CN101087464A - Network optimization method and device - Google Patents

Network optimization method and device Download PDF

Info

Publication number
CN101087464A
CN101087464A CNA2007101183014A CN200710118301A CN101087464A CN 101087464 A CN101087464 A CN 101087464A CN A2007101183014 A CNA2007101183014 A CN A2007101183014A CN 200710118301 A CN200710118301 A CN 200710118301A CN 101087464 A CN101087464 A CN 101087464A
Authority
CN
China
Prior art keywords
control action
load control
network
cell load
measured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101183014A
Other languages
Chinese (zh)
Inventor
陈取才
张晓燕
栾少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNA2007101183014A priority Critical patent/CN101087464A/en
Publication of CN101087464A publication Critical patent/CN101087464A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides network optimizing method and device. The network optimizing method includes: measure executing situation of area load control action and obtain result of measurement; ensuring network optimizing strategy based on result of measurement, and optimizing network based on network optimizing strategy. The network optimizing device includes: measuring module, output module, strategy module and optimizing module. The measuring module is used to measure executing situation of area load control action; the output module is used to output measurement result obtained by measuring module; the strategy module is used to ensure network optimizing strategy based on result of the output module; the optimizing module is used to optimize network based on network optimizing strategy output by strategy module. By measuring executing situation of area load control action, the network performance index of area load control action is used adequately, and it provides advantageous according for network optimizing.

Description

Network optimized approach and device
Technical field
The present invention relates to the network communications technology field, be specifically related to network optimized approach and device.
Background technology
Reasons such as number of users increase, class of business variation, urban construction can cause that the propagation conditions that jolts changes, thereby need carry out continual optimization to network, dispose, improve network operation performance, improve service quality to get rid of the various faults, the optimization Internet resources that constantly occur in the network, finally make network be in best running status all the time.
At present, the optimization method of network is: network side is measured miscellaneous service, then, according to measurement result corresponding business is adjusted processing, to optimize network.The object of above-mentioned measurement comprises: RRC (Radio Resource control) process, RAB (RAB circuit) process, signaling connect between foundation, soft switching process, direct-cut operation, transition process, system handoff procedure etc.
Summary of the invention
Embodiment of the present invention provides network optimized approach and device, to optimize network.
The network optimized approach that embodiment of the present invention provides comprises:
Implementation status to the cell load control action is measured, and obtains measurement result, and output;
Determine network optimization strategy according to the measurement result of described output, and network is optimized processing according to the described network optimization strategy of determining.
The network optimization device that embodiment of the present invention provides comprises:
Measurement module: be used for the implementation status of cell load control action is measured;
Output module: be used to export measurement module and measure the measurement result that obtains;
The measurement result of described output module output is used for determining network optimization strategy, and described network optimization strategy is used for the network optimization to be handled.
Description by technique scheme by the implementation status of cell load control action is measured, has made full use of this important network performance index of cell load control action, for the network optimization provides favourable foundation as can be known.
Description of drawings
Fig. 1 is the network optimized approach schematic flow sheet according to embodiment of the present invention.
Embodiment
Load control action such as cell load control action are a kind of important means of system held network stabilization, load control action such as cell load control action and network system efficient and network capacity etc. are closely related, therefore, load control action such as cell load control action are very important network performance indexes.By load control action such as cell load control action are measured, can provide favourable foundation for the network optimization.
Be example with the cell load control action below, the network optimized approach that embodiment of the present invention is provided describes.Of particular note, though following execution mode is that example describes with the cell load control action,, the load control action in the embodiment of the present invention is not restricted to the cell load control action.
At first, the cell load control action is measured.Embodiment of the present invention can be measured the number of times of accumulative total metering system here such as cell load control action execution in the cycle etc. to the cell load control action by CC (accumulative total is measured) mode.Embodiment of the present invention also can be measured the cell load control action by GAUGE (dynamic variable measurement) mode, can also measure the cell load control action by alternate manner.Embodiment of the present invention does not limit the mode that the cell load control action is measured.And the measurement here can be the measurement based on RNC, also can be the measurement based on the sub-district.Measurement based on RNC is promptly measured the cell load control action in the RNC scope, the number of times of carrying out as cell load control action in the measure R NC etc.Measurement based on the sub-district is promptly measured the cell load control action in cell range, as measuring the cell load control action is carried out in the sub-district number of times etc.Embodiment of the present invention also can be measured the cell load control action in other regional extent.Embodiment of the present invention is the concrete manifestation form of restricted area scope not.
Cell load control action in the embodiment of the present invention can comprise following one or multinomial: the alien frequencies load is switched, the professional reduction of speed of BE, uncontrollable real time business QoS are consulted again, CS (Circuit Switched, circuit switching) the different system load switching in territory, PS (Packet Switched, packet switching) the different system load switching in territory, AMR (Adaptive Multi-Rate, adaptive multi-rate) voice reduction of speed, BE (Best Effort, doing one's best) professional TF (Transport Format, transformat) control and user operation such as discharge.Embodiment of the present invention is the content that specifically comprises of restricted cell load control action not.
When the cell load control action is measured, can also carry out the measurement of cell load control action respectively according to different types of service.The division of concrete type of service can be carried out according to the actual conditions in the network, as being with multiple different delineation of activities: session service type, stream type of service, interactive service type, background service type.Embodiment of the present invention is the concrete dividing mode of limit service type not.By the cell load control action being measured, the situation that influences to network performance of different service types can be provided, thereby provide favourable foundation for operator's adjustment business according to different service types.
After the measurement of having carried out above-mentioned cell load control action, can determine strategy according to measurement result, and network is optimized processing according to this strategy to the network optimization.That is to say that embodiment of the present invention can be come problem that the fixer network performance exists, network anomaly etc. according to measurement result, thereby can determine the strategy of the network optimization according to these problems, phenomenon etc., and carries out the network optimization and handle.The network optimization strategy here can be various strategies of the prior art, as adjusting access service, the network capacity extension etc.That is to say that the network optimization in the embodiment of the present invention is handled can be diverse network optimization process operation of the prior art.The not concrete operations handled of the concrete manifestation form of limiting network optimisation strategy and the network optimization of embodiment of the present invention.
Be that example describes the network optimized approach that embodiment of the present invention provides with a concrete implementation procedure below.
At first, the cell load situation is measured, as periodically the cell load situation being measured, after being checked through the sub-district and having entered congestion state, network side can select to carry out the cell load control action, to reduce load, network side can be selected corresponding operation from following cell load control action: the alien frequencies load is switched, the professional reduction of speed of BE, uncontrollable real time business QoS are consulted again, different system load switchings in CS territory, different system load switchings in PS territory, Amr voice reduction of speed, BE business TF controls and user's release etc.Network side can select to be fit to carry out the user of cell load control action again in the sub-district according to type of action after selecting proper cell load control action.After selecting the user, send the indication of carrying out the cell load control action to this user.Before the user sends indication, can adopt CC mode or GAUGE mode etc. that performed cell load control action is measured.Certainly, embodiment of the present invention also can be measured performed cell load control action after sending indication.And the measurement here can be based on the measurement of RNC, also can be based on the measurement of sub-district.
After having obtained measurement result by the way, can determine corresponding network optimization strategy according to this measurement result, and carry out the network optimization according to this network optimization strategy and handle.For example, when adopting the CC mode that the cell load control action is measured, but in the measure R NC, and each sub-district in the number of times of execution cell load control action, according to the execution number of times of various cell load control actions the access service in the network is adjusted then.Again for example, adopt the GAUGE mode to RNC in each small area jam duration when measuring, can be according to the maximum situation of measuring each the small area jam duration that obtains, come the evaluating network performance according to the maximum situation of measuring each the small area jam duration that obtains then, obtain the general status and the timely anomaly of finding network of network operation performance, so that optimize and revise network.
In above-mentioned measuring process, can also carry out cell load control respectively to different types of service and carry out measurements such as number of times, can determine to provide the influence situation of different service types according to measurement result like this, thereby provide favourable foundation to optimize network for operator adjusts business to network.The type of service here can be divided into: session service type, stream type of service, interactive service type, background service type etc.
A concrete measurement result is as shown in table 1.
Table 1
When congested, carry out user's number (CC) (RNC and CELL) that the alien frequencies load is switched elementary
When congested, carry out user's number (CC) (RNC and CELL) of the professional reduction of speed rate of BE elementary
When congested, carry out user's number (CC) (RNC and CELL) of Amr reduction of speed elementary
When overload is congested, carry out user's number (CC) (RNC and CELL) of the professional TF control of BE
The elementary congested durations of sub-district uplink and downlink (GAUGE) (CELL)
The sub-district uplink and downlink transship congested duration (GAUGE) (CELL)
Each measuring process and meaning thereof in the following his-and-hers watches 1 describe.
1, when congested, carries out user's number that the alien frequencies load is switched elementary.
In measurement period, adopt the CC metering system, come user's number of having carried out alien frequencies load switching is measured based on RNC and CELL (sub-district) respectively.Whether measurement result can embody the network service and have problems, and carries out network optimization processing according to type and the dissimilar user that the alien frequencies load is switched, with timely optimization network.
2, when congested, carry out user's number of the professional reduction of speed rate of BE elementary.
In measurement period, adopt the CC metering system, come user's number of carrying out the professional reduction of speed rate of BE is measured based on RNC and CELL respectively, whether measurement result can embody the network service and have problems, and carry out the network optimization according to the user access control of the type of the professional reduction of speed rate of BE and BE type of service and handle, with timely optimization network.
3, when congested, carry out user's number of AMR voice reduction of speed elementary.
In measurement period, adopt the CC metering system, come user's number of carrying out AMR voice reduction of speed is measured based on RNC and CELL respectively, whether measurement result can embody the network service and have problems, and carry out the network optimization according to the user access control of the type of carrying out AMR voice reduction of speed and AMR type of service and handle, with timely optimization network.
4, when overload is congested, carry out user's number of the professional TF control of BE.
In measurement period, adopt the CC metering system, come user's number of carrying out the professional TF control of BE is measured based on RNC and CELL respectively, whether measurement result can embody the network service and have problems.Because the professional TF control of BE is just carried out when cell-overload, therefore, this measurement result need attract great attention, and takes corresponding network adjustment, in order in time adjusting, optimize network.
5, the elementary congested duration of sub-district uplink and downlink.
In measurement period, adopt the GAUGE metering system, come the elementary congestion time length of uplink and downlink is measured based on CELL, calculate the mean value of the elementary congested duration of sub-district uplink and downlink.The mean value of elementary congested duration can embody the general status of each small area jam situation in the network, when average congestion time is very long, can adopt modes such as dilatation corresponding service channel, congested control to optimize network.
The network optimized approach that provides below in conjunction with 1 pair of embodiment of the present invention of accompanying drawing describes.
Among Fig. 1, the cell load situation is measured in step 1, periodicity.
Step 2, judge according to the measurement result of cell load whether the sub-district is in congestion state, if determine that the sub-district is in congestion condition, then execution in step 3; Be not in congestion condition if determine the sub-district, then return step 1, wait for next time measurement the cell load situation.
Step 3, for reducing load, network side selects to carry out the cell load control action.The cell load control action that network side is selected can for: the alien frequencies load is switched, the professional reduction of speed of BE, uncontrollable real time business QoS are consulted again, different system load switchings in CS territory, different system load switchings in PS territory, AMR voice reduction of speed, the professional TF of BE controls and user's release in one or more.
Step 4, network side select to be fit to carry out this action according to the cell load control action type of selecting in the sub-district user.After selecting the user, difference execution in step 41 and step 42.
Step 41, network side send the indication of carrying out the cell load control action to the user who selects.
Step 42, network side adopt CC mode or GAUGE mode etc. that performed cell load control action is measured, and this measurement can be based on the measurement of RNC, also can be based on the measurement of sub-district.After having carried out step 42, execution in step 43.
Step 43, network side are determined corresponding network optimization strategy according to this measurement result, and carry out the network optimization according to this network optimization strategy and handle, this network optimization handle as to the access service in the network adjust, dilatation corresponding service channel, congested control or the like.
The technical scheme that embodiment of the present invention provides can be applied in WCDMA such as the various wireless communication networks such as R99, R5, and this technical scheme can to original cordless communication network without any the influence situation under, embody the implementation status of cell load control in the network with directly perceived, unified method of measurement, thereby provide strong foundation for operator optimizes network.
Network optimization device to embodiment of the present invention describes below.The network optimization device that embodiment of the present invention provides comprises: measurement module and output module.This network optimization device also can comprise: measurement module, output module and policy module.This network optimization device can also comprise: measurement module, output module, policy module and optimal module.
Measurement module is mainly used in to be measured the implementation status of load control action.Load control action here such as cell load control action.Measurement module can be measured based on RNC, also can measure based on the sub-district.Measurement based on RNC is promptly measured the cell load control action in the RNC scope, the number of times of carrying out as cell load control action in the measure R NC etc.Measurement based on the sub-district is promptly measured the cell load control action in cell range, as measuring the cell load control action is carried out in the sub-district number of times etc.Measurement module also can be measured the cell load control action in other regional extent.Embodiment of the present invention does not limit the concrete manifestation form of the regional extent that measurement module measures.And measurement module can be to following one or multinomial the measurement: the alien frequencies load is switched, the professional reduction of speed of BE, uncontrollable real time business QoS are consulted again, different system load switchings in CS territory, different system load switchings in PS territory, AMR voice reduction of speed, BE business TF controls and operation such as user's release.Measurement module can also carry out the measurement of cell load control action according to different types of service respectively when the cell load control action is measured.The division of concrete type of service can be carried out according to the actual conditions in the network, as being with multiple different delineation of activities: session service type, stream type of service, interactive service type, background service type.
The operation that measurement module is carried out can be by measuring submodule one and measuring submodule two and realize.
Measurement submodule one is mainly used in and adopts the accumulative total metering system that the implementation status of load control action is measured.The number of times of accumulative total metering system such as cell load control action execution in the cycle etc.Measure submodule one and when measuring, can measure, also can measure based on the sub-district based on RNC.Measuring submodule one also can measure the cell load control action in other regional extent.And measuring submodule one can be to following one or multinomial the measurement: the alien frequencies load is switched, the professional reduction of speed of BE, uncontrollable real time business QoS are consulted again, different system load switchings in CS territory, different system load switchings in PS territory, AMR voice reduction of speed, BE business TF controls and operation such as user's release.Measure submodule one when the cell load control action is measured, can also carry out the measurement of cell load control action respectively according to different types of service.The division of concrete type of service can be carried out according to the actual conditions in the network, as being with multiple different delineation of activities: session service type, stream type of service, interactive service type, background service type.
Measurement submodule two is mainly used in and adopts the dynamic variable metering system that the implementation status of load control action is measured.Measure submodule two and when measuring, can measure, also can measure based on the sub-district based on RNC.Measuring submodule two also can measure the cell load control action in other regional extent.And measuring submodule two can be to following one or multinomial the measurement: the alien frequencies load is switched, the professional reduction of speed of BE, uncontrollable real time business QoS are consulted again, different system load switchings in CS territory, different system load switchings in PS territory, AMR voice reduction of speed, BE business TF controls and operation such as user's release.Measure submodule two when the cell load control action is measured, can also carry out the measurement of cell load control action respectively according to different types of service.The division of concrete type of service can be carried out according to the actual conditions in the network, as being with multiple different delineation of activities: session service type, stream type of service, interactive service type, background service type.
Output module is mainly used in the output measurement module and measures the measurement result that obtains.For example output module output is measured submodule one and is measured the measurement result that obtains, and output module output is measured submodule two and measured the measurement result that obtains for another example.
Policy module is mainly used in according to the measurement result of output module output determines network optimization strategy, and the output network optimisation strategy.The network optimization strategy here can be network optimization strategy of the prior art, and is concrete as the description in the above-mentioned method execution mode.
The network optimization strategy that optimal module is mainly used in according to policy module output carries out network optimization processing.It can be that operation is handled in the network optimization of the prior art that the network optimization of optimal module execution is handled, concrete as the description in the above-mentioned method execution mode.
Though described the present invention by embodiment, those of ordinary skills know, the present invention has many distortion and variation and do not break away from spirit of the present invention, and the claim of application documents of the present invention comprises these distortion and variation.

Claims (10)

1, a kind of network optimized approach is characterized in that, comprising:
Implementation status to the cell load control action is measured, and obtains measurement result, and output;
Determine network optimization strategy according to the measurement result of described output, and network is optimized processing according to the described network optimization strategy of determining.
2, the method for claim 1 is characterized in that, the step of described measurement comprises following one or more:
Based on radio network controller the implementation status of cell load control action is measured;
Based on the sub-district implementation status of cell load control action is measured.
3, the method for claim 1 is characterized in that, the step of described measurement comprises following one or more:
Adopt the accumulative total metering system that the implementation status of cell load control action is measured;
Adopt the dynamic variable metering system that the implementation status of cell load control action is measured.
4, the method for claim 1 is characterized in that, the step of described measurement comprises:
Implementation status to the cell load control action of different service types is measured respectively.
5, method as claimed in claim 4 is characterized in that, described type of service comprises following one or more: session service type, stream type of service, interactive service type, background service type.
6, the method for claim 1 is characterized in that, the step of described measurement comprises following one or more:
Respectively the implementation status of cell load control action is measured according to the stage that cell load is congested.
7, the method for claim 1, it is characterized in that described cell load control action comprises following one or more: alien frequencies load switching, Best-Effort service reduction of speed, uncontrollable quality of real-time service are consulted again, the different system load switching of circuit commutative field, the different system load switching of packet-switched domain, adaptive multi-rate speech reduction of speed, the control of Best-Effort service transformat, user discharge.
8, a kind of network optimization device is characterized in that, described device comprises:
Measurement module: be used for the implementation status of cell load control action is measured;
Output module: be used to export measurement module and measure the measurement result that obtains;
The measurement result of described output module output is used for determining network optimization strategy, and described network optimization strategy is used for the network optimization to be handled.
9, device as claimed in claim 8 is characterized in that, described measurement module comprises:
Measure submodule one: be used to adopt the accumulative total metering system that the implementation status of cell load control action is measured;
Measure submodule two: be used to adopt the dynamic variable metering system that the implementation status of cell load control action is measured.
10, install as claimed in claim 8 or 9, it is characterized in that described device also comprises:
Policy module: be used for determining network optimization strategy according to the measurement result of output module output, and output;
Optimal module: be used for carrying out network optimization processing according to the network optimization strategy of policy module output.
CNA2007101183014A 2007-07-04 2007-07-04 Network optimization method and device Pending CN101087464A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101183014A CN101087464A (en) 2007-07-04 2007-07-04 Network optimization method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101183014A CN101087464A (en) 2007-07-04 2007-07-04 Network optimization method and device

Publications (1)

Publication Number Publication Date
CN101087464A true CN101087464A (en) 2007-12-12

Family

ID=38938161

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101183014A Pending CN101087464A (en) 2007-07-04 2007-07-04 Network optimization method and device

Country Status (1)

Country Link
CN (1) CN101087464A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102396255A (en) * 2008-12-17 2012-03-28 康博泰公司 Dynamic mobile network traffic control
CN103841577A (en) * 2012-11-22 2014-06-04 中兴通讯股份有限公司 Method and apparatus for automatically optimizing wireless network load of UMTS
WO2016000116A1 (en) * 2014-06-30 2016-01-07 华为技术有限公司 Cell bandwidth control method and apparatus
WO2023036042A1 (en) * 2021-09-07 2023-03-16 华为技术有限公司 Method, apparatus and system for determining network optimization policy

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102396255A (en) * 2008-12-17 2012-03-28 康博泰公司 Dynamic mobile network traffic control
CN103841577A (en) * 2012-11-22 2014-06-04 中兴通讯股份有限公司 Method and apparatus for automatically optimizing wireless network load of UMTS
CN103841577B (en) * 2012-11-22 2017-12-15 中兴通讯股份有限公司 A kind of UMTS wireless networks load automatic optimization method and device
WO2016000116A1 (en) * 2014-06-30 2016-01-07 华为技术有限公司 Cell bandwidth control method and apparatus
WO2023036042A1 (en) * 2021-09-07 2023-03-16 华为技术有限公司 Method, apparatus and system for determining network optimization policy

Similar Documents

Publication Publication Date Title
US8116324B2 (en) Network resource allocation system and method of the same
JP4685885B2 (en) Channel bandwidth and data error target selection dynamically based on determined transmission requirements
CN104270765B (en) Base station node resource distribution method and system, equipment
CN101449608B (en) Adaptive power control method for cellular systems
US20040166835A1 (en) Radio resource management with adaptive congestion control
CN101557644B (en) Adjusting method for wireless signal-path band width
US20060252429A1 (en) Flow-based call admission control for wireless communication systems
US20120057478A1 (en) Dynamic Bandwidth Allocation Control in a Multi-Access Radio Communication System
US20080075030A1 (en) Power control method
CN1980480B (en) Apparatus and method for call admission control
KR20120089467A (en) Enhanced data delivery based on real time analysis of network communications quality and traffic
Karmeshu et al. Adaptive mean queue size and its rate of change: queue management with random dropping
ATE411720T1 (en) METHOD AND ARRANGEMENT FOR CHANNEL TYPE SWITCHING
WO2005099296A1 (en) Radio base station apparatus and data transfer control method
CN101087464A (en) Network optimization method and device
US20070242606A1 (en) Dynamic reverse link overhead control based load information
US9713054B2 (en) Communication terminal and method for communicating data
JP2009524968A (en) Method and apparatus for reverse link control in a wireless communication network as a function of reverse link load characteristics
CN1862992B (en) Method for dynamic controlling block error probability desired value in WCDMA system
CN100490554C (en) Network optimization method and its system
JP2015515196A (en) Power saving method and apparatus for base station
CN102404745B (en) Method for carrying out dynamic traffic scheduling on users
CN104768228B (en) Downlink dynamic dispatching resource allocation methods, device and the base station of VOLTE business
CN102469521A (en) Method for dynamically adjusting quality of service (QoS) index
CN100433894C (en) Method of type conversion from dedicated channel to common channel in CDMA system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20071212