CN101227350A - System for parallel executing automatization test based on priority level scheduling and method thereof - Google Patents
System for parallel executing automatization test based on priority level scheduling and method thereof Download PDFInfo
- Publication number
- CN101227350A CN101227350A CNA2008100575978A CN200810057597A CN101227350A CN 101227350 A CN101227350 A CN 101227350A CN A2008100575978 A CNA2008100575978 A CN A2008100575978A CN 200810057597 A CN200810057597 A CN 200810057597A CN 101227350 A CN101227350 A CN 101227350A
- Authority
- CN
- China
- Prior art keywords
- test
- priority
- test case
- module
- case group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The invention discloses a parallel execution automation test system and a method which are based on priority scheduling, the system comprises a test plan module which is used to manage and draw up testing contents, an engineering topology configuring module which is used to topologically allocate test environment and manage the essential information of test environment, a test report and journal generating module for generating test journal and/or test report and a execution control module which is responsible for executing a plurality of test environment, and the invention also comprises an execution control management module, a connection execution control module, an engineering topology configuring module, a test report and journal generating module, a testing use case group with higher priority level which controls the execution control module to preferentially operate in test environment according to testing use case group, when the priority level is same, the relative testing use case group is operated in parallel. The invention greatly improves testing efficiency, which improves recourse utilization ratio, timely avoids ineffective test, and improves availability of test.
Description
Technical field
The present invention relates to the automatization testing technique in the communication technical field, particularly relate to a kind of system for parallel executing automatization test and method thereof based on priority scheduling.
Background technology
Along with the fast development of data communication industry, method of testing and means are also varied.Method of testing mainly is divided into manual test and automatic test two big classes at present.The advantage of manual test is flexible and changeable, and adaptability is more intense; Shortcoming is that repeatability is not strong, and randomness is bigger.When needing repeatedly retest, will seem uninteresting, dull for the substantive test task, and poor efficiency.Automatic test then is the developing direction of testing at present in the industry, for smoke test and regression test and large-scale various performance test the efficient more much higher than manual test is arranged all.
And existing various tester equipment, testing tool, tested also varied with data communications equipment, how can utilize automatization test system to manage that various testing equipments or testing tool test effectively to various systems under test (SUT) is a major issue of confronting faster and betterly, and this also is the automatic test key of success.
Traditional automatization test system, as shown in Figure 1, system 200 comprises: automatization test system management platform 100, equipment under test 91, testing equipment (or testing tool) 92.Wherein automatization test system management platform 100 comprises test case database management module 10, test case maintenance module 20, function library 30, test plan module 40, engineering topological arrangement module 50, testing engineering administration module 51 again, carries out control module 80, test report and daily record generation module 110.In such system, generate a test plan at every turn, form an engineering according to test plan, carry out the test case that control module 80 is gone to the performance of work the inside, obtain test log at last and form test report.
In such automatization test system, there is the following problem:
A1) usage ratio of equipment is not high.In a platform, be merely able to utilize simultaneously a cover test environment to test, can not utilize other idle test environment simultaneously.This has caused great waste to test resource.
A2) the test assignment execution cycle is long.Though automatic test is more faster than manual test, automatic test also needs spended time, particularly when test assignment is bigger.Need to test a function that beta version is all sometimes, at this time need the test case number carried out very huge, oepration at full load may be tested and reach some days time.When test assignment is pressed for time, obviously do not meet the demands, had a strong impact on the efficient of test.
A3) there is not association between each test macro.Have and have certain restricting relation in some systems under test (SUT) between each functional module.When some crucial module testing failure, it is just nonsensical that other module continues test.Such as when the test Routing Protocol, it at first is normal requiring three layer functions, and this is the necessary condition of Routing Protocol test, if at this time direct-connected three layer interfaces are all obstructed, the test of carrying out Routing Protocol again is just meaningless, has wasted valuable time.The work that at this time needs to do is in time to stop test, and reason searches problem.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of system for parallel executing automatization test and method thereof based on priority scheduling, be used for solving prior art usage ratio of equipment be not high when test automatically, the test assignment execution cycle long and test macro between do not have association and the problem of invalid test occurs.
To achieve these goals, the invention provides a kind of system for parallel executing automatization test based on priority scheduling, comprise the test plan module that is used to manage and formulate content measurement, be used for to test environment carry out the essential information of topological arrangement and management testing environment engineering topological arrangement module, be used to generate test log and/or test report test report and daily record generation module, be responsible for carrying out the execution control module of a plurality of described test environments; It is characterized in that, also comprise:
Carry out control management module, connect described execution control module, described engineering topological arrangement module, described test report and daily record generation module, be used for controlling described execution control module in the preferential higher test case group of running priority level of described test environment according to the priority of test case group, and when described priority is identical, the corresponding test case group of parallel running.
