CN101225658B - 一种软土地基的加固方法 - Google Patents

一种软土地基的加固方法 Download PDF

Info

Publication number
CN101225658B
CN101225658B CN2008100184989A CN200810018498A CN101225658B CN 101225658 B CN101225658 B CN 101225658B CN 2008100184989 A CN2008100184989 A CN 2008100184989A CN 200810018498 A CN200810018498 A CN 200810018498A CN 101225658 B CN101225658 B CN 101225658B
Authority
CN
China
Prior art keywords
vacuum
electric osmose
pipe
associating
soft soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100184989A
Other languages
English (en)
Other versions
CN101225658A (zh
Inventor
张志铁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2008100184989A priority Critical patent/CN101225658B/zh
Publication of CN101225658A publication Critical patent/CN101225658A/zh
Application granted granted Critical
Publication of CN101225658B publication Critical patent/CN101225658B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种软土地基的加固方法,它包括:a、低位真空自载联合预压首先对场地软土一次加固;b、真空预压电渗法对场地软土二次加固;c、真空电渗降水对泥封层加固和d、振动碾压,平整场地。本发明不仅适用于以超细颗粒为主且固结系数极小的流泥,淤泥及淤泥质土地基,而且特别适用于场地对强度及变形要求高但场地为灵敏度高的饱和软粘土及不宜采用强夯进行动力挤密加固的超软土地基的加固工程,为此类软土地基的快速、高效、高质量加固提供了性价比很高的处理方法。

