CN101222352B - Topological diagram indication method in telecommunication network guard system - Google Patents

Topological diagram indication method in telecommunication network guard system Download PDF

Info

Publication number
CN101222352B
CN101222352B CN2007100012653A CN200710001265A CN101222352B CN 101222352 B CN101222352 B CN 101222352B CN 2007100012653 A CN2007100012653 A CN 2007100012653A CN 200710001265 A CN200710001265 A CN 200710001265A CN 101222352 B CN101222352 B CN 101222352B
Authority
CN
China
Prior art keywords
entity
interface
atom
link
annex
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100012653A
Other languages
Chinese (zh)
Other versions
CN101222352A (en
Inventor
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2007100012653A priority Critical patent/CN101222352B/en
Publication of CN101222352A publication Critical patent/CN101222352A/en
Application granted granted Critical
Publication of CN101222352B publication Critical patent/CN101222352B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a method for realizing the display of topology in the telecommunication network management system, comprising the following: step S102, wherein an equipment entity and an accessory entity of the equipment entity are generated; step S104, wherein an entity data model is generated according to the equipment entity and the accessory entity of the equipment entity and corresponding link processing is conducted; and step S106, wherein the equipment entity is displayed according to the entity data model. Upon the application of the invention, a more simple and practical topology display in the telecommunication network management system than ILOG and the telecommunication network management system topology is improved in efficiency and performance.

