CN101139930A - 高进路转低进路提前降低顶板的方法 - Google Patents

高进路转低进路提前降低顶板的方法 Download PDF

Info

Publication number
CN101139930A
CN101139930A CNA2007101634409A CN200710163440A CN101139930A CN 101139930 A CN101139930 A CN 101139930A CN A2007101634409 A CNA2007101634409 A CN A2007101634409A CN 200710163440 A CN200710163440 A CN 200710163440A CN 101139930 A CN101139930 A CN 101139930A
Authority
CN
China
Prior art keywords
access road
route
exploitation
low
advance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101634409A
Other languages
English (en)
Inventor
柳军斌
柳兴斌
王虎
徐立青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CNA2007101634409A priority Critical patent/CN101139930A/zh
Publication of CN101139930A publication Critical patent/CN101139930A/zh
Pending legal-status Critical Current

Links

Images

Abstract

高进路转低进路提前降低顶板的方法,涉及一种在下向胶结充填采矿法中,高进路回采结束后,转入低进路回采时,提前形成假顶的方法。其特征在于在高进路在有假顶部分回采结束后,转入采用低进路回采增加的矿体时,在上一分层回采与它相邻的高进路时,提前对这条高进路砼末端假顶下的矿体掘横巷进行回采,形成一个回采空间,对这一空间加强吊挂,充填以后提前形成降低的假顶段,在该分层高进路回采到这一位置,进路的规格由于人工假顶的下降,自然转为低进路。本发明的方法,可以解决现采用的直接在原岩下降顶转低进路回采时的安全隐患问题,还可以减少职工的劳动强度、提高工作效率、节约成本。

Description

高进路转低进路提前降低顶板的方法
技术领域
高进路转低进路提前降低顶板的方法,涉及一种在下向胶结充填采矿法中,高进路回采结束后,转入低进路回采时,提前形成假顶的方法。
背景技术
目前,采用下向胶结充填采矿法采矿的采场,无砼顶板的进路规格,为了支护顶板方便,进路的高度约为有砼顶板进路的二分之一。现高进路需延长,转入无砼假顶低进路回采时,由于岩石在高进路回采过程中受爆破振动影响,岩石顶变得的松软破碎。顶部很难一次性直接降为低进路规格,原岩通常会顺高进路的砼顶板端部向上冒落,有些太破碎岩石,顶部甚至冒落达3米多。若是采用木棚支护,刹顶高度高、难度大,消耗大量的木材,增加了职工的劳动强度,使用大量的木料且在原岩下大量刹顶,对安全带来较大的隐患。
发明内容
本发明的目的就是针对上述已有技术存在的不足,提供一种能有效克服现有高进路转低进路回采中,不能一次性降低的现象,能一次性降低顶板,转入低进路回采,且安全、劳动强度低、工作效率高、成本消耗小的高进路转低进路提前降低顶板的方法。
本发明的目的是通过以下技术方案实现的。
高进路转低进路提前降低顶板的方法,其特征在于在高进路在有假顶部分回采结束后,转入采用低进路回采增加的矿体时,在上一分层回采与它相邻的高进路时,提前对这条高进路砼末端假顶下的矿体掘横巷进行回采,形成一个回采空间,对这一空间加强吊挂,充填以后提前形成降低的假顶段,在该分层高进路回采到这一位置,进路的规格由于人工假顶的下降,自然转为低进路。
本发明的方法,可以解决现采用的直接在原岩下降顶转低进路回采时的安全隐患问题,还可以减少职工的劳动强度、提高工作效率、节约成本。
附图说明
图1是采用本发明的方法提前形成假顶示意图。
具体实施方式
高进路转低进路提前降低顶板的方法,在本分层中,由于矿体增大,高进路在有假顶部分回采结束后,要转入采用低进路回采增加的矿体时。在上一分层回采与它相邻的高进路时,提前对这条高进路砼末端假顶下的矿体掘横巷进行回采,形成规格为高1.5~2米、宽约2米、长约2米的一个回采空间,对这一空间加强吊挂,充填以后提前形成降低的假顶段。在本分层高进路回采到这一位置,进路的规格由于人工假顶的下降,自然转为低进路。
图1中提前形成低进路的假顶(1);新增加的低进路(2);木棚(3);实测线①;上分层实测线②;进路中心线③;矿体④;充填体⑤。
表示高进路转低进路提前形成假顶后,低进路已形成了假顶,不会出现冒落现象,采用木棚支护需要的木材少。

Claims (1)

1.高进路转低进路提前降低顶板的方法,其特征在于在高进路在有假顶部分回采结束后,转入采用低进路回采增加的矿体时,在上一分层回采与它相邻的高进路时,提前对这条高进路砼末端假顶下的矿体掘横巷进行回采,形成一个回采空间,对这一空间加强吊挂,充填以后提前形成降低的假顶段,在该分层高进路回采到这一位置,进路的规格由于人工假顶的下降,自然转为低进路。
CNA2007101634409A 2007-10-25 2007-10-25 高进路转低进路提前降低顶板的方法 Pending CN101139930A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101634409A CN101139930A (zh) 2007-10-25 2007-10-25 高进路转低进路提前降低顶板的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101634409A CN101139930A (zh) 2007-10-25 2007-10-25 高进路转低进路提前降低顶板的方法

Publications (1)

Publication Number Publication Date
CN101139930A true CN101139930A (zh) 2008-03-12

Family

ID=39192012

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101634409A Pending CN101139930A (zh) 2007-10-25 2007-10-25 高进路转低进路提前降低顶板的方法

Country Status (1)

Country Link
CN (1) CN101139930A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011079538A1 (zh) * 2009-12-28 2011-07-07 河北邯邢矿冶设计院有限公司 一种分段充填采矿方法
CN102392641A (zh) * 2011-08-02 2012-03-28 中钢矿业开发有限公司 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法
CN103953344A (zh) * 2014-04-30 2014-07-30 金川集团股份有限公司 一种下向进路分层胶结充填采矿法
CN104100267A (zh) * 2013-04-08 2014-10-15 彭康 一种用于非胶结流沙体下的顶柱回采方法
CN105545353A (zh) * 2015-12-18 2016-05-04 北京科技大学 一种基于膏体充填的人工假顶构筑方法
CN108952803A (zh) * 2018-05-31 2018-12-07 西北矿冶研究院 一种适合破碎矿体回采的下向充填采矿法
CN110259507A (zh) * 2019-06-28 2019-09-20 山东新巨龙能源有限责任公司 一种井下不规则空间充填方法及发泡水泥制作方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011079538A1 (zh) * 2009-12-28 2011-07-07 河北邯邢矿冶设计院有限公司 一种分段充填采矿方法
CN102392641A (zh) * 2011-08-02 2012-03-28 中钢矿业开发有限公司 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法
CN102392641B (zh) * 2011-08-02 2013-09-11 中钢矿业开发有限公司 一种点柱式全矿床不分中段上向高分层连续推进充填采矿方法
CN104100267A (zh) * 2013-04-08 2014-10-15 彭康 一种用于非胶结流沙体下的顶柱回采方法
CN103953344A (zh) * 2014-04-30 2014-07-30 金川集团股份有限公司 一种下向进路分层胶结充填采矿法
CN103953344B (zh) * 2014-04-30 2016-03-09 金川集团股份有限公司 一种下向进路分层胶结充填采矿法
CN105545353A (zh) * 2015-12-18 2016-05-04 北京科技大学 一种基于膏体充填的人工假顶构筑方法
CN105545353B (zh) * 2015-12-18 2017-09-22 北京科技大学 一种基于膏体充填的人工假顶构筑方法
CN108952803A (zh) * 2018-05-31 2018-12-07 西北矿冶研究院 一种适合破碎矿体回采的下向充填采矿法
CN110259507A (zh) * 2019-06-28 2019-09-20 山东新巨龙能源有限责任公司 一种井下不规则空间充填方法及发泡水泥制作方法
CN110259507B (zh) * 2019-06-28 2021-08-10 山东新巨龙能源有限责任公司 一种井下不规则空间充填方法及发泡水泥制作方法

Similar Documents

Publication Publication Date Title
CN101139930A (zh) 高进路转低进路提前降低顶板的方法
CN105971606B (zh) 一种巨厚煤层长壁工作面开采方法
CN103147761B (zh) 一种缓倾斜松软顶板薄矿床充填采矿方法
CN103016047B (zh) 综放工作面顶板走向长钻孔抽放采空区瓦斯方法
CN102168579A (zh) 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN102011611A (zh) 控制上覆岩层移动变形的高水膨胀材料条带式充填方法
CN203452793U (zh) 近地表厚大、较倾斜矿体开采用浅孔留矿法的矿房结构
CN104712358A (zh) 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法
CN103244123B (zh) 一种急倾斜中厚矿体采矿方法
CN110259451A (zh) 一种缓倾斜中厚矿体预控顶高效采矿方法
CN108868771A (zh) 一种水平中深孔回采倾斜中厚矿体的采矿方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN105626071A (zh) 一种缓倾斜薄矿体采矿方法
CN106150546B (zh) 一种根据地表沉陷特征进行采空区部分充填的方法
CN103032070A (zh) 一种控界房柱式分段空场嗣后阶段充填采矿法
CN107725052B (zh) 一种采留一体化开采沿空巷道顶板恒阻锚体梁支护方法
CN103233771A (zh) 一种采空区充填处理过程中的接顶工艺
CN104806285A (zh) 基于地面水平井的煤矿采空区瓦斯治理方法
CN106194196A (zh) 一种横穿隧道洞身的大型溶洞处理与开挖方法
CN103161492A (zh) 一种基于上覆岩层裂隙壳的瓦斯抽采钻孔布置方法
CN103557001B (zh) 一种低段高无底柱留矿嗣后充填采矿法
CN106499396A (zh) 一种中厚缓倾斜含废石夹层矿体房柱采矿法
CN104453900A (zh) 一种近水平矿体充填采矿方法
CN104533415A (zh) 一种阶段强制崩落法与自然崩落法耦合的采矿方法
CN102418528A (zh) 使用钢混结构人工假顶的端部放矿崩落法高效开采工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080312