CN101251836A - 一种计及停电隐性损失的输电线路检修计划优化方法 - Google Patents

一种计及停电隐性损失的输电线路检修计划优化方法 Download PDF

Info

Publication number
CN101251836A
CN101251836A CNA2008100582562A CN200810058256A CN101251836A CN 101251836 A CN101251836 A CN 101251836A CN A2008100582562 A CNA2008100582562 A CN A2008100582562A CN 200810058256 A CN200810058256 A CN 200810058256A CN 101251836 A CN101251836 A CN 101251836A
Authority
CN
China
Prior art keywords
loss
maintenance
sigma
hidden
power failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100582562A
Other languages
English (en)
Inventor
束洪春
胡泽江
董俊
刘可真
孙士云
唐岚
刘志坚
孙向飞
杨毅
常勇
单节杉
刘永泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CNA2008100582562A priority Critical patent/CN101251836A/zh
Publication of CN101251836A publication Critical patent/CN101251836A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种计及停电隐性损失的输电线路检修计划优化方法,本方法建立包含检修成本和停电造成的显性损失与隐性损失在内的经济性目标函数模型,经济性目标函数模型包含检修成本以及停电损失两个部分,其中停电损失又分为显性损失与隐性损失,显性损失为停电造成的缺供电量的经济性量化,采用“可靠性指标变化量”与“安全风险指标变化量”度量隐性损失,通过将“可靠性指标的变化量”与系统“安全风险指标变化量”进行经济性量化,使它们包含于检修优化的经济性目标函数模型中,利用benders分解方法将该经济性目标函数分解并进行求解。