Description

The implementation method that topological diagram shows in the telecom network management system
Technical field
The present invention relates to the communications field, and especially, relate to the implementation method that topological diagram shows in a kind of telecom network management system.
Background technology
Topological diagram is the structural relation of coming display network in the mode of figure, and in telecom network management system, topological diagram is used to show level and the annexation between the telecommunication apparatus management object.
In order to demonstrate the topological diagram of network intuitively on the interface, the method for taking usually in the telecom network management system of each equipment company exploitation at present is exactly that the topological diagram of external ILOG company is introduced network management system, and own exploitation does not separately almost have.The international telecommunication standard develops though the topological diagram of ILOG company is based on, and still exists following deficiency in actual use:
Professional coupling closely, expandability is not high, ILOG is brought into the graphical display aspect with a lot of telecommunications concept, though the standard of seeming, specialty, in fact together with interface display and telecommunication service close-coupled, and the expansion of incompatibility telecommunication service, and, owing to introduce the notion of a lot of telecommunications aspect, cause system very huge, allow the user hang back easily; And the interface is drawn to refresh and is not atomic level when using, particularly for this centralized network management of EMS, to have the efficient bottleneck of performance in network element.
Summary of the invention
Consider above-mentioned technical problem and make the present invention, the invention provides a kind of than ILOG, the implementation method that topological diagram shows in the simpler and practical telecom network management system of method of the present invention.
To achieve these goals, according to one embodiment of present invention, provide the implementation method that topological diagram shows in a kind of telecom network management system.
This method may further comprise the steps: step S102, create equipment entity and annex entity thereof; Step S104 according to equipment entity and annex entity thereof, creates the solid data model, and carries out corresponding link and handle; And step S106, according to the solid data model, display device entity on the interface.
Wherein, in creating equipment entity, further may further comprise the steps: step S1021, according to the characteristic of equipment entity, create the atom entity; Step S1022 creates and draws encapsulated object, with the relation between decoupling zero interface display and the atom entity; And step S1023, according to drawing encapsulated object, create the equipment entity object.
And the annex entity of creating equipment entity comprises: step S1024, according to the characteristic of the annex entity of equipment entity, create annex atom entity; Step S1025 creates annex and draws encapsulated object, with the relation between decoupling zero interface display and the annex atom entity; And step S1026, draw encapsulated object according to annex, create the accessory device entity object.
In addition, the link increase comprises: the two ends entity of finding out link from the solid data model; And according to the two ends entity in topological diagram the position and occupied zone carry out the adjustment of link atom entity.And link circuit deleting comprises: the equipment entity that deletion is relevant; And the link in the solid data model analyzed, if there is no Xiang Guan equipment entity does not then show the atom entity of link when drawing.
In addition, step S106 comprises: step S1062 need show on the interface that the rendered object of topological diagram imports into; Step S1064 generates about the drawing area of atom entity and the link position of equipment entity and annex entity by obtaining the particular location of each atom entity in the rendered object at the interface of importing into; And step S1066, according to data, from lowermost layer to the top atom entity of drawing according to priority.
And this method also comprises the command mode processing of delaying time, and comprising: when carrying out a plurality of interface operation, open the deferred command pattern; The deferred command pattern is sent the interface operation order; To put into corresponding to the interface update command of interface operation and be used for distinguishing the order array that different classes of interface is upgraded; And from the order array, obtain the interface and upgrade, and will order array to empty with the renewal processing of triggering interface.
In addition, this method is used for telecom network management system is realized the topological diagram interface based on the JAVA2D standard demonstration.
By technique scheme of the present invention, can realize that topological diagram shows in the simpler and practical telecom network management system of ILOG, and improve the efficient and the performance of telecom network management system topological diagram.
Other features and advantages of the present invention will be set forth in the following description, and, partly from specification, become apparent, perhaps understand by implementing the present invention.Purpose of the present invention and other advantages can realize and obtain by specifically noted structure in the specification of being write, claims and accompanying drawing.
Description of drawings
Accompanying drawing is used to provide further understanding of the present invention, and constitutes the part of specification, is used from explanation the present invention with embodiments of the invention one, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the schematic diagram that concerns between each entity according in the implementation method of topological diagram demonstration in the telecom network management system of the embodiment of the invention;
Fig. 2 is the outline flowchart according to the implementation method of topological diagram demonstration in the telecom network management system of the embodiment of the invention;
Fig. 3 is the flow chart according to establishment equipment entity in the implementation method of topological diagram demonstration in the telecom network management system of the embodiment of the invention;
Fig. 4 is the flow chart according to the annex entity of establishment equipment entity in the implementation method of topological diagram demonstration in the telecom network management system of the embodiment of the invention;
Fig. 5 is the flow chart according to display device entity in the implementation method of topological diagram demonstration in the telecom network management system of the embodiment of the invention; And
Fig. 6 is the process chart according to deferred command pattern in the implementation method of topological diagram demonstration in the telecom network management system of the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein only is used for description and interpretation the present invention, and be not used in qualification the present invention.
At first with reference to Fig. 1 explanation notion relevant, in Fig. 1 with the embodiment of the invention:
The atom entity: the minimum material object of once playing up operation is finished in expression.All equipment entity are made of a plurality of atom entities on the topological diagram.The representative of each atom entity need the interface present some aspect.Each atom entity all has the ability of the various concrete drafting message of issue;
Equipment entity: the embodiment of expression telecommunicatioin network management equipment management object in logic on topological diagram;
The annex entity: be illustrated in and carry out specifically playing up of certain attribute on the equipment entity, acquiescence has four kinds of basic schemes of playing up in the present embodiment, and the user can expand as required;
Solid polymer composite: the notion in a zone of expression in topological diagram, this entity contains a plurality of equipment entity, two kinds of forms of expression are arranged on the interface: a kind ofly can be presented as general equipment entity, another is can be in topological diagram the entity of the inside to be shown in its scope.
Present embodiment adopts the MVC pattern, mainly based on the Java2D graphing capability, general drawing function is provided, it can express the atom entity that the complex geometry body assembles, and multiple modification means to the atom entity are provided, mainly comprise: translucent effect, outer rim, attached assembling between stepless zooming, a plurality of atom entity, abundant line style drafting etc.The implementation method that shows according to topological diagram in the telecom network management system of the embodiment of the invention will be described below.
As shown in Figure 2, the implementation method that shows according to topological diagram in the telecom network management system of the embodiment of the invention may further comprise the steps: step S102, create equipment entity and annex entity thereof; Step S104 according to equipment entity and annex entity thereof, creates the solid data model, and carries out corresponding link and handle; And step S106, according to the solid data model, display device entity on the interface.
Wherein, as shown in Figure 3, in creating equipment entity, further may further comprise the steps: step S1021, according to the characteristic of equipment entity, create the atom entity; Step S1022 creates and draws encapsulated object, with the relation between decoupling zero interface display and the atom entity (that is, the relation between interface display and the atom entity being disconnected); And step S1023, according to drawing encapsulated object, create the equipment entity object.
When an equipment entity was fabricated, it can be created out one and draw encapsulated object, and this Object Creation goes out the atom entity that an equipment entity needs, and the atom entity is responsible for presenting of equipment entity thus.
And, in description, mention Fig. 1 to the structure of solid polymer composite and the structure flow process basically identical of equipment entity, unique difference is self atom entity difference of solid polymer composite, has caused the difference when it is shown.In addition, solid polymer composite can also add solid polymer composite or equipment entity, becomes its descendants, can open the entity object of its inside by a sign clicking solid polymer composite.
And as shown in Figure 4, in the method according to present embodiment, the annex entity of creating equipment entity comprises: step S1024, according to the characteristic of the annex entity of equipment entity, create annex atom entity; Step S1025 creates annex and draws encapsulated object, with the relation between decoupling zero interface display and the annex atom entity; And step S1026, draw encapsulated object according to annex, create the accessory device entity object.
Wherein, equipment entity also includes the annex entity of representation attribute except the atom entity that comprises self, and equipment entity makes up the annex entity for this reason.For example be responsible for the atom entity of state specially, be responsible for the atom entity of alarm etc. specially, these annex entities all can be set its positional information separately when creating, so that particular location shows around equipment entity.
In addition,, when link being added physical model, all can adjust at every turn, regenerate the atom entity of link according to calculating according to the two ends entity of link for link.If there is equipment entity from data model, to delete, also can check link, see the link circuit deleting that whether needs unnecessary.During the deletion link, can be with link atom set and relevant atom set deletion from the atom entity sets of topological diagram.
The line style of link can customize and be that display mode is a self adaptation adjustment, and along with the end points that drags of mouse, the link relevant with end points can be made suitable drafting according to the position of two end points.And link is support direction also.
Wherein, the link increase comprises: the two ends entity of finding out link from physical model; And according to the two ends entity in topological diagram the position and occupied zone carry out the adjustment of link atom entity.And link circuit deleting comprises: the equipment entity that deletion is relevant; And the link in the physical model analyzed, if there is no Xiang Guan equipment entity does not then show the atom entity of link when drawing.
In addition, as shown in Figure 5, further comprise in the step S106 of display device entity: step S1062 need show on the interface that the rendered object of topological diagram imports into; Step S1064 generates about the drawing area of atom entity and the link position of equipment entity and annex entity by obtaining the particular location of each atom entity in the rendered object at the interface of importing into; And step S1066, according to data, from lowermost layer to the top atom entity of drawing according to priority.
In the process of display device entity,, on the interface, present device object according to the equipment entity model.Wherein, when drawing the interface, the Graphic2D object of JAVA is passed to topological diagram, topological diagram is supported hierarchical operations, and all there is the set of a concrete management atom entity each layer inside.Topological diagram is earlier according to hierarchical relationship, according to the sequencing of every layer atom set, plays up successively at last.At last, form a complete topological diagram.Because each atom entity all has the space of oneself, so when changing, the change that the atom entity only is responsible for oneself gets final product.
And the method for present embodiment can also comprise the processing of the command mode of delaying time, and as shown in Figure 6, this processing comprises: when carrying out a plurality of interface operation, open the deferred command pattern; The deferred command pattern is sent the interface operation order; To put into corresponding to the interface update command of interface operation and be used for distinguishing the order array that different classes of interface is upgraded; And from the order array, obtain the interface and upgrade, and will order array to empty with the renewal processing of triggering interface.
And because the attribute change of certain operations or equipment entity is when causing the interface to be upgraded, the interface is that unit upgrades operation with the atom, after operation that any triggering atom entity shows takes place, all can trigger the atomic kernel body weight and newly draw.The new drafting of atomic kernel body weight can not trigger the interface update all, only can relate to current atom entity, if but the drafting message of issue is too much, for the interface, can influence to some extent efficient.So the present embodiment design has the flow process of a deferred command pattern.Concrete drafting Message Processing is all handled in the deferred command model process.When concrete message event was handled, the deferred command pattern can be judged earlier, if current event is not the incident that needs drafting at last, then the order array is put in the order of its Message Processing.If the relevant position in the order array has had this to order, then cover, but this order do not carry out, to the last an incident finishes, and then the order in this order array is carried out once together.
The above is the preferred embodiments of the present invention only, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.Within the spirit and principles in the present invention all, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. the implementation method that topological diagram shows in the telecom network management system is characterized in that, comprising:
Step S102 creates equipment entity and annex entity thereof;
Step S104 according to described equipment entity and annex entity thereof, creates the solid data model, and carries out corresponding link and handle; And
Step S106 according to described solid data model, shows described equipment entity on the interface;
Wherein, the described equipment entity of described establishment comprises:
Step S1021 according to the characteristic of described equipment entity, creates the atom entity;
Step S1022 creates and draws encapsulated object, with the relation between decoupling zero interface display and the described atom entity; And
Step S1023 according to described drafting encapsulated object, creates described equipment entity object;
The described annex entity of the described equipment entity of described establishment comprises:
Step S1024 according to the characteristic of the described annex entity of described equipment entity, creates annex atom entity;
Step S1025 creates annex and draws encapsulated object, with the relation between decoupling zero interface display and the described annex atom entity; And
Step S1026 draws encapsulated object according to described annex, creates described accessory device entity object.
2. implementation method according to claim 1 is characterized in that, in described step S104, described link processing comprises that link increases and link circuit deleting.
3. implementation method according to claim 2 is characterized in that, described link increase comprises:
From described solid data model, find out the two ends entity of described link; And
According to described two ends entity in topological diagram the position and occupied zone carry out the adjustment of link atom entity.
4. implementation method according to claim 2 is characterized in that, described link circuit deleting comprises:
The described equipment entity that deletion is relevant; And
Described link in the described solid data model is analyzed, and if there is no Xiang Guan described equipment entity does not then show the described atom entity of described link when drawing.
5. implementation method according to claim 2 is characterized in that, described step S106 comprises:
Step S1062 need show on the interface that the rendered object of topological diagram imports into;
Step S1064 generates about the drawing area of described atom entity and the link position of described equipment entity and described annex entity by obtaining the particular location of each described atom entity in the described rendered object at the interface of importing into; And
Step S1066 according to described data, draws described atom entity from lowermost layer to top according to priority.
6. implementation method according to claim 5 is characterized in that, also comprises the command mode processing of delaying time.
7. implementation method according to claim 6 is characterized in that, described time-delay command mode is handled and comprised:
When carrying out a plurality of interface operation, open described deferred command pattern;
Described deferred command pattern is sent the interface operation order;
To put into corresponding to the interface update command of described interface operation and be used for distinguishing the order array that different classes of interface is upgraded; And
From described order array, obtain described interface and upgrade, and described order array is emptied with the renewal processing of triggering interface.
8. require each described implementation method according to aforesaid right, it is characterized in that, described implementation method is used for telecom network management system is realized the topological diagram interface based on JAVA 2D standard demonstration.
CN2007100012653A 2007-01-11 2007-01-11 Topological diagram indication method in telecommunication network guard system Expired - Fee Related CN101222352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100012653A CN101222352B (en) 2007-01-11 2007-01-11 Topological diagram indication method in telecommunication network guard system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100012653A CN101222352B (en) 2007-01-11 2007-01-11 Topological diagram indication method in telecommunication network guard system

