CN101179146A - Equal-diametercement lever antenna assembly - Google Patents
Equal-diametercement lever antenna assembly Download PDFInfo
- Publication number
- CN101179146A CN101179146A CN 200710009780 CN200710009780A CN101179146A CN 101179146 A CN101179146 A CN 101179146A CN 200710009780 CN200710009780 CN 200710009780 CN 200710009780 A CN200710009780 A CN 200710009780A CN 101179146 A CN101179146 A CN 101179146A
- Authority
- CN
- China
- Prior art keywords
- antenna
- diametercement
- equal
- cross
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Support Of Aerials (AREA)
Abstract
The invention relates to an equal-diameter type cement-pole antenna device, comprising a cement-pole with the top equipped with a lightning rod, a cross-arm and an antenna, characterized in that: the cross-arm is connected to the upper part of the cement-pole; the antenna is respectively erected at the two ends of the cross-arm and is connected with a feeder extending upwards to the upper part of the cement pole; the device has a simple structure and is wide in application range with a low requirement to the conditions of the construction site, and the device has a good applicability, besides the convenience in maintenance.
Description
Technical field
The utility model relates to a kind of equal-diametercement lever antenna assembly.
Background technology
Be located in mountainous terrain at present, The distance is far and the mountain is high mostly in the rural area, the population decentralization area, there is the problem that investment is big, income is low in communication construction, existing base station iron tower construction cost height, the cycle is long, difficulty is big, be not suitable for that the mountain area uses, and the problem of the antenna height deficiency that also can run in the construction of mobile base station, mountain area.
Summary of the invention
The purpose of this utility model is that a kind of equal-diametercement lever antenna assembly will be provided, and this device construction is simple, and the scope of application is wide, and low to the job site conditional request, applicability is strong, and is easy to maintenance.
The utility model comprises that the top is provided with the cement pole of lightning rod, cross-arm, antenna, is characterized in that: described cross-arm is connected in cement pole top, described antenna is perpendicular respectively be located at the cross-arm both ends and with depositing on extend to cement pole top feeder line be connected.
Remarkable advantage of the present utility model is short a, applied range of construction period, cost economic, higher, easy to maintenance, the long service life of Wind-Pressure Resistance.
Description of drawings
Fig. 1 is the utility model embodiment one organigram.
Fig. 2 is the A-A cutaway view of Fig. 1
Fig. 3 makes schematic diagram for the climbing framework
Embodiment
The utility model embodiment one comprises that the top is provided with the cement pole 2 of lightning rod 1, cross-arm 3, antenna 4, it is characterized in that: described cross-arm is connected in cement pole top, and described antenna is perpendicular respectively to be located at the cross-arm both sides and to be connected with the feeder line 5 that extends to cement pole top from bottom to top.
Described cement pole is welded by the isometrical cement of 3 joints.
Described cement pole is provided with climbing frame 6, and described climbing frame is made up of the climbing cross bar 8 of montant 7 and both sides, and described climbing frame is fixed on the cement pole by garter spring 9.
Be connected with radially quarter butt 10 between described climbing frame and the garter spring.
Be fixed with on described radially quarter butt and the cross-arm and be connected the special-purpose feeder line card 11 that feeder line is used, described feeder line from bottom to top is laid in radially the quarter butt side and is connected with antenna through the cross-arm following side.
The angle α of the connecting line on described antenna top to lightning rod top and the longitudinally extending line of cement pole is less than 45 degree.
