CN101207931B - 一种光传输系统全量业务调整方法 - Google Patents
一种光传输系统全量业务调整方法 Download PDFInfo
- Publication number
- CN101207931B CN101207931B CN2007101252141A CN200710125214A CN101207931B CN 101207931 B CN101207931 B CN 101207931B CN 2007101252141 A CN2007101252141 A CN 2007101252141A CN 200710125214 A CN200710125214 A CN 200710125214A CN 101207931 B CN101207931 B CN 101207931B
- Authority
- CN
- China
- Prior art keywords
- time
- business
- space
- full dose
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
本发明公开了一种光传输系统全量业务调整方法,包括以下处理过程:1)将时空分交叉系统的业务切换到主用时空分交叉系统上;2)下发全量配置业务到备用时空分交叉系统,且备用时空分交叉系统执行全量配置业务;3)当备用时空分交叉系统执行全量配置业务成功后,对时空分交叉系统进行主备切换,将业务切换到备用时空分交叉系统上;4)下发全量配置业务到主用时空分交叉系统,且主用时空分交叉系统执行全量配置业务。本发明通过改善全量业务配置处理流程,不需要增加其他硬件,与传统方法相比,大大缩短业务瞬断时间,保证了业务不中断。
Description
技术领域
本发明涉及光传输领域,具体涉及光传输系统全量业务交叉配置的瞬断问题。
背景技术
光传输网,包括WDM、SDH、SONET等传送网,在电信领域已经得到广泛应用,对于光业务网的业务配置,特别是多时分模块的业务配置,有时需要对业务配置进行全量优化调整。现在传统的方法,全量业务调整时都会导致业务瞬断时间大大超过50ms,从而造成用户业务的中断。目前已知的专利申请中,申请号为CN200510087238的中国专利申请:一种SDH系统光板下支路时隙时分优化配置方法、申请号为CN200510087237的中国专利申请:一种SDH系统光板到光板的时隙时分优化配置方法、申请号为CN200510087239的中国专利申请:一种SDH系统支路板上光板时隙时分优化配置方法都会产生全量业务调整的情况,并会产生瞬断问题,从而会导致业务中断。
发明内容
本发明为了克服采用传统方法在业务配置进行全量调整时,将业务配置同时下发给主备时隙交叉系统,造成用户业务中断的缺点,提出一种光传输系统全量业务调整方法,确保用户在进行业务配置全量调整,业务瞬断时间不超过50ms,不会造成用户业务中断,不影响用户业务的正常运行。
本发明提出的光传输系统全量业务调整方法,包括以下处理过程:
1)将时空分交叉系统的业务切换到主用时空分交叉系统上;
2)下发全量配置业务到备用时空分交叉系统,且备用时空分交叉系统执行全量配置业务;
3)当备用时空分交叉系统执行全量配置业务成功后,对时空分交叉系统进行主备切换,将所述时空分交叉系统的业务切换到备用时空分交叉系统上;
4)下发全量配置业务到主用时空分交叉系统,且主用时空分交叉系统执行全量配置业务。
优选的,所述步骤1)和步骤3)中由下发全量配置业务的主控板发起时空分交叉系统业务切换命令。
优选的,所述步骤3)中备用时空分交叉系统执行全量配置业务成功后,还发送执行成功消息通知下发全量配置业务的主控板。
优选的,所述主用和备用时空分交叉系统分别由至少一个时空分交叉板构成,各交叉板之间可以进行业务主备切换。
采用本发明所述方法与现有技术相比,可以大大的缩短进行全量业务调整的业务瞬断时间,并将其控制在50ms之内(传统的方法都大大超过50ms),这对于经常需要进行全量业务调整的多时分模块系统,大大提高用户业务的性能。
附图说明
图1是本发明全量业务调整方法优选实施例流程图。
具体实施方式
以下结合附图并通过具体实施例对本发明进行详细说明。
本发明提出的光传输系统全量业务调整方法适用于具有主用和备用的时空分交叉系统,并且都处于可用状态。主用或备用时空分交叉系统可以由一块或多块时空分交叉板组成,一个主用或备用时空分交叉系统中的各交叉板之间可以采用公用的主备切换技术。以下将下发业务配置的板称为主控板,主控板已经准备好了全量业务配置数据,处于下发状态。本发明的核心是:通过合理应用交叉时空分板的主备系统,当进行业务配置全量调整时,首先将业务交叉配置切换到时空分交叉板中主或备系统中的一个,这时将新的调整后业务全量配置下发另外一个系统,执行成功后,将业务切换到已经成功配置的时空分交叉系统,因为这时的业务切换只是时空分交叉系统的主备倒换,倒换时间可以控制在50ms之内。
下面再通过具体实施例对本发明的技术方案的实施作进一步的详细描述:
如图1所示,光传输系统的预置条件是:主控板NCP已经准备好全量业务配置数据,假设时空分交叉主备系统都是由一块时空分交叉合一的交叉板组成,分别为A交叉板和B交叉板。
传统的做法是:
第一步,NCP板同时向主备交叉板发送全量业务配置。
第二步:主备交叉板同时执行全量业务配置,因为涉及时分交叉路径和空分交叉路径的调整,业务瞬断时间远远大于50ms,造成业务中断。
采用传统方法业务瞬断时间大大超过50ms,会造成业务中断,影响用户的正常业务。
而本发明的做法是:
第一步:NCP板向系统下发时空分交叉主备系统强制切换命令,切换业务到A交叉板。此时会有一个50MS之内业务瞬断。
第二步:NCP板下发全量业务配置到B交叉板,B交叉板执行全量业务配置。
第三步:B交叉板执行全量业务配置成功后,将信息反馈给NCP板。
第四步:NCP板收到B交叉板执行成功的消息后,NCP板向系统下发时空分交叉主备系统强制切换命令,切换业务到B交叉板。此时又会产生一个50MS之内业务瞬断。
第五步:NCP板下发全量业务配置到A交叉板,A交叉板执行全量业务配置。
上述流程中,交叉系统执行全量业务配置失败的处理流程采用公知处理流程。
从上述过程可以看出,通过本发明方法进行全量业务配置时,只有两个50MS之内业务瞬断时间,不会造成业务中断。
从上面对比可知,通过改善全量业务配置处理流程,不需要增加其他硬件,本发明的方法相比传统方法,大大缩短业务瞬断时间,保证了业务不中断。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。
Claims (4)
1.一种光传输系统全量业务调整方法,其特征在于,所述方法包括以下处理过程:
1)将时空分交叉系统的业务切换到主用时空分交叉系统上;
2)下发全量业务配置到备用时空分交叉系统,且备用时空分交叉系统执行全量业务配置;
3)当备用时空分交叉系统执行全量业务配置成功后,对时空分交叉系统进行主备切换,将所述时空分交叉系统的业务切换到备用时空分交叉系统上;
4)下发全量业务配置到主用时空分交叉系统,且主用时空分交叉系统执行全量业务配置。
2.根据权利要求1所述的光传输系统全量业务调整方法,其特征在于,所述步骤1)和步骤3)中由下发全量业务配置的主控板发起时空分交叉系统业务切换命令。
3.根据权利要求1或2所述的光传输系统全量业务调整方法,其特征在于,所述步骤3)中备用时空分交叉系统执行全量业务配置成功后,还发送执行成功消息通知下发全量业务配置的主控板。
4.根据权利要求1或2所述的光传输系统全量业务调整方法,其特征在于,所述主用和备用时空分交叉系统分别由至少一个时空分交叉板构成,各交叉板之间可以进行业务主备切换。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101252141A CN101207931B (zh) | 2007-12-18 | 2007-12-18 | 一种光传输系统全量业务调整方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101252141A CN101207931B (zh) | 2007-12-18 | 2007-12-18 | 一种光传输系统全量业务调整方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101207931A CN101207931A (zh) | 2008-06-25 |
CN101207931B true CN101207931B (zh) | 2011-03-16 |
Family
ID=39567714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007101252141A Expired - Fee Related CN101207931B (zh) | 2007-12-18 | 2007-12-18 | 一种光传输系统全量业务调整方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101207931B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101924959B (zh) * | 2009-06-11 | 2013-06-12 | 中兴通讯股份有限公司 | 一种光同步数字体系网络中的业务调整方法及装置 |
CN101951301A (zh) * | 2009-07-10 | 2011-01-19 | 中兴通讯股份有限公司 | 一种减少子网连接保护业务瞬断次数的方法及系统 |
CN101616032B (zh) * | 2009-07-20 | 2012-07-18 | 中兴通讯股份有限公司 | 一种实现交叉容量升级的方法及装置 |
CN101969583B (zh) * | 2009-07-28 | 2013-06-05 | 中兴通讯股份有限公司 | 一种光传输系统的全量业务交叉配置方法和装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1324518A2 (en) * | 2001-12-20 | 2003-07-02 | Hitachi, Ltd. | Optical switching equipment, optical transport network, and methods of using them |
CN1510845A (zh) * | 2002-12-26 | 2004-07-07 | 华为技术有限公司 | 一种交叉主备保护的热备份方法 |
CN1581716A (zh) * | 2003-08-12 | 2005-02-16 | 华为技术有限公司 | 一种交叉板主备线路倒换方法和系统 |
CN1905425A (zh) * | 2005-07-28 | 2007-01-31 | 中兴通讯股份有限公司 | 一种sdh系统光板到光板时隙时分优化配置方法 |
CN1921326A (zh) * | 2006-08-29 | 2007-02-28 | 华为技术有限公司 | 一种主备倒换的控制方法、装置及系统 |
-
2007
- 2007-12-18 CN CN2007101252141A patent/CN101207931B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1324518A2 (en) * | 2001-12-20 | 2003-07-02 | Hitachi, Ltd. | Optical switching equipment, optical transport network, and methods of using them |
CN1510845A (zh) * | 2002-12-26 | 2004-07-07 | 华为技术有限公司 | 一种交叉主备保护的热备份方法 |
CN1581716A (zh) * | 2003-08-12 | 2005-02-16 | 华为技术有限公司 | 一种交叉板主备线路倒换方法和系统 |
CN1905425A (zh) * | 2005-07-28 | 2007-01-31 | 中兴通讯股份有限公司 | 一种sdh系统光板到光板时隙时分优化配置方法 |
CN1921326A (zh) * | 2006-08-29 | 2007-02-28 | 华为技术有限公司 | 一种主备倒换的控制方法、装置及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN101207931A (zh) | 2008-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100479434C (zh) | 实现虚拟路由器冗余协议主、备用设备切换的方法及系统 | |
CN106375342A (zh) | 一种基于zookeeper技术的系统集群方法及系统 | |
CN101567799B (zh) | 光网络单元自动配置方法 | |
CN100499507C (zh) | 一种容灾系统、方法和网络设备 | |
CN101207931B (zh) | 一种光传输系统全量业务调整方法 | |
CN106357787A (zh) | 一种存储容灾控制系统 | |
CN101160794B (zh) | 一种智能网业务控制设备容灾系统和方法 | |
CN102917286A (zh) | 一种epon接入系统中的手拉手保护倒换方法和系统 | |
CN103081439A (zh) | 逻辑链路管理方法和通信装置 | |
CN107528706A (zh) | 一种基于链路协议的设备主备倒换方法和装置 | |
WO2005125228A1 (fr) | Systeme de communication susceptible de mise a niveau et procede de mise a niveau d'un systeme de communication | |
CN100428697C (zh) | 旁路组合系统及基于旁路组合系统的业务处理方法 | |
CN100596037C (zh) | 光网络中提供节点保护的装置及其实现方法 | |
WO2012155671A1 (zh) | 光网络单元的光口切换方法和系统 | |
CN101079676B (zh) | 一种光同步数字传输网络系统升级方法 | |
CN101110609A (zh) | 主、备用模块实现通信的方法和系统 | |
CN101136711B (zh) | Sdh系统中光口业务、时钟、交叉业务高集成单板业务平滑切换系统 | |
CN106464511A (zh) | 一种业务保护方法及装置 | |
CN101345590B (zh) | Sncp业务配置方法 | |
CN1808950B (zh) | 一种复用段保护环带宽动态调整的方法 | |
CN100362761C (zh) | 一种实现单板倒换的方法 | |
EP3993327A1 (en) | Method for processing packet and first network device | |
CN101616032B (zh) | 一种实现交叉容量升级的方法及装置 | |
CN101924959B (zh) | 一种光同步数字体系网络中的业务调整方法及装置 | |
CN101218846B (zh) | 自动交换光网络链路资源整理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110316 Termination date: 20171218 |
|
CF01 | Termination of patent right due to non-payment of annual fee |