CN101242064B - Making method for dual lead device clamp - Google Patents

Making method for dual lead device clamp Download PDF

Info

Publication number
CN101242064B
CN101242064B CN200710007003A CN200710007003A CN101242064B CN 101242064 B CN101242064 B CN 101242064B CN 200710007003 A CN200710007003 A CN 200710007003A CN 200710007003 A CN200710007003 A CN 200710007003A CN 101242064 B CN101242064 B CN 101242064B
Authority
CN
China
Prior art keywords
device clamp
implementation step
dual lead
lead device
forging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200710007003A
Other languages
Chinese (zh)
Other versions
CN101242064A (en
Inventor
高裕彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200710007003A priority Critical patent/CN101242064B/en
Publication of CN101242064A publication Critical patent/CN101242064A/en
Application granted granted Critical
Publication of CN101242064B publication Critical patent/CN101242064B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forging (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention discloses a method for manufacturing a double-conductor equipment cable clamp, in the method for manufacturing the double-conductor equipment cable clamp two aluminum pipes are combined to an equipment pipe clamp through the procedures of pipe bending, smithing, soldering, hole drilling and the like, wherein, in the cable bending actualizing procedure: the tail of the aluminum pipe is processed and bent; in the smithing actualizing procedure: the bent aluminum pipe tail is executed with processing and smithing, and the tail of the aluminum pipe can form a block part which is matched comparatively and is to be soldered; in the soldering actualizing procedure: the parts of two aluminum pipes to be soldered is executed with relative soldering combination to compose an intermediate lock plate; in the hole drilling actualizing procedure: the intermediate lock plate is perforated to compose plural holes; after the actualizing procedures of pipe bending, smithing, soldering, hole drilling and the like a pair of double-conductor equipment cable clamp can be quickly and easily manufactured to provide the connecting and combination of the cable yarn. Through the manufacturing method of the invention the equipment cable clamp can be facilitated to possess the advantages of excellent quality, good structure strength, simple production, saving manufacturing cost and the like.

Description

The manufacture method of dual lead device clamp
Technical field
The present invention relates to a kind of manufacture method of dual lead device clamp.
Background technology
The existing dual lead device clamp that is used in two cables binding combinations, as shown in figure 11, it generally all is the manufacturing that is formed in one with the founding forging type, so both sides bend pipe 10 is to be made into integration with the jam plate 20 of centre, 201 of the borings of jam plate 20 are to reprocess perforate after the moulding, and the existing dual lead device clamp of this kind has following defective:
1, utilizes the dual lead device clamp of founding casting, its quality is very unstable, be easy to generate lyriform pore during casting, so the defect rate height, structural strength may be not good, it is with after cable combines, bear the wind-force invasion and attack in the air at height for a long time,, cause its entire body to suffer damage and failure easily because wind-force rocks the moment that causes and can put on this device clamp, cause power breakdown when serious, power industry will be suffered huge infringement.
2, the middle jam plate 20 of device clamp, except the processing of must holing, middle jam plate 20 and body also have the difference on the angle, middle jam plate 20 may be 90 configurations of spending with body, or the configuration at other angle of inclination, or middle jam plate 20 also has the difference difference of shaping area size, therefore, with having the device clamp of a variety of different sizes, could satisfy user demand, in other words, the producer must prepare the mould of each specification, the supply requirement of multi-mould at the device clamp of each specification, must cause the very big puzzlement in the manufacturing, and improved production cost greatly, very inconvenience in the manufacturing, the management and control of production and supply is difficult for, may need huge stocks in advance to get the raw materials ready the phenomenon that causes fund to overstock.
Summary of the invention
Main purpose of the present invention is to provide a kind of manufacture method of dual lead device clamp, it makes two aluminum pipes make a two-conductor line device clamp by implementation steps such as bend pipe, forging, welding and borings, by this construction method, the quality of this device clamp is more good, and structural strength is good, produces simple, do not need the supply of multi-mould yet, so can save manufacturing cost, have mobility more flexibly in the management and control of production and supply, do not need huge stocks in advance to get the raw materials ready.
Secondary objective of the present invention is to provide a kind of manufacture method of dual lead device clamp, it passes through bend pipe earlier with two aluminum pipes, impose forging, welding processing and jam plate in the middle of constituting in tail end again, therefore the arrangement angles of jam plate or the size of shaping area all can arbitrary decisions in forging process in the middle of, so very simple in the manufacturing.
The manufacture method that is to provide a kind of dual lead device clamp of another syllabus of the present invention, it is in forging the course of processing, afterbody can be forged to bigger scarf, make two aluminum pipes when welding processing, can produce bigger bonding area, guarantee that welding quality is better.
The manufacture method of a kind of dual lead device clamp provided by the invention, pass through with two aluminum pipes: implementation steps such as bend pipe, forging, welding, boring, allow two aluminum pipes therefore be combined into a device clamp, wherein:
Bend pipe implementation step: the processing of aluminum pipe afterbody is crooked;
Forge implementation step: the aluminum pipe afterbody after the bending is processed forging, make the aluminum pipe afterbody can form a portion block to be welded of mating relatively;
Welding implementation step: the portion to be welded of two aluminum pipes is imposed relative solder bond and constitutes a middle jam plate;
Boring implementation step: be drilled with perforate and constitute a plurality of borings at middle jam plate;
Get final product fast and simply manufacturing by implementation steps such as above-mentioned bend pipe, forging, welding and borings and finish a two-conductor line device clamp, so that the binding combination of cable to be provided.
In preferred version, determine this to be welded predetermined arrangement angles by this forging implementation step moulding.
In preferred version, determine the size of this to be welded predetermined shaping area by this forging implementation step moulding.
In preferred version, in forging implementation step, be afterbody to be forged be bigger scarf.
In sum, the present invention is significant with respect to the effect of prior art: the manufacture method of dual lead device clamp provided by the present invention, utilize two aluminum pipes to pass through for a kind of: the manufacture method of the device clamps that implementation step constituted such as bend pipe, forging, welding and boring, its whole manufacturing really conveniently fast, and best in quality, structural strength is good, also help to save manufacturing cost and safeguard the stability and security that electric power is carried, be a kind of reasonable and practical manufacture method.
Description of drawings
The dual lead device clamp stereogram that Fig. 1 finishes for manufacturing method according to the invention.
Fig. 2 implements the view of bend pipe processing in aluminum pipe for the present invention.
Fig. 3 is the schematic diagram of the present invention after two aluminum pipes are implemented to forge processing.
It is the various embodiment schematic diagrames of different portions to be welded in two aluminum pipes enforcement forging processing aftershaping that Fig. 4 to Fig. 7 is respectively the present invention.
Fig. 8 is the schematic diagram of the present invention after two aluminum pipes are implemented boring processing.
The dual lead device clamp sectional drawing that Fig. 9 finishes for manufacturing method according to the invention.
Figure 10 links the view of combination by draw processing and cable for the present invention.
Figure 11 is the device clamp stereogram of existing casting.
Embodiment
Following conjunction with figs. describes feature of the present invention and advantage in detail:
As shown in drawings, the manufacture method of forging formula dual lead device clamp provided by the present invention, it mainly is to pass through with two aluminum pipes 1: implementation steps such as bend pipe, forging, welding, boring, and allow two aluminum pipes therefore be combined into a device clamp (as shown in Figure 1), and wherein:
The bend pipe implementation step: as shown in Figure 2 that 11 processing of aluminum pipe 1 afterbody are crooked, approximately to 90 degree;
Forge implementation step: as shown in Figure 3, aluminum pipe after the bending 1 afterbody is processed forging, make aluminum pipe afterbody 11 can form block to be welded 12 of mating relatively, this to be welded 12 in this forging process, the arrangement angles that it is predetermined or the size of shaping area all can be in one-shot forming decisions (shown in the various different embodiment of Fig. 4 to Fig. 6) in this forging process;
The welding implementation step: as shown in Figure 7, to be welded 12 of two aluminum pipes 1 imposed relative solder bond, or optionally suitable again complanation trimming, can constitute one in the middle of jam plate 13;
The boring implementation step: as Fig. 8, shown in Figure 9, be drilled with perforate and constitute a plurality of borings 131 at middle jam plate 13, its drilling hole amount or distribution can optionally freely determine;
Get final product fast and simply manufacturing by implementation steps such as above-mentioned bend pipe, forging, welding and borings and finish a two-conductor line device clamp, so that the binding combination of cable 2 to be provided, the manufacture method of constructing according to this, the quality of this device clamp will be more good, and structural strength is good, produces simple in addition, do not need the supply of multi-mould yet, so can save manufacturing cost, have mobility more flexibly in the management and control of production and supply, do not need huge stocks in advance to get the raw materials ready.
As shown in Figure 9, the present invention is made as a suitable convex-shaped in the bottom face 132 of middle jam plate 13, making the bottom face 132 of this protrusion depend on object with relative locking specific forms preferable subsides and touches, facilitate the use and screw togather element and run through boring 131, and the dual lead device clamp that manufacturing method according to the invention is finished locking is incorporated into and depends on object.
As shown in figure 10, the dual lead device clamp that the present invention makes by draw processing, make this dual lead device clamp and cable 2 form firm binding combination, and after linking combination, the both sides tube wall promptly can form the draw 14 forms when linking combination with cable 2.
As shown in the figure, the present invention is in forging the course of processing, afterbody can be forged and be bigger scarf, make two aluminum pipes when welding processing, can produce bigger bonding area, better in order to guarantee welding quality, and when using, when middle jam plate 13 runs through boring 131 and is locked in specific when depending on object by screwing togather element, screw togather the sealed while of element, also can strengthen two block relatively combinations of to be welded 12 once more, so structural strength is good, quality is highly stable and good, it is with after cable combines, the invasion and attack that foot can bear high altitude wind, but the safety and stablization that long term maintenance electric power is carried.
The foregoing description only is the explanation that exemplifies of major technique of the present invention, it is not in order to limit technical scope of the present invention, all simple and easy change or displacements that relates to equivalent application or done based on the preceding paragraph technological means, for example the present invention can be applicable to easily that also the extension of hollow conductor and hollow conductor continues, and belongs in like manner feasible scope naturally.

