CN101184212A - Method to update monitoring front end of video monitoring system - Google Patents

Method to update monitoring front end of video monitoring system Download PDF

Info

Publication number
CN101184212A
CN101184212A CNA200710176703XA CN200710176703A CN101184212A CN 101184212 A CN101184212 A CN 101184212A CN A200710176703X A CNA200710176703X A CN A200710176703XA CN 200710176703 A CN200710176703 A CN 200710176703A CN 101184212 A CN101184212 A CN 101184212A
Authority
CN
China
Prior art keywords
server
monitoring front
front monitoring
upgrade
upgrading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710176703XA
Other languages
Chinese (zh)
Other versions
CN100551049C (en
Inventor
霍东风
鄢军
陕毅
苏静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNB200710176703XA priority Critical patent/CN100551049C/en
Publication of CN101184212A publication Critical patent/CN101184212A/en
Application granted granted Critical
Publication of CN100551049C publication Critical patent/CN100551049C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an upgrading method for monitor front end of the video monitor system, which is characterized in that: by a built-in network management protocol module at the monitoring front end, the protocol module and the protocol of the network management server are kept consistent. When the monitor front end is powered on to start, the built-in protocol module registers the information of the front end in the network management server. If the monitor front end is registered successfully or registered before, the network management server establishes different upgrading strategies according to the information carried by the monitor front end when registering. The network management server finds corresponding monitor front ends according to corresponding strategies, and sends messages of the uniform resource locator; the monitor front end receives the messages to judge, if upgrading is needed, the URL message is connected with the upgrading server to download the upgrading package to be upgraded. The invention has the advantages of batch upgrading of the monitor front end, greatly reducing the maintenance cost of the monitor front end, and enabling the upgrading process to be rapid and effective.