Description

一种计及停电隐性损失的输电线路检修计划优化方法
技术领域:
本发明涉及一种计及停电隐性损失的输电线路检修计划优化方法,属电力系统检修计划优化技术领域。
背景技术:
在我国,输电线路的检修计划长期以来都是根据经验粗放地进行安排,结果多数检修项目还是采用事后检修方式,难以保证运行中的设备安全地运行,而且还大量占用了线路停电时间。通过近几年的研究发展,检修计划的研究已取得一定成果,至今已提出了多种检修计划的优化算法如遗传算法、免疫算法、整数规划法、Benders分解法等(参考文献1-15)。但是大多数输电网络计划检修优化模型的目标都只包含经济性目标或者可靠性目标,没有将隐性损失计算在内。
从系统的观点出发,随着检修的进行,必然会有潮流转移或者降低传输容量等情况发生。潮流转移导致潮流所转移至的目标线路负载率增大,线路发热量增大,线路下垂距离增大等,导致目标线路故障几率增大,系统运行风险增大,势必导致输电可靠性及系统安全性降低;降低传输容量情况下,系统可用电量降低,输电可靠性也随之降低。
参考文献:
[1]周明,孙树栋.遗传算法原理及其应用[M].北京:国防工业出版社,1999.
[2]黄弦超,舒隽,张粒子,朱刚毅.免疫禁忌混合智能优化算法在配电网检修优化中的应用.中国电机工程学报,2004,24(11):97-100.
[3]Egan G T,et al.An Experimental Method of Determination of Optimal MaintenanceSchedules in Power Systems Using the Branch and Bound Technique[J].IEEE Trans on Manand Cybernetics.1976,6:538-547.
[4]Al-khamis T M,et al.Unit Maintenance Scheduling with Fuel Constraints[J].IEEE Transon Power Systems,1992,7:933-939.
[5]Yellen J,A1-Khamis T M.Vemuri S.et al.A Decomposition Approach to Unit MaintenanceScheduling[J].IEEE Trans on Power Systems,1992,7:726-733.
[6]于尔铿,刘广一,周金阳.能量管理系统[M].北京:科学出版社,2001.
[7]Marwali M K C.,Shahidehpour S M.Integrated Generation and Transmission MaintenanceScheduling with Network Constraints[J].IEEE Trans on Power Systems,1998,13(3):1063-1068.
[8]Marwali M K C,Shahidehpour S M.Long-term Transmission and Generation MaintenanceScheduling with Network Fuel and Emission Constraints[J].IEEE Trans on Power Systems,1999,14(3):1160-1165.
[9]丁明,冯永青.发输电设备联合检修安排模型及算法研究[J].中国电机工程学报,2004,24(5):18-23.
[10]Pinto L M V G,Filho J F P,Pereira M V F.A Model for the Maintenance Schedule of anElectrical Generation Transmission System[A].IEEE International Sympoisum on Circuits andSystems.1991.1216-1219.
[11]Marwali M K C,Shahidehpour S M.Coordination of Short-term and Long-term TransmissionMaintenance Scheduling in a Deregulated System[J].IEEE Power Engineering Review,1998,18(2):46-48
[12]冯永青,吴文传,张伯明,孙宏斌,何云良.基于可信性理论的输电网短期线路检修计划.中国电机工程学报,2007,27(4):65-71.
[13]李文沅,周家启,卢继平,颜伟.在输电服务价格设计中计入可靠性分量.中国电机工程学报,2006,26(13):43-49.
[14]冯永青,吴文传,张伯明,孙宏斌,何云良,叶永青,王志南.基于可信性理论的电力系统运行风险评估.电力系统自动化,2006,30(3):11-16.
[15]J.N.Hooker and G.Ottonson.Logic-based benders decomposition.Mathematical programming,2003,96:33-60.
发明内容
