Prior art keywords
materials
goods
design
product
attribute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101326499A
Other languages
Chinese (zh)
Inventor
金跃跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING YINFEI SHELF MANUFACTURING Co Ltd
Original Assignee
NANJING YINFEI SHELF MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING YINFEI SHELF MANUFACTURING Co Ltd filed Critical NANJING YINFEI SHELF MANUFACTURING Co Ltd
Priority to CNA2007101326499A priority Critical patent/CN101131766A/en
Publication of CN101131766A publication Critical patent/CN101131766A/en
Pending legal-status Critical Current

Links

Images

Abstract

This invention provides to a kind of parameter type shelf product design method, includes the following steps: builds material price system table in the system; builds standard drawing gallery, included the drawing information of each material, distributes to different material drawing number, builds material attribute manage bank, included material drawing number, material name, stock next process flow direction, material price and process cost, the said material attribute has variable parameter; builds variable module in the system: sets the parameter according to the product's character and the design request, takes the material in the said material attribute manage bank, describes the size, amount, color and other information of the material requested; gets the variable module, inputs the variable parameter's define value, finishes the design of the product, and build the shelf product drawing, the produce task list, the cost list and the stock list. The method can leave out a lot of simple repeated jobs, it is fast, correct, convenience and utility.

Description

Kind of parameter type shelf product design method
Technical field
The present invention relates to the method for product design, particularly kind of parameter type shelf product design method.
Background technology
According to market and client's demand, the shelf manufacturer often need release new product, and new goods shelf products is in case release just must provide information such as product drawing, quotation to the client.
Present method is the form exhibiting product of designer with drawing and drawing detail list, finishes the design of product.
Labor management will be handled this type of work with a lot of time, and the calculating of repeatability and decomposition list have occupied a large amount of manpowers, and as easy as rolling off a log making mistakes, and cause damage.
Summary of the invention
At above-mentioned defective, kind of parameter type shelf product design method provided by the invention, by setting up goods and materials attribute management storehouse, formal description product attribute with the parameter setting, call input relevant parameter value when becoming the moduli plate, finish the design of this goods shelf products, save a large amount of simple repetitive operation, accurately quick, convenient and practical.
The method of kind of parameter type shelf product management provided by the invention may further comprise the steps:
In system, set up prices of raw and semifnished materials diagram of system;
In system, set up the standard map picture library, comprise the drawing information of each goods and materials, and distribute different goods and materials figure numbers;
In system, set up goods and materials attribute management storehouse, comprise goods and materials figure number, goods and materials title, the buying road processing flow direction, the prices of raw and semifnished materials and processing charges down, contain variable element in the attribute of described goods and materials;
In system, set up to become the moduli plate: according to products characteristics and design, parameter is set, transfers the materials needed in the above-mentioned goods and materials attribute management storehouse, and describe the information such as size, quantity, color of materials needed with mathematical formulae;
Call change moduli plate in system, input becomes the determined value of ginseng, finishes product design.
Compared with prior art, kind of parameter type shelf product design method provided by the invention, only need the disposable goods and materials attribute management storehouse of setting up, put each goods and materials related data, interstructural logical relation in order, only need call relevant supplies and input dependent constant, just can handle a large amount of simple repetitive operation, accurately quick.
Description of drawings
Fig. 1 is the process flow diagram of the embodiment of the invention;
Embodiment
Be embodiment provided by the invention below, specifically introduce in conjunction with Fig. 1.
As shown in Figure 1, be the process flow diagram of the embodiment of the invention, the kind of parameter type shelf product design method that the embodiment of the invention provides may further comprise the steps:
101, beginning;
102, in system, set up prices of raw and semifnished materials diagram of system;
Comprise in the pricing system table: sheet material, section bar, tubing, wire rod, divide different wall, differential profiles, different processing modes, the stock up price compilation of approach of difference is formed database, uses for the goods and materials attribute definition.
103, in system, set up the standard map picture library, comprise the drawing information of each goods and materials, and distribute different goods and materials figure numbers;
According to the classification of product, with standard card cage, standardized component, standard element and standardized element, press the drawing figure number, set up the standard map picture library.
104, in system, set up goods and materials attribute management storehouse, comprise goods and materials figure number, goods and materials title, the buying road processing flow direction, the prices of raw and semifnished materials and processing charges down, contain variable element in the attribute of described goods and materials;
Zero member with standard, its attribute of specific definition, wherein contain the goods and materials figure number, the goods and materials title, materiel code, buying road processing down flows to (blanking, welding, the outsourcing finished product, plastic-blasting, clod wash, punching press, zinc-plated, weld after the external coordination etc.), material procurement character (outsourcing finished product, cooperation part, nonstandard member, semi-manufacture, auxiliary material, starting material etc.), valuation unit (kilogram, rice, part etc.), relevant procurement staff, the prices of raw and semifnished materials, information such as processing charges, wherein: generating the prices of raw and semifnished materials, processing charges, because goods and materials length of the same race, differences such as wall thickness, can establish the goods and materials variable, generate different prices.
105, in system, set up to become the moduli plate: according to products characteristics and design, parameter is set, transfers the materials needed in the above-mentioned goods and materials attribute management storehouse, and describe the information such as size, quantity, color of goods and materials with mathematical formulae; Determine to finish what task and technological requirement, product weight, plastic-blasting area, member cost, total cost, shipping list, next procedure and task time etc. simultaneously in what department, what workshop.
106, in system, call change moduli plate, input becomes the determined value of ginseng, finishes product design.
This moment, design result had: goods shelf products drawing, each production task list, the bill of costs and shopping list, all data forms all can freely call in system, become the Data Source of whole ERP system.
The kind of parameter type shelf product design method that the embodiment of the invention provides, only need the disposable change moduli plate of setting up required design, put each goods and materials related data, interstructural logical relation in order, only need call relevant supplies and input dependent constant, just can handle a large amount of simple repetitive operation, accurately quick.

