CN101168975B - Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit - Google Patents

Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit Download PDF

Info

Publication number
CN101168975B
CN101168975B CN2007100530864A CN200710053086A CN101168975B CN 101168975 B CN101168975 B CN 101168975B CN 2007100530864 A CN2007100530864 A CN 2007100530864A CN 200710053086 A CN200710053086 A CN 200710053086A CN 101168975 B CN101168975 B CN 101168975B
Authority
CN
China
Prior art keywords
pipes
steel pipe
pipe fitting
steel
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100530864A
Other languages
Chinese (zh)
Other versions
CN101168975A (en
Inventor
王践志
高竣波
王伟岑
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHUJU TECH Co Ltd WUHAN
Original Assignee
SHUJU TECH Co Ltd WUHAN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHUJU TECH Co Ltd WUHAN filed Critical SHUJU TECH Co Ltd WUHAN
Priority to CN2007100530864A priority Critical patent/CN101168975B/en
Publication of CN101168975A publication Critical patent/CN101168975A/en
Application granted granted Critical
Publication of CN101168975B publication Critical patent/CN101168975B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention relates to a method for producing an internal stretching prestress ultra-light structural unit. The method comprises the steps that wire cables penetrate through inner holes of steel pipes, pipes are connected through steel plates, the wire cables in the pipes are pre-stretched to a required pulling force designed in advance, then end sealing pieces are used for sealing the pipes atthe two ends of the wire cables, if two pipes are parallel, one end of the pipes is equipped with guiding pieces. The unit has the advantages that the structure is simple, the weight is light, the material amount is small, the price is low, the occupies resource amount is small, the rigidity is good, the intensity is high, a large amount of material can be saved when beam, column, and plate components of buildings made by connecting the units are filled with the filling material and then produced into die blocks, the factory production can be performed, when being assembled, the occupation space is little, the buildings have no waste and are environmental friendly, can be disassembled at any time, are convenient for assembly and transportation, and can be used repeatedly.

Description

Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit
Technical field
The present invention relates to building material technical field, specifically a kind of method for manufacturing inner stretch-draw prestressing force ultra-light structure unit.
Background technology
Now building is made general beam, post, plate, all is to utilize reinforcing bar to add concrete casting to finish, and the construction weight of making is heavy like this, can only be in existing construction, and floor space is big, and freight volume is big, and water that need be a lot of, and it is big to occupy stock number.Another kind is all to use steel frame construction, and the iron and steel amount of Shi Yonging is big like this, and building is heavy, uses stock number very big.
Summary of the invention
It is few to the objective of the invention is to develop a kind of use material, the method for manufacturing inner stretch-draw prestressing force ultra-light structure unit that rigidity is good, intensity is high.
Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit of the present invention, comprise: the endoporus at steel pipe fitting penetrates wire rope, connect with steel plate between steel pipe fitting and the steel pipe fitting, the pulling force that the pre-stretch-draw of wire rope needs to prior designing institute in the steel pipe fitting, secure the steel pipe fitting at wire rope two again with end socket spare, if two parallel steel tube parts, one of steel pipe fitting is equipped with guide.
Two or many steel pipe fittings can draw a straight line with steel plate, maybe can be linked to be some parallel lines.
The beam of building, post, plate can be connected to form with steel plate material by a plurality of inner stretch-draw prestressing force ultra-light structure units.
The advantage of method for manufacturing inner stretch-draw prestressing force ultra-light structure unit of the present invention: this block construction is simple, and is in light weight, and material is few, low price, it is few to occupy resource, good rigidly, the intensity height is filled out with the beam, post, the board member that connect the building make between the unit and to be made module behind the inserts and can save wide variety of materials, but batch production production, when being assembled into building, floor space is few, does not have discarded object, is environment protection architecture, and building demolition at any time assembling carrying is very convenient, can use repeatedly.
Description of drawings
Fig. 1 is an inner stretch-draw prestressing force light structure unit preparation method structural representation.
Fig. 2 is a multiple-unit package assembly schematic diagram.
The specific embodiment
Embodiment 1
According to shown in Figure 1, one of steel pipe fitting 1,2 is weldingly connected with steel plate 5, endoporus passes wire rope 3, one of steel pipe fitting 1 is equipped with end socket spare 4, and clamp wire rope 3, and the pulling force that wire rope 3 pre-stretch-draw need to design in advance, end socket spare 4 clamps the other end of wire rope 3, secure the other end of steel pipe fitting 2, then a unit is made.
Embodiment 2
According to shown in Figure 2, one of steel pipe fitting 1,2 is weldingly connected with steel plate 5, the other end of steel pipe fitting 1,2 is weldingly connected with steel plate 7, and on steel plate 7 guide 6 is housed, and wire rope 3 passes steel pipe fitting 1,2, one of wire rope 3 links to each other with end socket spare 4, secure the port of steel pipe fitting 2, the pulling force that wire rope 3 pre-stretch-draw need to design in advance, end socket spare 4 links to each other with wire rope 3 other ends, secure the port of steel pipe fitting 2, then two unit blocks are made.High pressure resistant inserts is filled at assembly neutral gear place, and then high-intensity unit module is made.
Embodiment 3
According to connecting with steel plate between the unit block of embodiment 2 and the unit block, high pressure resistant inserts is filled at assembly neutral gear place, spreads the incrustation plate, then can be made into building post or beam.
High pressure resistant inserts is made according to number of patent application 200510018810.0 " utilizing disused beverage cans, bottle to make the method for bearing unit ".
Fill method is operated according to number of patent application 200510018811.5 " utilizing disused beverage cans, bottles as bearing unit to make the method for beam column ".

Claims (2)

1. method for manufacturing inner stretch-draw prestressing force ultra-light structure unit, it is characterized in that: the endoporus at steel pipe fitting penetrates wire rope, connect with steel plate between steel pipe fitting and the steel pipe fitting, the pulling force that the pre-stretch-draw of wire rope needs to prior designing institute in the steel pipe fitting, secure the steel pipe fitting at wire rope two again with end socket spare, if two parallel steel tube parts, one of steel pipe fitting is equipped with guide.
2. method for manufacturing inner stretch-draw prestressing force ultra-light structure unit according to claim 1 is characterized in that: two or many steel pipe fittings can draw a straight line with steel plate, maybe can be linked to be some parallel lines.
CN2007100530864A 2007-08-30 2007-08-30 Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit Expired - Fee Related CN101168975B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100530864A CN101168975B (en) 2007-08-30 2007-08-30 Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100530864A CN101168975B (en) 2007-08-30 2007-08-30 Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit

Publications (2)

Publication Number Publication Date
CN101168975A CN101168975A (en) 2008-04-30
CN101168975B true CN101168975B (en) 2010-11-03

Family

ID=39389732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100530864A Expired - Fee Related CN101168975B (en) 2007-08-30 2007-08-30 Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit

Country Status (1)

Country Link
CN (1) CN101168975B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735247B (en) * 2016-03-11 2018-04-10 上海建工二建集团有限公司 The construction method of steel reinforcement cage unit, system and construction method and diaphram wall
CN106641928B (en) * 2016-10-31 2018-08-28 郑州轻工业学院 A kind of separable light pole

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2507939Y (en) * 2001-09-25 2002-08-28 张骏华 Concrete member of prestressed steel pipe
CN1619063A (en) * 2004-12-08 2005-05-25 重庆交通科研设计院 Post stress method stake body prestressed antislid stake and construction method
CN2739290Y (en) * 2004-09-18 2005-11-09 柳州欧维姆机械股份有限公司 Steel strand vertical prestress anchoring system
CN1807050A (en) * 2006-01-26 2006-07-26 许宏元 Prestressing system device of concrete structure and method for manufacturing the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2507939Y (en) * 2001-09-25 2002-08-28 张骏华 Concrete member of prestressed steel pipe
CN2739290Y (en) * 2004-09-18 2005-11-09 柳州欧维姆机械股份有限公司 Steel strand vertical prestress anchoring system
CN1619063A (en) * 2004-12-08 2005-05-25 重庆交通科研设计院 Post stress method stake body prestressed antislid stake and construction method
CN1807050A (en) * 2006-01-26 2006-07-26 许宏元 Prestressing system device of concrete structure and method for manufacturing the same

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2000-204657A 2000.07.25
JP特开2001-140274A 2001.05.22

Also Published As

Publication number Publication date
CN101168975A (en) 2008-04-30

Similar Documents

Publication Publication Date Title
CN201137213Y (en) Precast beam, column member frame connection structure
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN103072906B (en) Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN101168975B (en) Method for manufacturing inner stretch-draw prestressing force ultra-light structure unit
CN102433888A (en) Assembled steel bushing box
CN114108821B (en) Node connecting structure between FRP pultruded profiles and construction and assembly method
CN205558038U (en) Compound carrier bar that excels in of rectangle top flange steel reinforced concrete
CN105569188A (en) Square thin-wall steel pipe concrete filled steel column and steel girder prefabricated node structure and construction method thereof
CN201474083U (en) Novel steel-concrete combined panel node
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN101117835A (en) Reinforcement built-in anti-shear steel plate concrete combination beam
CN203905210U (en) Steel pipe bundle combined structure shear wall in-site splicing joint
CN101117836A (en) Method for manufacturing inner stretching prestressed super-light structural variable girder module and components
CN203049860U (en) Floor unit assembly
CN105156132A (en) Precast concrete component connected by grinding teeth and mounting method thereof
CN103046648A (en) Composite structure reinforcing steel bar connecting node
CN203065063U (en) Connecting device of internal-climbing type tower crane and architectural structure
CN203008127U (en) Connecting node of steel bar of composite structure
CN206090943U (en) Composite wallboard
CN202000346U (en) Prestressed concrete square pile
CN103255936B (en) Combination pond and construction method thereof
CN217027466U (en) Node connection structure between FRP pultrusion profiles
CN211313084U (en) Prefabricated type assembled steel concrete mixing column
CN212613064U (en) Connecting structure of module unit and ground
CN107882354A (en) The inner equilibrium steel member of Prestressed CFRP plate enhancing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101103

Termination date: 20130830