本发明的目的是提出一种计及停电隐性损失的输电线路检修计划优化方法,本方法建立包含检修成本和停电造成的显性损失与隐性损失在内的经济性目标函数模型,经济性目标函数模型包含检修成本以及停电损失两个部分,其中停电损失又分为显性损失与隐性损失,显性损失为停电造成的缺供电量的经济性量化,采用“可靠性指标变化量”与“安全风险指标变化量”度量隐性损失,通过将“可靠性指标的变化量”与系统“安全风险指标变化量”进行经济性量化,使它们包含于检修优化的经济性目标函数模型中,利用benders分解方法将该经济性目标函数分解并进行求解。
本发明通过以下方案达到其目的:
(1)对隐性损失进行经济性量化
输电网络中第i个检修阶段下,检修之前系统期望缺供电量为WEENSi,系统运行风险指标为Risk-i,检修时为WEENS’i与R’isk-i
U i = α ( W EEN S ′ i - W EENSi P i t i ) + ( 1 - α ) ( R ′ isk - i - R isk - i )
U r = C r 1 n Σ i = 1 n U i
其中:α为权值取0.5,Ui为检修阶段i下单位可靠性指标变化量,Cr为单位隐性损失的单价,Ur为平均单位隐性损失,Pi为检修阶段i涉及的负荷需求之和,ti为检修持续时间;
Cr包含可靠性指标与安全性指标两个隐性损失的单价,在此处对应的可靠性指标与安全性指标单价应取相等:
C r = 2 1 m Σ U IC i i 0.5 U i ′
U ′ i = ( W EEN S ′ i - W EENSi P i t i )
其中:UICi为系统前一年内进行第i次检修所花费成本;Ui’为第i次检修时单位可靠性变化量;
系统运行风险指标Risk定义如下:
R isk - i ( X t , f ) = Σ i = 1 n [ P r ( E j ) S ( E j , X i ) ]
S ( E j , X i ) = Σ i = 1 n [ ( Δ u i U i ) 2 m + ( Δ f i f i ) 2 m + P t ( X i > X t , i | X t , f ) ]
P t ( X i > X t , i | X t , f ) = k i l
P r ( E j ) = E j E
其中:Xt,f为时间t的运行方式;Xt,i为第i个检修阶段下传输容量上限;Xi为第i个检修阶段下传输容量实际值;Sev(Ej,Xi)为Ej和Xi作用下的损失程度,以线路过负荷、节点电压越限、频率越限作为衡量损失程度的标准;Pt(Xi>Xt,i|Xt,f)为第i个检修阶段下出现某线路传输容量实际值超过其上限的概率;l为输电网络总的线路条数;ki为检修阶段i下出现的超过传输容量上限的线路条数;Δu,Δf为电压和频率的越限幅度,U,f为电压和频率基准值;2m目的为克服遮蔽缺陷;Ej为因为状态检修i导致有扰动出现的开关动作次数;E为因为状态检修i导致的开关动作次数;Pr(Ej)为有扰动出现的概率;
(2)建立基于可信性理论的输电网络计划检修优化模型。以经济性为目标,包含检修费用与停电损失费用,其中停电损失费用包含因停电导致的显性损失(ψR-F,i)与隐性损失(Ur)。
min [ Σ t Σ i = 1 n C it ( 1 - x it ) ] + min { [ E R - F ( Σ t ψ R - F , i ) ] | ( 5 ) ~ ( 10 ) } + min { [ E R - F ( Σ t U r ) ] | ( 10 ) ~ ( 12 ) }
其中:ψR-F,i为第t小时的停电显性损失;Ur为第t小时的停电隐性损失;Cit为第t小时单位检修费用;xit为第t小时该检修线路的状态;
(3)建立与检修策略相关的约束及与全网随机模糊不确定风险相关的约束;
(4)利用benders分解法将目标函数分解并求解。
具体实施方式:
(1)对隐性损失进行经济性量化
对隐性损失的经济性量化需要选择相应的可靠性指标,考虑到所需指标的易统计性和能具体反映系统可靠性水平,选择期望缺供电量变化量与负荷需求之和的比值以及系统运行风险指标变化量来反映输电系统隐性损失。
输电网络中第i个检修阶段下,检修之前系统期望缺供电量为WEENSi,系统运行风险指标为Risk-i,检修时为WEENS’i与R’isk-i
U i = α ( W EEN S ′ i - W EENSi P i t i ) + ( 1 - α ) ( R ′ isk - i - R isk - i ) - - - ( 1 )
U r = C r 1 n Σ i = 1 n U i - - - ( 2 )
其中:α为权值取0.5;Ui为检修阶段i下单位可靠性指标变化量;Cr为单位隐性损失的单价;Ur为平均单位隐性损失;Pi为检修阶段i涉及的负荷需求之和;ti为检修持续时间。
由于Cr包含两个部分,即可靠性指标与安全性指标两个隐性损失的单价,在此处对应的可靠性指标与安全性指标单价应取相等:
C r = 2 1 m Σ U IC i i 0.5 U i ′ - - - ( 3 )
U ′ i = ( W EEN S ′ i - W EENSi P i t i ) - - - ( 4 )
其中:UICi为系统前一年内进行第i次检修所花费成本;Ui’为第i次检修时单位可靠性变化量。
系统运行风险指标Risk定义如下:
R isk - i ( X t , f ) = Σ i = 1 n [ P r ( E j ) S ( E j , X i ) ] - - - ( 5 )
S ( E j , X i ) = Σ i = 1 n [ ( Δ u i U i ) 2 m + ( Δ f i f i ) 2 m + P t ( X i > X t , i | X t , f ) ] - - - ( 6 )
P t ( X i > X t , i | X t , f ) = k i l - - - ( 7 )
P r ( E j ) = E j E - - - ( 8 )
其中:Xt,f为时间t的运行方式;Xt,i为第i个检修阶段下传输容量上限;Xi为第i个检修阶段下传输容量实际值;Sev(Ej,Xi)为Ej和Xi作用下的损失程度,以线路过负荷、节点电压越限、频率越限作为衡量损失程度的标准;Pt(Xi>Xt,i|Xt,f)为第i个检修阶段下出现某线路传输容量实际值超过其上限的概率;l为输电网络总的线路条数;ki为检修阶段i下出现的超过传输容量上限的线路条数;Δu,Δf为电压和频率的越限幅度,U,f为电压和频率基准值;2m目的为克服遮蔽缺陷;Ej为因为状态检修i导致有扰动出现的开关动作次数;E为因为状态检修i导致的开关动作次数;Pr(Ej)为有扰动出现的概率;
(2)建立基于可信性理论的输电网络计划检修优化模型,即经济性目标函数模型:
min E R - F [ Σ t Σ i = 1 n C it ( 1 - x it ) + Σ t ψ R - F , i + Σ t U r ] - - - ( 9 )
其中:ψR-F,i为第t小时的停电显性损失;Ur为第t小时的停电隐性损失;Cit为第t小时单位检修费用,xit为第t小时该检修线路的状态。
a.与检修策略相关的约束
检修资源约束:
Σ t Σ i = 1 n r ij ( 1 - x it ) ≤ a jt - - - ( 10 )
人力资源约束:
Σ i ∈ NL ( 1 - x it ) ≤ b l - - - ( 11 )
其中:ajt为在第i检修阶段输电资源j的可用总数;bl为在第i检修阶段可用人力资源;
计及天气影响的检修时间约束
天气因素本为随机问题,但如果详细考虑天气的随机性则只能对模型的求解增加难度,且可知天气预测在以天为单位的时间范围内还算精确。为计算简便认为天气的预测为精确预测,即可以精确到小时。
计及天气影响的检修时间约束:
x it = 1 t < e i andt > m i + d i x it = 0 s i &le; t &le; s i + d i x it &Element; { 0,1 } e i &le; t &le; m i &Sigma; t x it = m i - e i - d i e i &le; t &le; m i - - - ( 12 )
其中:si表示第i检修阶段在第si时段开始检修;ei表示第i检修阶段可开始检修的最早时间段;mi表示第i检修阶段可开始检修的最迟时间段;di表示第i检修阶段检修的持续时间;xit为第t小时该检修线路的状态,0表示处于检修状态,1表示处于合闸运行状态。
b.与系统网络随机模糊不确定风险相关的约束:
为简化模型及解算方便,以下约束都是以直流潮流模型为基础。
缺供电量约束:
ER-F[PEENS,R-F]<εt     (13)
功率平衡约束:
&Sigma; j &Element; NG P j + &Sigma; j &Element; NC D j = &Sigma; j &Element; NC C j - - - ( 14 )
A(P+D-C)=T               (15)
节点与线路约束:
Pmin≤P≤Pmax             (16)
0≤D≤C                   (17)
Pl≤Pl,max               (18)
Umin≤U≤Umax             (19)
fmin≤f≤fmax             (20)
式中:PEENS,R-F为第i检修阶段停电电量随机模糊变量;εt为第i检修阶段可接受停电功率随机模糊期望值。NL为线路集;NG为发电机节点集;NC为负荷节点集;P,D,C,Pl,Pl,max分别为发电机注入有功功率,切负荷量,负荷向量,支路潮流有功功率,支路潮流有功功率上限;A为节点注入有功功率与支路有功功率间的关联矩阵(以直流潮流模型计算)。
(3)利用benders分解法对模型进行分解
利用benders分解法可以将模型转化为如下优化问题:
min [ &Sigma; t &Sigma; i = 1 n C it ( 1 - x it ) ] + min { [ E R - F ( &Sigma; t &psi; R - F , i ) ] | ( 13 ) ~ ( 18 ) } + min { [ E R - F ( &Sigma; t U r ) ] | ( 18 ) ~ ( 20 ) } - - - ( 21 )
s.t.{(9)~(12)}
经过第k次benders迭代后,该模型分解为如下形式。
min [ &Sigma; t &Sigma; i = 1 n C it ( 1 - x it ) ] + F t , 1 k + F t , 2 k - - - ( 22 )
s.t.{(9)~(12)}
其中对偶方程:
F t , 1 k = max a , b , c , d min 0 &le; D &le; C P min &le; P &le; P ma P l , min &le; P l &le; P l , max { E R - F ( &Sigma; t &psi; R - F , i k ) + E R - F ( a t k ) &CenterDot; ( &Sigma; j &Element; NG P j + &Sigma; j &Element; NC D j - &Sigma; j &Element; NC C j ) + - - - ( 23 )
E R - F ( b t k ) &CenterDot; [ A ( P + D - C ) - T ] + E R - F ( c t k ) &CenterDot; [ E R - F ( P EENS , R - F ) - &epsiv; t ] + E R - F ( d t k ) &CenterDot; ( P l - P l , max )
F t , 2 k = max e min U min &le; U &le; U max f min &le; f &le; f max { E R - F [ E R - F ( &Sigma; t U r k ) ] + E R - F ( e t k ) &CenterDot; ( P l - P l , max ) - - - ( 24 )
对Ft,1 k,其可行与否与下式相关
minER-F(PEENS,R-F)<εt              (25)
则该式对偶函数:
G t , 1 k = max g , h , m min 0 &le; D &le; C P min &le; P &le; P ma P l , min &le; P l &le; P l , max { E R - F ( P EENS , R - F ) + E R - F ( g t k ) &CenterDot; ( &Sigma; j &Element; NG P j + &Sigma; j &Element; NC D j - &Sigma; j &Element; NC C j ) - - - ( 26 )
+ E R - F ( h t k ) &CenterDot; [ A ( P + D - C ) - T ] + E R - F ( m t k ) &CenterDot; ( P l - P l , max )
对Ft,2 k无不可行问题。
因此可知主问题为:
min z s . t . { ( 9 ) ~ ( 12 ) } z &GreaterEqual; min [ &Sigma; t &Sigma; i = 1 n C it ( 1 - x it ) ] + F t , 1 k + F t , 2 k &Sigma; t G t , 1 k < &epsiv; - - - ( 27 )
对子问题,如果式(25)不成立,则不可行割:
E R - F ( P EENS , R - F ) + &Sigma; i [ E R - F ( &mu; it k ) ] &CenterDot; P i , l , max &CenterDot; ( x it k - x it ) &le; &epsiv; t - - - ( 28 )
[ E R - F ( &mu; it k ) ] = E R - F [ &PartialD; ( E R - F ( P EENS , R - F ) ) &PartialD; C i k ] - - - ( 29 )
否则,子问题转化为:
z &GreaterEqual; &Sigma; t E R - F ( &psi; R - F , i ) + &Sigma; [ C it ( 1 - x it k ) + E R - F ( &lambda; it k ) &CenterDot; P i , l , max &CenterDot; ( x it k - x it ) ] - - - ( 30 )
[ E R - F ( &lambda; it k ) ] = E R - F [ &PartialD; ( E R - F ( &psi; R - F , i ) &PartialD; C i k ] - - - ( 31 )
(4)求解主问题与子问题
观察主问题,可知其为多目标整数规划模型,可利用隐枚举法对其进行求解。
观察子问题,其为非线性规划问题,其求解过程如下:
a.令e=1;
b.根据可信性理论,寻找θk使得Pos(θk)≥δ,(k=1,2,…)
c.求得ER-F(PEENS,R-F),并令
a=min1≤k≤NER-F[PEENS,R-Fk)],
b=max1≤k≤NER-F[PEENS,R-Fk)]。
d.对r∈[a,b],k=1,2,…N,若r≥0,则:
e=e+Cr{ER-F(PEENS,R-F)≥r}
否则:
e=e+Cr{ER-F(PEENS,R-F)≤r}
e.根据可信性理论,
ER-F(PEENS,R-F)=a∨0+b∧0+e·(b-a)/N,
将其带入子问题的可行割与不可行割,即可求解子问题。

Claims (2)

1. 一种计及停电隐性损失的输电线路检修计划优化方法,其特征在于:建立了以经济性为目标函数的检修优化模型,该检修优化的经济性目标函数模型包含检修成本和停电损失两个部分,停电损失又分为显性损失与隐性损失,显性损失为停电造成的缺供电量的经济性量化,采用“可靠性指标变化量”与“安全风险指标变化量”度量隐性损失,通过将“可靠性指标的变化量”与系统“安全风险指标变化量”进行经济性量化,使它们包含于检修优化的经济性目标函数模型中,利用benders分解法对该函数分解并进行求解,得出计及隐性损失的输电线路检修计划。
2. 根据权利要求1所述的计及隐性损失的输电线路检修计划优化方法,其特征在于完成上述方法的具体步骤如下:
(1)对隐性损失进行经济性量化
输电网络中第i个检修阶段下,检修之前系统期望缺供电量为WEENSi,系统运行风险指标为Risk-i,检修时为WEENS’i与R’isk-i
U i = &alpha; ( W EEN S &prime; i - W EENSi P i t i ) + ( 1 - &alpha; ) ( R &prime; isk - i - R isk - i )
U r = C r 1 n &Sigma; i = 1 n U i
其中:α为权值取0.5,Ui为检修阶段i下单位可靠性指标变化量,Cr为单位隐性损失的单价,Ur为平均单位隐性损失,Pi为检修阶段i涉及的负荷需求之和,ti为检修持续时间;
Cr包含可靠性指标与安全性指标两个隐性损失的单价,在此处对应的可靠性指标与安全性指标单价应取相等:
C r = 2 1 m &Sigma; U IC i i 0.5 U i &prime;
U &prime; i = ( W EEN S &prime; i - W EENSi P i t i )
其中:UICi为系统前一年内进行第i次检修所花费成本;Ui’为第i次检修时单位可靠性变化量;
系统运行风险指标Risk定义如下:
R isk - i ( X t , f ) = &Sigma; i = 1 n [ P r ( E j ) S ( E j , X i ) ]
S ( E j , X i ) = &Sigma; i = 1 n [ ( &Delta; u i U i ) 2 m + ( &Delta; f i f i ) 2 m + P t ( X i > X t , i | X t , f ) ]
P t ( X i > X t , i | X t , f ) = k i l
P r ( E j ) = E j E
其中:Xt,f为时间t的运行方式;Xt,i为第i个检修阶段下传输容量上限;Xi为第i个检修阶段下传输容量实际值;Sev(Ej,Xi)为Ej和Xi作用下的损失程度,以线路过负荷、节点电压越限、频率越限作为衡量损失程度的标准;Pt(Xi>Xt,i|Xt,f)为第i个检修阶段下出现某线路传输容量实际值超过其上限的概率;l为输电网络总的线路条数;ki为检修阶段i下出现的超过传输容量上限的线路条数;Δu,Δf为电压和频率的越限幅度,U,f为电压和频率基准值;2m目的为克服遮蔽缺陷;Ej为因为状态检修i导致有扰动出现的开关动作次数;E为因为状态检修i导致的开关动作次数;Pr(Ej)为有扰动出现的概率;
(2)建立基于可信性理论的输电网络计划检修优化模型。以经济性为目标,包含检修费用与停电损失费用,其中停电损失费用包含因停电导致的显性损失(ψR-F,i)与隐性损失(Ur)。
min [ &Sigma; t &Sigma; i = 1 n C it ( 1 - x it ) ] + min { [ E R - F ( &Sigma; t &psi; R - F , i ) ] | ( 5 ) ~ ( 10 ) } + min { [ E R - F ( &Sigma; t U r ) ] | ( 10 ) ~ ( 12 ) }
其中:ψR-F,i为第t小时的停电显性损失;Ur为第t小时的停电隐性损失;Cit为第t小时单位检修费用;xit为第t小时该检修线路的状态;
(3)建立与检修策略相关的约束及与全网随机模糊不确定风险相关的约束;
(4)利用benders分解法将目标函数分解并求解。
CNA2008100582562A 2008-04-07 2008-04-07 一种计及停电隐性损失的输电线路检修计划优化方法 Pending CN101251836A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100582562A CN101251836A (zh) 2008-04-07 2008-04-07 一种计及停电隐性损失的输电线路检修计划优化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100582562A CN101251836A (zh) 2008-04-07 2008-04-07 一种计及停电隐性损失的输电线路检修计划优化方法

Publications (1)

Publication Number Publication Date
CN101251836A true CN101251836A (zh) 2008-08-27

Family

ID=39955230

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100582562A Pending CN101251836A (zh) 2008-04-07 2008-04-07 一种计及停电隐性损失的输电线路检修计划优化方法

Country Status (1)

Country Link
CN (1) CN101251836A (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727543B (zh) * 2009-11-30 2012-07-25 国网电力科学研究院武汉南瑞有限责任公司 震后电网设施剩余寿命柔性过程模型诊断方法
CN103198222A (zh) * 2013-04-10 2013-07-10 国家电网公司 一种用于综合停电检修计划的平衡优化方法
CN103413182A (zh) * 2013-07-24 2013-11-27 清华大学 基于诱导函数的月度发输电一体化检修优化方法
CN103985006A (zh) * 2014-04-16 2014-08-13 北京航空航天大学 一种以维护时间最优化为目标的维护活动编排方法
CN104217255A (zh) * 2014-09-02 2014-12-17 浙江大学 一种市场环境下电力系统多目标检修优化方法
CN105512774A (zh) * 2016-01-24 2016-04-20 浙江大学 接入分布式光伏发电的配电网检修计划优化方法
CN106229966A (zh) * 2016-07-28 2016-12-14 国网山东省电力公司青岛供电公司 一种输电线路重叠检修判断方法及系统
CN106779372A (zh) * 2016-12-05 2017-05-31 东华大学 基于改进免疫禁忌算法的农机调度方法
CN107067156A (zh) * 2017-02-24 2017-08-18 广东电网有限责任公司佛山供电局 配电网停电策略的评估方法和装置
CN109472459A (zh) * 2018-10-17 2019-03-15 贵州电网有限责任公司 计及变动检修风险和等待时间的电网操作任务优化方法
CN110059913A (zh) * 2019-02-21 2019-07-26 国网浙江省电力有限公司绍兴供电公司 一种计及未来态的停电计划的量化评估方法
CN110060179A (zh) * 2019-04-24 2019-07-26 国网山东省电力公司济南供电公司 基于风险重叠度的多电压等级检修计划优化方法及装置
CN113595086A (zh) * 2021-09-30 2021-11-02 浙江浙达能源科技有限公司 一种输电网拓扑优化方法
CN116451876A (zh) * 2023-06-15 2023-07-18 国网江西省电力有限公司信息通信分公司 一种基于人工智能的配电网故障预测和主动检修系统

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101727543B (zh) * 2009-11-30 2012-07-25 国网电力科学研究院武汉南瑞有限责任公司 震后电网设施剩余寿命柔性过程模型诊断方法
CN103198222A (zh) * 2013-04-10 2013-07-10 国家电网公司 一种用于综合停电检修计划的平衡优化方法
CN103413182A (zh) * 2013-07-24 2013-11-27 清华大学 基于诱导函数的月度发输电一体化检修优化方法
CN103985006A (zh) * 2014-04-16 2014-08-13 北京航空航天大学 一种以维护时间最优化为目标的维护活动编排方法
CN103985006B (zh) * 2014-04-16 2017-02-01 北京航空航天大学 一种以维护时间最优化为目标的维护模型构建方法
CN104217255A (zh) * 2014-09-02 2014-12-17 浙江大学 一种市场环境下电力系统多目标检修优化方法
CN104217255B (zh) * 2014-09-02 2017-06-13 浙江大学 一种市场环境下电力系统多目标检修优化方法
CN105512774A (zh) * 2016-01-24 2016-04-20 浙江大学 接入分布式光伏发电的配电网检修计划优化方法
CN106229966B (zh) * 2016-07-28 2018-08-17 国网山东省电力公司青岛供电公司 一种输电线路重叠检修判断方法及系统
CN106229966A (zh) * 2016-07-28 2016-12-14 国网山东省电力公司青岛供电公司 一种输电线路重叠检修判断方法及系统
CN106779372A (zh) * 2016-12-05 2017-05-31 东华大学 基于改进免疫禁忌算法的农机调度方法
CN107067156A (zh) * 2017-02-24 2017-08-18 广东电网有限责任公司佛山供电局 配电网停电策略的评估方法和装置
CN109472459A (zh) * 2018-10-17 2019-03-15 贵州电网有限责任公司 计及变动检修风险和等待时间的电网操作任务优化方法
CN109472459B (zh) * 2018-10-17 2022-03-22 贵州电网有限责任公司 计及变动检修风险和等待时间的电网操作任务优化方法
CN110059913A (zh) * 2019-02-21 2019-07-26 国网浙江省电力有限公司绍兴供电公司 一种计及未来态的停电计划的量化评估方法
CN110060179A (zh) * 2019-04-24 2019-07-26 国网山东省电力公司济南供电公司 基于风险重叠度的多电压等级检修计划优化方法及装置
CN110060179B (zh) * 2019-04-24 2023-04-18 国网山东省电力公司济南供电公司 基于风险重叠度的多电压等级检修计划优化方法及装置
CN113595086A (zh) * 2021-09-30 2021-11-02 浙江浙达能源科技有限公司 一种输电网拓扑优化方法
CN113595086B (zh) * 2021-09-30 2022-01-04 浙江浙达能源科技有限公司 一种输电网拓扑优化方法
CN116451876A (zh) * 2023-06-15 2023-07-18 国网江西省电力有限公司信息通信分公司 一种基于人工智能的配电网故障预测和主动检修系统
CN116451876B (zh) * 2023-06-15 2023-09-22 国网江西省电力有限公司信息通信分公司 一种基于人工智能的配电网故障预测和主动检修系统

Similar Documents

Publication Publication Date Title
CN101251836A (zh) 一种计及停电隐性损失的输电线路检修计划优化方法
CN101640418B (zh) 电力系统故障的暂态稳定关键输电断面识别方法
CN103646358B (zh) 计及电力设备时变故障率的电网计划检修周期确定方法
Qiu et al. A risk-based approach to multi-stage probabilistic transmission network planning
CN107194574B (zh) 一种基于负荷损失的电网安全风险评估方法
CN102708411A (zh) 一种地区电网在线风险评估方法
CN103440400B (zh) 考虑灾害因素的电力系统短期风险判定方法
CN106384210A (zh) 一种基于检修风险收益的输变电设备检修优先级排序方法
CN104391202A (zh) 基于电量异常分析的异常用电判断方法
Hassan et al. Developing chaotic Bonobo optimizer for optimal power flow analysis considering stochastic renewable energy resources
CN102509018A (zh) 电力系统设备重要性评价系统及方法
CN102289731A (zh) 一种基于系统风险的输电设备状态检修方法
CN106600136A (zh) 一种电力断面越限控制效率评估方法
CN104281983A (zh) 配电网应急抢修所需资源调度方法与系统
Wang et al. Flexible transmission expansion planning for integrating wind power based on wind power distribution characteristics
Chen et al. A BP neural network-based hierarchical investment risk evaluation method considering the uncertainty and coupling for the power grid
CN117691645A (zh) 一种用于智能微电网的储能系统
Trojani et al. Stochastic security-constrained unit commitment considering electric vehicles, energy storage systems, and flexible loads with renewable energy resources
Wang et al. Full Life cycle management of power system Integrated with renewable energy: Concepts, Developments and Perspectives
Song et al. Low carbon transition of China's electric and heating sector considering reliability: A modelling and optimization approach
CN102255308B (zh) 一种配电网正常状态辨识方法
Shoferpour et al. Improving the flexibility of power systems using transportable battery, transmission switching, demand response, and flexible ramping product market in the presence of high wind power
Liu et al. A quantified resilience assessment approach for electrical power systems considering multiple transmission line outages
Li-jie et al. Research of risk-based security assessment of power system
CN109066664A (zh) 一种基于110kV变电站全停风险闭环管控的量化评估方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080827