Claims (1)

1. a kind of parameter type shelf product design method is characterized in that, may further comprise the steps:
In system, set up prices of raw and semifnished materials diagram of system;
In system, set up the standard map picture library, comprise the drawing information of each goods and materials, and distribute different goods and materials figure numbers;
In system, set up goods and materials attribute management storehouse, comprise goods and materials figure number, goods and materials title, the buying road processing flow direction, the prices of raw and semifnished materials and processing charges down, contain variable element in the attribute of described goods and materials;
In system, set up to become the moduli plate: according to products characteristics and design, parameter is set, transfers the materials needed in the above-mentioned goods and materials attribute management storehouse, and describe the information such as size, quantity, color of materials needed with mathematical formulae;
Call change moduli plate in system, input becomes the determined value of ginseng, finishes product design.
CNA2007101326499A 2007-09-18 2007-09-18 Method for parametrizing goods shelf product design Pending CN101131766A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101326499A CN101131766A (en) 2007-09-18 2007-09-18 Method for parametrizing goods shelf product design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101326499A CN101131766A (en) 2007-09-18 2007-09-18 Method for parametrizing goods shelf product design

Publications (1)

Publication Number Publication Date
CN101131766A true CN101131766A (en) 2008-02-27

Family

ID=39129027

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101326499A Pending CN101131766A (en) 2007-09-18 2007-09-18 Method for parametrizing goods shelf product design

Country Status (1)

Country Link
CN (1) CN101131766A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102209973A (en) * 2008-11-07 2011-10-05 松利得宇株式会社 Method and system for facilities management
CN104463517A (en) * 2013-09-24 2015-03-25 鸿富锦精密工业(深圳)有限公司 Server and logistics data processing system and method
CN106251091A (en) * 2016-08-17 2016-12-21 苏州朋泰智能科技有限公司 The material customizing method of a kind of ERP system and device
CN111833006A (en) * 2019-04-23 2020-10-27 中国石化工程建设有限公司 Non-standard product frame type bidding management platform
CN112801572A (en) * 2020-12-31 2021-05-14 中国农业银行股份有限公司 Loading container model construction method, device and equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102209973A (en) * 2008-11-07 2011-10-05 松利得宇株式会社 Method and system for facilities management
CN102209973B (en) * 2008-11-07 2014-12-10 松利得宇株式会社 Method and system for facilities management
CN104463517A (en) * 2013-09-24 2015-03-25 鸿富锦精密工业(深圳)有限公司 Server and logistics data processing system and method
CN106251091A (en) * 2016-08-17 2016-12-21 苏州朋泰智能科技有限公司 The material customizing method of a kind of ERP system and device
CN111833006A (en) * 2019-04-23 2020-10-27 中国石化工程建设有限公司 Non-standard product frame type bidding management platform
CN112801572A (en) * 2020-12-31 2021-05-14 中国农业银行股份有限公司 Loading container model construction method, device and equipment

Similar Documents

Publication Publication Date Title
Pasandideh et al. An investigation of vendor-managed inventory application in supply chain: the EOQ model with shortage
US20090063309A1 (en) System And Method For Automating Engineering Processes For Build-To-Order Projects
CN101980260A (en) System and method for designing and manufacturing design object
CN101131766A (en) Method for parametrizing goods shelf product design
Chiu et al. Combining an alternative multi-delivery policy into economic production lot size problem with partial rework
Krishnamoorthi et al. An EPQ model with imperfect production systems with rework of regular production and sales return
JP5881336B2 (en) Manufacturing cost management system and management method
CN112270444A (en) Light APS double-bridge planning system
CN111461590A (en) Method for calculating complete set of materials according to sales, inventory and purchase information
Bicheno et al. Constraint batch sizing in a lean environment
CN106910112A (en) A kind of 3D printing cloud platform price quoting method and system
Chiarini A comparison between time-driven activity-based costing and value stream accounting in a lean Six Sigma manufacturing case study
JP4951470B2 (en) Production planning support system
CN104573903A (en) Computer program for process control over enterprise production scheduling and production flow management
CN111652671A (en) Purchasing mall suitable for buyer market environment and purchasing method thereof
Xia et al. Market-based supply chain coordination by matching suppliers' cost structures with buyers' order profiles
US8437022B2 (en) Order system for printed matter, and method for calculating production of printed matter
CN101169844A (en) Kanban scheduling control system
CN108376350A (en) A kind of intelligent movable ERP order processing technological systems
Wang et al. An assemble-to-order production planning with the integration of order scheduling and mixed-model sequencing
Schönsleben Changeability of strategic and tactical production concepts
CN101593317A (en) The material requirement planning system and method
Kšksal et al. Manufacturing execution through e-FACTORY system
Sharma A composite model in the context of a production-inventory system
Chen APPLICATION OF ACTIVITY-BASED COSTING ON REINFORCING STEEL BAR MANUFACTURER.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080227