CN101215682B - Non-poaching-water common hot-dip galvanizing technique - Google Patents

Non-poaching-water common hot-dip galvanizing technique Download PDF

Info

Publication number
CN101215682B
CN101215682B CN2007103075813A CN200710307581A CN101215682B CN 101215682 B CN101215682 B CN 101215682B CN 2007103075813 A CN2007103075813 A CN 2007103075813A CN 200710307581 A CN200710307581 A CN 200710307581A CN 101215682 B CN101215682 B CN 101215682B
Authority
CN
China
Prior art keywords
workpiece
zinc
liquid
plating
plating piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007103075813A
Other languages
Chinese (zh)
Other versions
CN101215682A (en
Inventor
朱文德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Electric Power Transmission and Transforming Engineering Co
Original Assignee
ZHEJIANG SHENGDA STEEL TOWER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SHENGDA STEEL TOWER CO Ltd filed Critical ZHEJIANG SHENGDA STEEL TOWER CO Ltd
Priority to CN2007103075813A priority Critical patent/CN101215682B/en
Publication of CN101215682A publication Critical patent/CN101215682A/en
Application granted granted Critical
Publication of CN101215682B publication Critical patent/CN101215682B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a hot-dip galvanizing process, in particular to a common hot-dip galvanizing process without rinse water, which aims to solve the technical problems existing in prior art that after being treated, if industrial wastewater which is produced during hot-dip galvanizing is discharged reaching the standard, galvanizing needs to consume a large number of water source, and the treatment cost is greatly increased and the like. The steps of common hot-dip galvanizing process without rinse water of the invention comprises degreasing, cleaning and plating auxiliary, wherein to-be-galvanized workpieces are dipped in assisted plating solution, whose components are aqueous solution of ZnCl2 and NH4Cl, the PH valve of the assisted plating solution is adjusted through adding ammonia water, then Fe2+ on the surface of the workpiece is changed into Fe3+ through hydrogen peroxide solution, and then the Fe3+ is filtered out through a filter purification device, a layer of assisted plating film is formed on the surface of the workpiece, drying, hot-dip galvanizing, cooling and inactivating.