The technical performance contrast situation of the utility model embodiment and existing communication iron tower:
Project | 18 meters high isometrical shaft towers of embodiment | Simple and easy single-pipe tower | Guywire tower | Steel tube tower | Self-supporting steel tower | |
Build construction | Geological prospecting | Do not need | Need | Need | Need | Need |
Column foot is pre-buried | Do not need | Need | Need | Need | Need | |
Difficulty of construction | Easily | Easily | Complicated | Complicated, need lifting | Complicated | |
Construction period | 2-3 days | 25 days | 15 days | 30 days | 30 days | |
The rigidity of structure | Well | Good | Difference | Good | Good | |
Masthead horizontal jitter journey | Little | Little | Greatly | Little | Little |
Degree | |||||
Service life (year) | 40 | 40 | 20 | 40 | 40 |
Need the periodic maintenance member | Hardware except that the cement body of rod, and body of rod weld seam | Whole | Whole | Whole | Whole |
Safeguard complexity | Easily | Medium | Difficult | Medium | Medium |
Antenna construction complexity | Medium | Medium | Difficult | Medium | Medium |
Advantage | Cost economic, good rigidity, Wind-Pressure Resistance is higher, easy to maintenance, long service life. | Good rigidity, Wind-Pressure Resistance height, easy to maintenance, long service life, floor space are little, but construction is simple, the appearance looks elegant secondary utilizes again. | But cost economic, the low secondary of transport difficulty utilize again. | Good rigidity, Wind-Pressure Resistance height, easy to maintenance, long service life, floor space are little, but construction is simple, the appearance looks elegant secondary utilizes again. | Good rigidity, Wind-Pressure Resistance height, easy to maintenance, long service life, but construction is simple, the appearance looks elegant secondary utilizes again. |
The major technique innovative point
One, the construction period is short, the investment return ratio is high
Owing to the mountain area population decentralization, have inconvenient traffic, the unit telephone traffic is low, in recent years, because the host support price descends, the base station construction cost also descends year by year, but the construction of original communication shaft tower is because raw material appreciate, artificial and cost of transportation rises, and the shared proportion of construction investment is more and more higher.Reaching under the situation of identical coverage effect, 18 meters high isometrical shaft towers obviously have the investment return ratio that is higher than other communication tower because the construction period is short, cost is low.
Two, the scope of application is wide
The construction of 18 meters bars can be suitable for multiple geological condition.Generally confirm that at the scene place width and on-site soil are not the rock stratum that can't excavate fully, other soil property situation, for example: weak saprolite such as sand, loess, cohesive soil, middle saprolite, severely-weathered soil all can be built.This tower capital construction is comparatively simple, and the cement chassis of building one 1 meter * 1 meter 18 meters bar bottoms is aided with 8 backguys again and just can makes the body of rod satisfy the requirement of safe handling with the power of holding.Through design accounting: the maximum wind pressure that 18 meters cement pole structures can bear is 0.8KN/m
2, the blast in most of area, area, Sanming City has only 0.4KN/m
2, 18 meters bars can be similar to Sanming City this landlocked mountain area use in a big way.
Three, low to the job site conditional request
The construction of 18 meters bars is lower to the job site conditional request, has just catered to the remote mountain areas demand of building a station with a varied topography.It is as long as the scene provides a place can carry out the welding of 6 meters bodies of rod of 3 joints, and base station, the nearly all mountain area of this condition can be satisfied.
Four, applicability is strong
Through body of rod Structure Calculation, 18 meters bars can be supported two-layer platform up and down, and every layer of platform is by two secondary whippletree square crossings, every layer of platform can be supported 4 slave antennas, can support at most 8 slave antennas are installed, and the antenna mounting means is flexible, both can have supported omnidirectional antenna also can support the installation of directional antenna.
Five, easy to maintenance
Tower compared to other type needs whole body of the tower is carried out the integral body maintenance, it is comparatively simple and easy that the maintenance of 18 meters bars just shows, generally speaking, only need be the hardware except that the cement body of rod every the member of periodic maintenance half a year, and the weld seam of the body of rod, as long as regularly these members are carried out anticorrosion processing of rust removing, guarantee that the situation that relaxes, comes off does not appear in the junction, and the operating position of making regular check on backguy just can guarantee that the safety of 18 meters isometrical bars normally uses.And the simple and easy cat ladder on body of rod limit helps attendant's upper boom to carry out the maintenance of the body of rod and platform, also is convenient to the dismounting and the adjustment of antenna.(annotating: need carry out supplementary maintenance when standing typhoon weather or natural calamity and might jeopardize tower body safety).
Claims (6)
1. equal-diametercement lever antenna assembly, comprise that the top is provided with the cement pole of lightning rod, cross-arm, antenna, it is characterized in that: described cross-arm is connected in cement pole top, and described antenna is perpendicular respectively to be located at the cross-arm both ends and to be connected with the feeder line that extends to cement pole top from bottom to top.
