CN101047954A - Method for call setting request in PHS network - Google Patents

Method for call setting request in PHS network Download PDF

Info

Publication number
CN101047954A
CN101047954A CNA2006100663289A CN200610066328A CN101047954A CN 101047954 A CN101047954 A CN 101047954A CN A2006100663289 A CNA2006100663289 A CN A2006100663289A CN 200610066328 A CN200610066328 A CN 200610066328A CN 101047954 A CN101047954 A CN 101047954A
Authority
CN
China
Prior art keywords
time slot
mobile phone
base station
carrier frequency
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2006100663289A
Other languages
Chinese (zh)
Inventor
李平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CNA2006100663289A priority Critical patent/CN101047954A/en
Publication of CN101047954A publication Critical patent/CN101047954A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

This invention discloses a method for reducing re-requesting generation rate of PHS network including: 1, a cell phone searches for carrier frequencies of various time slots of its side to get interference situations of each carrier frequency, 2, the cell phone sends information to a base station including interference states of the carier frequencies of time slots of the cell phone, 3, the base station determines the best frequency of an idle time slot and sends information to it including the optimum carier frequency of the idle slot, 4, the cell phone synchronizes with the base station, if it is successfully, step 5 is executed, if it fails, it returns to step 2, 5, the link between the cell phone and the station is successful and the process is ended.