Publications (2)

Publication Number Publication Date
CN101222352A CN101222352A (en) 2008-07-16
CN101222352B true CN101222352B (en) 2010-06-23

Family

ID=39631944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100012653A Expired - Fee Related CN101222352B (en) 2007-01-11 2007-01-11 Topological diagram indication method in telecommunication network guard system

Country Status (1)

Country Link
CN (1) CN101222352B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101674197B (en) * 2009-09-30 2012-01-25 华为技术有限公司 Display method of network topological graph, display device and system
CN102136946B (en) * 2011-03-07 2014-04-23 中国电力科学研究院 Optical network topology graph drawing method and topological subsystem
CN103986594B (en) * 2013-02-07 2017-09-26 中国电信股份有限公司 The method and apparatus for generating network topological diagram

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6477572B1 (en) * 1998-12-17 2002-11-05 International Business Machines Corporation Method for displaying a network topology for a task deployment service
US6594696B1 (en) * 1999-05-10 2003-07-15 3Com Corporation Network management apparatus and method employing “object tips” for the display of detailed data
CN1713585A (en) * 2004-06-22 2005-12-28 中兴通讯股份有限公司 Network management displaying method for link state of network element apparatus
CN1791011A (en) * 2005-12-06 2006-06-21 电子科技大学 Network topology automatic forming method in network management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6477572B1 (en) * 1998-12-17 2002-11-05 International Business Machines Corporation Method for displaying a network topology for a task deployment service
US6594696B1 (en) * 1999-05-10 2003-07-15 3Com Corporation Network management apparatus and method employing “object tips” for the display of detailed data
CN1713585A (en) * 2004-06-22 2005-12-28 中兴通讯股份有限公司 Network management displaying method for link state of network element apparatus
CN1791011A (en) * 2005-12-06 2006-06-21 电子科技大学 Network topology automatic forming method in network management system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李又玲.基于J2EE的电信综合网管系统拓扑管理子系统的设计与实现.中国优秀博硕士学位论文全文数据库(硕士) 第08期.2005,(第08期),第29-55页.
李又玲.基于J2EE的电信综合网管系统拓扑管理子系统的设计与实现.中国优秀博硕士学位论文全文数据库(硕士) 第08期.2005,(第08期),第29-55页. *

Also Published As

Publication number Publication date
CN101222352A (en) 2008-07-16

Similar Documents

Publication Publication Date Title
US6028602A (en) Method for managing contents of a hierarchical data model
CN104484189B (en) The structure and design method of a kind of application interface
CN108234168A (en) A kind of method for exhibiting data and system based on service topology
CN108322937A (en) Resource allocation methods and composer in wireless access network for network slice
CN102394778A (en) Network topology display method and device
WO2005081101A2 (en) Data container for user interface content data
CN110532058B (en) Management method, device and equipment of container cluster service and readable storage medium
CN110347383A (en) The front end development approach and device of cross-platform desktop application
CN106408170A (en) Electronic worksheet processing method, workflow engine and electronic worksheet system
CN108182102A (en) Management through figures method, apparatus and readable storage medium storing program for executing
US8732615B2 (en) Unified interface for display and modification of data arrays
CN108446327A (en) Operation system dynamic creation method, device, computer equipment and storage medium
CN103268226A (en) Test script file generation method and device
CN106294299A (en) A kind of report form generation method and device
CN106033388A (en) A test use case library management method and system
CN110532059A (en) Quota management method and device for K8s cluster management software
CN104361098A (en) Method applied to customization of nodes in topological graph of cloud system
CN101222352B (en) Topological diagram indication method in telecommunication network guard system
CN109343858A (en) A kind of build a station automatically container deployment system and its working method based on server-side rendering
CN101150434B (en) An object-oriented function deployment method in network management
CN106998257A (en) System of selection and resource management system based on tree
CN103593188B (en) System and method for managing what-you-see-is-what-you-get menus of instrument
CN109033157B (en) Complex data retrieval method and system based on user-defined search condition tree
CN112838937A (en) Processing method and system for user-defined network topology
CN102868746A (en) Method for realizing mobile informationization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100623

Termination date: 20180111