Description

A kind of upgrade method of monitoring front end of video monitoring system
Technical field
The present invention relates to the video monitoring technology, particularly a kind of upgrade method of monitoring front end of video monitoring system.
Background technology
The market demand of video monitoring system is vigorous, thereby has obtained development fast, and present telecom operators, equipment supplier etc. drop into manpower and materials video monitoring system is widelyd popularize.The video monitoring system application is very extensive, the equipment the widest, that quantity is maximum that distribute in the video monitoring system are front monitoring front-ends, it mainly acts on is to carry out video signal collective, coding by camera, again the video signal information through coding is sent to video monitoring system platform or client, can also also be one of topmost equipment in the video monitoring system according to configuration service such as record a video.
Front monitoring front-end is distributed in each different place, and the monitoring place is distributed more widely, and corresponding maintenance work is cumbersome.If the upgrading monitoring front end need arrive each control point and safeguard or safeguard one by one separately, workload will be very huge so, and front monitoring front-end also needs administrative staff to carry out manual activation after its upgrading is finished normally at long-play, carry out collection of video signal and transmission for a long time.
The normally built-in web page server of method (webserver) that the upgrading of existing front monitoring front-end is adopted or be linked to front monitoring front-end by instrument, administrative staff trigger upgrading by landing front monitoring front-end built-in the web page or tool using, this upgrading mode shortcoming is to upgrade to front monitoring front-end one by one, and Sheng Ji workload is too big like this.The front monitoring front-end that also has adopted to power up that the AutoLink upgrade server is upgraded or link upgrade server at set intervals during in operation in when upgrading upgrades, switch that can be not frequent though this upgrading mode can keep the front monitoring front-end long-play, but because front monitoring front-end also needs continual carry out collection of video signal, coding transmission in running, like this, in the process that it is upgraded, may influence regular traffic.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of upgrade method of front monitoring front-end, so as fast, convenient and on a large scale front monitoring front-end is carried out software upgrading.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of upgrade method of monitoring front end of video monitoring system, front monitoring front-end is consistent with the network management protocol of NM server, and this method comprises:
A, front monitoring front-end are registered to NM server;
The information that b, NM server are registered according to front monitoring front-end is formulated different escalation policys, and triggers escalation process to registered front monitoring front-end issuing message;
C, front monitoring front-end need to judge whether upgrading after receiving described message, if need upgrade then execution in step d; Otherwise, withdraw from escalation process.
D, front monitoring front-end connect upgrade server, find corresponding AKU file and download, verify after to be downloaded the finishing that FileVersion is updated to the AKU file in the equipment of self after errorless;
E, upgrading finish the back front monitoring front-end and report updating result to NM server, if step b is then returned in the upgrading failure; If upgrading successfully then, NM server upgrades inner log-on message.
Wherein, described upgrade server is deployed in independently on the server, or is deployed on the same station server with NM server.
The network management protocol of described front monitoring front-end and NM server is specially: TR-069 agreement, or simple network management snmp protocol, or conversation initial Session Initiation Protocol.
The process that the described front monitoring front-end of step a is registered to NM server is:
A1, front monitoring front-end report the information of self to NM server;
A2, NM server are received the reporting information of front monitoring front-end, judge before whether this front monitoring front-end registered, if also unregistered, execution in step a3 then; Otherwise, withdraw from registration process.
A3, NM server add the information that front monitoring front-end reports, and return the message that succeeds in registration to front monitoring front-end.
The described information of registering according to front monitoring front-end of step b is formulated different escalation policys, is specially: upgrade according to the IP address field at front monitoring front-end place or the version number of front monitoring front-end.
Step b is described to be specially to registered front monitoring front-end issuing message: the uniform resource locator URL message that meets the upgrade server of HTML (Hypertext Markup Language) HTTP standard.
Step c is described to judge whether front monitoring front-end needs upgrading to be specially: compare with AKU version number to be upgraded according to the current service needed of front monitoring front-end self or with self version number.
The described front monitoring front-end of step a1 is specially to the information that NM server reports: the software version number of front monitoring front-end, or product ID, or manufacturer's information, or vendor code, or the combination in any of IP address and above information.
Step a2 is described to judge that whether this front monitoring front-end is registered, is specially: the software version number of front monitoring front-end, or the IP address and the combination thereof of front monitoring front-end.
The upgrade method of front monitoring front-end provided by the present invention has the following advantages:
The inventive method is built-in network management protocol module in front monitoring front-end, and make the used agreement of front monitoring front-end and NM server consistent, difference by front monitoring front-end reporting information that NM server is preserved, according to Different Strategies to the front monitoring front-end batch upgrade of classifying, greatly reduce the maintenance cost of front monitoring front-end, and make escalation process become fast effectively.
Description of drawings
Fig. 1 is registered to the process schematic diagram of TR-069 NM server for embodiment of the invention front monitoring front-end;
Fig. 2 is the embodiment of the invention one a front monitoring front-end batch upgrade schematic flow sheet;
Fig. 3 is the embodiment of the invention two front monitoring front-end batch upgrade schematic flow sheets.
Embodiment
Below in conjunction with accompanying drawing and embodiments of the invention method of the present invention is described in further detail.
Core concept of the present invention is: by making this protocol module consistent with the agreement of NM server in the built-in network management protocol module of front monitoring front-end, when front monitoring front-end powers up startup, built-in protocol module is registered the information of this front end to NM server, if front monitoring front-end succeeds in registration or registered before, the entrained different escalation policy of information issuing when then NM server is registered according to front monitoring front-end, NM server finds corresponding front monitoring front-end according to corresponding strategy, issue uniform resource locator (URL) message, front monitoring front-end is received this message and judges that upgrading is then upgraded to upgrade server download and upgrade bag according to the URL message linkage if desired.
