CN101196005A
CN101196005A CNA2006101299321A CN200610129932A CN101196005A CN 101196005 A CN101196005 A CN 101196005A CN A2006101299321 A CNA2006101299321 A CN A2006101299321A CN 200610129932 A CN200610129932 A CN 200610129932A CN 101196005 A CN101196005 A CN 101196005A
Authority
CN
China
Prior art keywords
drilled
stake
drill bit
steel pipe
immersed tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2006101299321A
Other languages
English (en)
Inventor
王翎羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAI'EN MARINE ENGINEERING TECHN SERVICE Co Ltd TIANJIN
Original Assignee
HAI'EN MARINE ENGINEERING TECHN SERVICE Co Ltd TIANJIN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAI'EN MARINE ENGINEERING TECHN SERVICE Co Ltd TIANJIN filed Critical HAI'EN MARINE ENGINEERING TECHN SERVICE Co Ltd TIANJIN
Priority to CNA2006101299321A priority Critical patent/CN101196005A/zh
Publication of CN101196005A publication Critical patent/CN101196005A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

一种海上钻吸桩结构及其施工方法。在钻头(11)破土钻进时沉管钻进钻机主机上的高压水泵(18)通过钻杆中心管道向钻头下方供高压水,形成高压泥浆,通过隔板上按装的单向阀(7)及连接的排浆管道(9)将泥浆排出钻吸桩外。钻头由钻吸桩的密封仓上部开始钻进破土到钻吸桩的最底部,将密封仓内的土塞全部清除排出钻吸桩外,钻头停钻同时高压水泵(18)停止供水。启动钻机上的潜污泵,锥形隔板上单向阀(7)关闭使下部成密封空间,潜污泵(19)将密封空间内的海水排出,形成负压,钻吸桩在海水压力下沉入海床,在钻吸桩下沉时钻头托在泥面上不动,钻吸桩的锥形隔板沿钻杆(10)下降到钻头处,停止潜污泵排水,钻吸桩完成一次钻进。重复前面的操作使钻吸桩成步进式沉管钻进方式进入海床,完成钻吸桩的打入施工。

Description

钻吸桩结构及其施工方法
技术领域
本发明属于海上钻吸桩结构及其施工方法的创新。
背景技术
目前海上钢管桩基础为直、斜钢管桩,其钢管桩采用打桩船上的大型打桩锤将大直径钢管桩入泥基础段打入海底泥面以下,钢管桩上部露出水面。整个打桩施工需要有大型浮吊打桩船,大型打桩锤,施工周期长、费用高。
发明内容
为了克服传统海上钢管桩打桩的大型打桩锤施工周期长费用高,特别是打水下桩还要专用水下打桩锤,本发明提供了一种海上钻吸桩结构设计和沉桩施工方法,克服了传统打桩施工的局限性和降低了打桩费用。
本发明所采用的技术方案是:在钻吸钢管桩底部焊接有圆形隔板,隔板中心设计有导向轴套,钻杆在导向轴套内旋转同时可以上下滑动,隔板上设计有两个排泥浆孔,其上按装有大规格单向阀,钻头向下钻进时通过排泥浆孔、单向阀打开向桩筒外排泥浆,在吸力沉管时单向阀关闭使钢管桩的锥形隔板下部成密封空间,钻杆为中空管状,是高压水的通道,钻杆下方与倒锥板形钻头连接。钻杆上方有可以方便脱开的联轴器,沉管钻进钻机主机动力轴通过联轴器驱动钻杆使钻头转动破土钻进。在钢管桩下部锥形隔板上方对称设计有两个矩形导向条,其作用是使沉管钻进钻机主机可以沿导向条上下移动同时克服钻机钻进时产生的扭矩的反力。在钻头破土钻进时沉管钻进钻机主机安装上的高压水泵通过钻杆中心管道向钻头下方供高压水,将钻头破下的土和高压水形成高压泥浆,通过隔板上按装的两个大规格单向阀及其连接的排浆管道将桩筒内的泥浆排出钢管桩外。钻头由钢管桩的密封仓上部开始钻进破土到钢管桩的最底部,将密封仓内的土塞全部清除排出钢管桩外,钻头停钻同时高压水泵停止供水。接下来启动沉管钻进钻机主机上安装的潜污泵,钢管桩锥形隔板上单向阀关闭使下部成密封空间,潜污泵将钢管桩底部密封空间内的海水排除,使其形成负压钢管桩在海水压力下沉入海床,在钢管桩下沉过程中钻头托在泥面上不动,钢管桩的锥形隔板沿钻杆下降到钻头处,停止沉管钻进钻机主机上安装的潜污泵,钢管桩也停止钻进完成一次钻进。重复前面的操作使钢管桩成步进式沉管钻进方式进入海床,完成钢管桩的打入施工。
本发明的成果是,解决了水下桩的施工难度,沉管钻进钻机结构简单,适合于钻吸桩基础的施工,缩短了施工进度和降低了打桩费用。
附图说明
本发明的海上钻吸桩沉管钻进钻机结构和施工步骤由图示进一步说明。
图1是海上钻吸桩沉管钻进钻机结构示意图。
图2、图3、图4是海上钻吸桩沉管钻进施工过程示意图。
图2a为驱动钻杆使钻头转动破土钻进示意图。
图2b为钻头破下的土和高压水形成高压泥浆、排浆示意图。
图3c为钻头由钢管桩的密封仓上部开始钻进破土到钢管桩的最底部示意图。
图3d为钢管桩底部密封仓排水负压沉管示意图。
图4为完成钢管桩的打入施工示意图。
图1中:
(1)海面  (2)泥面  (3)钻吸桩  (4)导向条  (5)锥形隔板  (6)排浆孔(7)大规格单向阀  (8)导向轴套  (9)排浆软管  (10)钻杆  (11)倒锥板形钻头(12)自脱开联轴器  (13)沉管钻进钻机主机支架  (14)滑靴  (15)集浆室  (16)总排浆管(17)液压马达  (18)液动高压水泵  (19)液动潜污泵
具体实施方式
钻吸桩定位后吊放到海中插入泥面(2),驱动钻杆使钻头转动破土钻进如图2a所示。启动液压马达(17)和液压高压水泵(18),沉管钻进钻机主机液压马达(17)动力轴通过联轴器(12)驱动钻杆(10)使倒锥板形钻头(11)转动破土钻进。钻头破下的土和高压水形成高压泥浆如图2b所示。排浆液动高压水泵(18)通过钻杆中心管道向钻头(11)下方供高压水,将钻头破下的土和高压水形成高压泥浆,通过锥形隔板(5)上按装的两个大规格单向阀(7)及其连接的排浆软管(9)将桩筒内的泥浆排出钢管桩(3)外。倒锥板形钻头(11)由钢管桩(3)的密封仓上部开始钻进破土到钢管桩(3)的最底部如图3c所示。将密封仓内的土塞全部清除排出钢管桩(3)外,倒锥板形钻头(11)停钻同时液动高压水泵(18)停止供水。钢管桩底部密封仓排水负压沉管如图3d所示。过程如下,启动沉管钻进钻机主机上安装的液动潜污泵(19),钢管桩锥形隔板(5)上单向阀关闭使下部成密封空间,潜污泵将钢管桩底部密封空间内的海水排除,使其形成负压钢管桩在海水压力下沉入海床,在钢管桩下沉过程中钻头托在泥面上不动,钢管桩的锥形隔板沿钻杆下降到钻头处,停止沉管钻进钻机主机上安装的潜污泵,钢管桩也停止钻进完成一次钻进。重复前面的操作使钢管桩成步进式沉管钻进方式进入海床。吊出沉管钻进钻机主机,完成钻吸钢管桩的打入施工如图4所示。

Claims (4)

1.一种海上钻吸桩结构,其特征是:在海上钻吸桩底部安装有锥形隔板和不可回收的钻头和钻杆,其上安装有沉管钻进钻机主机驱动钻头破土钻进,同时提供高压水形成泥浆排除钢管桩外,其后潜污泵将钢管桩底部密封空间内的海水排除,使其形成负压钢管桩在海水压力下沉桩,重复操作使钢管桩成步进式沉管钻进方式进入海床,完成钢管桩的打入施工。
2.根据权利要求1所述的海上钻吸桩,其特征是:在海上钻吸桩底部焊接有圆形隔板,隔板中心设计有导向轴套,钻杆在导向轴套内旋转同时可以上下滑动,隔板上设计有两个排泥浆孔,其上按装有大规格单向阀,钻头向下钻进时通过排泥浆孔、单向阀打开向桩筒外排泥浆,在吸力沉管时单向阀关闭使钢管桩的锥形隔板下部成密封空间,钻杆为中空管状,是高压水的通道,钻杆下方与倒锥板形钻头连接。钻杆上方有可以方便脱开的联轴器,沉管钻进钻机主机动力轴通过联轴器驱动钻杆使钻头转动破土钻进。在钢管桩下部锥形隔板上方对称设计有两个矩形导向条,其作用是使沉管钻进钻机主机可以沿导向条上下移动同时克服钻机钻进时产生的扭矩的反力。
3.根据权利要求1所述的沉管钻进钻机主机,其特征是:沉管钻进钻机主机上装有液压马达、液力驱动高压水泵、液力驱动潜污泵,通过钻杆中心管道向钻头下方供高压水,将钻头破下的土和高压水形成高压泥浆,通过隔板上按装的两个大规格单向阀及其连接的排浆管道将桩筒内的泥浆排出钢管桩外。
4.根据权利要求1所述的钻吸桩成步进式沉管钻进方式完成钻吸桩的打入施工,其特征是:钻头由钻吸桩的密封仓上部开始钻进破土到钻吸桩的最底部,将密封仓内的土塞全部清除排出钻吸桩外,钻头停钻同时高压水泵停止供水,启动沉管钻进钻机主机上安装的潜污泵,钻吸桩锥形隔板上单向阀关闭使下部成密封空间,潜污泵将钻吸桩底部密封空间内的海水排除,使其形成负压钻吸桩在海水压力下沉入海床,在钻吸桩下沉过程中钻头托在泥面上不动,钻吸桩的锥形隔板沿钻杆下降到钻头处,停止沉管钻进钻机主机上安装的潜污泵,完成一次钻进,重复操作使钻吸桩成步进式沉管钻进方式进入海床,完成钻吸桩的打入施工。
CNA2006101299321A 2006-12-08 2006-12-08 钻吸桩结构及其施工方法 Pending CN101196005A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2006101299321A CN101196005A (zh) 2006-12-08 2006-12-08 钻吸桩结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2006101299321A CN101196005A (zh) 2006-12-08 2006-12-08 钻吸桩结构及其施工方法

Publications (1)

Publication Number Publication Date
CN101196005A true CN101196005A (zh) 2008-06-11

Family

ID=39546613

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2006101299321A Pending CN101196005A (zh) 2006-12-08 2006-12-08 钻吸桩结构及其施工方法

Country Status (1)

Country Link
CN (1) CN101196005A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914921A (zh) * 2010-09-15 2010-12-15 徐国彬 海上风工程用新式桩基及其成桩方法
CN102906339A (zh) * 2010-05-28 2013-01-30 西门子公司 辅助将桩安装在海床中的设备、海上基础结构和建立海上基础的方法
CN103061341A (zh) * 2013-01-15 2013-04-24 江苏汤辰机械装备制造有限公司 中掘沉桩施工方法
CN103243717A (zh) * 2012-02-08 2013-08-14 中国石油化工股份有限公司 一种辅助拔桩机构及其使用方法
CN103924924A (zh) * 2013-01-11 2014-07-16 崔刚明 一种垂直钻井装置
CN105951826A (zh) * 2016-05-04 2016-09-21 太原理工大学 一种管桩内吸力地锚装置及其水压贯入方法
CN110593761A (zh) * 2019-10-22 2019-12-20 徐州盾安重工机械制造有限公司 泵吸全套管钻机
CN112009624A (zh) * 2020-08-05 2020-12-01 上海外高桥造船有限公司 一种远洋客船靠岸定位栓柱结构
CN110593761B (zh) * 2019-10-22 2024-06-07 上海工程机械厂有限公司 泵吸全套管钻机

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102906339A (zh) * 2010-05-28 2013-01-30 西门子公司 辅助将桩安装在海床中的设备、海上基础结构和建立海上基础的方法
CN102906339B (zh) * 2010-05-28 2015-11-25 西门子公司 辅助将桩安装在海床中的设备、海上基础结构和建立海上基础的方法
CN101914921A (zh) * 2010-09-15 2010-12-15 徐国彬 海上风工程用新式桩基及其成桩方法
CN103243717A (zh) * 2012-02-08 2013-08-14 中国石油化工股份有限公司 一种辅助拔桩机构及其使用方法
CN103924924A (zh) * 2013-01-11 2014-07-16 崔刚明 一种垂直钻井装置
CN103061341A (zh) * 2013-01-15 2013-04-24 江苏汤辰机械装备制造有限公司 中掘沉桩施工方法
CN105951826A (zh) * 2016-05-04 2016-09-21 太原理工大学 一种管桩内吸力地锚装置及其水压贯入方法
CN110593761A (zh) * 2019-10-22 2019-12-20 徐州盾安重工机械制造有限公司 泵吸全套管钻机
CN110593761B (zh) * 2019-10-22 2024-06-07 上海工程机械厂有限公司 泵吸全套管钻机
CN112009624A (zh) * 2020-08-05 2020-12-01 上海外高桥造船有限公司 一种远洋客船靠岸定位栓柱结构

Similar Documents

Publication Publication Date Title
CN102678040B (zh) 煤矿巷道底板钻孔装置及方法
CN101196005A (zh) 钻吸桩结构及其施工方法
CN101191405A (zh) 旋挖钻机射流反循环钻进岩石新工艺
CN202117556U (zh) 用于成型不同深度和形状的混凝土桩的螺旋钻机
DK2408992T3 (en) A method and apparatus for drilling wells in the ground layer composed of rock, clay and / or related materials
CN206267815U (zh) 钻进式连续冲砂装置
CN104832082A (zh) 一种用于旋挖钻机的气动潜孔锤反循环出渣施工工艺
CN111576423A (zh) 一种桩基沉渣清理装置及方法
CN202689924U (zh) 煤矿巷道底板钻孔装置
EP0096037B1 (en) Hydraulic down-the-hole rock drill
RU156918U1 (ru) Буровая установка
CN207905710U (zh) 一种砂性土降水井的快速成孔装置
CN2538851Y (zh) 钻孔高压喷射扩孔压灌混凝土异型桩的成桩装置
CN207331690U (zh) 管桩沉入式桩机
EP3252263A1 (en) Device and method for drilling a large diameter borehole
CN201908641U (zh) 一种水力冲击压裂解堵装置
CN110644483B (zh) 桥梁水下桩基施工装置
CN202023499U (zh) 旋泵成孔桩机
CN102251518A (zh) 旋泵成孔桩机
CN206000460U (zh) 钻孔大块孤石提取筒钻
CN109667266A (zh) 自钻大直径管桩的施工方法、装置及其配套的专用管桩
CN204311993U (zh) 集输站基建底桩建设装置
CN215860015U (zh) 钻井装置
CN201460719U (zh) 一种旋转冲击锤
CN221074096U (zh) 一种轻型井点降水成孔的打孔装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Zhang Lei

Document name: The request for reexamination is deemed to have not been submitted

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20080611