Described system for parallel executing automatization test based on priority scheduling, wherein, described execution control module further comprises:
Communication management module connects described execution control management module, be used for by with the executive process of described execution control management module Control on Communication test case group;
The test case Executive Module connects described communication management module, is used for being responsible for the execution work of described test case;
The test report log management module connects described test case Executive Module, is used to write down implementation, the execution result of current test case.
Described system for parallel executing automatization test based on priority scheduling, wherein, described execution control management module further comprises:
The task execution schedule module is used to manage, the scheduling of maintenance task formation;
The test environment administration module, connect described task execution schedule module, be responsible for telecommunication management with described test environment, safeguard, the described execution control module of monitoring, by the test result information that provides the task queue dispatching office to need to described task execution schedule module alternately with described test report and daily record generation module.
Described system for parallel executing automatization test based on priority scheduling, wherein, described test plan module is described test case set of dispense priority, and described test case component is fitted in each engineering according to the priority assignment principle, the test case component that priority is identical is fitted in the different engineerings, disposes corresponding topological environmental by described engineering topological arrangement module for each engineering again;
Described execution control management module is according to the priority of the test case group in each engineering, generate the test case group priority query of this test assignment, and control described execution control module according to the priority of described test case group and carry out described test case group.
Described system for parallel executing automatization test based on priority scheduling, wherein, described execution control module is taken out the highest test case group of priority to described execution control management module request for test task from described test case group priority query, and, carry out different disposal according to the command type that described execution control management module sends:
When command type was wait command, described execution control module entered wait state; Or
When command type when withdrawing from test command, described execution control module finishes this test, and empties task execution priority formation; Or
When command type is when agreeing the implementation of test cases order, described execution control module is carried out the highest test case group of this priority, and the test case group that this priority is the highest removes from described task execution priority formation, and the state of the test case group that this priority is the highest is set in the test.
Described system for parallel executing automatization test based on priority scheduling, wherein, described execution control management module is according to the test assignment of described execution control module request, inquire about described test case priority query, judge whether described test assignment is the highest test case group of priority, if not, then send wait command to described execution control module; If, further judge then whether the test case group that has a higher priority than described test assignment tests to finish, if test does not finish, then send wait command to described execution control module; If test finishes, judge further then whether the test case group that test finishes is passed through, if do not pass through, then send and withdraw from test command to described execution control module; If pass through, then send and agree the implementation of test cases order to described execution control module.
To achieve these goals, the present invention also provides a kind of parallel executing automatization method of testing based on priority scheduling, it is characterized in that, comprising:
Step 2, according to priority higher test case group of the preferential described test case group priority query's medium priority of operation in test environment of described test case group, and when described priority is identical, the corresponding test case group of parallel running;
Step 3 generates test log and/or test result according to test case group operation result.
Described parallel executing automatization method of testing based on priority scheduling wherein, in the described step 1, further comprises:
After distributing priority, dispose the step of corresponding topological environmental for each engineering according to described test case group.
Described parallel executing automatization method of testing based on priority scheduling wherein, in the described step 2, further comprises:
To the highest test case group of priority of from described test case group priority query, taking out, the request for test task, and, carry out the step of different disposal according to the command type of response described request:
When command type is wait command, enter wait state; Or
When command type when withdrawing from test command, finish this test, and empty task execution priority formation; Or
When command type is when agreeing the implementation of test cases order, carry out the highest test case group of this priority, and the test case group that this priority is the highest removes from described task execution priority formation, and the state of the test case group that this priority is the highest is set in the test.
Described parallel executing automatization method of testing based on priority scheduling wherein, in the described step 2, further comprises:
By inquiring about described test case priority query, judge whether current test assignment is the step of the highest test case group of priority;
If not, then sending wait command, indications etc. are to be tested; If, further judge then whether the test case group that has a higher priority than described current test assignment tests to finish, if test does not finish, then send wait command, indications etc. are to be tested; If test finishes, judge further then whether the test case group that test finishes is passed through, if do not pass through, then sends and withdraws from test command, and this test is withdrawed from indication; If pass through, then send and agree the implementation of test cases order, described current test assignment is carried out in indication.
Useful technique effect of the present invention:
Compared with prior art, the present invention proposes a kind of system for parallel executing automatization test and method thereof based on priority scheduling, it can be worked by a plurality of automatic test environment of parallel control simultaneously, has improved testing efficiency greatly, make full use of test resource, improved resource utilization; Executing the task and mutual restriction of the test environment of each parallel running in time avoided the generation of invalid test, improved the validity of test.Be embodied in following several aspect:
B1) usage ratio of equipment height.Can move at least one cover test environment of control simultaneously and test in a platform, each overlaps test environment can parallel running, carries out different scripts, can make full use of existing equipment.
B2) shortened the task execution cycle greatly.Because each test environment moves simultaneously, has improved testing efficiency greatly.
