CN101207512A - Method for switching and redundancy backup of database system - Google Patents

Method for switching and redundancy backup of database system Download PDF

Info

Publication number
CN101207512A
CN101207512A CNA2006101706243A CN200610170624A CN101207512A CN 101207512 A CN101207512 A CN 101207512A CN A2006101706243 A CNA2006101706243 A CN A2006101706243A CN 200610170624 A CN200610170624 A CN 200610170624A CN 101207512 A CN101207512 A CN 101207512A
Authority
CN
China
Prior art keywords
main computer
agency
guest machine
database
active
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006101706243A
Other languages
Chinese (zh)
Other versions
CN101207512B (en
Inventor
罗健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN2006101706243A priority Critical patent/CN101207512B/en
Publication of CN101207512A publication Critical patent/CN101207512A/en
Application granted granted Critical
Publication of CN101207512B publication Critical patent/CN101207512B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for the data recovery backup system and the switch of a database system. The method comprises the following steps: an active computer agent and a standby computer agent intercept the database operation packet broadcasted in an Ethernet to carry out the same database operation to each database instance, so as to finish the data replication; the database instance feedbacks a success/failure marking to the corresponding agent; the active computer agent receives the failure marking while the standby computer agent receives the success marking, then the active computer agent informs the standby computer agent to carry out the active-standby switching. The method utilizes the Ethernet broadcasting to carry out the backup restoring among a plurality of nodes, utilizes the message acknowledgement mechanism and further utilizes a switching timer to carry out the active-standby switching of the database system, thereby finishing the active-standby switching within a certain data operation period; the system is simple, and can especially solve the business paralysis caused by the abnormities that the database system often has instantaneous interruption or some programs are interrupted in the mobile communication HLR network element, thereby being able to reduce the system instability caused by the database abnormity as much as possible.

Description

A kind of redundancy backup of database system and changing method
Technical field
The present invention relates to database technology, be specifically related to a kind of redundancy backup of database system and changing method.
Background technology
The superfluous calamity of the Database Systems of broad sense refers to the loss of data that force majeure such as reducing nature, war causes; The superfluous calamity of the Database Systems of narrow sense, the Database Systems paralysis that bring comprise because the impact that misoperation, hardware damage, peak traffic, outage etc. cause Database Systems etc., this exists under the situation of BUG in Database Systems, more common, this situation is more frequent, and the normal operation of business has been brought immeasurable loss.Whether interrupt by business, be divided into superfluous calamity of data level and the superfluous calamity of application layer again 1..The application layer system that refers to finishes calamity automatically and is equipped with switching, and maximum reduces switching time, makes to use continual operation; The superfluous calamity of data is then inevitably understood interrupting service, data return to Database Systems during this period of time in, Database Systems are inoperable, modal is exactly that the backup that provides of most commercial relational databases recovers, before recovering, database is disabled.
Superfluous calamity Database Systems generally partly constitute by two, and the one, Database Systems are switched, and the 2nd, data are duplicated.The application layer calamity of IBM is equipped with the main High AvailabilityGeographical Cluster/High Availability Cluster Multi-Processing that adopts based on the AIX platform, be called for short the HAGEO/HACMP scheme or based on the Geographically Dispersed ParallelSysplex of S/390, be called for short the GDPS scheme, and the scheme of data level adopts Peer ToPeer Remote Copy or Extend Remote Copy based on disk system, is called for short PPRC or XRC functional software 2..System's switchover policy of Veritas then can be by customization, and at Global Cluster Manager/Veritas Cluster Server, be called for short in the GCM/VCS software and realize that data are duplicated and then adopted VolumeReplicator, be called for short VVR 3. logical volume is copied on a plurality of backup nodes.Data are duplicated, in general can on hardware or software layer, realize, as, disk hardware store level, file system level, operating system grade, database level, SNA network level etc.
Present superfluous calamity scheme still is at the superfluous calamity of data level mostly, for example, the PPRC/XRC functional software of IBM, it is to pass through optical-fibre channel, with the logical volume is unit, the local data synchronous mirror to far-end, can be had synchronously and asynchronous system, and difference is whether main frame is received that standby host is write to finish and just confirmed that data write success behind the signal.
Actually rare at the superfluous calamity of the continual application layer of business, ripe product, (rule of HACMP is equally applicable to HAGEO as the HAGEO/HACMP of IBM, 4. the distance that both support is distinguished to some extent) Clustering, its data copy mode has three kinds: synchronously, mirror image is synchronously with asynchronous, synchronizing process is a linear process substantially, writes far-end earlier and writes this locality again, waits active and standby writing to be over, just declaration is write and is finished, mirror image has adopted the equipment of a state diagram synchronously, writes state diagram earlier, again the handwritten copy domain, this locality has been write and has promptly been declared to write to finish, be responsible for far-end by the backstage and write, in full accord up to far-end and local data, asynchronous mode be allow active and standby between certain data difference, it is synchronous to be converted to mirror image after reaching difference value, to improve performance.
The HAGEO/HACMP handoff procedure is to utilize lan to come the state of monitoring host computer, network and network interface card, this environment is made of two cover networks, the one, the public network of client-access, it is the TCP/IP network, the one, the communication path of alternative TCP/IP can be a RS232 serial ports etc., promptly non-TCP/IP network, it is actually ' heartbeat ' line, is used for monitoring three default class faults specially: network interface card fault, network failure, node failure.In a single day main-standby nodes adds this cluster, each network interface card of node, non-TCP/IP network can constantly send and receive K_A (Keep_Alive) signal, if TCP/IP network that standby host receives and the K_A signal on the non-TCP/IP network are all lost, HACMP can predicate node failure so; If K_A dropout on the TCP/IP network that standby host receives, and the K_A signal on the TCP/IP network exists, HACMP can predicate network failure so; If the K_A signal of a certain network interface card is all lost, then HACMP can predicate the network interface card fault, under the default situations, HACMP only judges this three kinds of situations, some mechanism that other fault can provide in conjunction with AIX basic function and HACMP, as Error Notification Facility, clinfo API etc. monitor and take recovery measures such as switching to fault.
ORACLE Data Guard then provides a disaster recovery solution on the database level, it is that redo daily record with main frame copies on the standby host, recover daily record simultaneously, to reach active and standby machine data unanimity, but having an accident, certain node needs active and standby switching, still need artificial participation, ORACLE RAC allows the backup of N node, but still link between the node by exchanged form, switching still needs the clustermanager module to carry out heartbeat monitor 5., rather than utilizes the information that produces in the business procedure to judge.
Summary of the invention
The technical issues that need to address of the present invention provide a kind of redundancy backup of database system and changing method, make Database Systems make correct response in the time range of determining, reduce as far as possible because the systematic jitters that database brings unusually.
Above-mentioned technical problem of the present invention solves like this, and a kind of redundancy backup of database system and changing method are provided, and uses main computer and guest machine in the same local area network (LAN), may further comprise the steps:
1.1) primary and backup machine agency carries out the same database operation to database instance separately and finish data and duplicate by intercepting the database manipulation packet of broadcasting in the Ethernet simultaneously;
1.2) database instance returns success/fail sign to correspondence agency;
1.3) main computer agency takes defeat and indicate and the guest machine agency receives and successfully indicates, then acted on behalf of by main computer agent advertisement guest machine and carry out active and standby switching.
According to backup provided by the invention and changing method, described step 1.1) sets main computer in and switch timer, described step 1.3) main computer switches that timer expired main computer agency does not receive successfully/fail sign and guest machine receives successfully sign in, then initiates active and standby switching by main computer.
According to backup provided by the invention and changing method, described step 1.3) comprise that also guest machine agent advertisement main computer acts on behalf of the success of its correspondence/failure and indicate, the main computer agency returns response message.
According to backup provided by the invention and changing method, main computer agency and guest machine agency are by TCP/IP or serial ports RS235 link carrying out communication.
According to backup provided by the invention and changing method, before the described guest machine agent advertisement main computer agency guest machine is set and switches timer, guest machine switches timer expired and does not receive described response message, initiates active and standby switching by receiving the guest machine agency who successfully indicates.
According to backup provided by the invention and changing method, described guest machine is a plurality of, initiates active and standby switching by the formation priority.
According to backup provided by the invention and changing method, the network interface card of described primary and backup machine is made as the Promiscuous pattern.
According to backup provided by the invention and changing method, described active and standby switching is that the network interface card IP address with former guest machine changes main computer IP address into, and the network interface card IP address of former main computer changes other different IP addresses in the local area network (LAN) into.
According to backup provided by the invention and changing method, described database manipulation comprises read operation and write operation; Described step 1.1) in only main computer agency return the business datum of read operation or the success of write operation/failure indicates to the transaction processing system that sends the database manipulation packet.
According to backup provided by the invention and changing method, the main computer agency receives and carries out described returning after guest machine is acted on behalf of the notice of correspondence database operation response; Described response is that the guest machine agency receives successfully/fail sign.
Redundancy backup of database system provided by the invention and changing method, utilize Ethernet broadcasting characteristics to carry out data backup at multiple network node, and utilize message authentication mechanism and switch timer and carry out the active and standby machine switching of Database Systems, the Database Systems simple structure, and can in the time in an established data operation cycle, finish active and standby switching, reach the effect of the real-time Hot Spare of multimachine, can solve especially in the mobile communication HLR network element, the business paralysis that Database Systems usually cause because hit or some program interrupts etc. are unusual reduces as far as possible because the systematic jitters that database brings unusually.
Description of drawings
Further the present invention is described in detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is the system configuration schematic diagram that redundancy backup of the present invention and changing method are realized.
Fig. 2 is a data back up method logic flow schematic diagram of the present invention.
Fig. 3 is a main/standby switching method logic flow schematic diagram of the present invention.
Embodiment
At first, key of the present invention is described: in the read/write data operating process, the characteristics of utilizing packet to broadcast in Ethernet are carried out Backup Data, and the out-of-service time of Database Systems is limited in the definite time range by mechanism such as switching timer.
Second step illustrated that the present invention used the universe network environment, specifically as shown in Figure 1, comprised 1. Business Processing (application) system 40, and 2. router five 0 and the database local net system 30 that 3. is made up of main computer 10 and guest machine 20 are specific as follows:
1. Business Processing (application) system 40, its produces the read/write operation to Database Systems;
2. router five 0, between transaction processing system and database local net system, also can be switch or HUB hub;
3. database local net system 30, it is " sharing formula " local area network (LAN) that constitutes backstage entire database system, its essence is that a carrier wave detects the shared channel that multichannel is intercepted machine-processed control transmission, link to each other with bus mode by switch, HUB hub or router five 0 between main computer 10 and the guest machine 20, the Various types of data that transaction processing system 40 produces wraps in this channel with the broadcast mode transmission, for the data backup of guest machine 20 provides physical environment;
Database local net system 30 is made up of main computer 10 and guest machine 20, guest machine 20 can be one or more, here only listed a guest machine 20, the network interface card of main computer 10 and guest machine 20 is set to " mixing " Promiscuous pattern, receives the packet on the shared channel local area network (LAN);
Main computer agency 101 is positioned on the main computer 10, guest machine agency 201 agencies that are positioned on the guest machine 20, database instance 102 on the difference operational processes main computer 10 and the database instance 202 on the guest machine 20, they can be the databases of any support SQL;
By 60 communications of inter-agent communication network, communication network 60 can be that TCP/IP can be RS235 also between main computer agency 101 and guest machine agency 201 and a plurality of guest machine agency 201, between the agency by message authentication in order to active and standby switching.
Wherein, adopt the TCP/IP network to connect between transaction processing system 40 and the database local net system 30 that forms by main computer 10 and guest machine 20; Respectively have an agent process 101 and 201 to be responsible on main computer 10 and the guest machine 20: 1) processing data packets 2) the IP address replaces 3) initiate active and standby switching; Carry out communication by adopting TCP/IP or serial ports RS235 to link between main computer and the guest machine between agency on the main computer and the agency on the guest machine; The guest machine people is for being defined as first guest machine, second guest machine etc.; Active/standby identical with the machine software and hardware configuration.
