CN101201954B - Cash processing device - Google Patents
Cash processing device Download PDFInfo
- Publication number
- CN101201954B CN101201954B CN2007101633641A CN200710163364A CN101201954B CN 101201954 B CN101201954 B CN 101201954B CN 2007101633641 A CN2007101633641 A CN 2007101633641A CN 200710163364 A CN200710163364 A CN 200710163364A CN 101201954 B CN101201954 B CN 101201954B
- Authority
- CN
- China
- Prior art keywords
- detailed survey
- carried out
- cash
- mentioned
- settled date
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 claims description 13
- 230000008569 process Effects 0.000 claims description 13
- 230000008859 change Effects 0.000 claims description 10
- 238000000151 deposition Methods 0.000 claims description 9
- 230000008676 import Effects 0.000 claims description 5
- 230000009471 action Effects 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 21
- 238000010586 diagram Methods 0.000 description 6
- 101150047356 dec-1 gene Proteins 0.000 description 4
- 230000006870 function Effects 0.000 description 3
- 238000010200 validation analysis Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07D—HANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
- G07D11/00—Devices accepting coins; Devices accepting, dispensing, sorting or counting valuable papers
- G07D11/20—Controlling or monitoring the operation of devices; Data handling
- G07D11/24—Managing the inventory of valuable papers
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07F—COIN-FREED OR LIKE APPARATUS
- G07F19/00—Complete banking systems; Coded card-freed arrangements adapted for dispensing or receiving monies or the like and posting such transactions to existing accounts, e.g. automatic teller machines
- G07F19/20—Automatic teller machines [ATMs]
- G07F19/206—Software aspects at ATMs
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07D—HANDLING OF COINS OR VALUABLE PAPERS, e.g. TESTING, SORTING BY DENOMINATIONS, COUNTING, DISPENSING, CHANGING OR DEPOSITING
- G07D2211/00—Paper-money handling devices
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
The invention provides a cash processing device which prevents illegal actions through the random automatic detail checking operations of an operator. The manager stores the detail checking execution scheduled date which is inputted by an operation part (2) in a storing part (6) and then stores the execution date of the detail checking. When the business in the detail checking execution scheduled date is finished, an instruction for cutting off the power supply is inputted by the operator through the operation part (2). A control part (7) judges whether any detail checking is executed in the day according to the detail checking execution information, and then displays a picture for urging the operator to input the instruction for detail checking execution or changing the detail checking execution scheduled date if no detail checking is executed. The power supply is cut off when the operator executes any one operation.
Description
Technical field
The present invention relates to a kind of cash treatment of depositing and withdrawing and handling that is arranged at financial institution, carries out cash.
Background technology
In the business office of bank and other financial mechanism, be provided with the large-scale cash treatment that is called as open cash register that is used for cash in the administrative institute.
This cash treatment has: carry out the bill depositing/dispensing apparatus that paper money deposit and withdrawal is handled, carry out the coin automatic teller machine of depositing and withdrawing and handling of coin, the bank note envelope of certain number is accommodated in the cabinet of regulation or the envelope wisp payment machine of expenditure for wisp, and payment by each face amount will certain piece of number Coin packing be the cash processing units such as the excellent payment machine of money of bar-shaped money rod, the sales counter keeper (cashier) who concludes the business by sales counter and client in business office, or the operators' such as member concerning foreign affairs that conclude the business of access customer operation, follow transaction and the deposit or the processing of withdrawing the money that produce.(for example, with reference to patent documentation 1).
Patent documentation 1: TOHKEMY 2004-199360 communique (the 0002nd section, the 0010th~0014 section, Fig. 4)
Yet above-mentioned existing apparatus has following problem.
Promptly, this kind cash treatment, owing to take in a large amount of cashes, therefore termly (for example, every month final business day) carries out automatic detailed survey, confirm whether the actual cash of taking in is consistent with the existing specified number certificate of just having upgraded whenever having carried out concluding the business in each cash processing unit, but so regular detailed survey, owing to know the date of carrying out detailed survey in advance, therefore the operator might carry out following unlawful activities etc.: do not deposit the cash that should deposit in and divert in other purpose, cash is put back to before detailed survey again.
