CN101251922A - 人力发电装置的公共应用系统 - Google Patents
人力发电装置的公共应用系统 Download PDFInfo
- Publication number
- CN101251922A CN101251922A CNA2007100842616A CN200710084261A CN101251922A CN 101251922 A CN101251922 A CN 101251922A CN A2007100842616 A CNA2007100842616 A CN A2007100842616A CN 200710084261 A CN200710084261 A CN 200710084261A CN 101251922 A CN101251922 A CN 101251922A
- Authority
- CN
- China
- Prior art keywords
- coefficient
- generating
- manpower
- public
- electric power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
一种人力发电装置的公共应用系统,它外形上是一套直接固定在指定的电力应用装置上的手摇或脚踏式人刀发电装置,但通过中央处理电路集成了电力计量装置、指纹采集仪、卫星定位装置、通讯端口以及简单的信号输出输入装置。通过全国各地分散设置、统一管理的这种特殊的人力发电装置,为所有公民提供随时随地灵活就业的工作岗位。
Description
技术领域
本发明涉及一种人力发电装置的公共应用系统。
背景技术
人力发电和太阳能、风能等自然能发电都属于绿色无污染能源,但是由于人力发电装置的输出功率很小,手摇式发电机的的输出功率大致有三、四十瓦,单人脚踏发电装置长时间连续发电的输出功率基本上也不可能超过100w,使其应用范围十分有限;同时大规模火电、水电便宜的发电成本使人力发电完全不可能在相同的应用领域和火电、水电竞争。
但是众所周知,现有电力系统从发电厂到终端用户需要经过遥远的输送距离,途径多次的电压变换,会产生巨大的输变电损失,特别是很多边远环境且负荷分散的使用领域以及微小电力应用场所,使用市电产生的输变电损失尤其严重,而且线路建设和维护费用也相当高。另一方面,我国劳动力资源丰富,虽然经济多年超高速发展,但总体就业形式并不理想,城镇隐性失业现象十分严重,同时由于在仍将持续二十年以上的整个社会城市化进程中会有上亿的农民进城务工,所以我国长时间都会有大量人群处于失业边缘,他们是长期需要政府帮助的弱势群体,如果他们的基本生存权利都没有保障,就很可能影响社会的和谐稳定;但是我国的经济实力根本无法象西方发达国家那样为这样庞大的底层人群提供无偿的福利补助,同时目前也没有一条直接向庞大的底层人群发放补助的高效途径。
发明内容
本发明的主要目的是提供一种人力发电装置的公共应用系统,通过全国各地分散设置、统一管理的这种特殊的人力发电装置,为所有公民提供随时随地灵活就业的工作岗位,并以此保障底层弱势群体的基本生存权利;另外通过本系统特殊的计费和结算方式,国家可以随时按照宏观经济发展的要求引导劳动力人口在不同地区之间的流动。
人力发电装置的公共应用系统外形上是一套手摇或脚踏式人力发电装置,该装置直接固定在指定的电力应用装置上,与电力应用装置一体化设计安装,由其提供电能的电力应用装置主要是小功率、重要性一般但又不能缺少且负荷分散的公共使用领域,比如说农村小型的公共电力应用、城市城镇小型分散的公共照明、市电送电线路太远的各种信号指示装置等。本发明另外通过中央处理电路集成了电力计量装置、指纹采集仪、卫星定位装置、通讯端口以及简单的信号输出输入装置。电力计量装置用来记录发电量,指纹采集仪用来确定发电者的身份,卫星定位装置用来确定本系统准确的地理位置,信号输出输入装置主要用来指导初始设置和状态确认等。每次发电结束,中央处理电路通过无线通讯端口向当地的管理中心发送本次发电的相关信息,该地的管理中心根据统一规定的计费公式自动计算出电费后直接就把劳动报酬打到发电者的个人电子帐户上,发电者随时随地都可以通过银联卡取现或消费。
因为作为一种救济形式的临时工作岗位,劳动者在本岗位上工作一天(按照8小时计算)的报酬应该保证他当天不饿肚子,比如说当地一盒普通盒饭的价格是4元,劳动一天的基准报酬算8元就比较合适,也就是说,假设正常情况下连续发电的功率是100瓦的话,8小时的发电量总共是0.8度电,人力发电的基准电价确定在8元/0.8度=10元/度比较合适,而不能够按照市电计价,否则国家就不能通过本发明实现高效的社会救济;另外为了能够根据劳动者的具体情况合理支付政府救济,同时为了让国家能够根据宏观经济发展的需要引导劳动力人口在不同地区之间的流动,本发明设计了如下所示的一套特殊计费公式来帮助政府达到这个目的。
PUP=k1*k2*k3*k4*k5*K6*SMP
式中
PUP是personal unit price的缩写,表示每个劳动者每次发电的单价。
k1代表地区系数,可以根据地区经济发展的差距和国家宏观经济调控的要求设为若干挡。
k2代表时间系数,根据发电季节时间修正发电单价,以合理引导工作时间。
k3代表地点系数,根据发电装置具体安装位置的方便程度增加的一个修正系数,避免大家争抢位置。
k4、k5、k6分别代表年龄系数、性别系数和健康系数,通过这三个系数的修正来充分体现国家对妇女儿童及老弱病残的优先扶助。
SMP是standard manpower price的缩写,表示人力发电基准单价,由国家根据经济发展水平综合确定。
本发明完全不需要电力系统输变电投资,并且永远消除了这部分电力应用的输变电损失,相应减少了这部分电耗所必然产生的环境污染问题,更重要的是本发明可以彻底解决我国的失业问题,并合理引导劳动力人口在不同地区之间的流动。
附图说明
图1为人力发电装置的公共应用系统的组成原理框图。
具体实施方式
由于人力发电存在输出不稳定性以及不可避免的间断性,本发明人力发电装置与电力应用装置之间宜设置储能装置,储能装置可以是蓄电池或大容量电容;另外根据电力应用装置实际的电源要求还需设置相应的整流电路或逆变器,具体的产品形式需要根据实际应用场所进一步完善。
参照图1,本发明的工作过程如下:发电者首先通过指纹采集仪输入明确的身份,由它确定k4、k5、k6年龄、性别和健康三个系数的取值,为了照顾妇女儿童及老弱病残,基数岁(比如20岁)的年龄系数k4=1,其它年龄都分别确定一个固定的级差,比如说60岁的年龄系数k4=1.5,18岁的年龄系数k4=1.05;性别系数男性k5=1,性k5=1.2;正常情况下健康系数k6=1,有身体残疾或其它影响劳动能力疾病的则由当事人自己向当地指定的医疗部门申请免费鉴定,鉴定结果直接记录到管理中心全国联网的计算机个人档案中,以后当事人无论在全国任何地方提供人力发电,他的PUP计算式中健康系数k6都会根据健康状况调整为一个大于1的系数。身份确定后当事人就可以开始向电力应用装置发电,整个发电过程都通过电力计量装置计量统计,发电结束需再次通过指纹采集仪确认,以最大限度地减少作弊的可能性,同时触发系统通过无线通讯端口向管理中心发送本次发电的所有信息,其中卫星定位装置提供发电装置准确的地理位置,从而明确了地区系数k1和地点系数k3的取值,地区系数k1可以按照一定的级差划为若干挡,比如说上海市市区范围k1=2,北京昌平区范围k1=1.5,湖南长沙市市区范围k1=1.5,贵州省湄潭县范围k1=1.2;地点系数k3则可以根据发电装置所处位置交通的方便程度设为两三挡,比如说为边远的移动通信基站提供电力的人力发电装置的地点系数k3如果取1.5,则为市区公共照明提供电力的人力发电装置的地点系数k3则应取1。时间系数k2则根据系统时间自动匹配,比如说如果夏季傍晚6点~8点之间发电的时间系数k2取值为1,冬季半夜1点~6点之间发电的时间系数k2取值就可以设为2甚至3,这样才能合理的引导闲人的发电时间。
Claims (2)
1. 一种人力发电装置的公共应用系统,外形上是一套直接固定在指定的电力应用装置上的手摇或脚踏式人力发电装置,其特征是:它通过中央处理电路集成了电力计量装置、指纹采集仪、卫星定位装置、通讯端口以及简单的信号输出输入装置。
2. 根据权利要求1所述的人力发电装置的公共应用系统,其特征是:它采用如下计费公式
PUP=k1*k2*k3*k4*k5*K6*SMP,式中
PUP是personal unit price的缩写,表示每个劳动者每次发电的单价;
k1代表地区系数,根据地区经济发展的差距和国家宏观经济调控的要求设为若干挡;
k2代表时间系数,根据发电季节时间修正发电单价;
k3代表地点系数,根据发电装置具体安装位置的方便程度增加的修正系数;
k4、k5、k6分别代表年龄系数、性别系数和健康系数;
SMP是standard manpower price的缩写,表示人力发电基准单价,由国家根据经济发展水平综合确定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007100842616A CN101251922A (zh) | 2007-02-24 | 2007-02-24 | 人力发电装置的公共应用系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007100842616A CN101251922A (zh) | 2007-02-24 | 2007-02-24 | 人力发电装置的公共应用系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101251922A true CN101251922A (zh) | 2008-08-27 |
Family
ID=39955301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007100842616A Pending CN101251922A (zh) | 2007-02-24 | 2007-02-24 | 人力发电装置的公共应用系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101251922A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105654396A (zh) * | 2016-01-25 | 2016-06-08 | 冯建东 | 一种清洁能源交易系统 |
-
2007
- 2007-02-24 CN CNA2007100842616A patent/CN101251922A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105654396A (zh) * | 2016-01-25 | 2016-06-08 | 冯建东 | 一种清洁能源交易系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Eremia et al. | The smart city concept in the 21st century | |
Jagadeesh | Wind energy development in Tamil Nadu and Andhra Pradesh, India Institutional dynamics and barriers—A case study | |
CN103617453B (zh) | 考虑风电和谐消纳的电力系统中长期交易运营计划获取方法 | |
Ogola et al. | Lighting villages at the end of the line with geothermal energy in eastern Baringo lowlands, Kenya–Steps towards reaching the Millennium Development Goals (MDGs) | |
CN101251922A (zh) | 人力发电装置的公共应用系统 | |
Zhang et al. | Research on local consumption method of distributed photovoltaic generation for benefits of multi parties based on blockchain | |
Tuballa et al. | Prospects of a solar-diesel-grid energy system for Silliman University, Dumaguete City, Philippines | |
CN204856622U (zh) | 基于手机app的城乡公共服务设施规划标准运用系统 | |
Loka et al. | A case study for micro-grid PV: Rural electrification in India | |
Sumba et al. | Impact of distributed generation in the electrical system of Ecuador | |
Mechleri et al. | A mathematical programming approach to optimal design of smart distributed energy systems | |
Mansur et al. | Energy Assessment of Healthcare Facilities in Sindh | |
Makienko et al. | Assessment of Smart Technologies Implementation in Challenged People Life in Tomsk | |
Wu | The Role and Development of Low Carbon Ecological Planning in Urban Planning | |
Jia et al. | Research Review on Evaluation Index for Age-friendly Community-a Case Study of Tianjin City | |
Patil et al. | Case study on smart village | |
Hou et al. | Multi-objective Demand Responding Micro Grid Operation With Uncertain Renewable Energy and Load Demand | |
Mykolayivna et al. | THE MECHANISM OF INTERNATIONAL COOPERATION IN THE FIELD OF RENEWABLE ENERGY SOURCES | |
Hao et al. | Research on the Law of Electric Water Conversion Coefficient in Typical Wells of Chayou Middle Banner | |
Dai et al. | Analysis and Research on Resettlement Mode of Luola Hydropower Station Development in Tibet | |
Nalarsih et al. | Utilization of Solar-Powered Lights as a Means of Lighting the Mueang Pattani District Mosque Area | |
Sule et al. | ACCESSIBILITY AND UTILIZATION OF WATER FROM IMPROVED SOURCES AMONGST THE RURAL COMMUNITIES OF NORTHERN BAUCHI STATE, NIGERIA | |
Frattari | Drewniane Obudowy Awaryjne. Wooden Emergency Housings | |
Li et al. | Research on the Effectiveness, Problems and Improvement Strategies of Social Organizations in Targeted Poverty Alleviation-Take Zhuzhou City as an example | |
Cabioc et al. | SMS-Based Automatic Billing System of Household Power Consumption Based on Active Experts Messaging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080827 |