CN101248688B - Synchronization implementing method of base station asynchronous wireless links reconfiguration course - Google Patents

Synchronization implementing method of base station asynchronous wireless links reconfiguration course Download PDF

Info

Publication number
CN101248688B
CN101248688B CN2005800513891A CN200580051389A CN101248688B CN 101248688 B CN101248688 B CN 101248688B CN 2005800513891 A CN2005800513891 A CN 2005800513891A CN 200580051389 A CN200580051389 A CN 200580051389A CN 101248688 B CN101248688 B CN 101248688B
Authority
CN
China
Prior art keywords
message
base station
radio link
layer
wireless links
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2005800513891A
Other languages
Chinese (zh)
Other versions
CN101248688A (en
Inventor
陈爱弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Publication of CN101248688A publication Critical patent/CN101248688A/en
Application granted granted Critical
Publication of CN101248688B publication Critical patent/CN101248688B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W92/00Interfaces specially adapted for wireless communication networks
    • H04W92/04Interfaces between hierarchically different network devices
    • H04W92/12Interfaces between hierarchically different network devices between access points and access point controllers

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A method of realizing the asynchronous radio link reconfiguration process of base station synchronously is disclosed, which includes the following steps: base station receives asynchronous radio link reconfiguration request message from radio network controller; the control plane of base station constructs radio link preparation message; and sends it to each layer of base station to process; the control plane of base station judges the process result of each layer, if the process of each layer is fail, then transmitting message of reconfiguration failure; if the process of each layer is successful, then constructing radio link submission message, and sending it to each layer of base station to process; then base station responses asynchronous reconfiguration success message to radio network controller. While in another method of present invention, if the process preparation message of each layer is successful, base station re-constructs and processes radio link submission message after sending asynchronous reconfiguration success message. The present invention can greatly decrease the difficulty of returning due to failure of asynchronous radio link reconfiguration, and can decrease of possibility for user service being deleted abnormally, and can greatly improve the error tolerance of system.