Description

Non-poaching-water common hot-dip galvanizing technique
Technical field
The present invention relates to a kind of hot-dip galvanizing technique, especially relate to a kind of non-poaching-water common hot-dip galvanizing technique.
Background technology
Country handled the back qualified discharge to more and more attention of environmental pollution by water protection in order to solve the trade effluent (rinse water) that is produced in the galvanizing process in recent years, and zinc-plated enterprise will consume great amount of water resources, and processing cost increases substantially.Chinese patent discloses a kind of hot dip galvanizing process (publication number: CN 1847443A), it comprises the steps: alkali cleaning, washing, pickling, washing, dipping zinc ammonium chloride solvent, oven dry, galvanizing, cooling, is added with the nano zine oxide microemulsion colloid of weight percent 3.0~6.0% in the solvent in the dipping zinc ammonium chloride solvent step; Nano zine oxide microemulsion colloid is made up of 1~4% nano zine oxide, 0.2~0.6% polypropylene acid and balance of deionized water; Nano zine oxide content is 95~98.5%, grain diameter 10~20nm, specific area 20~120m 2/ g, burning decrement 4~0.1%, tap density 0.3~0.5g/ml; Polypropylene acid purity is 98%, molecular weight is 1000.But it because this step of washing is arranged, also needs to consume a large amount of water in manufacturing process flow.Reach first grade discharging requirement (COD≤100), 1 ton of plating piece of every plating is wanted 7~8 tons of consume water basically; Reach secondary emission request (100>COD≤300), 1 ton of workpiece of every plating is wanted 3~4 tons of consume water basically; So, 50,000 tons of/year zinc-plated enterprises, maximum water consumption was 400,000 tons in 1 year, the minimum water of also wanting 150,000 tons.
First purpose of water rinse is after the workpiece degreasing, for prevent alkaline degreasing fluid bring in the pickling tank in and hydrochloric acid pickler, increased meaningless acid consumption; Second purpose of water rinse is after the workpiece pickling, in order to prevent workpiece surface residual hydrochloric acid pickle solution and Fe 2+Ion is brought in the quickening liquid, feasible decline and the Fe that helps the pH value in the coating bath 2+The rising of ionic concn, thus workpiece enter help coating bath before, must carry out water rinse, with workpiece surface residual hydrochloric acid and Fe 2+The ion flush away.
The step that is absolutely necessary is washed in order to achieve the above object by therefore general enterprise, but simultaneously, just consumes a large amount of water.
Summary of the invention
The purpose of this invention is to provide a kind of non-poaching-water common hot-dip galvanizing technique, it mainly is that the solution existing in prior technology is a qualified discharge after the Industrial Wastewater Treatment that is produced in the solution galvanizing process, zinc-plated needs consume great lot of water resources, the technical problem that processing cost increases substantially etc.
Above-mentioned technical problem of the present invention is mainly solved by following technical proposals:
Non-poaching-water common hot-dip galvanizing technique of the present invention is characterized in that:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface;
C. help plating: treating that zinc-plated workpiece is immersed in the quickening liquid, the composition of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, quickening liquid is regulated pH value by adding ammoniacal liquor, again by hydrogen peroxide the Fe of workpiece surface 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+, form one deck on the plating piece surface and help plated film;
D. oven dry: the moisture that the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and after its surface forms zinc and zinc-iron alloy layer, treats the dipping certain hour of workpiece in zinc liquid, change workpiece over to refrigerating work procedure immediately;
F. cooling: the workpiece that proposes zinc liquid is put into cooling fluid,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface.
In the step c of no water rinse galvanizing process flow of the present invention, can adopt weakly alkaline ammoniacal liquor, i.e. NH 3H 2O adjusts the pH value in the control quickening liquid, by the resulting ammonium chloride NH of neutralization reaction 4Cl, it is again the important composition of quickening liquid, sees the neutralization reaction formula:
NH 3·H 2O+HCl=NH 4Cl+H 2O PH↑
Another Li Chu that selects ammoniacal liquor for use is when the quickening liquid ammonium chloride concentration reduces, and all is to add ammonium chloride in the past, adds ammoniacal liquor now and gets final product, and helps to be plated to originally to descend 20~30%.
Helping Fe ion in the coating bath quickening liquid all is divalence ferrous ion (Fe with solubility 2+) exist, be can not be by filtering and purifying divalence ferrous ion (Fe 2+) filter out.So we will remove divalence ferrous ion (Fe 2+), at first must be with divalence ferrous ion (Fe 2+) continue deep oxidation, make it become trivalent Fe ion (Fe 3+) after, by filtering and purifying it filtering out again, the Fe ionic concn in the coating bath quickening liquid just can be controlled so.Therefore adopt hydrogen peroxide (H 2O 2) be used as oxygenant, to divalence ferrous ion (Fe 2+) carry out deep oxidation.See the oxidizing reaction formula:
Fe 2++H 2O 2=Fe 3+
As preferably, the degreasing fluid among the described step a is the aqueous solution that contains 1~3% agent of non-phosphate degreasing, and the temperature of degreasing fluid is 40 ℃~50 ℃.Skimming treatment is treating that zinc-plated workpiece is immersed in the degreasing fluid, remove all kinds of grease contamination on plating piece to be plated surface, improving the operation of follow-up pickling efficient.
Zinc liquid among the step e is conventional galvanizing zinc liquid; Cooling fluid among the step f is generally water; Passivating solution in the step g is the general passivating solution of galvanizing.
As preferably, degreasing time is decided according to the greasy dirt degree among the described step a, is 10~15 minutes, and no greasy dirt impurity adheres to up to the plating piece surface.
As preferably, the composition of pickle solution is composed of the following components among the described step b: weight percent is 6~25% hydrochloric acid, 1%~2% inhibiter and acid fog inhibitor, and all the other are water; Cleanup acid treatment is the zinc-plated workpiece for the treatment of no oil pollution, is immersed in the pickle solution, and the oxide compound of removing iron on the plating piece surface is Fe 2O 3, Fe 3O 4, FeO operation, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.
As preferably, the pickling time is 0.5~6 hour among the described step b, is silver gray until the plating piece surface, and smooth surface does not have the chocolate patch, spot exists.
As preferably, the temperature of quickening liquid is 50 ℃~70 ℃ among the described step c, and the dipping time of workpiece in quickening liquid was at 1~5 minute.Helping plating promptly is treating that zinc-plated workpiece is immersed in the quickening liquid, form one deck on the plating piece surface and help plated film, and to the operation of plating piece preheating.
As preferably, the temperature of zinc liquid is 428 ℃~455 ℃ among the described step e, and the dipping time of workpiece in zinc liquid is 1~15 minute.Galvanizing is to be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and forms the operation of zinc and zinc-iron alloy layer on its surface.
As preferably,
Therefore, the present invention has when guaranteeing the product galvanizing quality, does not increase zinc-plated cost, the conserve water resource, thus reach zinc-plated zero discharge of industrial waste water, characteristics such as society and economic benefit are very big.