Claims (7)

1. the manufacture method of a dual lead device clamp is characterized in that, passes through with two aluminum pipes: the implementation step of bend pipe, forging, welding, boring, and allow two aluminum pipes therefore be combined into a device clamp, wherein:
Bend pipe implementation step: the processing of aluminum pipe afterbody is crooked;
Forge implementation step: the aluminum pipe afterbody after the bending is processed forging, make the aluminum pipe afterbody form a portion block to be welded of mating relatively;
Welding implementation step: the portion to be welded of two aluminum pipes is imposed relative solder bond and constitutes a middle jam plate;
Boring implementation step: be drilled with perforate and constitute a plurality of borings at middle jam plate;
Implementation step by above-mentioned bend pipe, forging, welding and boring can be fast and simple the manufacturing finish a two-conductor line device clamp, so that the binding combination of cable to be provided.
2. the manufacture method of dual lead device clamp as claimed in claim 1 is characterized in that, this bend pipe implementation step is approximately to 90 degree with aluminum pipe afterbody processing bending.
3. the manufacture method of dual lead device clamp as claimed in claim 1 is characterized in that, determines this to be welded predetermined arrangement angles by this forging implementation step moulding.
4. the manufacture method of dual lead device clamp as claimed in claim 1 is characterized in that, is determined the size of this to be welded predetermined shaping area by this forging implementation step moulding.
5. the manufacture method of dual lead device clamp as claimed in claim 1 is characterized in that, the bottom face of this centre jam plate is made as a convex-shaped.
6. the manufacture method of dual lead device clamp as claimed in claim 1 is characterized in that, this dual lead device clamp forms the binding combination by draw processing with cable.
7. the manufacture method of dual lead device clamp as claimed in claim 1 is characterized in that, in forging implementation step, is that afterbody with this bulk portion to be welded forges and is bigger scarf.
CN200710007003A 2007-02-05 2007-02-05 Making method for dual lead device clamp Expired - Fee Related CN101242064B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710007003A CN101242064B (en) 2007-02-05 2007-02-05 Making method for dual lead device clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710007003A CN101242064B (en) 2007-02-05 2007-02-05 Making method for dual lead device clamp

Publications (2)

Publication Number Publication Date
CN101242064A CN101242064A (en) 2008-08-13
CN101242064B true CN101242064B (en) 2010-05-19

Family

ID=39933357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710007003A Expired - Fee Related CN101242064B (en) 2007-02-05 2007-02-05 Making method for dual lead device clamp

Country Status (1)

Country Link
CN (1) CN101242064B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104393515B (en) * 2014-04-30 2016-08-24 国家电网公司 It is applied to the varied angle joint line fixture of transformer station's high-tension electricity equipment
CN105406208A (en) * 2015-12-17 2016-03-16 川铁电气(天津)股份有限公司 Sleeve-type cable clamp device
CN106583565B (en) * 2017-01-19 2018-07-10 河北科杰电力器材制造有限公司 A kind of hydraulic tension-proof wire clip semi-finished product make tooling
CN110846587A (en) * 2019-12-10 2020-02-28 国网河南省电力公司西峡县供电公司 Preparation method of novel wire clamp

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2504775Y (en) * 2001-09-12 2002-08-07 高正贤 Insulation acupuncture coditch wire clip with tap joint
CN1508923A (en) * 2002-12-19 2004-06-30 上海恒鼎电力器材有限公司 C-shape parrel-slot cable clamp
CN1780079A (en) * 2004-11-25 2006-05-31 高裕彬 Crimping and tension-resisting clip

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2504775Y (en) * 2001-09-12 2002-08-07 高正贤 Insulation acupuncture coditch wire clip with tap joint
CN1508923A (en) * 2002-12-19 2004-06-30 上海恒鼎电力器材有限公司 C-shape parrel-slot cable clamp
CN1780079A (en) * 2004-11-25 2006-05-31 高裕彬 Crimping and tension-resisting clip

Also Published As

Publication number Publication date
CN101242064A (en) 2008-08-13

Similar Documents

Publication Publication Date Title
CN101242064B (en) Making method for dual lead device clamp
CN105020566A (en) Section-variable metal lattice structure and machining method thereof
CN204185851U (en) Prestressed concrete pipe pile fast joint structure
CN204112606U (en) The branch sleeve of steel concrete supporting
CN203499033U (en) Anchoring piece
CN207513149U (en) One kind is applicable in a variety of Building assembling templates
CN108288770B (en) Narrow-end terminal, narrow-end terminal production method and special flaring device
KR101076374B1 (en) Nipple for hose joint and how to make it
CN210086233U (en) Concrete pipe pile butt-joint structure
CN107968368A (en) A kind of novel rapid-installation splicing sleeve
CN206820954U (en) Triangle is with holes to wear bluetooth earphone wire rod
CN201732880U (en) Connecting structure of explosive cladding copper and aluminum flexible connecting belt
CN104550298A (en) Die used for squeezing and drawing round tube
CN204464754U (en) Punching type lightning rod clamp
CN206039752U (en) Flame proof audible -visual annunciator cavity structures
CN207700696U (en) A kind of aluminum alloy mould plate exterior wall tie rod system
CN206571055U (en) A kind of attachment means of architectural engineering reinforcing bar and gear rack
CN204609205U (en) A kind of lattice metallic support framework
CN212452774U (en) Connecting joint at position of broken steel bar and immersed tube steel bar
CN206486997U (en) The inclined calibration bolt erecting device of steel structure node component hole
CN206373281U (en) Adjustable cutting ferrule steel strand cutter device
CN104790570B (en) The attachment structure of glass curtain wall and steel structure vertical keel and lateral keel
CN102758583A (en) Corner connector for connecting frame and frame
CN205047590U (en) Connect part
CN103111769A (en) Novel process method for reducing welding deformation of oil inlet and outlet of hydraulic oil cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20150205

EXPY Termination of patent right or utility model