Description

The synchronization implementation method of base station asynchronous wireless links reconfiguration course
Technical field
The asynchronous wireless links that the present invention relates to mobile communication system is reshuffled (Unsynchronised RadioLink Reconfiguration) process, particularly the synchronization implementation method of the base station asynchronous wireless links reconfiguration course in the third generation mobile.
Background technology
In the third generation mobile system, as TD SDMA (TD-SCDMA) system, radio link reconfiguration is a very important flow process for the third generation mobile system, and the increase that relates to customer service such as deletes at work.Radio link reconfiguration is initiated by RNC (Radio NetworkController, radio network controller), comprises that synchronised radio link reconfigure and asynchronous wireless links reshuffle.
For asynchronous wireless links is reshuffled; because the restriction of physical resource itself; can cause the radio link reconfiguration failure, and according to asynchronous flow process of reshuffling, system can switch directly; for whole system; the base station handoff failure, in most cases, owing to relate to whole base station system; so rollback difficulty behind the asynchronous wireless links reconfiguration failure, the user usually can be deleted.
The asynchronous wireless links of the Iub mouth of RNC is reshuffled normal flow as shown in Figure 1:
Usually under following situation, system can initiate the asynchronous flow process of reshuffling:
Transmission channel is revised;
Transmission channel increases;
The transmission channel deletion;
Physical channel is revised (FDD, Frequency Division Duplexing (FDD));
CCTRCH (CCTrCH Coded Composite Transport Channel, Code Composite Transport Channel) revises (TDD, time division duplex);
CCTRCH deletes (TDD).
As shown in Figure 1, send the asynchronous wireless links reconfiguration request message to the base station, send between the response message to RNC, do not have other any message to the base station at RNC.
Base station response message has two kinds:
Asynchronous reshuffling successfully;
Asynchronous reconfiguration failure, as shown in Figure 2.
Reason at the asynchronous reconfiguration failure of base station side roughly has: other reasonses such as network layer reason, transport layer reason, control overload.
Because in asynchronous reshuffling, the new configuration in the system requirements reconfiguration message comes into force at once, and between each subsystem of inside of base station owing to the relation of having levels, so if certain layer of reconfiguration failure, then other each layer rollback difficulties.For the base station, then mean asynchronous reconfiguration failure, and be expendable.For whole access network, because the irrecoverable property of base station asynchronous reconfiguration failure will cause the user to be released.
Be illustrated in figure 3 as the Message Processing schematic diagram between each layer of inside of base station.Because each internal system effect difference for ease of understanding, is used abstract block representation herein.
As shown in Figure 3, receive the asynchronous wireless links reconfiguration request message of RNC transmission when the base station after, should asynchronous reconfiguration request message send to user's face and base band successively by chain of command, treat base band to user's face respond asynchronous reshuffle the response success message after, user's face responds the asynchronous response success message of reshuffling to chain of command again, the base station just sends the asynchronous response success message of reshuffling to RNC.
Among Fig. 3, for user's face and the base band in the abstract block diagram, if user's face is after receiving the chain of command reconfiguration message, user's face is directly switch to the new configuration of reshuffling, to newly dispose simultaneously and send to base band and switch, in case the baseband switching failure, then the configuration of user's face can't rollback, this directly causes base station asynchronous reconfiguration failure, and the base station is difficult to rollback.
After if user's face is received the chain of command reconfiguration message, user's face elder generation reservation message sends to base band with asynchronous reconfiguration information, responds etc. base band, if respond successfully then user's face switches to new configuration.If the asynchronous reconfiguration failure of base band then returns asynchronous reconfiguration failure to chain of command, and keep old configuration.Although in this case, can be relatively easy to realize the rollback of reconfiguration failure, in this case same, if user's face is received the success response of reshuffling of base band, but the handoff failure of user's face own, base band is difficult to rollback equally.
At present in existing technology, also there is not a cover unified method at inside of base station, prevent the situation that locking system can't rollback behind asynchronous reconfiguration failure, this causes the user by not solution of release problem unusually, makes that also the fault freedom of system is lower.
Summary of the invention
Technical problem solved by the invention has been to provide a kind of synchronization implementation method of base station asynchronous wireless links reconfiguration course, can't rollback when the asynchronous reconfiguration failure to solve the base station, the problem that causes the user to be discharged unusually, and then the fault-tolerant ability of raising whole system.
For solving the problems of the technologies described above, technical scheme provided by the invention comprises the steps:
The base station receives the asynchronous wireless links reconfiguration request message from radio network controller;
The base stations control face is according to described reconfiguration request message, and the parameter of Radio Link itself, constructs a synchronised radio link reconfigure and prepares message;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and prepare message, and handle respectively by described each layer;
The base stations control face is judged the result of described each layer to described preparation message, after definite each layer handled all successes, constructs a synchronised radio link reconfigure and submits message to;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and submit message to, and handle respectively by described each layer;
Success message is reshuffled to radio network controller response asynchronous wireless links in the base station.