Description

一种软土地基的加固方法
技术领域
本发明涉及一种高效且性价比很高的大面积疏竣吹填场地的深层综合加固方法,尤其是一种以超细颗粒为主且固结系数极小的流泥、淤泥及淤泥质土地基的加固方法,特别适用于场地对强度及变形要求高但场地为灵敏度高的饱和软粘土及不宜采用强夯进行动力挤密加固的超软土地基的加固方法,具体地说是一种基于双真空预压联合电渗法的软土地基的加固方法。
背景技术
众所周知,真空预压法自80年代以来在我国已得到广泛应用,是一种既成熟又行之有效的软土地基处理方法,但该方法存在以下缺点和不足:(1)经真空预压加固的软土地基强度指标低。其场地承载力不超过80kPa;(2)当场地土是以固结系数极小的超细颗粒为主的清淤泥浆吹填而成时,一方面为了使疏浚泥浆在80kPa真空负压作用下达到足够的固结指标将要花费较长的抽真空时间,另一方面,作为竖向排水体系的塑料排水板因超细颗粒组成的疏浚泥浆对排水板严重的涂抹作用使有效抽真空时间锐减这一对矛盾将不可避免发生,严重影响了此类方法的加固效果。
发明内容
本发明的目的是针对现有的真空预压法处理软土地基时存在的效果差、周期长的问题,发明一种基于双真空预压联合电渗的软土地基的加固方法。
本发明的技术方案是:
一种软土地基的加固方法,其特征是采用低位真空自载联合预压和低位真空预压联合电渗相结合对场地软土进行固结处理,最后采用真空电渗联合降水加固泥封层直至地面泛白,电渗管周边开裂即可进行振动碾压和场地平整。
所述的低位真空自载联合预压步骤包括先筑围堰(1),插塑料排水板(2),铺真空水平管网(3),安装真空系统(5)和吹泥封层(6),其中吹泥封层的厚度为1.2~2.0m以保证泥浆失水收缩后的厚度保持在0.8~1.5m之间,低位真空自载联合预压开始,安装真空系统是指在场地工作面上铺设水平干管和支管,并使塑料排水板(2)和支管相连,支管与干管相连,干管和集水井相连,集水井和真空泵相连,低位真空预压的抽真空时间为30~50天。
所述的低位真空预压联合电渗步骤包括在塑料排水板(2)的内侧、泥面上竖插电渗管(6)和安装智能电渗仪(7),同时使采用直径为25~30毫米的钢筋作为电渗管,将其竖插在塑料排水板外侧,电渗管(6)之间用铝棒相连后和智能电渗仪(7)的正负极相连形成直流回路,真空预压联合电渗时间为20~25天。
所述的真空电渗联合降水加固包括在经过低位真空预压联合电渗处理后的泥面上、电渗管(6)的内侧竖设复合井点管(10),复合井点管(10)应贯穿泥封层,并使其和横置的连接管相连,连接管和集水总管连接,使集水总管和总管相连,总管和真空系统(9)连接,真空电渗联合降水12~15天直至地面泛白,电渗管(6)周边开裂即可。
本发明的有益效果:
本发明除了真空预压法的优点外,还具有以下优点:
本发明引入了低位真空预压联合电渗法对软土地基加固,使被加固的场地软土的固结指标高,经实际工程验证,工法中加入电渗后,虽造价提高20%~30%,但固结指标却提高60%~80%,性价比高。
在真空预压法的抽真空过程中,由于电渗(电泳)力的加入,大大改善了作为坚向排水系统的塑料排水板因涂抹作用造成的“死板”现象,提高了工法的加固效果。
本发明适用于以超细颗粒为主且固结系数极小的流泥,淤泥及淤泥质土地基,特别适用于场地对强度及变形要求高但场地为灵敏度高的饱和软粘土及不宜采用强夯进行动力挤密加固的超软土地基的加固工程,为此类软土地基的快速、高效、高质量加固提供了性价比很高的处理方法。
附图说明
图1是本发明加固过程中相关设备的安装位置剖视结构示意图。
图2是本发明的复合井点管的结构示意图。
图3是本发明的电渗管与塑料排水板在地下的布置图,图3中“。”为电渗管,“×”为塑料排水板。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
如图1、2、3所示。
一种软土地基的加固方法,包括以下步骤:
1、低位真空自载联合预压对场地软土作一次加固。
参见图1,先筑围堰1,插塑料排水板2,铺真空水平管网3,安装真空系统5,吹泥封层4,泥封层厚1.2~2.0m(以保证泥浆失水收缩后厚度在0.8~1.5m左右),低位真空预压(自载联合)开始。安装真空系统5是指在场地工作面上铺设水平干管和支管,塑料排水板和支管相连,支管连接干管,干管和集水井相连,集水井和真空泵相连。低位真空预压的抽真空时间一般为30~50天。
2、低位真空预压联合电渗法对场地软土作二次加固。
在塑料排水板2的内侧,泥面上竖插电渗管6,安装智能电渗仪7(可采用中国专利ZL200620077083.5所公开的技术加以实现),真空预压联合电渗法开始前应先在塑料排水板外侧布置直径为25~30毫米的钢筋作为电渗管,电渗管之间用铝棒及相应的夹紧件相连后和智能电渗仪7的正负极相连形成直流回路,一切就绪,真空预压联合电渗即可开始,其时间一般20-25天,真空预压即可结束3
3、对泥封层作真空电渗联合降水加固
在真空预压联合电渗20-25天、真空预压结束后即可在泥面上,在电渗管的内侧竖设图2所示的高效复合井点管10,图2中a为直径32mm,长500mm左右的短钢管,b为打有小孔的滤头,c为短钢管封头,d为塑料排水板,其端部封死。复合井点管10应贯穿泥封层,其间距为2倍竖向排水系统(塑料排水板)的间距,即1.6~2.4m,它和许多条横置的连接管相连,连接管可用41mm×51mm×40mm内含螺旋形钢丝的透明尼龙管,连接管和集水总管连接,集水总管可采用直径为63mm的PVC管,节间用与之配套的专用接头连接,并用三通将集水总管和总管相连,总管和真空系统9连接,真空电渗降水周期一般为12-15天,当地面泛白,电渗管周边开裂,真空电渗降水即可结束。
4、铺设30~50cm厚的土工复合填料层8后,振动碾压,平整场地即可。
本发明的加固原理:
A、泥封层以下的场地软土的加固机理:
(1)泥封层以下的场地超软土在80kPa真空负压及泥封层的自载预压荷载的共同作用下,将绝大部分自由水和部分孔隙水经塑料排水板排出,土体得到一次固结;
(2)经一次固结的场地土又在真空负压、电渗力和烘烤等共同作用下,将大部分孔隙水经塑料排水板排出,使土体达到超固结;
B、泥封层超软土的加固机理:
(1)泥封层在真空电渗降水的联合作用下,土体含水量大幅度下降至振动碾压不产生橡皮土的要求;
(2)经降水后的泥封层在振动碾压的动力挤密下,使土体孔隙比大幅度降低,最终使泥封层超软土达到超固结。
本发明所涉及的有关连接管和集水总管及总管的尺寸仅仅为一个示例,任何人均可根据本发明所公开的方法采用不同规格尺寸的零部件加以实现。
本发明未涉及部分均与现有技术相同或可采用现有技术加以实现。

Claims (1)

1.一种软土地基的加固方法,其特征是采用低位真空自载联合预压和低位真空预压联合电渗相结合对场地软土进行固结处理,最后采用真空电渗联合降水加固泥封层直至地面泛白,电渗管周边开裂即可进行振动碾压和场地平整;其中:
所述的低位真空自载联合预压步骤包括先筑围堰(1),插塑料排水板(2),铺真空水平管网(3),安装真空系统(5)和吹泥封层(6),其中吹泥封层的厚度为1.2~2.0m以保证泥浆失水收缩后的厚度保持在0.8~1.5m之间,低位真空自载联合预压开始,安装真空系统是指在场地工作面上铺设水平干管和支管,并使塑料排水板(2)和支管相连,支管与干管相连,干管和集水井相连,集水井和真空泵相连,低位真空自载联合预压的抽真空时间为30~50天;
所述的低位真空预压联合电渗步骤包括在塑料排水板(2)的内侧、泥面上竖插电渗管(6)和安装智能电渗仪(7),同时使采用直径为25~30毫米的钢筋作为电渗管,将其竖插在塑料排水板外侧,电渗管(6)之间用铝棒相连后和智能电渗仪(7)的正负极相连形成直流回路,低位真空预压联合电渗时间为20~25天;
所述的真空电渗联合降水加固包括在经过低位真空预压联合电渗处理后的泥面上、电渗管(6)的内侧竖设复合井点管(10),复合井点管(10)应贯穿泥封层,并使其和横置的连接管相连,连接管和集水总管连接,使集水总管和总管相连,总管和真空系统(9)连接,真空电渗联合降水12~15天直至地面泛白,电渗管(6)周边开裂即可。
CN2008100184989A 2008-02-18 2008-02-18 一种软土地基的加固方法 Expired - Fee Related CN101225658B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100184989A CN101225658B (zh) 2008-02-18 2008-02-18 一种软土地基的加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100184989A CN101225658B (zh) 2008-02-18 2008-02-18 一种软土地基的加固方法

Publications (2)

Publication Number Publication Date
CN101225658A CN101225658A (zh) 2008-07-23
CN101225658B true CN101225658B (zh) 2010-06-09

Family

ID=39857838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100184989A Expired - Fee Related CN101225658B (zh) 2008-02-18 2008-02-18 一种软土地基的加固方法

Country Status (1)