B3) be related between each test macro.The identical test case of they execution priorities simultaneously, when the high test case of priority was not complete, the test case of low priority can not be carried out.So just effectively avoid the invalid test of low priority test case, improved the validity of test.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Description of drawings
Fig. 1 is that the prior art neutral line is carried out automatization test system structural framing figure;
Fig. 2 is the structural framing figure that the present invention is based on the system for parallel executing automatization test of priority;
Fig. 3 is the structural framing figure that the present invention carries out control management module;
Fig. 4 is the structural framing figure that the present invention carries out control module;
Fig. 5 is the parallel executing automatization method of testing flow chart that the present invention is based on priority;
Fig. 6 is that the present invention carries out control flow chart;
Fig. 7 is that task of the present invention is carried out the control and management flow chart.
Embodiment
Below in conjunction with the drawings and specific embodiments technical scheme of the present invention is made further more detailed description.
As shown in Figure 2, be the structural framing figure that the present invention is based on the system for parallel executing automatization test of priority.This system 200 comprises: automatization test system management platform 100, equipment under test 91, testing equipment/testing tool 92.
Further, automatization test system management platform 100 comprises again: test case database management module 10, test case maintenance module 20, function library 30, test plan module 40, engineering topological arrangement module 50, engineering 60, execution control management module 70, execution control module 80, test report and daily record generation module 110.
Test case database management module 10 mainly is responsible for the management of test case library, guarantees the consistency of current test case version.
Test case maintenance module 20 mainly is responsible for editor, the maintenance of test case.
Engineering topological arrangement module 50 is responsible for each test environment is carried out topological arrangement, the essential information of management equipment under test 91, as the IP address of landing, physical address, port numbers sequence; The essential information of management testing equipment/testing tool 92, as IP address, slot number, the port numbers landed.
Carry out control management module 70, its function is to manage the operation of respectively carrying out control module 80.The preferential high test case (or test case group) of running priority level, when the high test case of priority (or test case group) when off-duty finishes, the test case of low priority (or test case group) can not be moved.Test case at the same level (or test case group) can parallel running.
Carry out control module 80, be responsible for the execution work of each concrete test environment, comprise: test case loads various Relational databases according to the execution flow process of subscribing when carrying out, carry out various types of script files, monitoring in the test case running, the judgement of test result, and by calling test report and daily record generation module 110 generation test log and/or test report.
Equipment under test 91, testing equipment/testing tool 92 have constituted test environment jointly.Execution control module 80 control equipment under tests 91, testing equipment/testing tool 92 go to carry out corresponding operation.Between control equipment under test 91 and the testing equipment/testing tool 92, and and carry out and carry out the mutual of data and command information between the control module 80.
Test report and daily record generation module 110 generate test log, and/or form test report after test is finished.
As shown in Figure 3, be the structural framing figure that the present invention carries out control management module.This figure has provided the structure of the important composition module-execution control management module 70 in the automatization test system, comprising: task execution schedule module 71, test environment administration module 72 two parts.
Task execution schedule module 71, the function of finishing are the scheduling of management, maintenance task formation.Whether the implementation status based on the priority of task and higher level's task, brother task decides current task to carry out.
Test environment administration module 72, be responsible for telecommunication management with each execution environment, safeguard, control and measuring carries out control module 80, is responsible for mutual with test report and daily record generation module 110, the test result information that provides the task queue dispatching office to need for task execution schedule module 71.
As shown in Figure 4, be the structural framing figure that the present invention carries out control module.This figure has provided the structure of the important composition module-execution control module 80 in the automatization test system, comprising: communication management module 81, test report log management module 82, test case Executive Module 83.
Test report log management module 82, the implementation of the current test case of responsible record, the result of execution, so that carry out 70 couples of results' of control management module inquiry, thus the executive process of control test case group.
Test case Executive Module 83 is responsible for the execution work of each test case.
As shown in Figure 5, be the parallel executing automatization method of testing flow chart that the present invention is based on priority.This flow process has been described the concrete implementation step that automatization test system is tested, specifically:
Step S501, engineering topological arrangement module 50 is distributed priority according to each test case group to the influence of other use-case group size, influence big priority height, influences little or does not have the priority that influences low.To each engineering, the topology of test case will be mated with this project in the same engineering with the test case component in the test plan.
In this step, distribution principle is that the test case component that priority is identical is fitted in the different engineerings.The test case that priority is identical just can operation simultaneously in different test environments like this.
Step S502, engineering topological arrangement module 50 is that engineering disposes corresponding topological environmental according to the test case group.
In this step, topological environmental comprises: essential information of topological structure, tester/testing tool essential information, equipment under test or the like.
Step S503 carries out control management module 70 generates this test assignment according to the test case group priority in each engineering test case group priority query.
In this step, preferentially carry out the formation front that comes that priority is high, and carry out the formation back that comes that priority is low.
Step S504, carry out control module 80 according to the test case group in the engineering to carrying out control management module 70 request for test tasks.
Step S505 carries out the test result that control management module 70 is inquired about higher priority test case group in the test case group priority queries, if test finishes and test result is passed through, the test case group that then can allow to ask is tested.
Step S506, carry out control management module 70 inquiry test case group priority queries, whether the priority of the test case group of inspection current request is the highest, if priority is the highest, and step S505 also passes through, and then carries out control management module 70 and can carry out request for test use-case group command to carrying out control module 80 transmissions.
Step S507, the corresponding test case script that execution control module 80 is called in the test case library carries out automatic test.
Step S508 carries out control module 80 and generates test log and/or test result.
As shown in Figure 6, be that the present invention carries out control flow chart.This flow process has been described in carrying out control module 80 test case based on priority and has been carried out flow process, specifically comprises:
Step S601, test case group priority query in the visit engineering.Judge that whether this priority query is empty, if priority query is not empty, then carries out step S602; If empty, then execution in step S606 withdraws from this test.
Step S602 takes out the highest test case group of priority to carrying out control management module 70 request for test tasks from test case group priority query.
Step S603 judges whether carry out control management module 70 sends this test case group command of agreement execution, if then change step S605 over to, otherwise enter step S604.
Step S604 judges that further the order that execution control management module 70 is sent is wait command or withdraws from test command;
Send wait command if carry out control management module 70, then carry out control module 80 and enter wait state, the wait value order of magnitude to be minute calculating, and enters step S602;
Withdraw from test command if execution control management module 70 is sent, then carry out control module 80 and finish these all tests, empty task execution priority formation, change step S606 over to.
Step S605 carries out this test case group, it is carried out the Priority Queues from task remove, and the state that is provided with is " carrying out ", and changes step S601 over to.
Step S606 withdraws from test.
As shown in Figure 7, be that task of the present invention is carried out the control and management flow chart.This flow process has been described a kind of parallel test case group management process based on priority, specifically comprises:
Step S701 generates test case group priority query.
Step S702, carrying out control module 80 is unit request for test task with the test case group.
Step S703, inquiry test case group priority query, whether the test assignment of current request is limit priority task in this priority query.If not the limit priority task then requires to carry out control module 80 and enters wait state; If the limit priority task then enters next step S704.
Step S704, whether the test case group that inquiry has a higher priority than the test assignment of current request is tested and is finished.If test does not finish, then require to carry out control module 80 and enter wait state; Finish if tested, then enter next step S705.
Step S705, whether the test case group with higher priority that inquiry has been finished is passed through.If do not pass through, then withdraw from this test, finish all tasks, finish test; If pass through, then agree to carry out this test case group.
Step S706, the state of this test case group is set to " in the test ".
But the present invention works simultaneously by a plurality of automatic test environment of parallel control in a unified automatization test system platform, has improved testing efficiency greatly, has improved resource utilization; Many covers test environment of each parallel running based on the priority mutual restriction, can in time be avoided a large amount of failures of test result and causes invalid test under the control of carrying out control module, thereby improves the efficient and the validity of automatic test.
Certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection range of the appended claim of the present invention.
Claims (10)
1. system for parallel executing automatization test based on priority scheduling, comprise the test plan module that is used to manage and formulate content measurement, be used for to test environment carry out the essential information of topological arrangement and management testing environment engineering topological arrangement module, be used to generate test log and/or test report test report and daily record generation module, be responsible for carrying out the execution control module of a plurality of described test environments; It is characterized in that, also comprise:
Carry out control management module, connect described execution control module, described engineering topological arrangement module, described test report and daily record generation module, be used for controlling described execution control module in the preferential higher test case group of running priority level of described test environment according to the priority of test case group, and when described priority is identical, the corresponding test case group of parallel running.
2. the system for parallel executing automatization test based on priority scheduling according to claim 1 is characterized in that, described execution control module further comprises:
Communication management module connects described execution control management module, be used for by with the executive process of described execution control management module Control on Communication test case group;
The test case Executive Module connects described communication management module, is used for being responsible for the execution work of described test case;
The test report log management module connects described test case Executive Module, is used to write down implementation, the execution result of current test case.
3. the system for parallel executing automatization test based on priority scheduling according to claim 2 is characterized in that, described execution control management module further comprises:
The task execution schedule module is used to manage, the scheduling of maintenance task formation;
The test environment administration module, connect described task execution schedule module, be responsible for telecommunication management with described test environment, safeguard, the described execution control module of monitoring, by the test result information that provides the task queue dispatching office to need to described task execution schedule module alternately with described test report and daily record generation module.
4. according to claim 1 or 2 or 3 described system for parallel executing automatization test based on priority scheduling, it is characterized in that, described test plan module is described test case set of dispense priority, and described test case component is fitted in each engineering according to the priority assignment principle, the test case component that priority is identical is fitted in the different engineerings, disposes corresponding topological environmental by described engineering topological arrangement module for each engineering again;
Described execution control management module is according to the priority of the test case group in each engineering, generate the test case group priority query of this test assignment, and control described execution control module according to the priority of described test case group and carry out described test case group.
5. the system for parallel executing automatization test based on priority scheduling according to claim 4, it is characterized in that, described execution control module is taken out the highest test case group of priority to described execution control management module request for test task from described test case group priority query, and, carry out different disposal according to the command type that described execution control management module sends:
When command type was wait command, described execution control module entered wait state; Or
When command type when withdrawing from test command, described execution control module finishes this test, and empties task execution priority formation; Or
When command type is when agreeing the implementation of test cases order, described execution control module is carried out the highest test case group of this priority, and the test case group that this priority is the highest removes from described task execution priority formation, and the state of the test case group that this priority is the highest is set in the test.
6. the system for parallel executing automatization test based on priority scheduling according to claim 5, it is characterized in that, described execution control management module is according to the test assignment of described execution control module request, inquire about described test case priority query, judge whether described test assignment is the highest test case group of priority, if not, then send wait command to described execution control module; If, further judge then whether the test case group that has a higher priority than described test assignment tests to finish, if test does not finish, then send wait command to described execution control module; If test finishes, judge further then whether the test case group that test finishes is passed through, if do not pass through, then send and withdraw from test command to described execution control module; If pass through, then send and agree the implementation of test cases order to described execution control module.
7. the parallel executing automatization method of testing based on priority scheduling is characterized in that, comprising:
Step 1 is test case set of dispense priority in each engineering, according to the priority generation test case group priority query of described test case group;
Step 2, according to priority higher test case group of the preferential described test case group priority query's medium priority of operation in test environment of described test case group, and when described priority is identical, the corresponding test case group of parallel running;
Step 3 generates test log and/or test result according to test case group operation result.
8. the parallel executing automatization method of testing based on priority scheduling according to claim 7 is characterized in that, in the described step 1, further comprises:
After distributing priority, dispose the step of corresponding topological environmental for each engineering according to described test case group.
9. according to claim 7 or 8 described parallel executing automatization method of testings, it is characterized in that, in the described step 2, further comprise based on priority scheduling:
To the highest test case group of priority of from described test case group priority query, taking out, the request for test task, and, carry out the step of different disposal according to the command type of response described request:
When command type is wait command, enter wait state; Or
When command type when withdrawing from test command, finish this test, and empty task execution priority formation; Or
When command type is when agreeing the implementation of test cases order, carry out the highest test case group of this priority, and the test case group that this priority is the highest removes from described task execution priority formation, and the state of the test case group that this priority is the highest is set in the test.
10. the parallel executing automatization method of testing based on priority scheduling according to claim 9 is characterized in that, in the described step 2, further comprises:
By inquiring about described test case priority query, judge whether current test assignment is the step of the highest test case group of priority;
If not, then sending wait command, indications etc. are to be tested; If, further judge then whether the test case group that has a higher priority than described current test assignment tests to finish, if test does not finish, then send wait command, indications etc. are to be tested; If test finishes, judge further then whether the test case group that test finishes is passed through, if do not pass through, then sends and withdraws from test command, and this test is withdrawed from indication; If pass through, then send and agree the implementation of test cases order, described current test assignment is carried out in indication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100575978A CN101227350B (en) | 2008-02-03 | 2008-02-03 | System for parallel executing automatization test based on priority level scheduling and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100575978A CN101227350B (en) | 2008-02-03 | 2008-02-03 | System for parallel executing automatization test based on priority level scheduling and method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101227350A true CN101227350A (en) | 2008-07-23 |
CN101227350B CN101227350B (en) | 2011-05-11 |
Family
ID=39859117
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100575978A Expired - Fee Related CN101227350B (en) | 2008-02-03 | 2008-02-03 | System for parallel executing automatization test based on priority level scheduling and method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101227350B (en) |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976221A (en) * | 2010-10-14 | 2011-02-16 | 北京航空航天大学 | Particle swarm taboo combination-based parallel test task dispatching method and platform |
CN102013993A (en) * | 2010-10-14 | 2011-04-13 | 中兴通讯股份有限公司 | Physical topology use management method and system |
CN102111801A (en) * | 2010-12-23 | 2011-06-29 | 北京宜富泰网络测试实验室有限公司 | Method and system for testing network management interface of third generation mobile communication network |
CN102135939A (en) * | 2011-03-30 | 2011-07-27 | 镇江睿泰信息科技有限公司 | Test case operation dispatching device and method |
CN102214139A (en) * | 2011-06-01 | 2011-10-12 | 北京航空航天大学 | Automatic test performance control and debugging method facing distributed system |
CN102238048A (en) * | 2011-07-19 | 2011-11-09 | 大唐移动通信设备有限公司 | Protocol consistency testing method and system |
CN102495804A (en) * | 2011-12-27 | 2012-06-13 | 创新科存储技术(深圳)有限公司 | Automatic software testing method |
CN102508775A (en) * | 2011-10-31 | 2012-06-20 | 彭勇 | Interactive automation test system |
CN102609352A (en) * | 2011-01-19 | 2012-07-25 | 阿里巴巴集团控股有限公司 | Parallel testing method and parallel testing server |
CN103024791A (en) * | 2012-12-28 | 2013-04-03 | 广州联正达通信科技股份有限公司 | Multi-service processing model and multi-service processing method in communication test system |
CN103092756A (en) * | 2013-01-08 | 2013-05-08 | 彭勇 | Interactive automated testing system and method thereof |
CN103838673A (en) * | 2014-03-05 | 2014-06-04 | 广东小天才科技有限公司 | Automatic testing method and device |
CN104731702A (en) * | 2013-12-23 | 2015-06-24 | 展讯通信(上海)有限公司 | Test system and service side thereof |
CN105119978A (en) * | 2015-07-21 | 2015-12-02 | 浪潮(北京)电子信息产业有限公司 | Metadata cluster parallel distribution processing method and metadata cluster parallel distribution processing system |
CN105471680A (en) * | 2015-12-09 | 2016-04-06 | 上海斐讯数据通信技术有限公司 | Network voice communication testing system and method |
CN105679375A (en) * | 2015-12-31 | 2016-06-15 | 浪潮(北京)电子信息产业有限公司 | Automatic test system of storage equipment, and method thereof |
CN105893263A (en) * | 2016-04-25 | 2016-08-24 | 北京智能综电信息技术有限责任公司 | Dispatching method for test tasks |
CN106021100A (en) * | 2016-05-12 | 2016-10-12 | 中国电子科技集团公司第四十研究所 | Test task operation scheduling method in support of parallel tests |
CN103092756B (en) * | 2013-01-08 | 2016-11-30 | 彭勇 | A kind of interactive automation test system and method thereof |
CN106815146A (en) * | 2016-12-27 | 2017-06-09 | 甘肃万维信息技术有限责任公司 | A kind of software automated testing system based on VBScript |
CN107462845A (en) * | 2017-07-28 | 2017-12-12 | 华南理工大学 | LED light product-derived electrical characteristic parameter single-station multi parameter intallingent test device and method |
CN108021516A (en) * | 2017-12-19 | 2018-05-11 | 联芸科技(杭州)有限公司 | The command scheduling management system and method for a kind of parallel memorizing media storage controller |
CN108154431A (en) * | 2018-01-17 | 2018-06-12 | 北京网信云服信息科技有限公司 | A kind of target raises condition processing method and device |
CN108459966A (en) * | 2018-03-21 | 2018-08-28 | 东软集团股份有限公司 | Dispatching method, device, equipment and the computer readable storage medium of test suite |
CN108763093A (en) * | 2018-06-01 | 2018-11-06 | 政采云有限公司 | A kind of automated testing method and system |
CN111356169A (en) * | 2018-12-20 | 2020-06-30 | 安立股份有限公司 | Mobile terminal testing device and test case extraction method thereof |
CN111611156A (en) * | 2020-04-28 | 2020-09-01 | 北京小米移动软件有限公司 | Function testing method, function testing apparatus, and computer-readable storage medium |
CN112597032A (en) * | 2020-12-26 | 2021-04-02 | 中国农业银行股份有限公司 | Test case maintenance method and device |
CN114285780A (en) * | 2021-12-23 | 2022-04-05 | 中国电子科技集团公司第十四研究所 | Radar network testing system and method based on priority queue |
CN114296890A (en) * | 2021-11-17 | 2022-04-08 | 宁波三星智能电气有限公司 | Service processing method and power terminal applying same |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6643607B1 (en) * | 1999-11-30 | 2003-11-04 | Agilent Technologies, Inc. | Monitoring system and method implementing automatic testing with a smart scanning algorithm |
CN1302641C (en) * | 2004-04-16 | 2007-02-28 | 华为技术有限公司 | Method and appatatus for processing wide band device fault positioning requesting |
CN100536414C (en) * | 2007-07-04 | 2009-09-02 | 中兴通讯股份有限公司 | Automatic test system and method based on network stack system |
-
2008
- 2008-02-03 CN CN2008100575978A patent/CN101227350B/en not_active Expired - Fee Related
Cited By (48)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102013993B (en) * | 2010-10-14 | 2014-06-11 | 中兴通讯股份有限公司 | Physical topology use management method and system |
CN102013993A (en) * | 2010-10-14 | 2011-04-13 | 中兴通讯股份有限公司 | Physical topology use management method and system |
CN101976221A (en) * | 2010-10-14 | 2011-02-16 | 北京航空航天大学 | Particle swarm taboo combination-based parallel test task dispatching method and platform |
CN101976221B (en) * | 2010-10-14 | 2012-12-19 | 北京航空航天大学 | Particle swarm taboo combination-based parallel test task dispatching method and platform |
CN102111801A (en) * | 2010-12-23 | 2011-06-29 | 北京宜富泰网络测试实验室有限公司 | Method and system for testing network management interface of third generation mobile communication network |
CN102111801B (en) * | 2010-12-23 | 2013-08-21 | 北京宜富泰网络测试实验室有限公司 | Method and system for testing network management interface of third generation mobile communication network |
CN102609352A (en) * | 2011-01-19 | 2012-07-25 | 阿里巴巴集团控股有限公司 | Parallel testing method and parallel testing server |
CN102609352B (en) * | 2011-01-19 | 2014-11-19 | 阿里巴巴集团控股有限公司 | Parallel testing method and parallel testing server |
CN102135939A (en) * | 2011-03-30 | 2011-07-27 | 镇江睿泰信息科技有限公司 | Test case operation dispatching device and method |
CN102135939B (en) * | 2011-03-30 | 2014-01-22 | 镇江睿泰信息科技有限公司 | Test case operation dispatching device and method |
CN102214139A (en) * | 2011-06-01 | 2011-10-12 | 北京航空航天大学 | Automatic test performance control and debugging method facing distributed system |
CN102214139B (en) * | 2011-06-01 | 2013-11-27 | 北京航空航天大学 | Automatic test performance control and debugging method facing distributed system |
CN102238048A (en) * | 2011-07-19 | 2011-11-09 | 大唐移动通信设备有限公司 | Protocol consistency testing method and system |
CN102238048B (en) * | 2011-07-19 | 2015-06-03 | 大唐移动通信设备有限公司 | Protocol consistency testing method and system |
CN102508775A (en) * | 2011-10-31 | 2012-06-20 | 彭勇 | Interactive automation test system |
CN102495804A (en) * | 2011-12-27 | 2012-06-13 | 创新科存储技术(深圳)有限公司 | Automatic software testing method |
CN103024791A (en) * | 2012-12-28 | 2013-04-03 | 广州联正达通信科技股份有限公司 | Multi-service processing model and multi-service processing method in communication test system |
CN103024791B (en) * | 2012-12-28 | 2015-07-01 | 广州联正达通信科技股份有限公司 | Multi-service processing model and multi-service processing method in communication test system |
CN103092756A (en) * | 2013-01-08 | 2013-05-08 | 彭勇 | Interactive automated testing system and method thereof |
CN103092756B (en) * | 2013-01-08 | 2016-11-30 | 彭勇 | A kind of interactive automation test system and method thereof |
CN104731702A (en) * | 2013-12-23 | 2015-06-24 | 展讯通信(上海)有限公司 | Test system and service side thereof |
CN104731702B (en) * | 2013-12-23 | 2017-12-26 | 展讯通信(上海)有限公司 | Test system and its service end |
CN103838673A (en) * | 2014-03-05 | 2014-06-04 | 广东小天才科技有限公司 | Automatic testing method and device |
CN105119978B (en) * | 2015-07-21 | 2019-05-24 | 浪潮(北京)电子信息产业有限公司 | A kind of parallel distribution processing method of metadata cluster and system |
CN105119978A (en) * | 2015-07-21 | 2015-12-02 | 浪潮(北京)电子信息产业有限公司 | Metadata cluster parallel distribution processing method and metadata cluster parallel distribution processing system |
CN105471680A (en) * | 2015-12-09 | 2016-04-06 | 上海斐讯数据通信技术有限公司 | Network voice communication testing system and method |
CN105679375A (en) * | 2015-12-31 | 2016-06-15 | 浪潮(北京)电子信息产业有限公司 | Automatic test system of storage equipment, and method thereof |
CN105893263A (en) * | 2016-04-25 | 2016-08-24 | 北京智能综电信息技术有限责任公司 | Dispatching method for test tasks |
CN105893263B (en) * | 2016-04-25 | 2018-08-03 | 北京智能综电信息技术有限责任公司 | A kind of test assignment dispatching method |
CN106021100B (en) * | 2016-05-12 | 2018-12-04 | 中国电子科技集团公司第四十一研究所 | A kind of test assignment traffic control method for supporting concurrent testing |
CN106021100A (en) * | 2016-05-12 | 2016-10-12 | 中国电子科技集团公司第四十研究所 | Test task operation scheduling method in support of parallel tests |
CN106815146A (en) * | 2016-12-27 | 2017-06-09 | 甘肃万维信息技术有限责任公司 | A kind of software automated testing system based on VBScript |
CN107462845A (en) * | 2017-07-28 | 2017-12-12 | 华南理工大学 | LED light product-derived electrical characteristic parameter single-station multi parameter intallingent test device and method |
CN107462845B (en) * | 2017-07-28 | 2019-12-24 | 华南理工大学 | Single-station multi-parameter intelligent testing method for electrical characteristic parameters of LED light source product |
CN108021516A (en) * | 2017-12-19 | 2018-05-11 | 联芸科技(杭州)有限公司 | The command scheduling management system and method for a kind of parallel memorizing media storage controller |
CN108154431B (en) * | 2018-01-17 | 2021-07-06 | 北京网信云服信息科技有限公司 | Target recruitment state processing method and device |
CN108154431A (en) * | 2018-01-17 | 2018-06-12 | 北京网信云服信息科技有限公司 | A kind of target raises condition processing method and device |
CN108459966A (en) * | 2018-03-21 | 2018-08-28 | 东软集团股份有限公司 | Dispatching method, device, equipment and the computer readable storage medium of test suite |
CN108459966B (en) * | 2018-03-21 | 2021-11-16 | 东软集团股份有限公司 | Method, device and equipment for scheduling test components and computer readable storage medium |
CN108763093A (en) * | 2018-06-01 | 2018-11-06 | 政采云有限公司 | A kind of automated testing method and system |
CN111356169A (en) * | 2018-12-20 | 2020-06-30 | 安立股份有限公司 | Mobile terminal testing device and test case extraction method thereof |
CN111356169B (en) * | 2018-12-20 | 2023-06-23 | 安立股份有限公司 | Mobile terminal test device and test case extraction method thereof |
CN111611156A (en) * | 2020-04-28 | 2020-09-01 | 北京小米移动软件有限公司 | Function testing method, function testing apparatus, and computer-readable storage medium |
CN111611156B (en) * | 2020-04-28 | 2024-01-30 | 北京小米移动软件有限公司 | Function test method, function test device, and computer-readable storage medium |
CN112597032A (en) * | 2020-12-26 | 2021-04-02 | 中国农业银行股份有限公司 | Test case maintenance method and device |
CN114296890A (en) * | 2021-11-17 | 2022-04-08 | 宁波三星智能电气有限公司 | Service processing method and power terminal applying same |
CN114285780A (en) * | 2021-12-23 | 2022-04-05 | 中国电子科技集团公司第十四研究所 | Radar network testing system and method based on priority queue |
CN114285780B (en) * | 2021-12-23 | 2023-12-15 | 中国电子科技集团公司第十四研究所 | Radar network testing system and testing method based on priority queue |
Also Published As
Publication number | Publication date |
---|---|
CN101227350B (en) | 2011-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101227350B (en) | System for parallel executing automatization test based on priority level scheduling and method thereof | |
CN101727389B (en) | Automatic test system and method of distributed integrated service | |
Ammar et al. | Time scale decomposition of a class of generalized stochastic Petri net models | |
CN102768642B (en) | A kind of LINUX kernel reliability evaluating system and method analyzed based on source code | |
CN103502942A (en) | Virtual machine administration device, virtual machine administration method, and program thereof | |
CN101090295A (en) | Test system and method for ASON network | |
CN106021111A (en) | Interface testing method and system | |
CN105574082A (en) | Storm based stream processing method and system | |
CN105071994B (en) | A kind of mass data monitoring system | |
CN101819529A (en) | System and method for realizing visual development of workflow task interface | |
CN105162646A (en) | Multi-protocol interface test system and method | |
CN102750301A (en) | Blueprint generating method for integrated avionic system model aiming at architecture analysis and design language (AADL) description | |
CN103473642A (en) | Method for rule engine for production dispatching | |
CN102929899A (en) | Distributed reporting system based on intermediate table | |
CN102194018A (en) | System and method for predictive analysis of energy consumption of building based on cloud computing | |
CN109769016A (en) | A kind of the Multi-task Concurrency meter register method and device, system of intelligent meter data recording system | |
CN112581080A (en) | Lightweight distributed workflow engine construction system | |
CN104881730A (en) | Boiler virtual prototype collaborative design system and method based on workflow | |
CN114385126B (en) | K8 s-based multi-tenant deep learning model research and development system and method | |
CN202083936U (en) | DNC network system | |
Huang | Modeling of software partition for distributed real-time applications | |
CN101114930A (en) | Service tracing method and tracing equipment and system | |
Lin et al. | Research on building an innovative electric power marketing business application system based on cloud computing and microservices architecture technologies | |
CN103441895A (en) | Automatic cipher machine test system and working method thereof | |
CN116823316A (en) | Service center for electric power marketing service and construction method of service center |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20180203 |
|
CF01 | Termination of patent right due to non-payment of annual fee |