Fig. 1 is registered to the process schematic diagram of TR-069 NM server for embodiment of the invention front monitoring front-end, and as shown in Figure 1, the process that front monitoring front-end is registered to NM server is as follows:
Step 101: after front monitoring front-end powers up startup, report the information of self to NM server.
TR-069 is the standard agreement that Digital Subscriber Line forum (DSL Forum) proposes, and is used for managing wide area network customer premises equipment, CPE (CPEs).In the present embodiment, the built-in TR-069 agency by agreement of front monitoring front-end (agent) module, consistent with the network management protocol that NM server is adopted, promptly be the TR-069 agreement.Front monitoring front-end comprises to the information that NM server reports: information such as the software version number of front monitoring front-end, product ID, manufacturer, vendor code, IP address.
Step 102: NM server is received the reporting information of front monitoring front-end, judges whether this front monitoring front-end is registered, if also unregistered, then execution in step 103; Otherwise, withdraw from this process.
Describedly judge whether front monitoring front-end is registered, it is the self information that reports according to front monitoring front-end, usually the front monitoring front-end information of being preserved according to information such as the software version number that reports, the IP address of front monitoring front-end and NM server inside is to recently judging, for example, if the IP address of the front monitoring front-end that reports can not find, prove that then this front monitoring front-end has not yet registered in NM server.
Step 103: NM server adds the information that front monitoring front-end reports, and returns the message that succeeds in registration to front monitoring front-end.
The information that front monitoring front-end reported that described NM server will need to register is kept in the memory, and returns the message that succeeds in registration to front monitoring front-end, thus the registration process of finishing.
According to the difference of the practical application of video monitoring system, upgrade server both can be deployed on the different servers with NM server and also can be deployed on the same station server, below was respectively the escalation process of front monitoring front-end under two kinds of situations.Described upgrade server can be described as version server, version file server or file server, below is referred to as upgrade server.
Fig. 2 is the embodiment of the invention one a front monitoring front-end batch upgrade schematic flow sheet, and as shown in Figure 2, upgrade server is deployed on the different servers with NM server, and the escalation process of front monitoring front-end is as follows:
Step 201: front monitoring front-end powers up startup, is registered to NM server.
Described front monitoring front-end is registered to the process of NM server, and essence is the process of the information of NM server collection monitoring front end.If front monitoring front-end also is not registered to NM server, then register according to the described method of Fig. 1.
Step 202: NM server is formulated escalation policy according to the log-on message that front monitoring front-end reports.
Described NM server is formulated escalation policy, be specially: can upgrade according to the front monitoring front-end that certain IP address field will belong to this address field, for example, 192.168.1.10 is upgraded to all front monitoring front-ends of this IP address field of 192.168.1.200, can in database, find out qualified front monitoring front-end upgrading according to this IP address field.Also can upgrade according to the software version number of front monitoring front-end, in database, find out the front monitoring front-end that meets version number's condition, for example, version number being lower than 2.0 front monitoring front-end upgrades, then can analyze the software version number of registered front monitoring front-end, find out version number and be lower than 2.0 front monitoring front-end, the software unification of these front monitoring front-ends is upgraded to 2.0 editions.
Step 203: NM server triggers upgrading to the front monitoring front-end issuing message of registration.
The described message that issues to registered front monitoring front-end is meant uniform resource locator (URL) message that will meet the upgrade server of HTTP(Hypertext Transport Protocol) standard.
Step 204: front monitoring front-end need to judge whether upgrading, if need upgrade then execution in step 205; Otherwise, withdraw from this process.
Front monitoring front-end compares according to the current service needed of self or with software version number of self and software version number to be upgraded, if current front monitoring front-end WKG working one is to urgent personage, then temporarily do not upgrade, report the upgrading failed message to NM server, like this, the version number of front monitoring front-end still keeps the preceding version of original upgrading constant.
Step 205: front monitoring front-end connects upgrade server, finds corresponding AKU file.
Front monitoring front-end finds the AKU file that meets promotion condition according to the URL address on upgrade server.
Step 206: front monitoring front-end is from upgrade server download and upgrade APMB package.
Step 207: the correctness of front monitoring front-end checking FileVersion after the AKU download is finished is updated in the equipment of self then.
Step 208: front monitoring front-end reports updating result to NM server, and NM server upgrades inner log-on message if upgrade successfully then; If step 203 is then returned in the upgrading failure.
In the inventive method, except the used TR-069 agreement of embodiment, also can adopt other network management protocol, as Simple Network Management Protocol (SNMP, Simple Network Management Protocol) or session initiation protocol (SIP, Session Initiation Protocol) carries out the software upgrading of front monitoring front-end,, can resolve the order that the other side sends mutually and get final product as long as make NM server consistent with front monitoring front-end two sides' agreement.
Fig. 3 is the embodiment of the invention two front monitoring front-end batch upgrade schematic flow sheets, as shown in Figure 3, upgrade server and NM server are deployed in the same server, the escalation process of front monitoring front-end is compared with the situation that upgrade server shown in Figure 2 is independent of NM server under this kind mode, step 201 is corresponding one by one to step 304 with step 301 respectively to step 204, difference only is the place difference of front monitoring front-end download and upgrade APMB package, that is:
Step 305: front monitoring front-end connects NM server/upgrade server, finds corresponding AKU file.
Front monitoring front-end finds the AKU file that meets promotion condition according to the URL address on NM server/upgrade server.
Step 306: front monitoring front-end is from NM server/upgrade server download and upgrade APMB package.
Step 307: the correctness of front monitoring front-end checking FileVersion after the AKU download is finished is updated in the equipment of self then.
Step 308: front monitoring front-end reports updating result to NM server/upgrade server, and NM server/upgrade server upgrades inner log-on message if upgrade successfully then; If the upgrading failure, then NM server/upgrade server triggers upgrading once more to the front monitoring front-end issuing message of registration.
The above is preferred embodiment of the present invention only, is not to be used to limit protection scope of the present invention.

Claims (9)

1. the upgrade method of a monitoring front end of video monitoring system is characterized in that, front monitoring front-end is consistent with the network management protocol of NM server, and this method comprises:
A, front monitoring front-end are registered to NM server;
The information that b, NM server are registered according to front monitoring front-end is formulated different escalation policys, and triggers escalation process to registered front monitoring front-end issuing message;
C, front monitoring front-end need to judge whether upgrading after receiving described message, if need upgrade then execution in step d; Otherwise, withdraw from escalation process.
D, front monitoring front-end connect upgrade server, find corresponding AKU file and download, verify after to be downloaded the finishing that FileVersion is updated to the AKU file in the equipment of self after errorless;
E, upgrading finish the back front monitoring front-end and report updating result to NM server, if step b is then returned in the upgrading failure; If upgrading successfully then, NM server upgrades inner log-on message.
2. upgrade method according to claim 1 is characterized in that, described upgrade server is deployed in independently on the server, or is deployed on the same station server with NM server.
3. upgrade method according to claim 1 is characterized in that, the network management protocol of described front monitoring front-end and NM server is specially: TR-069 agreement, or simple network management snmp protocol, or conversation initial Session Initiation Protocol.
4. upgrade method according to claim 1 is characterized in that, the process that the described front monitoring front-end of step a is registered to NM server is:
A1, front monitoring front-end report the information of self to NM server;
A2, NM server are received the reporting information of front monitoring front-end, judge before whether this front monitoring front-end registered, if also unregistered, execution in step a3 then; Otherwise, withdraw from registration process.
A3, NM server add the information that front monitoring front-end reports, and return the message that succeeds in registration to front monitoring front-end.
5. upgrade method according to claim 1 is characterized in that, the described information of registering according to front monitoring front-end of step b is formulated different escalation policys, is specially: upgrade according to the IP address field at front monitoring front-end place or the version number of front monitoring front-end.
6. upgrade method according to claim 1 is characterized in that, step b is described to registered front monitoring front-end issuing message, is specially: the uniform resource locator URL message that meets the upgrade server of HTML (Hypertext Markup Language) HTTP standard.
7. upgrade method according to claim 1 is characterized in that, step c is described to judge that whether front monitoring front-end needs upgrading, is specially: compare with AKU version number to be upgraded according to the current service needed of front monitoring front-end self or with self version number.
8. upgrade method according to claim 4, it is characterized in that, the information that the described front monitoring front-end of step a1 reports to NM server, be specially: the software version number of front monitoring front-end, or product ID, or manufacturer's information, or vendor code, or the combination in any of IP address and above information.
9. upgrade method according to claim 4 is characterized in that, step a2 is described to judge that whether this front monitoring front-end is registered, is specially: the software version number of front monitoring front-end, or the IP address and the combination thereof of front monitoring front-end.
CNB200710176703XA 2007-11-01 2007-11-01 A kind of upgrade method of monitoring front end of video monitoring system Expired - Fee Related CN100551049C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200710176703XA CN100551049C (en) 2007-11-01 2007-11-01 A kind of upgrade method of monitoring front end of video monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200710176703XA CN100551049C (en) 2007-11-01 2007-11-01 A kind of upgrade method of monitoring front end of video monitoring system

Publications (2)

Publication Number Publication Date
CN101184212A true CN101184212A (en) 2008-05-21
CN100551049C CN100551049C (en) 2009-10-14

Family

ID=39449263

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200710176703XA Expired - Fee Related CN100551049C (en) 2007-11-01 2007-11-01 A kind of upgrade method of monitoring front end of video monitoring system

Country Status (1)

