CN101166208B - 一种维护作业自动化的方法及系统 - Google Patents
一种维护作业自动化的方法及系统 Download PDFInfo
- Publication number
- CN101166208B CN101166208B CN200610113938XA CN200610113938A CN101166208B CN 101166208 B CN101166208 B CN 101166208B CN 200610113938X A CN200610113938X A CN 200610113938XA CN 200610113938 A CN200610113938 A CN 200610113938A CN 101166208 B CN101166208 B CN 101166208B
- Authority
- CN
- China
- Prior art keywords
- task
- time
- business object
- object model
- attribute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200610113938XA CN101166208B (zh) | 2006-10-20 | 2006-10-20 | 一种维护作业自动化的方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200610113938XA CN101166208B (zh) | 2006-10-20 | 2006-10-20 | 一种维护作业自动化的方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101166208A CN101166208A (zh) | 2008-04-23 |
CN101166208B true CN101166208B (zh) | 2010-10-06 |
Family
ID=39334667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200610113938XA Active CN101166208B (zh) | 2006-10-20 | 2006-10-20 | 一种维护作业自动化的方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101166208B (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101968750B (zh) * | 2010-10-15 | 2012-12-26 | 珠海举天软件科技有限公司 | 计算机系统及其工作方法 |
CN102394932A (zh) * | 2011-11-04 | 2012-03-28 | 浪潮(北京)电子信息产业有限公司 | 一种云海操作系统及其资源调度方法 |
CN103207807B (zh) * | 2012-01-12 | 2017-06-27 | 阿里巴巴集团控股有限公司 | 任务调度方法和装置 |
CN107317839A (zh) | 2012-07-04 | 2017-11-03 | 中兴通讯股份有限公司 | 物联网消息处理方法、装置及系统 |
CN105511958A (zh) * | 2014-10-11 | 2016-04-20 | 阿里巴巴集团控股有限公司 | 任务的调度方法及装置 |
CN104504495A (zh) * | 2014-11-27 | 2015-04-08 | 北京百度网讯科技有限公司 | 运维异常处理方法、装置及设备 |
US9870266B2 (en) * | 2015-07-30 | 2018-01-16 | Nasdaq, Inc. | Background job processing framework |
CN105306273B (zh) * | 2015-11-10 | 2018-12-14 | 中国建设银行股份有限公司 | 流程配置方法及装置 |
CN106815072A (zh) * | 2017-01-16 | 2017-06-09 | 北京市天元网络技术股份有限公司 | 一种任务调度方法 |
CN107102894A (zh) * | 2017-04-07 | 2017-08-29 | 百度在线网络技术(北京)有限公司 | 任务调度方法、装置和系统 |
CN107392762A (zh) * | 2017-04-14 | 2017-11-24 | 阿里巴巴集团控股有限公司 | 清算文件处理的方法、装置及设备 |
CN108958915A (zh) * | 2018-06-28 | 2018-12-07 | 中国建设银行股份有限公司 | 定时任务执行方法及装置 |
CN110768872B (zh) * | 2019-10-31 | 2020-07-17 | 南方电网数字电网研究院有限公司 | 巡检方法、系统、装置、计算机设备和存储介质 |
CN112506625B (zh) * | 2020-11-16 | 2024-03-12 | 国家卫星气象中心(国家空间天气监测预警中心) | 一种业务自动启停控制方法 |
CN113722067A (zh) * | 2021-08-24 | 2021-11-30 | 咪咕音乐有限公司 | 信息任务调度方法、装置、设备及存储介质 |
CN117992198B (zh) * | 2024-02-06 | 2024-06-14 | 广州翌拓软件开发有限公司 | 用于自适应调度的任务处理方法及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1485727A (zh) * | 2002-09-23 | 2004-03-31 | ��Ϊ��������˾ | 一种设备数据轮询调度方法 |
CN1570910A (zh) * | 2003-07-11 | 2005-01-26 | 北京直真节点技术开发有限公司 | 一种通用对象建模方法及通用对象管理系统 |
CN1606301A (zh) * | 2004-07-09 | 2005-04-13 | 清华大学 | 一种共享资源访问的调度控制方法及装置 |
-
2006
- 2006-10-20 CN CN200610113938XA patent/CN101166208B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1485727A (zh) * | 2002-09-23 | 2004-03-31 | ��Ϊ��������˾ | 一种设备数据轮询调度方法 |
CN1570910A (zh) * | 2003-07-11 | 2005-01-26 | 北京直真节点技术开发有限公司 | 一种通用对象建模方法及通用对象管理系统 |
CN1606301A (zh) * | 2004-07-09 | 2005-04-13 | 清华大学 | 一种共享资源访问的调度控制方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN101166208A (zh) | 2008-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101166208B (zh) | 一种维护作业自动化的方法及系统 | |
CN101510164B (zh) | 一种多业务调度方法、装置与系统 | |
Cho et al. | An optimal real-time scheduling algorithm for multiprocessors | |
Saad et al. | Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems | |
CN108920261A (zh) | 一种适于大规模并行数据处理任务的两级自适应调度方法 | |
So | Some heuristics for scheduling jobs on parallel machines with setups | |
CN102243598A (zh) | 分布式数据仓库中的任务调度方法及系统 | |
CN103336714A (zh) | 一种作业调度方法和装置 | |
US20060271420A1 (en) | System and method for performing capacity checks and resource scheduling within a supply chain management system | |
CN101923487A (zh) | 一种综合嵌入式实时周期任务调度方法 | |
Valente et al. | Development of multi-level adaptive control and scheduling solutions for shop-floor automation in reconfigurable manufacturing systems | |
Nelissen et al. | Reducing preemptions and migrations in real-time multiprocessor scheduling algorithms by releasing the fairness | |
Qiu et al. | Cost-minimizing preemptive scheduling of mapreduce workloads on hybrid clouds | |
CN101582043A (zh) | 一种异构计算系统动态任务分配方法 | |
CN101424941A (zh) | 一种控制实现方法和系统 | |
CN110009202A (zh) | 一种肥料工厂的智能排产排程系统及方法 | |
CN104598311A (zh) | 一种面向Hadoop的实时作业公平调度的方法和装置 | |
Wang et al. | Real-time scheduling based on nonblocking supervisory control of state-tree structures | |
CN100508501C (zh) | 基于开放网格服务体系结构的网格工作流虚拟服务调度法 | |
Panahi et al. | The design of middleware support for real-time SOA | |
Kung et al. | Heuristic factory planning algorithm for advanced planning and scheduling | |
US7474998B2 (en) | Simulation of production processes by means of continuous fluid models | |
Kong et al. | Guaranteed scheduling for (m, k)-firm deadline-constrained real-time tasks on multiprocessors | |
Badr | An agent-based scheduling framework for flexible manufacturing systems | |
Jin et al. | Research and implementation of high priority scheduling algorithm based on intelligent storage of power materials |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Beijing Science and Technology Co., Ltd. Assignor: ZZNode Corporation Contract record no.: 2011110000078 Denomination of invention: A method and system for maintaining work automation Granted publication date: 20101006 License type: Exclusive License Open date: 20080423 Record date: 20110707 |
|
EC01 | Cancellation of recordation of patent licensing contract |
Assignee: Beijing Science and Technology Co., Ltd. Assignor: ZZNode Corporation Contract record no.: 2011110000078 Date of cancellation: 20130620 |
|
LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
ASS | Succession or assignment of patent right |
Owner name: BEIJING ZZNODE TECHNOLOGY CO., LTD. Free format text: FORMER OWNER: ZZNODE CORPORATION Effective date: 20130801 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 100080 HAIDIAN, BEIJING TO: 100190 HAIDIAN, BEIJING |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130801 Address after: 100190 Beijing city Haidian District North Fourth Ring Road No. 9 Yingu building room 1506 Patentee after: Beijing Science and Technology Co., Ltd. Address before: 100080 Beijing city Haidian District North Fourth Ring Road No. 9 Yingu building room 1506 Patentee before: ZZNode Corporation |