Particularly, the financial Room instructs financial institution will take to prevent the countermeasure of unlawful activities, and from this point, financial institution also needs to prevent unlawful activities.
Summary of the invention
The present invention is a problem to solve such problem.
For this reason, cash treatment of the present invention, possesses the cash processing unit of depositing and withdrawing and handling that carries out cash, and function with detailed survey, in this detailed survey, to count and the count results of taking in cash that obtains by above-mentioned cash processing unit, the existing specified number certificate of handling the storage part that just upgrades is checked with having carried out whenever above-mentioned cash processing unit depositing and withdrawing, judge consistent inconsistent, it is characterized in that, above-mentioned storage part, its storage detailed survey is carried out the pre-settled date, and store it and carry out day when having carried out detailed survey, this cash treatment also comprises control part, and this control part is when having imported the indication of deenergization, if above-mentioned detailed survey is carried out the pre-settled date, then judge this day whether to have carried out detailed survey according to above-mentioned detailed survey fulfillment information, when not carrying out detailed survey, prompting operation person imports detailed survey implementation indication or the change detailed survey is carried out the pre-settled date, after having carried out wherein any one operation, power supply is disconnected.
Like this, when the present invention carries out the service ending on pre-settled date at the detailed survey that is stored in storage part in advance, when having imported the indication of deenergization by the operator, investigate this day and whether carried out detailed survey, when not carrying out detailed survey, show and urge enforcement detailed survey or change detailed survey to carry out the information on pre-settled date, so can make the operation of the automatic detailed survey that the operator happens suddenly, therefore can prevent unlawful activities, and, even also must be when changing detailed survey and carrying out pre-settled date to supvr's request that due authority is arranged, so effect of the unlawful activities that can be inhibited, financial institution can use the cash treatment of having realized preventing unlawful activities thus, and this prevents that unlawful activities from being to conform to the guidance in the financial Room.
Description of drawings
Fig. 1 is the block diagram of expression first embodiment.
Fig. 2 is the process flow diagram of the effect of expression first embodiment.
Fig. 3 carries out the figure of the setting picture on pre-settled date for the detailed survey of expression second embodiment.
Fig. 4 is the figure of the detailed survey table of expression second embodiment.
Fig. 5 is the process flow diagram of the effect of expression second embodiment.
Fig. 6 is the figure of the information frame of expression second embodiment.
Symbol description: 1... display part; 2... operating portion; 3... card reader; 4... printer; 5... cash processing unit; 6... storage part; 7... control part
Embodiment
Below, the embodiment to cash treatment of the present invention describes with reference to accompanying drawing.
Fig. 1 is the block diagram of first embodiment of expression cash treatment.
In the drawings, 1 display part for constituting by LCD etc., show the menu screen of option dealing or the operation guide picture of selected transaction etc., 2 for being used for the operating portions such as keyboard of information input, 3 for the card from the operator that operates this device etc. reads the card reader of identifying information etc., and 4 for printing on transaction results or detailed survey result etc. the printer of detail form etc., and 5 is the cash processing unit, 6 is storage part, and 7 is the control part that is connected with these inscapes of 1~6.
Cash processing unit 5 is the bank note storage money machine shown in the above-mentioned patent documentation 1, coin storage money machine, envelope wisp payment machine, money rod payment machine etc.
Store existing specified number certificate, detailed survey information and detailed survey registration form etc. in storage part 6, wherein, existing specified number is according to comprising the information of importing when concluding the business, piece number and the amount of money that is accommodated in each face amount cash (currency or coin) of each cash processing unit 5; Its detailed survey result and date of execution when whether the detailed survey information representation has been implemented the information of detailed survey and implemented detailed survey; Set the pre-settled date of implementation of registration detailed survey in the detailed survey registration form.
In addition, in addition, the control program (software) that is used for the control device action also is stored in storage part 6, and in addition, the picture data of the hint image of each treatment step in the menu screen that option dealing is used and each transaction and input picture etc. also is stored in this storage part 6.
Describe at this detailed survey cash treatment.
The cash treatment that in financial institution, uses as cash register, carried out once the detailed survey of cash to twice device in common one month, the operator of device utilizes operating portion 2 selections to be shown in " detailed survey " of the menu screen of display part 1, and control part 7 is carried out detailed surveies thus.
The process of detailed survey is, according to the indication of control part 7, by each cash processing unit 5 bank note and coin are derived successively, and one piece of one piece of ground distinguishes face amount, at par carries out the counting of currency or coin again.
At this moment, for indistinguishable bank note and coin, be delivered to earlier and reject safety cabinet and be accommodated in wherein, the distinguishing of all currency and coinses, count end after, the operator from reject safety cabinet with its taking-up, put into device once more and count automatically, while or operator oneself with the naked eye confirm to count, and by its count results of operating portion 2 input.
For wisp, money rod, moving singly under the situation about counting, generally need soar the earlier preparation of safety cabinet etc., but because the size of wisp and money rod is certain, therefore, can be disclosed as for example Japanese kokai publication hei 11-238161 communique or Japanese kokai publication hei 07-021439 communique, utilize sensor to count.
Automatic detailed survey like this can shorten time of detailed survey, therefore can be when the clearing of funds on account of checking one day, also can be when the service ending of disconnecting device power supply etc. implementation.
Then, the detailed survey among first embodiment being carried out the setting registration on pre-settled date describes.
In addition, the below action of Shuo Ming each one is controlled by control part 7 according to the control program that is stored in storage part 6 (software), for reading picture data etc. by control part 7 from storage part 6 grades, omits its explanation.
Carrying out the setting registration on pre-settled date for detailed survey, the common operator of use device, is that operators such as sales counter keeper and member concerning foreign affairs can not carry out, and the supvr who only has regulation authorities such as control power can set registration.
The supvr utilizes the menu screen that is shown in display part 1 to select detailed survey to carry out the setting on pre-settled date, makes card reader 3 read the identifying information of the card of oneself.
When control part 7 was the supvr according to the validation of information that reads from card reader 3, the setting picture of detailed survey being carried out the pre-settled date was shown in display part.
The setting picture that this detailed survey is carried out the pre-settled date is the picture that is used to import the pre-settled date of implementation of detailed survey, and the supvr carries out the pre-settled date according to this picture by operating portion 2 input detailed surveies.
The detailed survey of input is carried out the pre-settled date and is stored in the registration form that is set in the storage part 6.
Fig. 2 describes according to the step of representing with S among the figure for the process flow diagram of the effect of the first above-mentioned embodiment of expression.
When service ending during the indication of operator by operating portion 2 input disconnecting device power supplys (S1), control part 7 retrieve stored are set table in the detailed survey of storage part 6, judge whether this day is that detailed survey is carried out the pre-settled date (S2), carry out the pre-settled date if not detailed survey, control part 7 comes into force and the end process (S7) of disconnecting device power supply the indication of deenergization.
If detailed survey is carried out the pre-settled date, then control part 7 confirms this day whether to have carried out detailed survey (S3) from storage part 6 retrieval detailed survey fulfillment information.
Its result, when this day having carried out detailed survey, carry out the end process (S7) of disconnecting device power supply, processing finishes, when not carrying out detailed survey, control part 7 makes the indication of deenergization invalid, and shows that on display part 1 urgency input detailed survey is carried out indication or the change detailed survey is carried out the information frame on pre-settled date.
On this information frame, showing that " this day is carried out the pre-settled date for detailed survey.Please implement detailed survey or change the pre-settled date." etc. information the time, also show " affirmation " key.
After the operator is seeing that this picture is pressed " affirmation " key, control part 7 is the display menu picture on display part 1, when the operator has selected implementation detailed survey (S4) on this menu screen, control part 7 makes each cash processing unit 5 carry out said counting, its count results and existing specified number certificate are checked, carry out detailed survey (S5), after the implementation, control part 7 comes into force and the end process (S7) of disconnecting device power supply the indication of deenergization.
On the other hand, when the change detailed survey is carried out pre-settled date (S4), if the operator is not the supvr, then this operator will ask to change detailed survey to the supvr and carry out the pre-settled date.
Detailed survey is carried out the change on pre-settled date, similarly carry out with the situation of carrying out the setting registration that above-mentioned detailed survey carries out the pre-settled date, changed detailed survey and carried out predetermined (S6) in the future, control part 7 comes into force and the end process (S7) of disconnecting device power supply the indication of deenergization.
First embodiment according to above explanation, in advance detailed survey being carried out the pre-settled date is registered in storage part, after when this detailed survey is carried out the service ending on pre-settled date, having imported the indication of deenergization by the operator, investigate this day and whether carried out detailed survey, when not carrying out detailed survey, owing to show and urge implementation indication of input detailed survey or change detailed survey to carry out the information on pre-settled date, so, can make the operation of the automatic detailed survey that the operator happens suddenly, therefore can prevent unlawful activities, and, even changing detailed survey carries out the pre-settled date and also must therefore can obtain suppressing the effect of unlawful activities, thus to the supvr request that due authority is arranged, financial institution can use the cash treatment of having realized preventing unlawful activities, and this prevents that unlawful activities from being to conform to the guidance in the financial Room.
In addition, be registered in cash treatment itself, so be effective especially for the cash treatment of using as the open cash register of absolute version because detailed survey is carried out the pre-settled date.
Secondly, second embodiment is described.
The structure of this second embodiment is the same with first embodiment, in addition, and the below action of Shuo Ming each one, according to the control program that is stored in storage part 6 (software), control by control part 7,, omit its explanation for reading picture data etc. from storage part 6 grades by control part 7.
Below the detailed survey among this second embodiment carried out the setting registration on pre-settled date describe.
This second embodiment too, carry out the setting registration on pre-settled date for detailed survey, the common operator of use device, be that operators such as sales counter keeper or member concerning foreign affairs can not carry out, the supvr who only has regulation authorities such as control power can set registration.
At first, have the supvr of regulation authorities such as control power, under the menu screen that is shown in display part 1, select detailed survey to carry out the setting on pre-settled date, make card reader 3 read the identifying information of the card of oneself.
When control part 7 was the supvr according to the validation of information that reads from card reader 3, the setting picture that makes detailed survey carry out the pre-settled date was shown in display part.
Fig. 3 carries out the figure of the setting picture example on pre-settled date for this detailed survey of expression.
The cash treatment that in financial institution, uses as cash register, carried out once the detailed survey of cash to twice device in common one month, Fig. 2 shows and can set the example that the detailed survey that carried out twice detailed survey in month is carried out the pre-settled date, but be not limited to this, also can set carry out once or more than three times the detailed survey of detailed survey carry out the pre-settled date.
The supvr according to this picture by operating portion 2 input for the first time and secondary separately detailed survey carry out the pre-settled date and confirm the moment.
In (during deenergization) one when confirming constantly to be chosen as the clearing of the every day that is predetermined by financial institution and when finishing the service ending of use of device.
At this, clearing are meant following processing: carry out the deposit of a day of financial institution regulation (for example noon before that day 2 to 2 pm this day), whole transaction data of withdrawing the money etc. and one day the finish time cash amount of taking in each cash processing unit affirmation etc.
Example for Fig. 3, show input " Dec 01 " as the pre-settled date of primary implementation, when confirming constantly be service ending that is " 2 ", and input " Dec 15 " as the pre-settled date of secondary implementation, confirm constantly when settling accounts that is the situation of " 1 ".
The detailed survey that is transfused to is carried out the pre-settled date and is confirmed and constantly is stored in the detailed survey setting table that is set in storage part 6.
Fig. 4 sets the figure of the memory contents example in the table for the expression detailed survey, and above-mentioned such first time of importing and secondary separately detailed survey are carried out the pre-settled date and confirmed and constantly store explicitly.
In addition, be set with the OK condition of allowing the disconnecting device power supply in this table, as long as " 1 " of this OK condition is for having implemented detailed survey, and " 2 " are for requiring count results and showing specified number according to consistent.
Fig. 5 describes according to the step of representing with S among the figure for the process flow diagram of the effect of above-mentioned second embodiment of expression.
In addition, at this, carry out the pre-settled date with detailed survey as utilizing above-mentioned Fig. 3 explanation and be " Dec 1 ", confirm constantly for " 2 ", when being service ending, the OK condition is " 2 ", be detailed survey as a result the situation of unanimity (count results with now specified number according to consistent) be that example describes.
When the operator has imported the indication of disconnecting device power supply by operating portion 2 when service ending (S1), control part 7 retrieve stored are in the registration form of storage part 6 and investigate detailed survey and carry out the pre-settled date, judge whether this day is that detailed survey is carried out the pre-settled date (S2).
Neither Dec 1 neither Dec 15 time, promptly be detailed survey when carrying out pre-settled date, control part 7 comes into force and the end process (S8) of disconnecting device power supply the indication of deenergization as Ben Ri.
When this day when the Dec 1, when detailed survey is carried out pre-same day on settled date, retrieve stored confirms whether carried out detailed survey (S3) in the detailed survey information of storage part 6, when when carrying out detailed survey this Dec 1, judges detailed survey result consistent or inconsistent (S4).
When the detailed survey result is consistent, promptly in practiced detailed survey, with the cash of each cash processing unit 5, be that the existing specified number of count results and the cash that is stored in storage part 6 of currency or coin is according to checking, when consistent, control part 7 comes into force and the end process (S8) of disconnecting device power supply the indication of deenergization, and processing finishes.
When not carrying out detailed survey, or the detailed survey result is when inconsistent, and control part 7 makes the indication of deenergization invalid, shows the information frame (S5) of urging the input detailed survey to carry out indication on display part 1.
Fig. 6 is the figure of this information frame of expression, is showing that " this day is the pre-settled date of detailed survey.Please implement detailed survey." etc. information the time, also show " affirmation " key.
The operator is seeing that control part 7 is the display menu picture on display part 1 when this picture is pressed " affirmation " key (S6), and when having selected the implementation detailed survey under this menu screen, control part 7 is carried out detailed survey (S7).
Promptly, 5 pairs of cashes of control part 7 each cash processing unit of indication are counted, thus, after each cash processing unit 5 had carried out counting, control part 7 was checked its count results and the existing specified number certificate of the cash that is stored in storage part 6, judge unanimity whether (S4), if inconsistent, then carry out the processing that begins from S4 repeatedly, if consistent, then control part 7 comes into force and the end process (S8) of disconnecting device power supply the indication of deenergization, and processing finishes.
In addition, in the above-mentioned example, to the OK condition of detailed survey table be " 2 ", be detailed survey as a result the situation of unanimity be illustrated, if but the OK condition be " 1 ", promptly carry out detailed survey, the processing of then omitting above-mentioned S4.
In addition, detailed survey shown in Figure 4 is carried out the pre-settled date and is also carried out and above-mentioned same processing during for " Dec 15 ".At this moment, confirm the moment for " 1 ", when promptly settling accounts, therefore the input that is treated to of above-mentioned S1 " is settled accounts indication ", implementation clearing in S8.
Second embodiment according to above explanation, except can obtain with the same effect of first embodiment, because in the time of will implementing detailed survey and be appointed as service ending and any one when settling accounts, therefore, can also obtain following effect: the transaction situation that can carry out the pre-settled date with the situation and the detailed survey in the shop that is provided with cash treatment etc. is correspondingly taked counter-measure flexibly, and then, because the existing specified number of the count results of the cash of each cash processing unit and the cash that is stored in storage part 6, so can obtain and can more strictly find as condition according to consistent in the time of can be with detailed survey, the effect of control unlawful activities.
In addition, among above-mentioned first, second embodiment, the operating portion 2 that the supvr operates cash treatment is imported detailed survey and is carried out the pre-settled date etc., set registration, but, be connected in online mode at cash treatment under the situation of system of epigyny devices such as server, also can receive and utilize the detailed survey of epigyny device input carry out the pre-settled date, and be registered in the detailed survey table of storage part 6 by cash treatment.
Claims (5)
1. cash treatment, possesses the cash processing unit of depositing and withdrawing and handling that carries out cash, and has the function of carrying out detailed survey, in this detailed survey, will by above-mentioned cash processing unit count and the count results of taking in cash that obtains, with carried out whenever above-mentioned cash processing unit depositing and withdrawing handle the storage part that just upgrades existing specified number according to checking, judge that unanimity is inconsistent, it is characterized in that
Above-mentioned storage part, its storage detailed survey is carried out the pre-settled date, and stores it and carry out day when having carried out detailed survey;
This cash treatment also comprises control part, this control part is when having imported the indication of deenergization, if above-mentioned detailed survey is carried out the pre-settled date, then judge this day whether to have carried out detailed survey according to the detailed survey fulfillment information, when not carrying out detailed survey, prompting operation person imports that detailed survey is carried out indication or the change detailed survey is carried out the pre-settled date, carried out wherein any one operation after, power supply is disconnected.
2. cash treatment, possesses the cash processing unit of depositing and withdrawing and handling that carries out cash, and has the function of carrying out detailed survey, in this detailed survey, will by above-mentioned cash processing unit count and the count results of taking in cash that obtains, with carried out whenever above-mentioned cash processing unit depositing and withdrawing handle the storage part that just upgrades existing specified number according to checking, judge that unanimity is inconsistent, it is characterized in that
Above-mentioned storage part is carried out the pre-settled date with detailed survey and is stored in above-mentioned storage part, and stores it and carry out day when having carried out detailed survey;
This cash treatment also comprises control part, this this control part is when any one indication of having imported service ending and clearing, if above-mentioned detailed survey is carried out the pre-settled date, then judge this day whether to have carried out detailed survey according to the detailed survey fulfillment information, when not carrying out detailed survey, after prompting operation person imports detailed survey and carries out indication and carried out detailed survey, implement deenergization or settlement process.
3. cash treatment according to claim 1 and 2 is characterized in that,
Above-mentioned detailed survey is carried out the pre-settled date and is utilized this cash treatment input.
4. cash treatment according to claim 1 and 2 is characterized in that,
It is to receive from the epigyny device that is connected with this cash treatment that above-mentioned detailed survey is carried out the pre-settled date.
5. cash treatment according to claim 1 and 2 is characterized in that,
Import above-mentioned detailed survey by prompting operation person and carry out the detailed survey that indication is carried out, with count results with show specified number according to consistent be condition.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2006333491 | 2006-12-11 | ||
JP2006-333491 | 2006-12-11 | ||
JP2006333491A JP5030570B2 (en) | 2006-12-11 | 2006-12-11 | Cash processing equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101201954A CN101201954A (en) | 2008-06-18 |
CN101201954B true CN101201954B (en) | 2011-08-17 |
Family
ID=39517105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007101633641A Expired - Fee Related CN101201954B (en) | 2006-12-11 | 2007-10-19 | Cash processing device |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP5030570B2 (en) |
KR (1) | KR100901681B1 (en) |
CN (1) | CN101201954B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5664393B2 (en) * | 2011-03-23 | 2015-02-04 | 沖電気工業株式会社 | Cash processing apparatus and cash processing system |
JP2015156141A (en) * | 2014-02-20 | 2015-08-27 | 富士電機株式会社 | Automatic teller machine and balance management method of automatic teller machine |
JP5844417B2 (en) * | 2014-05-23 | 2016-01-13 | グローリー株式会社 | Money handling apparatus and money handling system |
JP6550948B2 (en) * | 2015-06-12 | 2019-07-31 | 沖電気工業株式会社 | Cash handling equipment |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6598170B1 (en) * | 1999-02-26 | 2003-07-22 | Fujitsu Limited | Power supply control based on preset schedule with independent schedule monitor and backup system for executing schedule operation when malfunction occurs |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020009255A (en) * | 2000-07-25 | 2002-02-01 | 이재관 | Automatic System and Method for Management of CD/ATM |
JP4050888B2 (en) | 2001-10-16 | 2008-02-20 | グローリー株式会社 | Cash machine |
JP4284514B2 (en) | 2003-10-20 | 2009-06-24 | 株式会社三井住友銀行 | ATM remote management method, management system, and ATM |
KR100650348B1 (en) * | 2004-06-21 | 2006-11-29 | 노틸러스효성 주식회사 | Optimization for Distribution of Sending in Cash of ATM |
-
2006
- 2006-12-11 JP JP2006333491A patent/JP5030570B2/en not_active Expired - Fee Related
-
2007
- 2007-10-19 KR KR1020070105681A patent/KR100901681B1/en not_active IP Right Cessation
- 2007-10-19 CN CN2007101633641A patent/CN101201954B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6598170B1 (en) * | 1999-02-26 | 2003-07-22 | Fujitsu Limited | Power supply control based on preset schedule with independent schedule monitor and backup system for executing schedule operation when malfunction occurs |
Also Published As
Publication number | Publication date |
---|---|
KR100901681B1 (en) | 2009-06-08 |
JP2008146389A (en) | 2008-06-26 |
KR20080053879A (en) | 2008-06-16 |
CN101201954A (en) | 2008-06-18 |
JP5030570B2 (en) | 2012-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100235531B1 (en) | Electronic money transaction method of atm | |
WO2013098556A1 (en) | A user terminal system | |
CN101201954B (en) | Cash processing device | |
JP2012203703A (en) | Cash processor | |
CN101197058B (en) | Automatic teller machine | |
RU113044U1 (en) | SIM CARD AUTOMATIC | |
CN101847291A (en) | Automatic dealing method and device | |
JP2018142036A (en) | Automatic transaction device, automatic transaction system, and automatic transaction program | |
JP4867360B2 (en) | Automated trading system | |
JP7106831B2 (en) | Cash management device and cash management system | |
JP4706346B2 (en) | Automatic transaction equipment | |
JP4050879B2 (en) | Cash processing machine and its inspection method | |
JP2015176551A (en) | teller machine management system | |
US20220398570A1 (en) | Method for perfroming currency exchange operations and a system for implementation thereof | |
JP7134281B2 (en) | Deposit/withdrawal management system, deposit/withdrawal management device, and deposit/withdrawal management method | |
JP2014149596A (en) | Automatic transaction apparatus and automatic transaction method | |
JPH11144122A (en) | Automatic transaction system | |
US20220292494A1 (en) | Money processing device, method of resolving abnormality of money processing device, and computer-readable recording medium | |
JP5691570B2 (en) | Monitoring monitor system, automatic transaction apparatus and monitoring monitor | |
KR102120978B1 (en) | Automatic teller machine and deal method of using the machine | |
JP6756117B2 (en) | Cash processing device | |
AU2024203385A1 (en) | Establishing a casino line of credit based on cryptocurrency held in a casino controlled custodian account | |
JP2008046974A (en) | Cash processing system | |
JPH09190484A (en) | Cash processor and automatic transaction system | |
KR20060041564A (en) | Method of banking without card or bankbook in coin dealing atm and recording media in which the program implementing that method is saved |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110817 Termination date: 20211019 |
|
CF01 | Termination of patent right due to non-payment of annual fee |