Country Link
CN (1) CN100551049C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946564A (en) * 2012-11-29 2013-02-27 乐视致新电子科技(天津)有限公司 Video service system automatic update method
CN103701856A (en) * 2013-11-29 2014-04-02 四川长虹电器股份有限公司 Method for defining and acquiring upgrade package of terminal equipment
CN103841106A (en) * 2014-03-10 2014-06-04 珠海市君天电子科技有限公司 Data updating method and device of servers
CN104469278A (en) * 2013-09-25 2015-03-25 浙江大华技术股份有限公司 Method and device for upgrading monitoring system
CN105376085A (en) * 2014-08-27 2016-03-02 中兴通讯股份有限公司 Method, device and system for upgrading data collection agent
CN106375122A (en) * 2016-08-31 2017-02-01 上海澳润信息科技有限公司 Intelligent gateway strategy upgrading method based on LAMP (Linux+Apache+Mysql/MariaDB+Perl/PHP/Python)
CN107291515A (en) * 2017-07-10 2017-10-24 北京明朝万达科技股份有限公司 A kind of custom end intelligent upgrade method and system based on feedback of status
CN109561121A (en) * 2017-09-26 2019-04-02 北京国双科技有限公司 Monitor the method and device of deployment
CN109753403A (en) * 2017-11-06 2019-05-14 阿里巴巴集团控股有限公司 Server operation method, apparatus, equipment and system
CN112527346A (en) * 2020-11-26 2021-03-19 三维通信股份有限公司 Software upgrading method and device, storage medium and electronic device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102946564A (en) * 2012-11-29 2013-02-27 乐视致新电子科技(天津)有限公司 Video service system automatic update method
CN104469278A (en) * 2013-09-25 2015-03-25 浙江大华技术股份有限公司 Method and device for upgrading monitoring system
CN103701856A (en) * 2013-11-29 2014-04-02 四川长虹电器股份有限公司 Method for defining and acquiring upgrade package of terminal equipment
CN103701856B (en) * 2013-11-29 2016-08-17 四川长虹电器股份有限公司 A kind of method that definition and terminal device obtain AKU
CN103841106B (en) * 2014-03-10 2017-10-17 珠海市君天电子科技有限公司 A kind of server data update method and device
CN103841106A (en) * 2014-03-10 2014-06-04 珠海市君天电子科技有限公司 Data updating method and device of servers
CN105376085A (en) * 2014-08-27 2016-03-02 中兴通讯股份有限公司 Method, device and system for upgrading data collection agent
CN106375122A (en) * 2016-08-31 2017-02-01 上海澳润信息科技有限公司 Intelligent gateway strategy upgrading method based on LAMP (Linux+Apache+Mysql/MariaDB+Perl/PHP/Python)
CN107291515A (en) * 2017-07-10 2017-10-24 北京明朝万达科技股份有限公司 A kind of custom end intelligent upgrade method and system based on feedback of status
CN109561121A (en) * 2017-09-26 2019-04-02 北京国双科技有限公司 Monitor the method and device of deployment
CN109753403A (en) * 2017-11-06 2019-05-14 阿里巴巴集团控股有限公司 Server operation method, apparatus, equipment and system
CN109753403B (en) * 2017-11-06 2022-09-23 阿里巴巴集团控股有限公司 Server operation method, device, equipment and system
CN112527346A (en) * 2020-11-26 2021-03-19 三维通信股份有限公司 Software upgrading method and device, storage medium and electronic device
WO2022110645A1 (en) * 2020-11-26 2022-06-02 三维通信股份有限公司 Software upgrade method and device, storage medium and electronic device

Also Published As

Publication number Publication date
CN100551049C (en) 2009-10-14

Similar Documents

Publication Publication Date Title
CN100551049C (en) A kind of upgrade method of monitoring front end of video monitoring system
CN100479456C (en) Method and system of remote dynamic configuration of a web server to provide capacity on demand
US6393478B1 (en) Cable modem and personal computer troubleshooting tool
US8099488B2 (en) Real-time monitoring of service agreements
CN100514943C (en) An upgrade management method and system for instant message client
US20080147840A1 (en) Remote activation of home devices
CN101404588B (en) Front end equipment management method, platform and system
US20130144989A1 (en) Unified device management method and system
CN102457390B (en) A kind of Fault Locating Method based on QOE and system
CA2761820C (en) Configuring network devices
CN101877650A (en) Method and system for updating software version automatically
CN102082702A (en) Terminal alarm processing method, device and system thereof
CN102447582A (en) Resource synchronization method and device
CN103312593B (en) A kind of message distributing system and method
CN101989919A (en) Local software diagnosing and maintaining system as well as corresponding method and system for diagnosis and maintenance
CN100479380C (en) Network device managing method, network device and network managing system
CN101409654B (en) Method for processing SNMP information in network management system
US20160352843A1 (en) Data Processing Method, Device, and ESB System
US20150148003A1 (en) Adaptive Request Processing Service For Charging Requests
CN107911764A (en) A kind of method for accelerating intensity EPON ONU service management
CN101212346B (en) Software version management method and device for network element management system
US8768327B2 (en) Feature based management
EP1953957B1 (en) A remote load system of network device and method thereof
CN102845023B (en) For registering the apparatus and method of transmission capacity in broadband access network
CN107707406B (en) Method for upgrading equipment based on TR069

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091014

Termination date: 20171101