Description of drawings
Accompanying drawing 1 is a process flow sheet of the present invention;
In accompanying drawing 2 quickening liquids of the present invention in pH value and the Fe ionic concn and oxidation filtration, purification cycle control schematic diagram.
Embodiment
Below by embodiment, and in conjunction with the accompanying drawings, technical scheme of the present invention is described in further detail.
Embodiment 1: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 2%, and temperature is controlled at 40 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 10 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 6%, adds 1% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 60 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 50 ℃, and the dipping time of workpiece in plating assistant agent was at 3 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 428 ℃, and the dipping time of workpiece in zinc liquid is 3 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 2: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 1%, and temperature is controlled at 45 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 15 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 15%, adds 1.5% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 47 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 60 ℃, and the dipping time of workpiece in plating assistant agent was at 2 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 435 ℃, and the dipping time of workpiece in zinc liquid is 2 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 3: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 3%, and temperature is controlled at 50 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 11 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 25%, adds 2% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 30 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 70 ℃, and the dipping time of workpiece in plating assistant agent was at 1 minute, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 450 ℃, and the dipping time of workpiece in zinc liquid is 1.5 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 4: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 1.5%, and temperature is controlled at 45 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 10 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 20%, adds 1.8% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 120 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 65 ℃, and the dipping time of workpiece in plating assistant agent was at 5 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 455 ℃, and the dipping time of workpiece in zinc liquid is 6 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 5: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 1%, and temperature is controlled at 40 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 14 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 8%, adds 1.4% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 360 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 55 ℃, and the dipping time of workpiece in plating assistant agent was at 5 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 438 ℃, and the dipping time of workpiece in zinc liquid is 15 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 6: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 2.4%, and temperature is controlled at 48 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 13 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 12%, adds 1.2% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 50 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 56 ℃, and the dipping time of workpiece in plating assistant agent was at 5 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 440 ℃, and the dipping time of workpiece in zinc liquid is 12 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 7: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 2%, and temperature is controlled at 42 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 14 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 19%, adds 1.8% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 90 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 63 ℃, and the dipping time of workpiece in plating assistant agent was at 4 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 445 ℃, and the dipping time of workpiece in zinc liquid is 5 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 8: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 1.5%, and temperature is controlled at 46 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 15 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 14%, adds 2% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 120 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 61 ℃, and the dipping time of workpiece in plating assistant agent was at 4 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 432 ℃, and the dipping time of workpiece in zinc liquid is 4 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 9: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 2%, and temperature is controlled at 40 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 15 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 8%, adds 1% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 240 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 52 ℃, and the dipping time of workpiece in plating assistant agent was at 4 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 437 ℃, and the dipping time of workpiece in zinc liquid is 3 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.
Embodiment 10: the non-poaching-water common hot-dip galvanizing technique that this is routine such as Fig. 1, and step is as follows:
A. degreasing:, remove all kinds of grease contamination on plating piece to be plated surface treating that zinc-plated workpiece is immersed in the degreasing fluid.Degreasing fluid is the aqueous solution of agent of non-phosphate degreasing, and it contains agent of non-phosphate degreasing 1.6%, and temperature is controlled at 48 ℃, and the degreasing dipping time is decided according to the greasy dirt degree, is 12 minutes, and the up-to-standard standard of skimming treatment is that the no greasy dirt impurity in plating piece surface adheres to;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface, i.e. Fe 2O 3, Fe 3O 4, FeO, the zinc-iron alloy reaction is carried out smoothly when guaranteeing hot dip process.The pickle solution main component is a hydrochloric acid 22%, adds 2% inhibiter and acid fog inhibitor simultaneously, and all the other are water, and the pickling time is 160 minutes, the standard that pickling quality is qualified: the plating piece surface is silver gray, and smooth surface does not have the chocolate patch, spot exists;
C. help plating:, form one deck on the plating piece surface and help plated film treating that zinc-plated workpiece is immersed in the quickening liquid.The main component of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, temperature is at 58 ℃, and the dipping time of workpiece in plating assistant agent was at 3 minutes, and quickening liquid is regulated pH value by adding ammoniacal liquor, by hydrogen peroxide Fe 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+Thereby, reach Fe in the control quickening liquid 2+Content;
D. oven dry: the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface moisture;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and form zinc and zinc-iron alloy layer on its surface.Zinc liquid is conventional galvanizing zinc liquid, and the temperature of zinc liquid is at 442 ℃, and the dipping time of workpiece in zinc liquid is 5 minutes, treat that the dipping time of workpiece in zinc liquid reaches requirement after, propose workpiece and change refrigerating work procedure immediately over to;
F. cooling: the workpiece that just proposes zinc liquid is put into water coolant,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface, passivating solution is the general passivating solution of galvanizing.

Claims (6)

1. non-poaching-water common hot-dip galvanizing technique is characterized in that:
A. degreasing: treating that zinc-plated workpiece is immersed in the degreasing fluid, remove all kinds of grease contamination on plating piece to be plated surface, degreasing fluid is the aqueous solution that contains 1~3% agent of non-phosphate degreasing, and the temperature of degreasing fluid is 40 ℃~50 ℃;
B. pickling: the zinc-plated workpiece for the treatment of no oil pollution, be immersed in the pickle solution, remove the oxide compound of iron on the plating piece surface;
C. help plating: after the pickling treat zinc-plated workpiece not by the rinsing direct impregnation in quickening liquid, the composition of quickening liquid is ZnCl 2And NH 4The aqueous solution of Cl, quickening liquid is regulated the pH value by adding ammoniacal liquor, again by hydrogen peroxide the Fe of workpiece surface 2+Be converted into Fe 3+, then by filtering and purifying filtering Fe 3+, form one deck on the plating piece surface and help plated film;
D. oven dry: the moisture that the workpiece that helps plating is placed on zinc liquid top oven dry workpiece surface;
E. galvanizing: will be immersed in the fused zinc liquid through the plating piece that helps plating to handle, and after its surface forms zinc and zinc-iron alloy layer, treats the dipping certain hour of workpiece in zinc liquid, change workpiece over to refrigerating work procedure immediately;
F. cooling: the workpiece that proposes zinc liquid is put into cooling fluid,, stop the iron-zinc alloy reaction by quick reduction plating piece temperature;
G. passivation: refrigerative workpiece is immersed in the passivating solution, forms one deck passive film on the galvanized workpiece surface.
2. non-poaching-water common hot-dip galvanizing technique according to claim 1 is characterized in that degreasing time is decided according to the greasy dirt degree among the described step a, is 10~15 minutes, and no greasy dirt impurity adheres to up to the plating piece surface.
3. non-poaching-water common hot-dip galvanizing technique according to claim 1, the composition that it is characterized in that pickle solution among the described step b is composed of the following components: weight percent is 6~25% hydrochloric acid, 1%~2% inhibiter and acid fog inhibitor, and all the other are water;
4. non-poaching-water common hot-dip galvanizing technique according to claim 1 is characterized in that the pickling time is 0.5~6 hour among the described step b, is silver gray until the plating piece surface, and smooth surface does not have the chocolate patch, spot exists.
5. non-poaching-water common hot-dip galvanizing technique according to claim 1, the temperature that it is characterized in that quickening liquid among the described step c are 50 ℃~70 ℃, and the dipping time of workpiece in quickening liquid was at 1~5 minute.
6. non-poaching-water common hot-dip galvanizing technique according to claim 1, the temperature that it is characterized in that zinc liquid among the described step e are 428 ℃~455 ℃, and the dipping time of workpiece in zinc liquid is 1~15 minute.
CN2007103075813A 2007-12-29 2007-12-29 Non-poaching-water common hot-dip galvanizing technique Expired - Fee Related CN101215682B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007103075813A CN101215682B (en) 2007-12-29 2007-12-29 Non-poaching-water common hot-dip galvanizing technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007103075813A CN101215682B (en) 2007-12-29 2007-12-29 Non-poaching-water common hot-dip galvanizing technique