Wherein judge in the step of described each layer to the result of described preparation message,, then send asynchronous wireless links reconfiguration failure message to radio network controller if determine the processing failure of any one deck at described base stations control face.
The present invention also provides another kind of technical scheme, comprises the steps:
The base station receives the asynchronous wireless links reconfiguration request message from radio network controller;
The base stations control face is according to described reconfiguration request message, and the parameter of Radio Link itself, constructs a synchronised radio link reconfigure and prepares message;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and prepare message, and handle respectively by described each layer;
The base stations control face is judged the result of described each layer to described preparation message, after definite each layer handled all successes, reshuffles success message to radio network controller response asynchronous wireless links, and constructs a synchronised radio link reconfigure and submit message to;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and submit message to, and handle respectively by described each layer.
Wherein judge in the step of described each layer to the result of described preparation message,, then send asynchronous wireless links reconfiguration failure message to radio network controller if determine the processing failure of any one deck at described base stations control face.
Because the synchronization implementation method that the present invention provides asynchronous wireless links to reshuffle in base station side, wireless link synchronization is prepared message, wireless link synchronization is submitted message to by generating in the inside of base station simulation, thereby reshuffles synchronization process at inside of base station realization asynchronous wireless links.After synchronization process, even the accurate failure of wireless link synchronization in handle the base station, the base station is rollback very easily also, and under wireless link synchronization was ready to complete situation, switching itself can not failed simultaneously.Therefore, the application of the invention can significantly reduce system's rollback difficulty that asynchronous wireless links failure brought, the probability that customer service is deleted unusually, has strengthened system survivability greatly.
Summary of drawings
Fig. 1 is in the third generation mobile, the message flow schematic diagram when asynchronous wireless links is reshuffled successfully;
Fig. 2 is in the third generation mobile, the message flow schematic diagram during the asynchronous wireless links reconfiguration failure;
Fig. 3 is in the prior art, and the schematic diagram of asynchronous wireless links reconfiguration message is handled in the base station;
Fig. 4 is according to first embodiment of the present invention, the message flow schematic diagram when handling the success of in-built asynchronous wireless links reconfiguration prepare message in the base station;
Fig. 5 is according to first embodiment of the present invention, the message flow schematic diagram when handling the failure of in-built asynchronous wireless links reconfiguration prepare message in the base station;
Fig. 6 is the synchronization implementation method flow chart according to the described base station asynchronous wireless links reconfiguration course of first embodiment of the invention;
Fig. 7 is according to second embodiment of the present invention, the message flow schematic diagram when handling the success of in-built asynchronous wireless links reconfiguration prepare message in the base station;
Fig. 8 is the synchronization implementation method flow chart according to the described base station asynchronous wireless links reconfiguration course of second embodiment of the invention;
Fig. 9 is the corresponding diagram that concerns of asynchronous reallocation message of Radio Link described in the embodiment of the invention and described wireless link synchronization reallocation message.
Preferred forms of the present invention
The present invention is further elaborated below in conjunction with accompanying drawing.
The synchronization implementation method of base station asynchronous wireless links reconfiguration course provided by the present invention, be that the base station is after receiving the asynchronous wireless links reconfiguration message of RNC, portion simulates and generates wireless link synchronization preparation message within it, wireless link synchronization is submitted message to, comes to reshuffle synchronization process at inside of base station realization asynchronous wireless links.Set forth the present invention below in conjunction with concrete implementation step.
First embodiment:
Be the message flow schematic diagram of first embodiment of the present invention when handling the success of in-built asynchronous wireless links reconfiguration prepare message in the base station as shown in Figure 4:
Step 401: after the asynchronous wireless links reconfiguration message that the Iub mouth sends was received in the base station, the base stations control face constructed Radio Link and prepares message according to the parameter of asynchronous wireless links reconfiguration message content and Radio Link itself;
Step 402: the base stations control face sends the Radio Link ready message for each layer of inside of base station according to the processing mode of Radio Link preparation message;
Step 403: each layer of inside of base station handled Radio Link and prepared message according to the processing mode of Radio Link preparation message; Inside of base station keeps the old and new's configuration of Radio Link when handling Radio Link preparation message;
Step 404: inside of base station is after Radio Link is prepared successfully, and Radio Link of chain of command structure is submitted message to; Inside of base station sends for each layer of inside of base station and processing Radio Link submission message according to the processing mode of Radio Link submission message;
Step 405: the base station is responded asynchronous wireless links to RNC and is reshuffled success message.
Reshuffle in the synchronization process method at above-mentioned base station asynchronous wireless links, it is the inside of base station structure that Radio Link is prepared message, and it is to construct according to the asynchronous wireless links reconfiguration message of Iub mouth transmission and the wireless link information of base station itself.
Base stations control sends synchronised radio link reconfigure towards each layer of inside of base station and prepares message, and the step handled respectively of each layer of base station, is that the processing mode according to Radio Link preparation message sends and handles.
Reshuffle in the synchronization process method at above-mentioned asynchronous wireless links, the Radio Link new configuration take-effective time in the message of submitting to should be short as far as possible, to avoid Iub mouth asynchronous wireless links to reshuffle response timeout, the new configuration take-effective time should be shorter than asynchronous wireless links and reshuffle the response timeout time.
Base stations control sends synchronised radio link reconfigure towards each layer of inside of base station and submits message to, and the step handled respectively of each layer of base station, is that the processing mode according to Radio Link submission message sends and handles.
Be the message flow schematic diagram of first embodiment of the present invention when handling the failure of in-built asynchronous wireless links reconfiguration prepare message in the base station as shown in Figure 5:
Step 501: receive the asynchronous wireless links reconfiguration message of Iub mouth transmission in the base station after, the base stations control face constructs Radio Link and prepares message according to the parameter of asynchronous wireless links reconfiguration message content and Radio Link itself;
Step 502: the base stations control face sends the Radio Link ready message for each layer of inside of base station according to the processing mode of Radio Link preparation message;
Step 503: each layer of inside of base station handled Radio Link and prepared message according to the processing mode of Radio Link preparation message; When inside of base station is handled Radio Link preparation message, keep the old and new's configuration of Radio Link;
Step 504: the inside of base station Radio Link is prepared failure, sends asynchronous wireless links reconfiguration failure message to RNC, and each layer of inside of base station recovers original configuration simultaneously.
Base stations control sends described synchronised radio link reconfigure towards each layer of inside of base station and prepares message, and the step handled respectively of each layer of base station, is that the processing mode according to Radio Link preparation message sends and handles.
The specific implementation process of present embodiment as shown in Figure 6, in the third generation mobile system, the base station prepares message by inside of base station structure wireless link synchronization and wireless link synchronization is submitted message to, realizes that the process of asynchronous wireless links reconfiguration process is implemented according to the following steps:
Step 601: the asynchronous wireless links reconfiguration message that the lub mouth sends is received in the base station;
Step 602: the base stations control face constructs Radio Link and prepares message according to the parameter of asynchronous wireless links reconfiguration message content and Radio Link itself;
Step 603: each layer of inside of base station sends, handles Radio Link and prepare message according to the processing mode of Radio Link preparation message;
Step 604: the Radio Link preparation message scenario that the base stations control face is handled structure according to inside of base station judges whether successful Radio Link is prepared;
Step 605: if the inside of base station Radio Link is prepared failure, then send asynchronous wireless links reconfiguration failure message to RNC, each layer of inside of base station recovers original configuration simultaneously;
Step 606: if the inside of base station Radio Link is prepared successfully, then Radio Link of chain of command structure is submitted message to;
Step 607: each layer of inside of base station pressed the processing mode that Radio Link is submitted message to, sends, handles Radio Link and submit message to;
Step 608: base stations control is responded asynchronous wireless links towards RNC and is reshuffled success message.
In an embodiment, respond asynchronous wireless links to RNC and reshuffle success message, after handling Radio Link submission message, inside of base station carries out, therefore, when the structure Radio Link is submitted message to, the new configuration take-effective time in this message is short as far as possible, reshuffles timeout issue to avoid that asynchronous wireless links takes place, and preferred plan is to make to submit to the time that new configuration information comes into force in the message to reshuffle response time less than asynchronous wireless links among the RNC.
Second embodiment:
Reshuffle response timeout for fear of Iub mouth asynchronous wireless links, the present invention also provides the synchronization process method of another kind of base station asynchronous wireless links reconfiguration course, wherein be not both: after the success of in-built Radio Link preparation message is handled in the base station, the base station sent asynchronous wireless links to the Iub mouth and reshuffles response before the structure Radio Link is submitted message to.
Set forth this a kind of implementation method of the present invention below in conjunction with concrete implementation step.
Be the message flow schematic diagram of the second embodiment of the present invention when handling the success of in-built asynchronous wireless links reconfiguration prepare message in the base station as shown in Figure 7:
Step 701: receive the asynchronous wireless links reconfiguration message of Iub mouth transmission in the base station after, the base stations control face constructs Radio Link and prepares message according to the parameter of asynchronous wireless links reconfiguration message content and Radio Link itself;
Step 702: the base stations control face is prepared message process mode according to Radio Link, sends the Radio Link ready message for each layer of inside of base station;
Step 703: each layer of inside of base station handled Radio Link and prepared message according to the processing mode of Radio Link preparation message, when each layer of inside of base station handled Radio Link preparation message, and the old and new's configuration of maintenance Radio Link;
Step 704: if the inside of base station Radio Link is prepared failure, then send asynchronous wireless links reconfiguration failure message to RNC, each layer of inside of base station recovers original configuration simultaneously; If the inside of base station Radio Link is prepared successfully, the base station is responded asynchronous wireless links to RNC and is reshuffled success message, and behind the response success message, Radio Link of inside of base station chain of command structure is submitted message to, changes step 705 over to;
Step 705: each layer of inside of base station sends, handles Radio Link and submit message to according to the processing mode of Radio Link submission message.
Reshuffle in the synchronization process method at asynchronous wireless links, it is the inside of base station structure that Radio Link is prepared message, and it is to construct according to the asynchronous wireless links reconfiguration message of Iub mouth transmission and the wireless link information of base station itself.
Base stations control sends synchronised radio link reconfigure towards each layer of inside of base station and prepares message, and the step handled respectively of each layer of base station, is that the processing mode according to Radio Link preparation message sends and handles.
Reshuffle in the synchronization process method at asynchronous wireless links, the Radio Link new configuration take-effective time in the message of submitting to should be short as far as possible, to avoid Iub mouth asynchronous wireless links to reshuffle response timeout, the new configuration take-effective time should be shorter than asynchronous wireless links and reshuffle the response timeout time.
Base stations control sends synchronised radio link reconfigure towards each layer of inside of base station and submits message to, and the step handled respectively of each layer of base station, is that the processing mode according to Radio Link submission message sends and handles.
Among the embodiment implementation process of this method as shown in Figure 8, this process is implemented according to the following steps:
Step 801: the asynchronous wireless links reconfiguration message that the Iub mouth sends is received in the base station;
Step 802: the base stations control face constructs Radio Link and prepares message according to the parameter of asynchronous wireless links reconfiguration message content and Radio Link itself;
Step 803: each layer of inside of base station sends, handles Radio Link and prepare message according to the processing method of Radio Link preparation message;
Step 804: the Radio Link that the base stations control face is handled structure according to inside of base station is prepared message scenario, judges whether successful Radio Link is prepared;
Step 805: prepare failure if inside of base station is handled Radio Link, then send asynchronous wireless links reconfiguration failure message to RNC, each layer of inside of base station recovers original configuration simultaneously;
Step 806: prepare successfully if inside of base station is handled Radio Link, then send asynchronous wireless links and reshuffle success message to RNC;
Step 807: after the inside of base station Radio Link was prepared successfully, Radio Link of base stations control surface construction was submitted message to;
Step 808: each layer of inside of base station sends, handles Radio Link and submit message to according to the processing method of Radio Link submission message.
The present invention is for system is pre-created resource because wireless link synchronization is prepared message itself in this embodiment, so under this message case of successful of system handles, new and old configuration switching can not failed.So in the method, the base station can send asynchronous wireless links to radio network controller at once and reshuffle response after the intact in-built wireless link synchronization of inter-process is prepared.
For further setting forth the present invention, we describe and how to construct synchronization message according to asynchronous reconfiguration request message again by the asynchronous reallocation message of Radio Link of Fig. 9 and the corresponding relation of wireless link synchronization reallocation message.
Can see by Fig. 9, the asynchronous reallocation message of Radio Link is the subclass of wireless link synchronization reallocation message, a kind of way wherein is, with the content in the asynchronous reallocation message of Radio Link, form by the wireless link synchronization reallocation message is inserted, to the part that the asynchronous reprovision of Radio Link does not comprise, insert 0 in the field in wireless link synchronization message, just constitute complete wireless link synchronization reallocation message.
In sum, in the method for the invention, the base station is when handling the asynchronous wireless links reconfiguration message, be to have constructed wireless link synchronization at inside of base station to prepare message and wireless link synchronization submission message, because itself can preserve the old and new's configuration when wireless link synchronization was prepared Message Processing, even the accurate failure of wireless link synchronization, base station be rollback very easily also; Simultaneously under wireless link synchronization is ready to complete situation, switching itself can not failed, therefore the synchronization process by asynchronous wireless links is reshuffled can significantly reduce system's rollback difficulty that the asynchronous wireless links reconfiguration failure brings, the probability that customer service is deleted unusually.
Therefore, in asynchronous wireless links reconfiguration process process, even reconfiguration failure, the previous business of user still is able to normally strengthen system survivability greatly.The inventive method is applicable to that also other relates to the system that asynchronous wireless links is reshuffled.
Industrial applicibility
Utilize the present invention, the base station is when the asynchronous wireless links reconfiguration message that processing is received, construct wireless link synchronization at inside of base station and prepared message and wireless link synchronization submission message, because itself can preserve the old and new's configuration when wireless link synchronization was prepared Message Processing, even the accurate failure of wireless link synchronization, the base station is rollback very easily also, simultaneously under wireless link synchronization is ready to complete situation, switching itself can not failed, so synchronization process by asynchronous wireless links is reshuffled, can greatly reduce system's rollback difficulty that the asynchronous wireless links failure brings, the probability that customer service is deleted has unusually strengthened system survivability greatly. The inventive method is applicable to that also other relates to the system that asynchronous wireless links is reshuffled.

Claims (12)

1. the synchronization implementation method of a base station asynchronous wireless links reconfiguration course is characterized in that, comprises the steps:
The base station receives the asynchronous wireless links reconfiguration request message from radio network controller;
The base stations control face is according to described reconfiguration request message, and the parameter of Radio Link itself, constructs a synchronised radio link reconfigure and prepares message;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and prepare message, and handle respectively by described each layer;
The base stations control face is judged the result of described each layer to described preparation message, after definite each layer handled all successes, constructs a synchronised radio link reconfigure and submits message to;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and submit message to, and handle respectively by described each layer;
Success message is reshuffled to radio network controller response asynchronous wireless links in the base station.
2. the method for claim 1, it is characterized in that, described base stations control face is judged the step of described each layer to the result of described preparation message, if determine the processing failure of any one deck, then sends asynchronous wireless links reconfiguration failure message to radio network controller.
3. method as claimed in claim 2 is characterized in that, described step to radio network controller transmission asynchronous wireless links reconfiguration failure message, and further comprise: each layer of inside of base station recovers original configuration.
4. the method for claim 1, it is characterized in that, describedly sending described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and prepare message, and by the step that described each layer handled respectively, is that the processing mode according to Radio Link preparation message sends and handles.
5. the method for claim 1, it is characterized in that, synchronised radio link reconfigure of described structure is submitted the step of message to, and the wherein said synchronised radio link reconfigure new configuration take-effective time in the message of submitting to is shorter than asynchronous wireless links and reshuffles the response timeout time.
6. the method for claim 1, it is characterized in that, describedly sending described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and submit message to, and by the step that described each layer handled respectively, is that the processing mode according to Radio Link submission message sends and handles.
7. the synchronization implementation method of a base station asynchronous wireless links reconfiguration course is characterized in that, comprises the steps:
The base station receives the asynchronous wireless links reconfiguration request message from radio network controller;
The base stations control face is according to described reconfiguration request message, and the parameter of Radio Link itself, constructs a synchronised radio link reconfigure and prepares message;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and prepare message, and handle respectively by described each layer;
The base stations control face is judged the result of described each layer to described preparation message, after definite each layer handled all successes, reshuffles success message to radio network controller response asynchronous wireless links, and constructs a synchronised radio link reconfigure and submit message to;
Send described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and submit message to, and handle respectively by described each layer.
8. method as claimed in claim 7, it is characterized in that, described base stations control face is judged the step of described each layer to the result of described preparation message, if determine the processing failure of any one deck, then sends asynchronous wireless links reconfiguration failure message to radio network controller.
9. method as claimed in claim 8 is characterized in that, described step to radio network controller transmission asynchronous wireless links reconfiguration failure message, and further comprise: each layer of inside of base station recovers original configuration.
10. method as claimed in claim 7, it is characterized in that, describedly sending described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and prepare message, and by the step that described each layer handled respectively, is that the processing mode according to Radio Link preparation message sends and handles.
11. method as claimed in claim 7, it is characterized in that, synchronised radio link reconfigure of described structure is submitted the step of message to, and the wherein said synchronised radio link reconfigure new configuration take-effective time in the message of submitting to is shorter than asynchronous wireless links and reshuffles the response timeout time.
12. method as claimed in claim 7, it is characterized in that, describedly sending described synchronised radio link reconfigure by base stations control towards each layer of inside of base station and submit message to, and by the step that described each layer handled respectively, is that the processing mode according to Radio Link submission message sends and handles.
CN2005800513891A 2005-11-29 2005-11-29 Synchronization implementing method of base station asynchronous wireless links reconfiguration course Expired - Fee Related CN101248688B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2005/002043 WO2007062544A1 (en) 2005-11-29 2005-11-29 Method of realizing the asynchronous radio link reconfiguration process of base station synchronously

Publications (2)

Publication Number Publication Date
CN101248688A CN101248688A (en) 2008-08-20
CN101248688B true CN101248688B (en) 2011-02-02

Family

ID=38091849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2005800513891A Expired - Fee Related CN101248688B (en) 2005-11-29 2005-11-29 Synchronization implementing method of base station asynchronous wireless links reconfiguration course

Country Status (2)

Country Link
CN (1) CN101248688B (en)
WO (1) WO2007062544A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409906B (en) 2007-10-10 2010-08-18 北京信威通信技术股份有限公司 Method for reconfiguration of business in radio communication system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1399433A (en) * 2001-07-20 2003-02-26 华为技术有限公司 Consultative code resource-distributing method in CDMA system
CN1428950A (en) * 2001-12-27 2003-07-09 华为技术有限公司 Method for base station load recombination in universal land radio access web
CN1658542A (en) * 2004-02-17 2005-08-24 华为技术有限公司 Method for setting wireless access load

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1399433A (en) * 2001-07-20 2003-02-26 华为技术有限公司 Consultative code resource-distributing method in CDMA system
CN1428950A (en) * 2001-12-27 2003-07-09 华为技术有限公司 Method for base station load recombination in universal land radio access web
CN1658542A (en) * 2004-02-17 2005-08-24 华为技术有限公司 Method for setting wireless access load

Also Published As

Publication number Publication date
WO2007062544A1 (en) 2007-06-07
CN101248688A (en) 2008-08-20

Similar Documents

Publication Publication Date Title
CN102868505B (en) For the buffering of packets of harmless handover
CN101128050B (en) Wireless carrier control method, system and service wireless network controller
US7672673B2 (en) Mobile communication system, relief method of competition between downlink RRC message and inter-cell movement of user equipment, and radio network controller
CN108306708B (en) Data packet processing method and device
CN100438700C (en) A method to process failing reconfiguration of wireless bearing service
CN101594644B (en) Signaling interaction method supporting CoMP operation set option
WO2007145340A1 (en) Base station, user device, and method
CN100551159C (en) Method for handover control
EP2498570A1 (en) Method and system for mobility parameter negotiation between base stations
CN101170795B (en) A method, system and device for controlling user equipment to switch between cells
CN101621819A (en) Information synchronization detection method for active-standby switching interface module, network element system and link
CN102448183A (en) Uu interface reconfiguration method and equipment
CN109716855B (en) Signaling control transmission method and related product
KR102455840B1 (en) Serving node update method, terminal and network device
CN101248688B (en) Synchronization implementing method of base station asynchronous wireless links reconfiguration course
CN101188787B (en) Disaster tolerance method and system for home register
CN109348491A (en) The method, device and equipment that L2 state variable step-out is restored
CN115412986A (en) Data forwarding method, system, equipment and storage medium based on terminal indication
CN101179850A (en) Method of implementing non-synchronous wireless links reconfiguration in base station
CN103828283A (en) Method and system for reducing MAC-is reset ambiguity for common E-DCH transmissions
CN101175319B (en) Method for switch-over between new and old configuration of wireless network controller
CN100455040C (en) Method for treating peer entities on side of control equipment in wireless network
CN100370874C (en) A method for solving configuration failure of radio resource control process
CN101188853A (en) A method for switching status in mobile communication system
WO2023179365A1 (en) Communication method and communication apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20080820

Assignee: SHENZHEN ZTE MICROELECTRONICS TECHNOLOGY CO., LTD.

Assignor: ZTE Corporation

Contract record no.: 2015440020319

Denomination of invention: Synchronization implementing method of base station asynchronous wireless links reconfiguration course

Granted publication date: 20110202

License type: Common License

Record date: 20151123

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20171129

CF01 Termination of patent right due to non-payment of annual fee