In the 3rd step, further specify the read-write operation of database local net of the present invention system:
The operation of ㈠ read data may further comprise the steps:
1. in the transaction processing system, read data operation (SQL statement character string) after network/transmission/link layer packing, enters the switch buffer memory in the TCP/IP network;
2. switch sends read data operating data bag to the active/standby machine of using by broadcast mode, and the agency on the main computer receives read data operating data bag, and the agency on the guest machine also receives read data operating data bag;
3. active/standby accept read data operating data bag with the agency on the machine after, the switching timer on main computer and the guest machine picks up counting simultaneously;
4. after the database instance on the main computer is handled SQL statement character string in the packet, return to the agency's two class data on the main computer: business datum, success/failure sign (comprises hardware, work as machine, overtime, the SQL grammer, can not find out faults such as data, further sorting processing by the agency differentiates then), processing procedure is the same with main computer on the guest machine, also returns this two classes data, if the guest machine frequency of failure reaches certain number of times, then first guest machine is substituted by former second guest machine, and the like, and alarm;
5. the agency on the main computer returns to transaction processing system with the business datum packing by the TCP/IP network, agency on the guest machine then will be separately the data returned of database all shield (all interceptions, not to transaction processing system return data bag), success/failure sign is returned to agency on the main computer by another set of network, and the agency on the main computer beams back response message to each guest machine then;
6. if the agency on the main computer monitors the database instance failure on the main frame, perhaps the switching timer on the main computer is overtime, and received the successful sign that the agency on first guest machine returns, then initiate to switch by master agent, take over main frame by first guest machine, agency on this guest machine at first initiates to replace main computer IP operation, then the business datum packing is returned to transaction processing system by switch network.This is that agency on the main computer is normal, in the time in a read data operation cycle, is initiated the situation of active and standby switching by the agency on the main computer;
7. if in the 5th step, before the switching timer expired that the agency on the guest machine started in the 4th step arrives, do not receive the response message of the agency on the main computer yet, then initiate active and standby switching by the agency on first guest machine;
8. if first guest machine is initiated active and standby handoff failure, then then initiate active and standby switching by second guest machine, all fail up to guest machine;
(2) data writing operation may further comprise the steps:
1. in the transaction processing system, data writing operation (SQL statement character string) after network/transmission/link layer packing, enters the switch buffer memory in the TCP/IP network;
2. switch sends read data operating data bag to the active/standby machine of using by broadcast mode, and the agency on the main computer receives the data writing operation packet, and the agency on the guest machine also receives the data writing operation packet;
3. active/standby accept the data writing operation packet with the agency on the machine after, the switching timer on main computer and the guest machine picks up counting;
4. after the database instance on the main computer is handled SQL statement character string in the packet, return to the agency's class data only on the main computer: success/failure sign (comprises hardware, work as machine, overtime, the SQL grammer, can not find out faults such as data, further sorting processing by the agency differentiates then), processing procedure is the same with main computer on the guest machine, also return this class data, if the guest machine frequency of failure reaches certain number of times, then first guest machine is substituted by former second guest machine, and the like, and alarm;
5. the agency on the main computer returns to transaction processing system with success/failure sign by the TCP/IP network, guest machine returns to agency on the main computer with success/failure sign by another set of network, and the agency on the main computer beams back response message to each guest machine then;
6. if the agency on the main computer monitors the database instance failure on the main frame, perhaps the switching timer on the main computer is overtime, and received the successful sign that the agency on first guest machine returns, then initiate to switch by master agent, take over main frame by first guest machine, agency on this guest machine at first initiates to replace main computer IP operation, then the business datum packing is returned to transaction processing system by switch network.This is that agency on the main computer is normal, in the time in a read data operation cycle, is initiated the situation of active and standby switching by the agency on the main computer;
7. if in the 5th step, before the switching timer expired that the agency on the guest machine started in the 4th step arrives, do not receive the response message of the agency on the main computer yet, then initiate active and standby switching by the agency on first guest machine;
8. if the agency on first guest machine initiates active and standby handoff failure, then then initiate active and standby switching by the agency on second guest machine, all fail up to guest machine;
Wherein, in the read/write data process, maximum difference is active/standby with return results difference behind the database instance treatment S QL on the machine: if reading data course, then except success/failure sign, return query results in addition, the write data process then can the return results collection, and active/standby different with the processing of machine on this, all the other are identical.
The 4th step illustrated data backup of the present invention/data reproduction process, specifically as shown in Figure 2, may further comprise the steps:
1. transaction processing system 40 is initiated the reading and writing operation, and in the local area network (LAN) of shared channel, packet can be comprised in this local area network (LAN) that all nodes of main computer 10 and guest machine 20 listen to;
2. main computer agency 101 and guest machine agency 201 receive and comprise the packet of carrying out the SQL instruction, start by " switching timer ", and simultaneously, database instance 102 on the main computer and the database instance 202 on the guest machine are also received this packet;
3. 102 pairs of this SQL operations of main computer database instance are finished, and return success/conditional codes such as failure flags, and 101 pairs of these signs of agency are sorted out judgment processing on the main computer, see Table 1:
Table 1
Fault type Classification criteria Processing procedure
Logic fault, as: the major key conflict, can not find data, table is locked ... Deng Fault can be recovered, and does not influence database manipulation next time If be asynchronous mode, agency 101 directly returns operation system 40 these operating results on the main computer; If be synchronous mode, agency 101 will return transaction processing system 40 these operating results after will waiting for and acting on behalf of 201 " end of operation " notification message on all guest machines again on the main computer
Software fault, as: database instance is worked as machine, and program exception withdraws from, communication abnormality ... Deng Fault is irrecoverable, influence database manipulation next time, but do not need manual intervention " the switching timer " that agency 101 starts on the main computer is overtime, enters the switching flow " 2 " that is triggered by " timer " among Fig. 3.
Hardware fault, as: machine is worked as machine, and network interface card is unusual, Bad Track ... Deng Fault is irrecoverable, and influence is the database manipulation of section for a long time, needs manual intervention Hardware fault has had influence on the operation of agency 101 on the main computer, can't respond acting on behalf of 201 " end of operation " notification message on the guest machine.
4. 202 pairs of this SQL operations of guest machine database instance are finished, and return success/conditional codes such as failure flags, and 201 pairs of these signs of agency are sorted out judgment processing on the guest machine, see Table 2:
Table 2
Fault type Classification criteria Processing procedure
Logic fault, as: the major key conflict, can not find data, table is locked ... Deng Fault can be recovered, and does not influence database manipulation next time The agency 101 this " end of operations " of agency 201 on the guest machine on main computer notification message
Software fault, as: database instance is worked as machine, and program exception withdraws from, communication abnormality ... Deng Fault is irrecoverable, influence database manipulation next time, but do not need manual intervention " the switching timer " that agency 201 starts on the guest machine is overtime, enters the switching flow " 2 " that is triggered by " timer " among Fig. 3, but does not switch.
Hardware fault, as: machine is worked as machine, and network interface card is unusual, Bad Track ... Deng Fault is irrecoverable, and influence is the database manipulation of section for a long time, needs manual intervention Hardware fault has had influence on the operation of agency 201 on the guest machine, can't initiate " end of operation " notification message
5. if hardware fault has had influence on and has acted on behalf of 101 operation on the main computer in the 3rd step, can't respond acting on behalf of 201 " end of operation " notification message on the guest machine, will cause that then guest machine agency 201 can not receive response and enters the switching flow " 2 " that the switching timer causes;
6. if hardware fault has had influence on and has acted on behalf of 201 operation on the guest machine in the 4th step, can't initiate " end of operation " notification message, to cause that then main computer agency 101 can not receive message, and this guest machine will be designated as inefficacy, take over contingent next time switching by next guest machine;
7. the process of data backup is in the 2nd step, finish in the 4th step, agency 201 listens to the IP packet that transaction processing system 40 mails to main computer 10 on the guest machine, and abandons not according under the normal condition, and its partition is handled follow-up supervention to database instance on the guest machine 202;
8., enter the switching flow " 1 " that message causes if agency 101 receives the success message notice of agency 201 on failure flags and the guest machine on the 4th step main computer.
At last, the active and standby machine handoff procedure of the present invention is described, specifically as shown in Figure 3, may further comprise the steps:
1. database instance 20b finishes this SQL operation on guest machine, send the message of this " end of operation " by agency 201 on the guest machine, act on behalf of after 101 on the notice main computer, if agency 201 is at the response message of not receiving on the main computer agency 101 within the certain hour on the guest machine, then beam back result such as this database manipulation success/failure flags to transaction processing system 40;
2. behind the return results, initiated to switch by agency on the guest machine 201, remaining this guest machine of guest machine of notice is upgraded to main computer, and obtains the affirmation of all normal guest machines, finishes some initial work;
3. on main computer, act on behalf of after the 101 SQL operating data bags that receive from transaction processing system 40, agency 101 starts " switching " timer on the main computer, if main computer is normal, return to main computer agency 101 time the result such as this success/failure flags of operation system, timer can be stopped zero clearing, if overtime, then initiate " switching " flow process " 2 ";
4. notify all guest machines by agency 101 on the main computer, guest machine has just been determined the replacement sequential queue when whole system is initialized, guest machine by queue heads is upgraded to main computer, main computer 10 enters the replacement rear of queue, become guest machine 20, and obtain the affirmation of all normal guest machines, finish some initial work;
5. after agency 201 IP with guest machine replace to the IP of main computer on the guest machine, can receive packet, carry out the SQL operation of database from transaction processing system 40;
6. the process of active and standby switching is finished by acting on behalf of " switching " timer of being managed on interacting message between the agency and the active and standby machine on the active and standby machine, and the former guarantees can carry out active and standby switching under the hardware fault, and the latter guarantees can carry out active and standby switching under the software fault.

Claims (10)

1. redundancy backup of database system and changing method is characterized in that, use main computer and guest machine in the same local area network (LAN), may further comprise the steps:
1.1) primary and backup machine agency carries out the same database operation to database instance separately and finish data and duplicate by intercepting the database manipulation packet of broadcasting in the Ethernet simultaneously;
1.2) database instance returns success/fail sign to correspondence agency;
1.3) main computer agency takes defeat and indicate and the guest machine agency receives and successfully indicates, then acted on behalf of by main computer agent advertisement guest machine and carry out active and standby switching.
2. according to described backup of claim 1 and changing method, it is characterized in that, described step 1.1) sets main computer in and switch timer, described step 1.3) main computer switches that timer expired main computer agency does not receive successfully/fail sign and guest machine receives successfully sign in, then initiates active and standby switching by main computer.
3. according to claim 1 or 2 described backup and changing methods, it is characterized in that described step 1.3) comprise that also guest machine agent advertisement main computer acts on behalf of the success of its correspondence/failure and indicate, the main computer agency returns response message.
4. according to described backup of claim 3 and changing method, it is characterized in that main computer agency and guest machine agency are by TCP/IP or serial ports RS235 link carrying out communication.
5. according to described backup of claim 3 and changing method, it is characterized in that, before the described guest machine agent advertisement main computer agency guest machine is set and switches timer, guest machine switches timer expired and does not receive described response message, initiates active and standby switching by receiving the guest machine agency who successfully indicates.
6. according to described backup of claim 5 and changing method, it is characterized in that described guest machine is a plurality of, initiate active and standby switching by the formation priority.
7. according to described backup of claim 5 and changing method, it is characterized in that the network interface card of described primary and backup machine is made as the Promiscuous pattern.
8. according to claim 1 or 2 described backup and changing methods, it is characterized in that described active and standby switching is that the network interface card IP address with former guest machine changes main computer IP address into, the network interface card IP address of former main computer changes other different IP addresses in the local area network (LAN) into.
9. according to described backup of claim 1 and changing method, it is characterized in that described database manipulation comprises read operation and write operation; Described step 1.1) in only main computer agency return the business datum of read operation or the success of write operation/failure indicates to the transaction processing system that sends the database manipulation packet.
10. according to described backup of claim 9 and changing method, it is characterized in that the main computer agency receives and carries out described returning after guest machine is acted on behalf of the notice of correspondence database operation response; Described response is that the guest machine agency receives successfully/fail sign.
CN2006101706243A 2006-12-22 2006-12-22 Method for switching and redundancy backup of database system Expired - Fee Related CN101207512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006101706243A CN101207512B (en) 2006-12-22 2006-12-22 Method for switching and redundancy backup of database system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006101706243A CN101207512B (en) 2006-12-22 2006-12-22 Method for switching and redundancy backup of database system

Publications (2)

Publication Number Publication Date
CN101207512A true CN101207512A (en) 2008-06-25
CN101207512B CN101207512B (en) 2011-05-11

Family

ID=39567416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006101706243A Expired - Fee Related CN101207512B (en) 2006-12-22 2006-12-22 Method for switching and redundancy backup of database system

Country Status (1)

Country Link
CN (1) CN101207512B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917263A (en) * 2010-08-16 2010-12-15 深圳市赫迪威信息技术有限公司 Multi-machine hot standby method and system
CN102546233A (en) * 2011-11-28 2012-07-04 中标软件有限公司 Method for realizing serial heartbeat in high-availability cluster
CN102841895A (en) * 2011-06-22 2012-12-26 阿里巴巴集团控股有限公司 Method and system for processing database state transition
CN103419199A (en) * 2013-07-09 2013-12-04 天津大学 Teaching system based on open type welding robot
CN104537046A (en) * 2014-12-24 2015-04-22 北京奇虎科技有限公司 Method and device for complementing data
CN104751238A (en) * 2015-03-06 2015-07-01 国家电网公司 Reserve dispatch solving method based on analyzing analysis and priority judgment
CN106126652A (en) * 2016-06-24 2016-11-16 武汉斗鱼网络科技有限公司 Mishap Database changing method and system for distributed experiment & measurement system
CN109471902A (en) * 2017-09-08 2019-03-15 阿里巴巴集团控股有限公司 A kind of database switching method, device, equipment and system
CN109491830A (en) * 2017-09-12 2019-03-19 北京京东尚科信息技术有限公司 The method and system in switch data source
CN109544827A (en) * 2018-11-27 2019-03-29 福州市台江区金科电子科技有限公司 Cash register and its application method with data backup device
CN110019484A (en) * 2018-01-04 2019-07-16 腾讯科技(深圳)有限公司 Database Systems and implementation method, management equipment, data interface unit and medium
CN110502489A (en) * 2019-08-29 2019-11-26 浪潮商用机器有限公司 A kind of GPFS storage replacement method, device and electronic equipment and storage medium
CN111225048A (en) * 2020-01-02 2020-06-02 盛科网络(苏州)有限公司 Asynchronous message synchronization method and device for OpenFlow controller
CN111324668A (en) * 2020-02-18 2020-06-23 中国联合网络通信集团有限公司 Database data synchronous processing method and device and storage medium
CN113542028A (en) * 2021-07-17 2021-10-22 辽宁工业大学 Dual-computer hot standby method for receiving data of Internet of things
CN113821376A (en) * 2021-08-19 2021-12-21 广东电力信息科技有限公司 Cloud disaster backup-based integrated backup disaster recovery method and system
CN114402568A (en) * 2019-08-02 2022-04-26 欧姆龙株式会社 Network system, information processing apparatus, and information processing method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4444688A1 (en) * 1994-12-15 1996-06-20 Abb Patent Gmbh Process for highly reliable and consistent message transmission
CN1299203C (en) * 2004-09-14 2007-02-07 中国人民解放军上海警备区司令部指挥自动化工作站 Data disaster tocerance backup control system

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101917263A (en) * 2010-08-16 2010-12-15 深圳市赫迪威信息技术有限公司 Multi-machine hot standby method and system
CN102841895A (en) * 2011-06-22 2012-12-26 阿里巴巴集团控股有限公司 Method and system for processing database state transition
CN102841895B (en) * 2011-06-22 2015-06-24 阿里巴巴集团控股有限公司 Method and system for processing database state transition
CN102546233A (en) * 2011-11-28 2012-07-04 中标软件有限公司 Method for realizing serial heartbeat in high-availability cluster
CN103419199A (en) * 2013-07-09 2013-12-04 天津大学 Teaching system based on open type welding robot
CN104537046A (en) * 2014-12-24 2015-04-22 北京奇虎科技有限公司 Method and device for complementing data
CN104537046B (en) * 2014-12-24 2018-09-11 北京奇虎科技有限公司 Supplementing Data method and apparatus
CN104751238A (en) * 2015-03-06 2015-07-01 国家电网公司 Reserve dispatch solving method based on analyzing analysis and priority judgment
CN104751238B (en) * 2015-03-06 2018-02-09 国家电网公司 Method is solved based on the back scheduling for studying and judging analysis and priority judgement
CN106126652A (en) * 2016-06-24 2016-11-16 武汉斗鱼网络科技有限公司 Mishap Database changing method and system for distributed experiment & measurement system
CN106126652B (en) * 2016-06-24 2019-03-15 武汉斗鱼网络科技有限公司 Mishap Database switching method and system for distributed experiment & measurement system
CN109471902A (en) * 2017-09-08 2019-03-15 阿里巴巴集团控股有限公司 A kind of database switching method, device, equipment and system
CN109491830A (en) * 2017-09-12 2019-03-19 北京京东尚科信息技术有限公司 The method and system in switch data source
CN110019484A (en) * 2018-01-04 2019-07-16 腾讯科技(深圳)有限公司 Database Systems and implementation method, management equipment, data interface unit and medium
CN109544827B (en) * 2018-11-27 2021-10-29 福州市台江区金科电子科技有限公司 Cash register with data backup device and use method thereof
CN109544827A (en) * 2018-11-27 2019-03-29 福州市台江区金科电子科技有限公司 Cash register and its application method with data backup device
CN114402568A (en) * 2019-08-02 2022-04-26 欧姆龙株式会社 Network system, information processing apparatus, and information processing method
CN114402568B (en) * 2019-08-02 2023-06-30 欧姆龙株式会社 Network system, information processing apparatus, and information processing method
CN110502489A (en) * 2019-08-29 2019-11-26 浪潮商用机器有限公司 A kind of GPFS storage replacement method, device and electronic equipment and storage medium
CN111225048A (en) * 2020-01-02 2020-06-02 盛科网络(苏州)有限公司 Asynchronous message synchronization method and device for OpenFlow controller
CN111225048B (en) * 2020-01-02 2022-04-15 苏州盛科通信股份有限公司 Asynchronous message synchronization method and device for OpenFlow controller
CN111324668A (en) * 2020-02-18 2020-06-23 中国联合网络通信集团有限公司 Database data synchronous processing method and device and storage medium
CN111324668B (en) * 2020-02-18 2023-11-21 中国联合网络通信集团有限公司 Database data synchronous processing method, device and storage medium
CN113542028A (en) * 2021-07-17 2021-10-22 辽宁工业大学 Dual-computer hot standby method for receiving data of Internet of things
CN113821376A (en) * 2021-08-19 2021-12-21 广东电力信息科技有限公司 Cloud disaster backup-based integrated backup disaster recovery method and system
CN113821376B (en) * 2021-08-19 2023-11-28 广东电力信息科技有限公司 Cloud disaster recovery-based integrated backup disaster recovery method and system

Also Published As

Publication number Publication date
CN101207512B (en) 2011-05-11

Similar Documents

Publication Publication Date Title
CN101207512B (en) Method for switching and redundancy backup of database system
CN101212458A (en) Database system backup method
CN106341454B (en) Across computer room distributed data base management system (DDBMS) mostly living and method
EP2281240B1 (en) Maintaining data integrity in data servers across data centers
CN100354834C (en) Multi-site remote-copy system
US7428657B2 (en) Method for rolling back from snapshot with log
CN106815097A (en) Database disaster tolerance system and method
CN101706795B (en) Method for synchronizing data of database in active/standby server
US20020194015A1 (en) Distributed database clustering using asynchronous transactional replication
DE602004005344T2 (en) METHOD, SYSTEM AND PROGRAM FOR HANDLING A FAILOVER TO A REMOTE MEMORY
US6421688B1 (en) Method and apparatus for database fault tolerance with instant transaction replication using off-the-shelf database servers and low bandwidth networks
CN101212341A (en) Database system switching method
US8862541B1 (en) N-site asynchronous replication
CN101145946B (en) A fault tolerance cluster system and method based on message log
WO2012145963A1 (en) Data management system and method
CN104503965A (en) High-elasticity high availability and load balancing realization method of PostgreSQL (Structured Query Language)
CN109117310A (en) Realize disaster tolerance system, the method and device of data backup
CN111800484B (en) Service anti-destruction replacing method for mobile edge information service system
CN103136070A (en) Method and device for processing data disaster tolerance
CN107135097A (en) The disaster tolerance system and disaster recovery method filed based on bookkeeping
CN115473908A (en) Block chain link point fault recovery method and block chain system
CN109165122B (en) Method for improving disaster recovery capability of application system same city multi-park deployment realized based on block chain technology
WO2021115043A1 (en) Distributed database system and data disaster backup drilling method
CN101448028A (en) Method for protecting continuous data, device and system thereof
JPH09186686A (en) Network management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUANGDONG HUABO ENTERPRISE MANAGEMENT CONSULTING C

Free format text: FORMER OWNER: ZTE CORPORATION

Effective date: 20141008

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518057 SHENZHEN, GUANGDONG PROVINCE TO: 510640 GUANGZHOU, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141008

Address after: 510640 Guangdong city of Guangzhou province Tianhe District gold Yinglu No. 1 was 1106 room two

Patentee after: GUANGDONG HUABO ENTERPRISE MANAGEMENT CONSULTING Co.,Ltd.

Address before: 518057 Nanshan District high tech Industrial Park, Guangdong, South Road, science and technology, ZTE building, legal department

Patentee before: ZTE Corp.

ASS Succession or assignment of patent right

Owner name: STATE GRID SHANGHAI ELECTRIC POWER COMPANY

Free format text: FORMER OWNER: GUANGDONG HUABO ENTERPRISE MANAGEMENT CONSULTING CO., LTD.

Effective date: 20141127

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 510640 GUANGZHOU, GUANGDONG PROVINCE TO: 200002 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20141127

Address after: 200002 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Address before: 510640 Guangdong city of Guangzhou province Tianhe District gold Yinglu No. 1 was 1106 room two

Patentee before: GUANGDONG HUABO ENTERPRISE MANAGEMENT CONSULTING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

CF01 Termination of patent right due to non-payment of annual fee