Publications (2)

Publication Number Publication Date
CN101215682A CN101215682A (en) 2008-07-09
CN101215682B true CN101215682B (en) 2010-11-03

Family

ID=39622188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007103075813A Expired - Fee Related CN101215682B (en) 2007-12-29 2007-12-29 Non-poaching-water common hot-dip galvanizing technique

Country Status (1)

Country Link
CN (1) CN101215682B (en)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101823804B (en) * 2010-04-27 2012-08-01 成都四友镀锌设备有限公司 Waste water zero emission treatment system for hot-dip galvanizing workshop
CN104004983B (en) * 2014-05-12 2016-06-29 领新(南通)重工有限公司 Method for heat zinc coating auxiliary liquid integrated treatment ferrous ion
CN104060182A (en) * 2014-05-27 2014-09-24 安徽红桥金属制造有限公司 Spring and surface treatment process thereof
CN104195485B (en) * 2014-06-12 2017-01-18 丹阳市腾黄钢管镀锌有限责任公司 On-line automatic pretreatment process for steel pipe hot-dip galvanizing
CN105057586A (en) * 2015-08-07 2015-11-18 昆山—邦泰汽车零部件制造有限公司 Method for manufacturing automobile hardware
CN105063530A (en) * 2015-08-07 2015-11-18 昆山—邦泰汽车零部件制造有限公司 Method for manufacturing high-hardness automobile hardware
CN105063696A (en) * 2015-08-07 2015-11-18 昆山—邦泰汽车零部件制造有限公司 Manufacturing method of abrasion-proof automotive hardware
CN105063581A (en) * 2015-08-07 2015-11-18 昆山—邦泰汽车零部件制造有限公司 Method for manufacturing high-tenacity automobile hardware
CN105063697A (en) * 2015-08-07 2015-11-18 昆山—邦泰汽车零部件制造有限公司 Manufacturing method of automobile hardware with high polishing performance
CN105296910A (en) * 2015-10-21 2016-02-03 常熟风范电力设备股份有限公司 Spraying process for surface of angle steel of power transmission and transformation angle steel tower
CN107513681B (en) * 2017-08-18 2019-12-20 桐乡市铁盛线路器材有限公司 Hot-dip galvanizing process
CN107557709B (en) * 2017-08-23 2019-09-13 江苏国电新能源装备有限公司 A kind of environment-friendly type zincincation
CN107513682B (en) * 2017-08-23 2019-09-13 江苏国电新能源装备有限公司 A kind of zincincation of acid circulation
CN108070810A (en) * 2017-11-30 2018-05-25 重庆徐丁科技有限公司 A kind of motorcycle accessories surface zincincation
CN108048773A (en) * 2017-12-22 2018-05-18 无锡科茂金属材料有限公司 In steel wire used in a kind of rare earth zinc steel strand wires and derusting method
CN109574292A (en) * 2018-10-31 2019-04-05 徐州瑞马智能技术有限公司 A kind of auxiliary agent processing system and method
CN109852914A (en) * 2019-03-01 2019-06-07 安徽省庐峰镀锌有限公司 A kind of high-strength alloyed steel plate hot dip galvanizing process
CN109881133A (en) * 2019-03-12 2019-06-14 常熟风范电力设备股份有限公司 A kind of electric power tower component hot dip galvanizing process
CN109761448A (en) * 2019-03-12 2019-05-17 常熟风范电力设备股份有限公司 A kind of processing method of steel member hot galvanizing waste water
CN110358903A (en) * 2019-07-23 2019-10-22 常熟市长江不锈钢材料有限公司 A kind of production technology of hot-galvanized steel band
CN110699621A (en) * 2019-10-14 2020-01-17 青海金功新能源技术有限公司 Galvanizing method for steel member of solar photovoltaic/photothermal support system
CN111118429A (en) * 2020-01-10 2020-05-08 苏州科赛精密机械有限公司 Surface treatment process of seamless steel pipe for fire fighting collecting pipe
CN115156845A (en) * 2022-06-16 2022-10-11 唐山钢铁集团高强汽车板有限公司 Production method of galvanized hot forming steel for preventing coating from sticking to roller

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974834A (en) * 2006-12-01 2007-06-06 华南理工大学 Comprehensive plating promoter treatment process and apparatus for hot galvanizing production line

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974834A (en) * 2006-12-01 2007-06-06 华南理工大学 Comprehensive plating promoter treatment process and apparatus for hot galvanizing production line

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
孔纲等.热浸镀锌助镀工艺的研究与应用.材料保护.2005,56-58. *
苗立贤等.钢制件热镀锌优化工艺.电镀与涂饰25 11.2006,25(11),20-22.
苗立贤等.钢制件热镀锌优化工艺.电镀与涂饰25 11.2006,25(11),20-22. *
郝建军等.环保型脱脂剂的研制.沈阳理工大学学报24 1.2005,24(1),50-52.
郝建军等.环保型脱脂剂的研制.沈阳理工大学学报24 1.2005,24(1),50-52. *

Also Published As

Publication number Publication date
CN101215682A (en) 2008-07-09

Similar Documents

Publication Publication Date Title
CN101215682B (en) Non-poaching-water common hot-dip galvanizing technique
CN103108988B (en) Steel plate for container and manufacture method thereof
CN108149179B (en) Hot galvanizing production process for fastener
CN110369244A (en) A kind of without phosphorus silane process of car body coating environmental protection pre-treatment
CN111926338A (en) Stainless steel cleaning passivator and application thereof
CN103243338A (en) Acid cleaning and phosphorizing method of electromobile frame
CN104498925B (en) A kind of metal surface treating liquid and application based on polyfunctional group alkyl phosphate
CN101624244B (en) Synthetic processing method of hydroxyethylidene pre-plated copper waste water
JP2006219691A (en) Metal surface treatment method
CN103693729B (en) Treatment method for nitric-acid-containing wastewater in adipic acid production technology
KR100693902B1 (en) A double nickel plating method of a permanent magnet with Nd-Fe-B
CN103938201B (en) A kind of high corrosion-resistance black phosphating method
CN105648378A (en) Antirust heat treatment technology for spare parts
JP4862445B2 (en) Method for producing electrogalvanized steel sheet
EP1233084A2 (en) "Anodizing process, with low environmental impact, for a workpiece of aluminium or aluminium alloys"
US20090200178A1 (en) Electropolishing method
CN103898529A (en) Rust-removing method
JP3769661B2 (en) Electrogalvanization of secondary molded products
CN103160822A (en) Fluorine-free phosphating process of AZ91 magnesium alloy
JP2010150600A (en) Waste water treatment equipment for recycling water in surface treatment using trivalent chromate, and waste water treatment method for recycling water
CN101100762A (en) Regeneration treating agent for chloride zinc coating solution and solution regeneration treating method
CN113445039A (en) Zinc surface chromium-free passivation solution and passivation method
CN106086852A (en) A kind of surface processes uses economical passivating solution
CN1102442A (en) Process for producing a zinc-containing metal-plated steel composite sheet having excellent resistance to black tarnishing and white rust
US4317848A (en) Method of sewageless metallization, especially galvanizing of a steel surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHEJIANG ELECTRIC POWER TRANSMISSION AND TRANSFORM

Effective date: 20141117

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141117

Address after: 311232 red soil farm, Xiaoshan economic and Technological Development Zone, Hangzhou, Zhejiang

Patentee after: Zhejiang Shengda Steel Tower Co., Ltd.

Patentee after: Zhejiang Electric Power Transmission and Transforming Engineering Co.

Address before: 311232 red soil farm, Xiaoshan economic and Technological Development Zone, Hangzhou, Zhejiang

Patentee before: Zhejiang Shengda Steel Tower Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103

Termination date: 20201229

CF01 Termination of patent right due to non-payment of annual fee