(c) with vegetable fibre and glue by 60-90: 10-40 mixes, material is packed in the plate die cavity of step (b), reinforced complete can the compacting, pressure is 25-65 kilogram/cm 2, and at 120-180 degree heat preservation solidification stopped heating after 3-15 minute, get final product the demoulding.
CN2008100184620A 2008-02-02 2008-02-02 Plant fibre pallet equipped with reinforced rib and preparation method thereof Expired - Fee Related CN101254835B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100184620A CN101254835B (en) 2008-02-02 2008-02-02 Plant fibre pallet equipped with reinforced rib and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100184620A CN101254835B (en) 2008-02-02 2008-02-02 Plant fibre pallet equipped with reinforced rib and preparation method thereof

Publications (2)

Publication Number Publication Date
CN101254835A CN101254835A (en) 2008-09-03
CN101254835B true CN101254835B (en) 2013-04-10

Family

ID=39890033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100184620A Expired - Fee Related CN101254835B (en) 2008-02-02 2008-02-02 Plant fibre pallet equipped with reinforced rib and preparation method thereof

Country Status (1)

Country Link
CN (1) CN101254835B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11554896B2 (en) 2019-03-06 2023-01-17 Chep Technology Pty Limited Hybrid pallet

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103332366B (en) * 2013-06-18 2015-11-25 泗阳蓝阳托盘设备科技有限公司 Be provided with that the vegetable fibre integral extrusion of reinforced rib is shaping two-wayly to be pitched into type single deck pallet
CN103863653A (en) * 2013-09-07 2014-06-18 中南林业科技大学 Bamboo-based flat pallet used for logistics operation and production method thereof
CN105460344B (en) * 2015-11-17 2018-07-17 浙江双友物流器械股份有限公司 A kind of logistics tray

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11554896B2 (en) 2019-03-06 2023-01-17 Chep Technology Pty Limited Hybrid pallet

Also Published As

Publication number Publication date
CN101254835A (en) 2008-09-03

Similar Documents

Publication Publication Date Title
CN101254835B (en) Plant fibre pallet equipped with reinforced rib and preparation method thereof
CN101607411B (en) Bamboo fiber reinforced composite material and manufacturing method thereof
CN102336292B (en) Die pressing tray and production process of same
JP2009166397A (en) Assembly of long vascular bundle of bamboo, its manufacturing method, and block material using the same
JPWO2018216682A1 (en) Method of using palm material, and wood-based material and method of manufacturing the same
CN201158484Y (en) Plant fiber bracket tray with stiffening rib
CN203045916U (en) Original-state whole-bamboo refined defibering and reorganizing laminated veneer lumber
CN102756418B (en) Method for improving stability of recombinant bamboo wood
CN102009427A (en) Method for manufacturing structural timber by sheet lamination of fast growing wood
JP6164649B2 (en) Wood laminate, wood compacted laminate, and method for manufacturing wood compacted laminate
CN2923242Y (en) Novel heavy-bamboo composite floor
CN103331800B (en) Inside establish the string extruded product of perpendicular muscle and extruder and production method
CN209567209U (en) A kind of four-way plug-in type environmental protection wood plastics tray of Fast Installation
CN202271420U (en) Plywood block
CN209382489U (en) A kind of bamboo fragment pallet packing plate
CN103482173A (en) Hermetically-sealed compressor packing tray and manufacturing method thereof
CN108162107A (en) A kind of preparation method of light-duty bamboo lumber
CN203428162U (en) Package tray of hermetically sealed refrigeration compressor
CN105460344B (en) A kind of logistics tray
CN201030977Y (en) Tray provided with conjoined supporting foot
CN201074400Y (en) Novel transverse surface floor
CN202430625U (en) I-shaped bamboo plywood beam structure
CN204894126U (en) Compound material of bamboo wood
CN2832682Y (en) Paper pallet
CN103332366B (en) Be provided with that the vegetable fibre integral extrusion of reinforced rib is shaping two-wayly to be pitched into type single deck pallet

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
EE01 Entry into force of recordation of patent licensing contract

Assignee: Siyang Shunyang Wood Co., Ltd.

Assignor: Zhang Cuilan

Contract record no.: 2010320000341

Denomination of invention: Plant fibre pallet equipped with reinforced rib and preparation method thereof

License type: Common License

Open date: 20080903

Record date: 20100402

EC01 Cancellation of recordation of patent licensing contract

Assignee: Siyang Shunyang Wood Co., Ltd.

Assignor: Zhang Cuilan

Contract record no.: 2010320000341

Date of cancellation: 20110328

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130410

Termination date: 20180202