Country Link
CN (1) CN101225658B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101787691B (zh) * 2010-03-04 2011-04-27 张志铁 真空电动力学复合强化土壤修复方法
CN102296590A (zh) * 2011-06-09 2011-12-28 宁波高新区围海工程技术开发有限公司 超软地基的高强度加固方法
CN102392439A (zh) * 2011-11-11 2012-03-28 河海大学 一种防治土体液化对上部结构物影响的电渗法保护方法
CN102535432B (zh) * 2011-12-26 2014-04-09 河海大学 一种真空-电渗-堆载联合加固软基的系统和方法
CN102535431B (zh) * 2012-03-14 2014-09-17 天津港(集团)有限公司 吹填超软土地基表层硬壳快速形成方法和实现该方法的装置
CN103510504B (zh) * 2012-06-15 2015-11-18 中国石油化工股份有限公司 高饱和不均匀吹填土地基处理方法
CN102888835A (zh) * 2012-10-24 2013-01-23 天津大学 二次覆泥密封抽真空加固吹填土方法
CN104790372B (zh) * 2015-04-28 2017-05-10 上海大学 一种振动‑压气‑真空联合地基加固系统和方法
CN108118684B (zh) * 2017-11-28 2023-06-16 浙江大学城市学院 一种滩涂围垦吹填淤泥夹砂层地基加固结构及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1884707A (zh) * 2006-07-11 2006-12-27 叶吉 真空电渗降水及低能量强夯综合加固软土地基的方法
CN1932165A (zh) * 2006-09-01 2007-03-21 叶凝雯 大面积软地基处理分层分遍电渗降水联合真空降水方法
CN101078207A (zh) * 2007-06-15 2007-11-28 张志铁 疏浚泥浆直接筑堤法
CN101100852A (zh) * 2007-08-06 2008-01-09 张志铁 双真空自载预压及土工复合填料低能量强夯加固软土的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1884707A (zh) * 2006-07-11 2006-12-27 叶吉 真空电渗降水及低能量强夯综合加固软土地基的方法
CN1932165A (zh) * 2006-09-01 2007-03-21 叶凝雯 大面积软地基处理分层分遍电渗降水联合真空降水方法
CN101078207A (zh) * 2007-06-15 2007-11-28 张志铁 疏浚泥浆直接筑堤法
CN101100852A (zh) * 2007-08-06 2008-01-09 张志铁 双真空自载预压及土工复合填料低能量强夯加固软土的方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李昌宁.真空-堆土堆载联合预压软基加固技术及其应用研究.铁路客运专线建设技术交流会论文集.2005,427-433. *
盛崇文.土的加固技术-第五讲 真空预压和电渗预压.水运工程.1984,56-58. *

Also Published As

Publication number Publication date
CN101225658A (zh) 2008-07-23

Similar Documents

Publication Publication Date Title
CN101225658B (zh) 一种软土地基的加固方法
CN101245592A (zh) 基于真空电渗复合预压法的软土地基加固方法
CN100516373C (zh) 双真空自载预压及土工复合填料低能量强夯加固软土的方法
CN100516375C (zh) 双真空预压及动力挤密法联合加固软土地基方法
CN100549303C (zh) 深层软土地基加固方法
CN101831902B (zh) 软土地基工后不留排水通道的排水固结方法
CN1884708A (zh) 双真空自载联合预压及动力挤密综合加固软土地基的方法
WO2008064550A1 (fr) Procédé d'informations combiné avec une consolidation dynamique et un drainage sous vide pour le renforcement d'un terrain au sol meuble
CN101016739A (zh) 真空电渗降水及低能量强夯的深层加固方法
CN103866759A (zh) 一种增压式真空预压联合电渗加固软土地基的方法
CN205012315U (zh) 一种挤压真空软土地基处理装置
CN102535519A (zh) 地下连续墙工字钢接头结构及其施工方法
CN101748721A (zh) 大面积软土地基“复式负压固结”处理方法
CN102817355B (zh) 一种真空电渗联合预压软土地基的简易加固方法
CN102776877B (zh) 超软土地基梯级真空排水固结方法
CN100572688C (zh) 预排水动力固结加固软土地基的方法
CN1821492A (zh) 双控动力固结处理软地基的方法
CN101225654A (zh) 吹填土地基处理方法及其注气排水装置
CN103790151A (zh) 一种软土路基排水预压后封堵结构及施工方法
CN102733370A (zh) 真空-堆载联合预压加固软土地基新方法
CN107401163B (zh) 一种用于消减管桩负摩阻力的施工方法
CN203307829U (zh) 一种用于地下工程防水设施的外盲沟
CN1884707A (zh) 真空电渗降水及低能量强夯综合加固软土地基的方法
CN110005144A (zh) 一种适用于上盖开发的排水立管结构及其设置方法
CN101748749B (zh) 预制装配式预应力地下连续墙及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100609

Termination date: 20150218

EXPY Termination of patent right or utility model