2. equal-diametercement lever antenna assembly according to claim 1 is characterized in that: described cement pole is welded by the isometrical cement pole of 3 joints.
3. equal-diametercement lever antenna assembly according to claim 1 and 2 is characterized in that: described cement pole is provided with the climbing frame, and described climbing frame is made up of the climbing cross bar of montant and both sides, and described climbing frame is fixed on the cement pole by garter spring.
4. equal-diametercement lever antenna assembly according to claim 3 is characterized in that: be connected with radially quarter butt between described garter spring and the climbing frame.
5. according to claim 1 or 4 described equal-diametercement lever antenna assemblies, it is characterized in that: be fixed with on described radially quarter butt and the cross-arm and be connected the special-purpose feeder line card that feeder line is used, described feeder line from bottom to top is laid in radially the quarter butt side and is connected with antenna through the cross-arm following side.
6. equal-diametercement lever antenna assembly according to claim 1 and 2 is characterized in that: the angle α of the connecting line on described antenna top to lightning rod top and the longitudinally extending line of cement pole is less than 45 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200710009780 CN101179146B (en) | 2007-11-13 | 2007-11-13 | Equal-diametercement lever antenna assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200710009780 CN101179146B (en) | 2007-11-13 | 2007-11-13 | Equal-diametercement lever antenna assembly |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101179146A true CN101179146A (en) | 2008-05-14 |
CN101179146B CN101179146B (en) | 2013-08-28 |
Family
ID=39405298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200710009780 Active CN101179146B (en) | 2007-11-13 | 2007-11-13 | Equal-diametercement lever antenna assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101179146B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110346547A (en) * | 2019-08-01 | 2019-10-18 | 河南海威路桥工程咨询有限公司 | A kind of road surface real-time humidity sensor monitoring equipment |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1057549A (en) * | 1990-06-22 | 1992-01-01 | 吉林省四平市无线电管委会 | With the mutual interference inversion of the same tower of frequency range (bar) antenna |
CN2704647Y (en) * | 2004-05-25 | 2005-06-15 | 同济大学建筑设计研究院 | Movable base stations |
-
2007
- 2007-11-13 CN CN 200710009780 patent/CN101179146B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110346547A (en) * | 2019-08-01 | 2019-10-18 | 河南海威路桥工程咨询有限公司 | A kind of road surface real-time humidity sensor monitoring equipment |
Also Published As
Publication number | Publication date |
---|---|
CN101179146B (en) | 2013-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203939288U (en) | Anti-wind net structure | |
CN205647362U (en) | Large -span prestressing force cable photovoltaic support | |
CN207987927U (en) | Multistage echelon foundation pit supporting system | |
CN201053123Y (en) | Deep foundation ditch tower crane platform base frame | |
CN102296843B (en) | Multi-arch multilayer plant-separation type parking device | |
CN103375033A (en) | Integrated communication base station | |
CN206319610U (en) | Roof system steel truss slipping and assembling construction platform structure | |
CN103741708B (en) | Prefabricated concrete rod sleeve basis | |
CN101179146B (en) | Equal-diametercement lever antenna assembly | |
CN202125099U (en) | Multi-arch multi-layer plant separating type parking device | |
CN203008470U (en) | Roof guyed tower | |
CN200958291Y (en) | Hexagonal tower | |
TWI669901B (en) | Support device for overhead solar power generation facilities | |
CN203684258U (en) | Prefabricated concrete rod sleeve foundation | |
CN205089056U (en) | Prevent wind dust screen to build structure | |
CN212002582U (en) | Communication tower with high stability | |
CN209067279U (en) | A kind of step ladder for evacuation platform in subway circular tunnel | |
CN204531575U (en) | Cement pole Reinforcement Reinforced Concrete Structure | |
RU85529U1 (en) | ANTENNA MOUNT | |
CN204152171U (en) | The scaffold of the high verticality with safety climbing ladder | |
CN209066472U (en) | Mountain area transmission line of electricity tower foundation and transmission line of electricity | |
CN202390848U (en) | Foundation structure of pile cap of communication iron tower | |
TWM561364U (en) | Support device for high-stand type solar power generation facilities | |
CN201167125Y (en) | Aerical device for roof communication | |
CN213359558U (en) | Asymmetric tower head structure of iron tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |