CN101053926A - Axial-flow rotary propeller type water turbine runner blade crackle treating method - Google Patents

Axial-flow rotary propeller type water turbine runner blade crackle treating method Download PDF

Info

Publication number
CN101053926A
CN101053926A CN 200710049214 CN200710049214A CN101053926A CN 101053926 A CN101053926 A CN 101053926A CN 200710049214 CN200710049214 CN 200710049214 CN 200710049214 A CN200710049214 A CN 200710049214A CN 101053926 A CN101053926 A CN 101053926A
Authority
CN
China
Prior art keywords
welding
crackle
blade
groove
root
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710049214
Other languages
Chinese (zh)
Inventor
严祥兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Dongfeng Electric Machinery Works Co Ltd
Original Assignee
Sichuan Dongfeng Electric Machinery Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Dongfeng Electric Machinery Works Co Ltd filed Critical Sichuan Dongfeng Electric Machinery Works Co Ltd
Priority to CN 200710049214 priority Critical patent/CN101053926A/en
Publication of CN101053926A publication Critical patent/CN101053926A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a crack treating method for an axial turning blade hydro-turbine runner, wherein the runner can be repaired in situ without being hoisted out from a runner chamber. 'R' value of round corner of one front side of the blade on exit edge which is connected with a root flange is enlarged intentionally; crack arrest holes are drilled on end part of crack, with different shaped groove for different crack, and the preheat, patch weld and heat preservation are carried out based on predetermined process order. The invention has the following advantages: construction on-the-spot, restoration in short period, avoided miscellaneous disassembly and assembly work, saved transportation cost, good weld restoration strength and stiffness, strong crack resistance, thus the invention can satisfy the work requirement of the axial turning blade hydro-turbine runner after repairing the crack.

Description

Axial-flow rotary propeller type water turbine runner blade crackle treating method
Affiliated field
The present invention relates to crackle processing method, particularly axial-flow rotary propeller type water turbine runner blade crackle treating method.
Background technology
Movable propeller turbine, by long use, blade will produce crackle in various degree.The reason that crackle produces mainly comprises following aspect: the one, because the long-term underload of unit, excess load or, make runner bucket under the alternate stress effect, produce the crack or aggravated the development of crackle in the bad vibrating area operation of operating mode; The 2nd, because the kaplan turbine runner blade is a cantilever force, crackle appears in blade variable cross-section root if no transition arc or amount of transition hour easy generation stress is concentrated.Cantilever runner bucket Root Stress in the unit operation is concentrated, the suffered basic stress of blade is higher, and the dynamic stress the during synergy of various load is bigger in addition, and the suffered alternation dynamic stress of blade has been aggravated fatigue of materials, produce fatigue rupture, cause runner bucket to crack.
Summary of the invention
Purpose of the present invention promptly is to overcome the shortcoming of prior art, provides a kind of repair process at the scene, the axial-flow rotary propeller type water turbine runner blade crackle treating method that the cycle is short, expense is low.
Purpose of the present invention is achieved through the following technical solutions: axial-flow rotary propeller type water turbine runner blade crackle treating method, runner without lifting goes out runner envelope, repair at the scene, have a mind to strengthen " R " value that face of blade goes out the excessive fillet that waterside one side is connected with the root flange with the method for built-up welding; Afterbody at crackle bores stop hole, and different crackles is adopted difform groove, in accordance with regulations process sequence preheating, repair welding and insulation, and it may further comprise the steps:
(1) preparation
(a) blade is beaten to fully open position, simultaneously to blade just, back side crackle handles;
(b) set up workbench;
(c) pull down the pivot sealing;
(d) blade and runner envelope are fixed, added suitable support fixation simultaneously between blade and web, it is stressed to reduce the blade axle journal;
(2) removing of crackle
(a) check sharf neck position front and back with PT flaw detection comprehensively and go out the waterside positive and make the visible marking;
(b) remove preceding the beating of crackle and only prolong the hole, bore the diameter that only prolongs the hole and be about 8mm, the big 4~6mm of hole depth rate crack depth in the line tail bit of crackle;
(c) rooting out of crackle adopts carbon arc air gouging to exclude, before removing crack site is reached near the 200mm scope with 80 ℃~100 ℃ of oxy-acetylene preheatings, the carbon arc air gouging direction should be removed to direction of check from stop hole, and till crackle was peace and quiet, carbon arc air gouging must be interrupted use;
(d) leave the repair welding groove during carbon arc air gouging simultaneously.
(e) after defective is thoroughly removed totally, the case-carbonizing oxide layer of groove is polished with mushroom hair style abrasive machine;
(f) confirm that with PT flaw detection crackle treats repair welding after thoroughly peace and quiet.
(3) welding
(a) welding rod must be dried 2h before using under 350 ℃ of temperature, is incubated under 100 ℃ of constant temperature.
(b) before weldering, rejected region is carried out integral body or local preheating, runner envelope environment temperature integral body is heated to 30~40 ℃, to adopting oxy-acetylene flame local preheating in repair welding position and near the 200mm scope, temperature rise speed is advisable with 8~10 ℃/h, temperature is controlled at 80-120 ℃, and preheat temperature reaches after the requirement again that constant temperature 2~4h can weld.
(c) welding adopts thin layer, segmentation, room for manoeuvre solder technology;
(d) in the welding process except that bottom and superficial layer every layer adopt hammering method to eliminate stress;
(e) use the slow cooling of asbestos cloth covering and heat insulating after the repair welding immediately;
(4) cleaning, polishing
Postwelding is removed welding slag, is splashed, with the slick and sly into treatment sites of the suitable vane type line reconditioning of emery wheel;
(5) PT flaw detection and inspection
Into treatment sites and hot shadow zone are carried out " PT " defect detecting test, and qualified back is removed and is supported, and inspection distortion situation and polishing are supported spot welding place to slyness.
Leave the repair welding groove during carbon arc air gouging simultaneously, the form of groove is mainly according to crackle situation, position with root out and weld and convenient decide, all crackles that does not penetrate, the degree of depth at 30mm with interior opening " V " shape groove, the degree of depth opening more than 30mm " U " shape groove is near employing " V " the shape groove of root; All crackles that penetrates, the degree of depth at 40mm with interior opening " X " shape groove, near root open " K " shape groove, the need of thickness more than 40mm are opened " U " shape groove, near root open " K " shape groove, the groove root repairs suitable fillet R.
Welding adopts Austria 307 and G232 stainless steel electrode during welding, welding rod specification Φ 3.2, Φ 4, and 307 stainless steel electrodes wherein difficult to understand are used for bottom and intermediate layer, and the G232 stainless steel electrode is used for capping and built-up welding R part.
Welding adopts thin layer, segmentation, room for manoeuvre solder technology, long weld seam is taked the segmentation weldering, every segment length 100~150mm, the above not chemistry of 300mm is taked segmentation room for manoeuvre weldering, can be below the 300mm by the centre to outside weld, the sectionalizing joint place should successively overlap, and weld seam takes turns to weld just on the contrary, to the groove of the degree of depth more than 40mm, should use bilateral fringing welding technology; To the degree of depth below 40mm and by the then available one-sided fringing welding technology of groove of root of blade, should behind its face bonding 2--3 road weld seam, root out the overlap of groove bottom again with pneumatic shovel at its back side to through wall flaw, begin welding when waiting to expose new weld seam again, in the crackle repair welding, under which floor adopts little electric current as far as possible and lacks electric arc (general 2~2.5mm) with the welding rod of diameter 3.2mm and under the situation that guarantees through welding, and the control interlayer temperature must not be greater than 120 ℃, welding order should first repair welding axle journal middle part, and repair welding goes out the position, waterside again.
By top narration as can be seen, the present invention has the following advantages: site operation, repairing efficiency is short, avoided numerous and diverse disassemble and assemble work, saved cost of transportation, REPAIR WELDING place intensity, stiffness are good, and crack resistance is strong, can satisfy the job requirement of axial-flow rotary propeller type water turbine runner blade after the crackle reparation.
The specific embodiment
The present invention will be further described below in conjunction with the specific embodiment, position, shape, the length of the crackle through turbine runner blade is checked out and the direction that may continue to develop have been carried out comprehensive analysis, take the specific aim measure that the blade crackle is repaired, strictness is carried out recovery scenario and is observed welding procedure when blade is repaired.Runner without lifting goes out runner envelope, repairs at the scene, is the intensity of reinforced blade root, has a mind to strengthen " R " value that face of blade goes out the excessive fillet that waterside one side is connected with the root flange with the method for built-up welding; Afterbody at crackle bores stop hole, and different crackles is adopted difform groove, in accordance with regulations process sequence preheating, repair welding and insulation, and it may further comprise the steps:
(1) preparation
(a) blade is beaten to fully open position, be beneficial to can be simultaneously to blade just, back side crackle handles.
(b) set up workbench, be advisable with handled easily and assurance safety.
(c) pull down the pivot sealing, sealing strip damages in the process of patch weld to avoid.
(d) blade and runner envelope are fixed,, do not welded, in processing procedure, do not change to guarantee runner and runner envelope gap only with blade and runner envelope gap jam-pack.It is stressed to reduce the blade axle journal to add simultaneously suitable support fixation between blade and web.
(e) in-situ processing should specifically confer with the power station and get ready before processing with instrument, equipment and material.
(2) removing of crackle
(a) check sharf neck position (front and back) with PT flaw detection comprehensively and go out the waterside positive and make the visible marking.
(b) because the afterbody internal stress of crackle near the ultimate strength of material, also can continue to extend under the influence of external force or thermal stress, therefore, before removing crackle, need beat and only prolong the hole, stop the extension of crackle to block crackle in the line tail bit of crackle.Boring the diameter that only prolongs the hole is 8mm, the general big 4~6mm of hole depth rate crack depth.
(c) the employing speed of the rooting out carbon arc air gouging fast, easy and simple to handle of crackle is excluded.Before removing crack site is reached near the 200mm scope with 80~100 ℃ of oxy-acetylene preheatings.For preventing that when excluding crackle because of the extension of the former crackle of temperature effect, the carbon arc air gouging direction should be removed to direction of check from stop hole, till crackle is peace and quiet.Cause the expansion of deformable blade and crackle for preventing that blade is overheated, carbon arc air gouging must be interrupted use.
(d) leave the repair welding groove during carbon arc air gouging simultaneously, the form of groove is mainly according to crackle situation, position with root out and weld and conveniently decide.All crackles that does not penetrate, the degree of depth at 30mm with interior opening " V " shape groove; The degree of depth opening more than 30mm " U " shape groove; Employing " V " shape groove near root.All crackles that penetrates, the degree of depth at 40mm with interior opening " X " shape groove; Open " K ", shape groove near root; The need of thickness more than 40mm are opened " U " shape groove; Open " K " shape groove near root.The groove root repairs suitable fillet R.
(e) after defective is thoroughly removed totally, the case-carbonizing oxide layer of groove is polished with mushroom hair style abrasive machine, grind off the metallic luster that oxide layer is exposed mother metal.
(f) confirm that with PT flaw detection crackle treats repair welding after thoroughly peace and quiet.
(3) welding
(a) be the solderability requirement of guaranteeing intensity, rigidity and the material of repair place, welding employing good mechanical property, crack resistance is strong, plasticity is big Austria 307 and G232 stainless steel electrode, welding rod specification 3.2,4.307 stainless steel electrodes wherein difficult to understand are big because of plasticity, crack resistance is used for bottom and intermediate layer by force; The G232 stainless steel electrode is used for capping and built-up welding R part because of intensity height, erosion resistant.Welding rod must be dried 2h before using under 350 ℃ of temperature, be incubated under 100 ℃ of constant temperature.
(b) concentrate and improve the metallographic structure of weld seam for the stress that reduces the repair welding district, the particularly heat affecting of weld seam and base material transition region, prevent to crack once more, before weldering, rejected region is carried out integral body or local preheating, the runner envelope environment temperature is heated to 30 ℃~40 ℃ with electric stove integral, to adopting oxy-acetylene flame local preheating in repair welding position and near the 200mm scope, temperature rise speed is advisable with 8~10 ℃/h, temperature is controlled at 80-120 ℃, and preheat temperature reaches after the requirement again that constant temperature 2~4h can weld.
(c) weld employing thin layer, segmentation, room for manoeuvre solder technology, long weld seam is taked the segmentation weldering, every segment length 100~150mm, and the above not chemistry of 300mm takes the segmentation room for manoeuvre to weld, can be by the centre to outside weld below the 300mm.Notice preventing to weld that the starting the arc and current interruption crack in the repair process.For preventing the concordant weldquality that influences in joint, the sectionalizing joint place should successively overlap, and weld seam takes turns to weld just on the contrary.To the groove of the degree of depth more than 40mm, should use bilateral fringing welding technology; Below 40mm and by the then available one-sided fringing welding technology of groove of root of blade, should behind its face bonding 2--3 road weld seam, root out the overlap of groove bottom again with pneumatic shovel at its back side to the degree of depth, begin welding when waiting to expose new weld seam again through wall flaw.In the crackle repair welding, beneath which floor adopt little electric current and short electric arc (general 2~2.5mm), and the control interlayer temperature must not be greater than 120 with the welding rod of diameter 3.2mm and under the situation that guarantees through welding as far as possible.Welding order should first repair welding axle journal middle part, and repair welding goes out the position, waterside again.
(d) in the welding process except that bottom and superficial layer every layer adopt hammering method to eliminate stress.
(e) use the slow cooling of asbestos cloth covering and heat insulating after the repair welding immediately.
Note in the processing procedure covering protection being carried out at other positions, weld seam is coated with on every side and prevents splash agent.
(4) cleaning, polishing
Postwelding is removed welding slag, is splashed, with the slick and sly into treatment sites of the suitable vane type line reconditioning of emery wheel.
(5) PT flaw detection and inspection
Into treatment sites and hot shadow zone are carried out PT defect detecting test, and qualified back is removed and is supported, and inspection distortion situation and polishing are supported spot welding place to slyness.

Claims (4)

1, axial-flow rotary propeller type water turbine runner blade crackle treating method is characterized in that runner without lifting goes out runner envelope, repairs at the scene, has a mind to strengthen " R " value that face of blade goes out the excessive fillet that waterside one side is connected with the root flange with the method for built-up welding; Afterbody at crackle bores stop hole, and different crackles is adopted difform groove, in accordance with regulations process sequence preheating, repair welding and insulation, and it may further comprise the steps:
(1) preparation
(a) blade is beaten to fully open position, simultaneously to blade just, back side crackle handles;
(b) set up workbench;
(c) pull down the pivot sealing;
(d) blade and runner envelope are fixed, added suitable support fixation simultaneously between blade and web, it is stressed to reduce the blade axle journal;
(2) removing of crackle
(a) check sharf neck position front and back with PT flaw detection comprehensively and go out the waterside positive and make the visible marking;
(b) remove preceding the beating of crackle and only prolong the hole, bore the diameter that only prolongs the hole and be about 8mm, the big 4~6mm of hole depth rate crack depth in the line tail bit of crackle;
(c) rooting out of crackle adopts carbon arc air gouging to exclude, before removing crack site is reached near the 200mm scope with 80 ℃~100 ℃ of oxy-acetylene preheatings, the carbon arc air gouging direction should be removed to direction of check from stop hole, and till crackle was peace and quiet, carbon arc air gouging must be interrupted use;
(d) leave the repair welding groove during carbon arc air gouging simultaneously;
(e) after defective is thoroughly removed totally, the case-carbonizing oxide layer of groove is polished with mushroom hair style abrasive machine;
(f) confirm that with PT flaw detection crackle treats repair welding after thoroughly peace and quiet;
(3) welding
(a) welding rod must be dried 2h before using under 350 ℃ of temperature, is incubated under 100 ℃ of constant temperature;
(b) before weldering, rejected region is carried out integral body or local preheating, runner envelope environment temperature integral body is heated to 30~40 ℃, to adopting oxy-acetylene flame local preheating in repair welding position and near the 200mm scope, temperature rise speed is advisable with 8~10 ℃/h, temperature is controlled at 80-120 ℃, and preheat temperature reaches after the requirement again that constant temperature 2~4h can weld;
(c) welding adopts thin layer, segmentation, room for manoeuvre solder technology;
(d) in the welding process except that bottom and superficial layer every layer adopt hammering method to eliminate stress;
(e) use the slow cooling of asbestos cloth covering and heat insulating after the repair welding immediately;
(4) cleaning, polishing
Postwelding is removed welding slag, is splashed, with the slick and sly into treatment sites of the suitable vane type line reconditioning of emery wheel;
(5) PT flaw detection and inspection
Into treatment sites and hot shadow zone are carried out " PT " defect detecting test, and qualified back is removed and is supported, and inspection distortion situation and polishing are supported spot welding place to slyness.
2, axial-flow rotary propeller type water turbine runner blade crackle treating method according to claim 1, it is characterized in that, leave the repair welding groove during carbon arc air gouging simultaneously, the form of groove is mainly according to crackle situation, position with root out and weld and convenient decide, all crackles that does not penetrate, with interior opening " V " shape groove, the degree of depth opening more than 30mm " U " shape groove is near employing " V " the shape groove of root at 30mm for the degree of depth; All crackles that penetrates, the degree of depth at 40mm with interior opening " X " shape groove, near root open " K " shape groove, the need of thickness more than 40mm are opened " U " shape groove, near root open " K " shape groove, the groove root repairs suitable fillet R.
3, axial-flow rotary propeller type water turbine runner blade crackle treating method according to claim 1, it is characterized in that, welding adopts Austria 307 and G232 stainless steel electrode during welding, welding rod specification Φ 3.2, Φ 4,307 stainless steel electrodes wherein difficult to understand are used for bottom and intermediate layer, and the G232 stainless steel electrode is used for capping and built-up welding R part.
4, axial-flow rotary propeller type water turbine runner blade crackle treating method according to claim 1, it is characterized in that, welding adopts thin layer, segmentation, room for manoeuvre solder technology, and long weld seam is taked segmentation weldering, every segment length 100~150mm, the above not chemistry of 300mm is taked segmentation room for manoeuvre weldering, can be below the 300mm by the centre to outside weld, the sectionalizing joint place should successively overlap, and weld seam takes turns to weld just on the contrary, to the groove of the degree of depth more than 40mm, should use bilateral fringing welding technology; To the degree of depth below 40mm and by the then available one-sided fringing welding technology of groove of root of blade, should behind its face bonding 2--3 road weld seam, root out the overlap of groove bottom again with pneumatic shovel at its back side to through wall flaw, begin welding when waiting to expose new weld seam again, in the crackle repair welding, under which floor adopts little electric current as far as possible and lacks electric arc (general 2~2.5mm) with the welding rod of diameter 3.2mm and under the situation that guarantees through welding, and the control interlayer temperature must not be greater than 120 ℃, welding order should first repair welding axle journal middle part, and repair welding goes out the position, waterside again.
CN 200710049214 2007-05-31 2007-05-31 Axial-flow rotary propeller type water turbine runner blade crackle treating method Pending CN101053926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710049214 CN101053926A (en) 2007-05-31 2007-05-31 Axial-flow rotary propeller type water turbine runner blade crackle treating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710049214 CN101053926A (en) 2007-05-31 2007-05-31 Axial-flow rotary propeller type water turbine runner blade crackle treating method

Publications (1)

Publication Number Publication Date
CN101053926A true CN101053926A (en) 2007-10-17

Family

ID=38794062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710049214 Pending CN101053926A (en) 2007-05-31 2007-05-31 Axial-flow rotary propeller type water turbine runner blade crackle treating method

Country Status (1)

Country Link
CN (1) CN101053926A (en)

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101915222A (en) * 2010-08-16 2010-12-15 国电联合动力技术有限公司 Method for repairing cracks of blade adhesive
CN101710079B (en) * 2009-12-10 2011-06-01 贵州电力试验研究院 Decision method for testing in-service water turbine runner crackle
CN102134716A (en) * 2011-03-07 2011-07-27 江苏联冠科技发展有限公司 Wear-resisting corrosion-resisting coating for strengthening and repairing blades and barrel of plastic mixing machine and preparation method thereof
CN102134717A (en) * 2011-03-07 2011-07-27 江苏联冠科技发展有限公司 Laser alloying process for strengthening and restoring paddle and cylinder surface of high-speed mixer
CN102284826A (en) * 2011-08-09 2011-12-21 东芝水电设备(杭州)有限公司 Repair process for cavitation corrosion of runner chamber of through-flow type water turbine
CN102430889A (en) * 2011-09-09 2012-05-02 沈阳黎明航空发动机(集团)有限责任公司 Method for repairing crack and chipping of shunt ring of case
CN102632321A (en) * 2012-04-23 2012-08-15 湖南华菱湘潭钢铁有限公司 Process for welding and repairing cracks of roller end connector of rolling mill
CN102744551A (en) * 2012-06-14 2012-10-24 燕山大学 Method for compositely repairing half buried cracks in cold working mould
CN103008833A (en) * 2011-09-22 2013-04-03 宝山钢铁股份有限公司 Surfacing method for antiseptic wear-resisting layer of dovetail groove
CN103079753A (en) * 2010-06-17 2013-05-01 西门子能量股份有限公司 Method of servicing an airfoil assembly for use in a gas turbine engine
CN103111724A (en) * 2012-12-07 2013-05-22 无锡透平叶片有限公司 Turbine blade laser cladding area flaw welding method
CN103192223A (en) * 2013-03-29 2013-07-10 中国十七冶集团有限公司 Method for processing welding heat affected zone cracks of plates of moderate thicknesses
CN103921057A (en) * 2013-09-18 2014-07-16 马鞍山马钢设备安装工程有限公司 Welding method of low-carbon quenched and tempered steel
CN103962739A (en) * 2014-04-23 2014-08-06 哈尔滨飞机工业集团有限责任公司 Method for welding grey cast iron cracks
CN104209624A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Special connector crack repair process method
CN104439878A (en) * 2014-10-20 2015-03-25 广东梅雁吉祥水电股份有限公司 Method for repairing cavitation damaged face of turbine runner
CN105149861A (en) * 2015-10-19 2015-12-16 东方电气集团东方汽轮机有限公司 Method for repairing damaged precision part of turbine
CN105252202A (en) * 2015-09-24 2016-01-20 共享铸钢有限公司 Repair welding reworking method for crack defects of flange disc casting with rib plate
CN106181087A (en) * 2016-08-01 2016-12-07 攀钢集团工程技术有限公司 A kind of air circulation fan impeller is at welding method
CN106493450A (en) * 2016-11-17 2017-03-15 中国华冶科工集团有限公司 Cleft welding method
CN106808058A (en) * 2017-01-22 2017-06-09 大连理工大学 A kind of repair method of austenitic stainless steel casting core pump case
CN107350715A (en) * 2017-07-03 2017-11-17 中南钻石有限公司 A kind of superhard material synthetic mould welding and restoring process
CN107855725A (en) * 2017-10-31 2018-03-30 徐家成 The repair method of cast iron end-sealing die
CN109079420A (en) * 2018-09-14 2018-12-25 安徽马钢重型机械制造有限公司 A kind of casting defect removing method
CN109332927A (en) * 2018-10-17 2019-02-15 东方电气集团东方电机有限公司 A kind of Francis Turbine Blade outlet edge crackle processing method
CN110280967A (en) * 2019-04-25 2019-09-27 华能平凉发电有限责任公司 The big specification part of steel exempts from the steel welding repair method of the same race of post weld heat treatment
CN110328435A (en) * 2019-06-11 2019-10-15 中国人民解放军第五七一九工厂 A kind of titanium alloy small space welding method
CN111889958A (en) * 2020-07-30 2020-11-06 东芝水电设备(杭州)有限公司 Abrasion repairing method for movable guide vane of water turbine
CN111940993A (en) * 2020-10-19 2020-11-17 中国航发沈阳黎明航空发动机有限责任公司 Method for repairing cracks on mounting edge of bearing frame of inclined support plate
CN112355567A (en) * 2020-11-11 2021-02-12 广西柳州钢铁集团有限公司 Method for repairing cracks of bogie of metallurgical railway diesel locomotive
CN112658682A (en) * 2020-12-30 2021-04-16 白玉东 Propeller surfacing device for ship repair and surfacing process
CN112676680A (en) * 2020-12-17 2021-04-20 河北星烁锯业股份有限公司 Method for repairing circular saw blade crack by gas shielded welding
CN114102052A (en) * 2021-10-19 2022-03-01 哈尔滨电机厂有限责任公司 Method for welding triangular block on rotating wheel of water turbine
CN115415732A (en) * 2022-07-22 2022-12-02 国能锅炉压力容器检验有限公司 Method for treating material degradation of induced draft blade of deep peak regulation coal-electric unit
CN115890132A (en) * 2022-09-28 2023-04-04 华能澜沧江水电股份有限公司 Method for eliminating cracks of runner of water turbine

Cited By (46)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101710079B (en) * 2009-12-10 2011-06-01 贵州电力试验研究院 Decision method for testing in-service water turbine runner crackle
CN103079753A (en) * 2010-06-17 2013-05-01 西门子能量股份有限公司 Method of servicing an airfoil assembly for use in a gas turbine engine
CN101915222A (en) * 2010-08-16 2010-12-15 国电联合动力技术有限公司 Method for repairing cracks of blade adhesive
CN102134716B (en) * 2011-03-07 2013-04-10 江苏联冠机械有限公司 Wear-resisting corrosion-resisting coating for strengthening and repairing blades and barrel of plastic mixing machine and preparation method thereof
CN102134717A (en) * 2011-03-07 2011-07-27 江苏联冠科技发展有限公司 Laser alloying process for strengthening and restoring paddle and cylinder surface of high-speed mixer
CN102134716A (en) * 2011-03-07 2011-07-27 江苏联冠科技发展有限公司 Wear-resisting corrosion-resisting coating for strengthening and repairing blades and barrel of plastic mixing machine and preparation method thereof
CN102284826A (en) * 2011-08-09 2011-12-21 东芝水电设备(杭州)有限公司 Repair process for cavitation corrosion of runner chamber of through-flow type water turbine
CN102284826B (en) * 2011-08-09 2013-10-16 东芝水电设备(杭州)有限公司 Repair process for cavitation corrosion of runner chamber of through-flow type water turbine
CN102430889A (en) * 2011-09-09 2012-05-02 沈阳黎明航空发动机(集团)有限责任公司 Method for repairing crack and chipping of shunt ring of case
CN102430889B (en) * 2011-09-09 2013-06-26 沈阳黎明航空发动机(集团)有限责任公司 Method for repairing crack and chipping of shunt ring of case
CN103008833A (en) * 2011-09-22 2013-04-03 宝山钢铁股份有限公司 Surfacing method for antiseptic wear-resisting layer of dovetail groove
CN103008833B (en) * 2011-09-22 2016-02-24 宝山钢铁股份有限公司 The overlaying method of dovetail groove anticorrosion antiwear layer
CN102632321A (en) * 2012-04-23 2012-08-15 湖南华菱湘潭钢铁有限公司 Process for welding and repairing cracks of roller end connector of rolling mill
CN102744551A (en) * 2012-06-14 2012-10-24 燕山大学 Method for compositely repairing half buried cracks in cold working mould
CN103111724A (en) * 2012-12-07 2013-05-22 无锡透平叶片有限公司 Turbine blade laser cladding area flaw welding method
CN103111724B (en) * 2012-12-07 2015-02-25 无锡透平叶片有限公司 Turbine blade laser cladding area flaw welding method
CN103192223A (en) * 2013-03-29 2013-07-10 中国十七冶集团有限公司 Method for processing welding heat affected zone cracks of plates of moderate thicknesses
CN104209624A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Special connector crack repair process method
CN103921057A (en) * 2013-09-18 2014-07-16 马鞍山马钢设备安装工程有限公司 Welding method of low-carbon quenched and tempered steel
CN103962739A (en) * 2014-04-23 2014-08-06 哈尔滨飞机工业集团有限责任公司 Method for welding grey cast iron cracks
CN104439878A (en) * 2014-10-20 2015-03-25 广东梅雁吉祥水电股份有限公司 Method for repairing cavitation damaged face of turbine runner
CN105252202A (en) * 2015-09-24 2016-01-20 共享铸钢有限公司 Repair welding reworking method for crack defects of flange disc casting with rib plate
CN105149861B (en) * 2015-10-19 2017-11-10 东方电气集团东方汽轮机有限公司 A kind of restorative procedure of steam turbine precise part damage
CN105149861A (en) * 2015-10-19 2015-12-16 东方电气集团东方汽轮机有限公司 Method for repairing damaged precision part of turbine
CN106181087B (en) * 2016-08-01 2018-06-22 攀钢集团工程技术有限公司 A kind of air circulation fan impeller is in welding method
CN106181087A (en) * 2016-08-01 2016-12-07 攀钢集团工程技术有限公司 A kind of air circulation fan impeller is at welding method
CN106493450A (en) * 2016-11-17 2017-03-15 中国华冶科工集团有限公司 Cleft welding method
CN106808058A (en) * 2017-01-22 2017-06-09 大连理工大学 A kind of repair method of austenitic stainless steel casting core pump case
CN107350715A (en) * 2017-07-03 2017-11-17 中南钻石有限公司 A kind of superhard material synthetic mould welding and restoring process
CN107855725A (en) * 2017-10-31 2018-03-30 徐家成 The repair method of cast iron end-sealing die
CN109079420A (en) * 2018-09-14 2018-12-25 安徽马钢重型机械制造有限公司 A kind of casting defect removing method
CN109332927A (en) * 2018-10-17 2019-02-15 东方电气集团东方电机有限公司 A kind of Francis Turbine Blade outlet edge crackle processing method
CN110280967A (en) * 2019-04-25 2019-09-27 华能平凉发电有限责任公司 The big specification part of steel exempts from the steel welding repair method of the same race of post weld heat treatment
CN110328435A (en) * 2019-06-11 2019-10-15 中国人民解放军第五七一九工厂 A kind of titanium alloy small space welding method
CN111889958B (en) * 2020-07-30 2022-06-21 东芝水电设备(杭州)有限公司 Abrasion repairing method for movable guide vane of water turbine
CN111889958A (en) * 2020-07-30 2020-11-06 东芝水电设备(杭州)有限公司 Abrasion repairing method for movable guide vane of water turbine
CN111940993A (en) * 2020-10-19 2020-11-17 中国航发沈阳黎明航空发动机有限责任公司 Method for repairing cracks on mounting edge of bearing frame of inclined support plate
CN111940993B (en) * 2020-10-19 2021-01-12 中国航发沈阳黎明航空发动机有限责任公司 Method for repairing cracks on mounting edge of bearing frame of inclined support plate
CN112355567A (en) * 2020-11-11 2021-02-12 广西柳州钢铁集团有限公司 Method for repairing cracks of bogie of metallurgical railway diesel locomotive
CN112676680A (en) * 2020-12-17 2021-04-20 河北星烁锯业股份有限公司 Method for repairing circular saw blade crack by gas shielded welding
CN112658682A (en) * 2020-12-30 2021-04-16 白玉东 Propeller surfacing device for ship repair and surfacing process
CN114102052A (en) * 2021-10-19 2022-03-01 哈尔滨电机厂有限责任公司 Method for welding triangular block on rotating wheel of water turbine
CN114102052B (en) * 2021-10-19 2023-11-14 哈尔滨电机厂有限责任公司 Method for welding triangular blocks on rotating wheel of water turbine
CN115415732A (en) * 2022-07-22 2022-12-02 国能锅炉压力容器检验有限公司 Method for treating material degradation of induced draft blade of deep peak regulation coal-electric unit
CN115890132A (en) * 2022-09-28 2023-04-04 华能澜沧江水电股份有限公司 Method for eliminating cracks of runner of water turbine
CN115890132B (en) * 2022-09-28 2024-04-05 华能澜沧江水电股份有限公司 Method for eliminating cracks of turbine runner

Similar Documents

Publication Publication Date Title
CN101053926A (en) Axial-flow rotary propeller type water turbine runner blade crackle treating method
CN101543926B (en) Overlaying welding technology of ductile cast iron roller
CN104759797B (en) Thick member crack forming mechanism combination type groove and combination type groove renovation technique
CN107984105A (en) The welding procedure of wind power tower S355NL steel
CN109702427B (en) Method for repairing corrosion part of original composite layer of tank body
CN104924018A (en) On-site repairing method for large motor rotor large section cracks
CN111318781A (en) Repair process for repairing, welding and reinforcing cracks of engine room chassis of wind generating set
CN110640279B (en) Welding flux copper gasket method submerged-arc welding process for Q420 high-strength steel thick plate
CN1814387A (en) 12Cr1MoV alloy steel pipe welding method
CN102107314A (en) Method for overlaying wear-resistant layer of blade shroud of turbine working blade
CN113172361B (en) Method and system for welding and repairing hub of wind generating set
CN106378579B (en) A kind of transmission angle steel tower column foot corrosion damage method for reinforcing
CN110340619A (en) Stainless steel bell crack restorative procedure
CN103464925A (en) High-temperature heat-proof steel component welding repair method for power station
CN102069275A (en) Welding technology for flexible connection of disconnector conductive arm
CN108326461A (en) A kind of soldering restorative procedure for improving anode steel claw electric conductivity
CN109531046B (en) Spot welding crack repairing method for aeroengine shunt ring part
CN101920429A (en) Combustion engine crankshaft electric spark overlaying repairing process
CN112388245A (en) Welding repair method for broken teeth of large gear of ball mill
CN101439434B (en) High intensity alloyed steel traction pin and welding process of foundation
CN112122878A (en) Method for repairing surface defects of rotary kiln supporting roller
CN111215830A (en) Method for repairing cracks of high-pressure medium-carbon cast steel oil cylinder body with thickness larger than 200mm
CN115415732A (en) Method for treating material degradation of induced draft blade of deep peak regulation coal-electric unit
CN112372118B (en) Submerged arc welding method for low-Mo refractory steel
CN206232825U (en) Anode steel claw is recycled after one kind corrosion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication