CN101236640A - Predetermined plan management method - Google Patents

Predetermined plan management method Download PDF

Info

Publication number
CN101236640A
CN101236640A CNA2007101247586A CN200710124758A CN101236640A CN 101236640 A CN101236640 A CN 101236640A CN A2007101247586 A CNA2007101247586 A CN A2007101247586A CN 200710124758 A CN200710124758 A CN 200710124758A CN 101236640 A CN101236640 A CN 101236640A
Authority
CN
China
Prior art keywords
prediction scheme
predetermined plan
masterplate
management
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101247586A
Other languages
Chinese (zh)
Inventor
余玉丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN KEHAOINFO TECHNOLOGY Co Ltd
Original Assignee
SHENZHEN KEHAOINFO TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN KEHAOINFO TECHNOLOGY Co Ltd filed Critical SHENZHEN KEHAOINFO TECHNOLOGY Co Ltd
Priority to CNA2007101247586A priority Critical patent/CN101236640A/en
Publication of CN101236640A publication Critical patent/CN101236640A/en
Pending legal-status Critical Current

Links

Landscapes

  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention relates to a predetermined plan management method which comprises the following steps that: a serve side is provided with a predetermined plan management system based on a network access mode; the operation of the predetermined plan management is provided with an access authority, the user visits the predetermined plan management system through a public network or an internal network according to the authority of the user; an established predetermined plan is imported into the predetermined plan management system, or a predetermined plan template is used to make an on-line establishment to the predetermined plan; and the predetermined plan in the predetermined plan management system is retrieved and read. The predetermined plan management has the advantages that: the internalization management of the predetermined plan greatly improves the management efficiency of the predetermined plan; the templatization of the predetermined plan ensures that the establishment of the predetermined plan is more uniform, meets the national standard, and can also meet special requirements of various kinds of users; a 'text emergency predetermined plan' is converted into a 'digital emergency predetermined plan' with strong performability, which ensures that the predetermined plan is an emergency response plan capable of being directly used for rescuing.

Description

Predetermined plan management method
Technical field the present invention relates to be used for the data processing method in the emergent field of Emergent Public Events, particularly relates to the data processing method of prediction scheme.
Background technology is according to the requirement of state's laws, rules and policy document etc., all must formulate the emergency preplan of each key industry and enterprise from national level to area, national each province and city, the content of emergency preplan mainly relates to all kinds of Emergent Public Events such as safety in production, disaster.Present existing prediction scheme quantity reaches more than ten million.Because quantity is big, the distribution area is many, country for the management work of national each province and city and key enterprise's prediction scheme difficulty carry out, thereby the localized management principle is taked in the management work of prediction scheme basically, promptly manage prediction scheme separately separately, be generally papery text managemant or electronic document management.
The structure of prediction scheme mainly is to set up according to the establishment guide rule of existing overall prediction scheme of country and regulation at present, makes the overall prediction scheme of national level, provincial, and municipal level, the special prediction scheme of production and operation unit can form unified structure.Simultaneously by laws and regulations hard and fast rule enterprise establishment prediction scheme, organize expert's evaluation of having a meeting, and prediction scheme is carried out annual at least combat exercise, by summing up the operability of rehearsal reinforcement prediction scheme.
Existing predetermined plan management method generally is based on papery text or electronic document, adopts the prediction scheme plain text data to deposit and mail form transfer management, has access to or is to get text or find out document from computer hard disc and check from data bank when using prediction scheme; Or prediction scheme carried out data base administration as a kind of information database separately, the effect of prediction scheme and service efficiency are reduced greatly.
First, carry out the program management operating angle from administration and supervision authorities, if under the bigger situation of prediction scheme quantity, prediction scheme as the management of national emergency management and rescue command centre reaches more than ten million, mode by mail or document copying transmits prediction scheme, can employ great amount of manpower, inefficiency brings inconvenience and bears to management work.
Second, though the prediction scheme in district in all parts of the country can be write with reference to the establishment guide rule of existing overall prediction scheme of country and regulation, but still have a lot of industry prediction schemes and individual event prediction scheme not to have the standard can reference, therefore cause the prediction scheme structure of each enterprise of various places to vary, numerous prediction schemes all do not have complete structure, the entry required that has even lack prediction scheme.Owing to lack the relevant knowledge in the emergent field of safety, prediction scheme not to be understood yet, the prediction scheme practicality of writing out is also little.
The 3rd, the text prediction scheme of having write the just literal of a big piece of writing is piled up, when having an accident, few rescue personnel can go to browse the text prediction scheme, make the poor operability of prediction scheme, become one " being locked in the book in the drawer ", do not embody the essential of prediction scheme at all.Though there is pair prediction scheme to drill, also be the interlude as similar the acting in a play, " drama " finished writing in advance walked one time, the result is " drilling successfully " all the time, the experience that can sum up is very few.
The summary of the invention the technical problem to be solved in the present invention is to avoid above-mentioned the deficiencies in the prior art part and proposes a kind of predetermined plan management method, make the user can realize the centralized and unified management function of prediction scheme by the mode of network and database combination, carry out the standardization establishment of prediction scheme by network, decompose by prediction scheme, change the text prediction scheme of poor operability into executable digitizing prediction scheme.
The present invention solve the technical problem can be by realizing by the following technical solutions:
Propose a kind of predetermined plan management method of access mode Network Based, may further comprise the steps:
1. the program management system of access mode Network Based is installed in service end;
2. to the operation setting access rights of described program management system, the user is by public network or Intranet, visits described program management system according to user right;
The prediction scheme that 3. will weave imports the program management system, perhaps utilizes the online establishment prediction scheme of prediction scheme masterplate;
4. the prediction scheme in the program management system is retrieved and had access to.
Compare with prior art, beneficial effect of the present invention is:
1. the network management of emergency preplan has greatly improved the efficiency of management of prediction scheme, makes things convenient for the centralized and unified management of user for all kinds of prediction schemes, shortens the operation period that prediction scheme is worked out, reports, examines and issued; And stronger full-text search function can be provided, improved the speed that prediction scheme is had access to;
2. prediction scheme masterplateization makes more unified, the standard more of prediction scheme establishment, when meeting national standard, can satisfy the specific demand of all types of user again;
3. program management system, embody the management philosophy of " digitizing ", " text emergency preplan " changed into enforceability strong " digitizing emergency preplan ", making prediction scheme no longer is " being locked in the book in the drawer ", but can be directly used in the emergency disposal scheme of rescue, can also provide support for prevention, the preliminary work of accident simultaneously." digitizing " of prediction scheme is meant: (1) is carried out task with existing prediction scheme and is divided and separate, and is divided into the task (prevention, prepare, response, recover) of quadravalence section and every task is carried out resource distribution; (2) with the task structure processing, the task framework of cambium layer aggregated(particle) structure makes things convenient for task distributing in the process of implementation; (3) the prediction scheme attachment management is supported multimedia file, as damage sequence sunykatuib analysis result of calculation figure, plant area's planimetric map, dangerous matter sources AutoCAD figure, GIS figure, audio file, video file or the like.
Description of drawings
Fig. 1 is the process flow diagram of predetermined plan management method of the present invention;
Fig. 2 is the functional frame composition of program management system among the present invention.
Embodiment is described in further detail below in conjunction with the most preferred embodiment shown in the accompanying drawing.
Predetermined plan management method of the present invention may further comprise the steps:
1. the program management system of access mode Network Based is installed in service end;
2. to the operation setting access rights of described program management system, as general user and leading subscriber authority, the user is by public network or Intranet, visits described program management system according to user right;
The prediction scheme that 3. will weave imports the program management system, perhaps utilizes the online establishment prediction scheme of prediction scheme masterplate;
4. the prediction scheme in the program management system is retrieved and had access to.
The inventive method mainly embodies centralized and unified management, masterplate establishment and the digitizing notion of prediction scheme, in the good existing a large amount of prediction schemes at present of management, prediction scheme is carried out standardization, digitizing.
The program management flow process as shown in Figure 1, the described program management of User login system can make amendment/edit or newly-built prediction scheme compiling the text prediction scheme.Making amendment/edit or during newly-built prediction scheme, can import the prediction scheme of outside native system, finishing or select the prediction scheme masterplate to carry out prediction scheme text editing, after prediction scheme text editing is finished, the prediction scheme text can be carried out the prediction scheme digital management to compiling the text prediction scheme.The text prediction scheme is become digital prediction scheme.Text prediction scheme or digital prediction scheme are preserved, and carry out prediction scheme and report.Leading subscriber is had access to prediction scheme, the prediction scheme that reports is examined, and the prediction scheme that audit is passed through is issued and the prediction scheme statistical management.
The function structure of described program management system 100 comprises prediction scheme establishment 110 as shown in Figure 2, and program management 120 and prediction scheme masterplate are managed 130 3 functional modules.Wherein, prediction scheme establishment 110 comprises the auxiliary editor of prediction scheme essential information 111, prediction scheme text importing/editor 112, prediction scheme task/resource management 113, prediction scheme attachment management 114 and prediction scheme submodule 115 again; Program management 120 comprises that the prediction scheme additions and deletions change 121, prediction scheme has access to 122, prediction scheme reports 123, prediction scheme audit/issue 124 and prediction scheme statistical management submodule 125; Prediction scheme masterplate management 130 comprises that national standard prediction scheme masterplate 131, expert's standard prediction scheme masterplate 132, User Defined masterplate 133, the importing 134 of prediction scheme masterplate and masterplate additions and deletions change 135 submodules.
Described program management system 100 adopts B/S (Browser/Server) frameworks, multi-user management, and the keeper is the different authority of all types of user distribution.This program management system 100 can combine with other emergency system simultaneously, as the part by auxiliary editor 115 submodules of the prediction scheme in the prediction scheme compiling module 110 and prediction scheme execution module and the emergent platform of other being combined into one of emergency system.When having an accident, the user imports keyword and carries out prediction scheme from digitizing emergency preplan system 100 and mate fast, find out suitable prediction scheme, the user selects best prediction scheme to import its task and resource, through revising processing, generate emergency preplan, task/resource is distributed by the emergency management and rescue command system.After the prediction scheme upgrading, can also import the upgrading prediction scheme again, Merge Scenarios and task are to be fit to the demand of actual conditions.The emergency training exercise system can carry out supporting prediction scheme according to the prediction scheme in the program management system to be deduced, and basic procedure is identical with the rescue process of real event.
Specifically describe the technical scheme of present embodiment as follows in conjunction with the framework of the management process of prediction scheme and program management system:
One, in service end the program management system is installed, or integrated emergent platform.Wherein, integrated emergent platform comprises program management system, emergency management and rescue command system, damage sequence sunykatuib analysis system, emergency information management system and emergency training exercise system etc.The general user visits this system by public network or Intranet, carries out the series operation of prediction scheme, as the establishment of prediction scheme, search, revise, report etc.Leading subscriber can be examined, issue and statistics etc. the prediction scheme that domestic consumer reports.
Two, need write or report domestic consumer's login system of prediction scheme after, at first enter the prediction scheme compiling module, the essential information of prediction scheme inserted in newly-increased prediction scheme record.Essential information comprises: information such as prediction scheme title, prediction scheme numbering, prediction scheme version number, prediction scheme suitable application area, scope, classification, rank, risk object and/or prediction scheme summary, after the prediction scheme issue, also need insert information such as body release and/or date issued.
Three, general program management: after the general user enters described prediction scheme compiling module, can be directly the prediction scheme electronic document of working out outside described program management system be imported in this system in full; Perhaps select existing prediction scheme masterplate to carry out the prediction scheme authorized strength work.The annex of prediction scheme as annexes such as picture concerned, document or references, can import to and carry out Classification Management in the system.This moment, general emergency preplan authorized strength work was finished, and the user can report prediction scheme.
Four, digitizing program management: no matter be that the user or the user of newly-built prediction scheme who has prediction scheme can decompose prediction scheme, be divided into the task (prevention, preparation, response, recovery) of quadravalence section and every task is carried out resource distribution.But also structuring processing of task simultaneously, for example: earlier the prediction scheme task is divided into fire-fighting speedily carry out rescue work task groups, medical aid task groups, warning public security task groups etc., again with each task groups segmentation, as fire-fighting speedily carry out rescue work task groups be divided into the fire extinguishing task groups, leak stopping task groups, rescue people's task groups, detection task group or the like, be subdivided into each concrete executable task at last.Resource can be carried out overall arrangement, and the task of also can be each refinement is Resources allocation all.Prediction scheme when helping the accident generation after the task structureization is more carried out.The prediction scheme attachment management is supported multimedia file, as damage sequence sunykatuib analysis result of calculation figure, the figure of plant area, dangerous matter sources AutoCAD figure, GIS figure, audio file, video file or the like.Make " text prediction scheme " become " digital prediction scheme ", enforceability and practicality greatly improve.
Five, the prediction scheme masterplate comprises national standard prediction scheme masterplate, expert's standard prediction scheme masterplate and/or User Defined masterplate.The user can import the structure that has prediction scheme as the prediction scheme masterplate.
Six, the user can be by combining with damage sequence sunykatuib analysis system, emergency information management system and GIS (geographicinformation system) system, carry out the auxiliary editor of prediction scheme, for the establishment of the parts such as " figure of plant area " of " risk analysis " " responder " in the prediction scheme provides foundation.Can deposit analysis result figure, GIS figure and all kinds of information of searching in prediction scheme accessory information unified management as annex simultaneously.
Seven, after the prediction scheme establishment finished, domestic consumer can submit the prediction scheme of finishing to, perhaps selected the object that reports.Leading subscriber can be had access to this prediction scheme in the program management module, and examines, gives an written reply, agrees operations such as issue.Simultaneously leading subscriber also can be added up the prediction scheme in the prediction scheme storehouse, as press regional statistics, press the business enterprice sector statistics, presses days and add up or the like.Also dispose " problem escalation/feedback opinion " function simultaneously in " prediction scheme reports " submodule, make things convenient for and carry out information communication between domestic consumer and the leading subscriber, simultaneity factor also has information.
Eight, described program management system also comprises the prediction scheme execution module, and this module provides interface to realize the execution and the rehearsal function of prediction scheme by emergency management and rescue command system and emergency training exercise system.When having an accident, the user imports keyword and carries out prediction scheme from digitizing emergency preplan system and mate fast, find out suitable prediction scheme, the user selects best prediction scheme to import its task and resource, through revising processing, generate emergency preplan, task/resource is distributed by the emergency management and rescue command system.After the prediction scheme upgrading, can also import the upgrading prediction scheme again, Merge Scenarios and task are to be fit to the demand of actual conditions.The emergency training exercise system can carry out supporting prediction scheme according to the prediction scheme in the program management system to be deduced, and basic procedure is identical with the rescue process of real event.

Claims (6)

1. the predetermined plan management method of an access mode Network Based is characterized in that, may further comprise the steps:
1. the program management system of access mode Network Based is installed in service end;
2. to the operation setting access rights of described program management system, the user is by public network or Intranet, visits described program management system according to user right;
The prediction scheme that 3. will weave imports the program management system, perhaps utilizes the online establishment prediction scheme of prediction scheme masterplate;
4. the prediction scheme in the program management system is retrieved and had access to.
2. predetermined plan management method as claimed in claim 1 is characterized in that: described program management system comprises prediction scheme establishment, program management, three functional modules of prediction scheme masterplate management.
3. predetermined plan management method as claimed in claim 1 is characterized in that: described prediction scheme masterplate comprises national standard prediction scheme masterplate, expert's standard prediction scheme masterplate and/or User Defined masterplate.
4. predetermined plan management method as claimed in claim 2 is characterized in that: described prediction scheme establishment comprises the auxiliary editor of prediction scheme essential information, prediction scheme text importing/editor, prediction scheme task/resource management, prediction scheme attachment management and prediction scheme submodule again; Program management comprises that the prediction scheme additions and deletions change, prediction scheme is had access to, prediction scheme reports, prediction scheme is examined/issued and prediction scheme statistical management submodule; The management of prediction scheme masterplate comprises that national standard prediction scheme masterplate, expert's standard prediction scheme masterplate, User Defined masterplate, prediction scheme masterplate import and the masterplate additions and deletions change submodule.
5. predetermined plan management method as claimed in claim 1 is characterized in that: the user decomposes the prediction scheme in the described program management system, is divided into prevention, preparation, response and recovers the task of quadravalence section and at every task resource allocation.
6. predetermined plan management method as claimed in claim 1 is characterized in that: when having an accident, and the described program management of User login system, the input keyword carries out the quick retrieval of prediction scheme and has access to.
CNA2007101247586A 2007-11-26 2007-11-26 Predetermined plan management method Pending CN101236640A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101247586A CN101236640A (en) 2007-11-26 2007-11-26 Predetermined plan management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101247586A CN101236640A (en) 2007-11-26 2007-11-26 Predetermined plan management method

Publications (1)

Publication Number Publication Date
CN101236640A true CN101236640A (en) 2008-08-06

Family

ID=39920236

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101247586A Pending CN101236640A (en) 2007-11-26 2007-11-26 Predetermined plan management method

Country Status (1)

Country Link
CN (1) CN101236640A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103034926A (en) * 2012-12-07 2013-04-10 北京三博中自科技有限公司 Method and system of accident emergency informationalized management
CN105787851A (en) * 2016-03-01 2016-07-20 中国人民解放军第306医院 Special accident and damage plan deducing system
CN111061580A (en) * 2019-12-18 2020-04-24 中信百信银行股份有限公司 Computer system emergency plan drilling method, server and system
CN111523757A (en) * 2020-03-18 2020-08-11 北京易华录国际技术有限公司 Plan digital management system and method
CN113780785A (en) * 2021-09-01 2021-12-10 上海智眭科技有限公司 Plan management system and management method thereof
CN113780784A (en) * 2021-09-01 2021-12-10 上海智眭科技有限公司 Intelligent plan management system and management method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103034926A (en) * 2012-12-07 2013-04-10 北京三博中自科技有限公司 Method and system of accident emergency informationalized management
CN103034926B (en) * 2012-12-07 2016-08-31 北京三博中自科技有限公司 A kind of accident emergency informatization management method and system
CN105787851A (en) * 2016-03-01 2016-07-20 中国人民解放军第306医院 Special accident and damage plan deducing system
CN111061580A (en) * 2019-12-18 2020-04-24 中信百信银行股份有限公司 Computer system emergency plan drilling method, server and system
CN111061580B (en) * 2019-12-18 2023-09-08 中信百信银行股份有限公司 Computer system emergency plan exercise method, server and system
CN111523757A (en) * 2020-03-18 2020-08-11 北京易华录国际技术有限公司 Plan digital management system and method
CN113780785A (en) * 2021-09-01 2021-12-10 上海智眭科技有限公司 Plan management system and management method thereof
CN113780784A (en) * 2021-09-01 2021-12-10 上海智眭科技有限公司 Intelligent plan management system and management method thereof

Similar Documents

Publication Publication Date Title
CN103226743B (en) Aircraft equipment technology maturity based on TRL assesses information processing method
CN113392227B (en) Metadata knowledge graph engine system oriented to rail transit field
CN101236640A (en) Predetermined plan management method
CN104657903A (en) Compressive guarantee system for equipment based on IETM
CN105022769A (en) Data interaction system of urban underground pipeline, and method thereof
CN104572615A (en) Method and system for on-line case investigation processing
CN106447550A (en) MySQL based real estate sales management system
US20200334314A1 (en) Emergency disposal support system
CN104573885A (en) Auditing service working platform based on Internet cloud computing service function
CN112541748A (en) Engineering project management system based on BIM technology
CN103226779A (en) Road logistics price index
US20070244975A1 (en) System and methods for processing operating experience data
CN111427869A (en) Log system based on block chain
CN105225176B (en) Warrant basic information system
CN110858354A (en) Urban public safety service system
CN112148717A (en) Data resource management system for urban data middling station
CN101576981A (en) Scene-type service system
CN101571935A (en) Method, device and system for realizing intelligent traffic unified office platform
CN109284982A (en) Rural environmental problems Health Project management system
CN114238531A (en) Method and device for drawing mechanism resources
CN103927634B (en) Information resource ecological operation platform
Yan Research and design on integrated management system of digitalized emergency preplan
CN114493472A (en) System platform applied to uniform authority confirmation registration of natural resources
CN103136031A (en) Large-scale scene skill training simulation software of business model navigation
Guan et al. The design and development of a school file management system for standardized

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20080806