Description

The method of setup requests in a kind of PHS network
Technical field
The present invention relates to the resource allocation methods in the mobile communcations system, relate in particular to resource allocation methods in PHS (Personal HandyphoneSystem, the personal handyphone system) system.
Background technology
At present, Zhong Guo Personal Handyphone System(PHS) total number of users constantly increases.PHS network for various places, the user who bears is also in continuous growth, the network base station number is also in continuous increase, but for honeycomb or micro cellular system, the open ended base station of per unit area number is certain, because for concrete certain network, operational frequency resource is limited, and the base station is overstocked, must cause mutual serious interference.In addition, a large amount of users of conversation simultaneously in the unit are, also can raising because of background noise, cause the increase of mutual interference, if the frequency that particularly a large amount of users distributes concentrates on some continuum, these regional frequency noises are increased, thereby make these regional unallocated frequencies also become unavailable, the link establishment of mobile phone asks incidence just to rise significantly more like this, cause the connecting time of mobile phone to increase greatly, network performance is affected, thus link establishment to ask incidence again be the important indicator that Virtual network operator is investigated network performance.
It is that Resources allocation after the request for building link of mobile phone is received in the base station that the link establishment of PHS mobile phone is asked again, indicate to the link assignment that mobile phone issues, this Indication message carries base station institute's distributed time slot and carrier frequency, mobile phone receive after this message by and the synchronous burst of base station transceiver (Synchronization Burst) and TCH idle (Traffic Channel idle frame) carry out TCH activation, as shown in Figure 1; If the failure of TCH activation, then mobile phone is asked to base station transmission link establishment again, as shown in Figure 2; Wherein the immediate cause of TCH activation failure is exactly that the carrier frequency that distributes of base station exists and disturbs, and it is incorrect or unstable to cause receiving and dispatching sequential, will guarantee that therefore base station institute's distributed time slot and carrier frequency are just directly depended in the success of TCH activation.
The processing that the time slot of PHS base station and carrier distribution method are general all is to carry out carrier search at one's leisure on the crack by the base station promptly to obtain aerial receiving slot RSSI (incoming level value) on as shown in Figure 3 certain carrier frequency, can obtain the RSSI value of a plurality of carrier frequency on each time slot.The base station selects time slot and carrier frequency to distribute according to certain strategy when receiving the request for building link of mobile phone.
A kind of method that also has in addition as shown in Figure 2 is the RSSI value that the base station not only obtains aerial receiving slot when carrying out carrier search, also obtains aerial sending time slots RSSI value simultaneously, and comprehensively the two determines the carrier frequency of distribution.
Such distribution method all is to determine the carrier frequency availability by the CF signal of base stations detected side, the CF signal situation that can't truly reflect each time slot of mobile phone side reduces link establishment by the improvement algorithm and asks relatively difficulty of incidence again under this strategy.
Summary of the invention
At defective that exists in the prior art and deficiency, the invention provides the method for setup requests in a kind of PHS network that utilizes the CF signal situation that mobile phone reports each time slot of mobile phone side.
The method of setup requests in a kind of PHS network may further comprise the steps:
(1) mobile phone is under holding state, and each carrier frequency of each time slot of adversary's pusher side is searched for, and obtains each carrier frequency disturbed condition;
(2) mobile phone is in caller off-hook dialing or called when receiving beep-page message, described mobile phone sends request for building link message (Link channel establishment request) to the base station, and described request for building link message comprises each carrier frequency disturbed condition of each time slot of mobile phone side.
(3) base station is according to each carrier frequency disturbed condition of each time slot of mobile phone side, and the time slot and the carrier frequency situation of base station itself, determine the optimum carrier frequency of an idle time slot, and to mobile phone transmission link assignment message (Link channel assignment), described link assignment message comprises the optimum carrier frequency of above-mentioned idle time slot;
(4) mobile phone and base station synchronization success, step finishes; Synchronization failure then continues following steps;
(5) mobile phone sends link establishment request message (Link channel establishment rerequest) again to the base station, and described link establishment request message again comprises each carrier frequency disturbed condition of each time slot of mobile phone side;
(6) the base station link establishment request message again of receiving mobile phone discharges as yet if the base station is the resource of handset allocation, enters step (7), otherwise returns step (3);
(7) the optimum carrier frequency of sub-distribution carrier frequency is selected to remove in the base station from former distribution time slot, and structure link assignment message is filled into time slot and the carrier frequency that finds in the message body, sends to mobile phone, returns step (4) then.
The method of setup requests in above-mentioned a kind of PHS network, described step (1) is specially, mobile phone is under holding state, carrier search is carried out in timing or not timing, obtain the RSSI value under each carrier frequency of 4 time slots, get the minimum value of all carrier frequency,, determine the disturbed condition of each time slot according to the carrier frequency judgement threshold value of regulation among the 23rd page of the RCR STD-28 (V4.0).
The method of setup requests in above-mentioned a kind of PHS network, described step (2) is specially following steps:
A, mobile phone make a call;
B, handset configuration request for building link message are filled into the corresponding time slot position of Octet5 in the described request for building link message (byte 5) with the time slot interference information slip, send request for building link message to the base station.
The method of setup requests in above-mentioned a kind of PHS network, described step (5) is specially, the handset configuration link establishment is request message again, and the time slot interference information slip is filled into the described link establishment corresponding time slot position of Octet5 in the request message again, sends link establishment request message again to the base station.
The method of setup requests in above-mentioned a kind of PHS network, described step (3) is specially following steps:
(A) the request for building link message of mobile phone is received in the base station;
(B) from the Octet5 (byte 5) of message, extract mobile phone side time slot interference situation, obtain the time slot option table according to level of interference;
(C) according to the time interval resource table of the sequential query inside of base station from excellent to bad in the time slot option table, if find idle time slot, jump to step D, otherwise jump to step F;
(D) carrier frequency resource of described idle time slot is according to the availability sequence arrangement, and the sequential search available carrier frequencies if find, jumps to step e; If can not find an available carrier frequencies, and all time slots all search and finish, and jump to step F, if also have time slot not search as yet, jump to step C;
(E) structure link assignment message is filled into time slot and the carrier frequency that finds in the message body, sends to mobile phone;
(F) structure refusal link assignment message, Reason For Denial is no available time slot;
(G) structure refusal link assignment message, Reason For Denial is no available carrier frequencies.
From above process as can be seen, compared with prior art, the present invention has used that the free word among the Link channelestablishment request and Link channel establishment rerequest message realizes that mobile phone initiatively reports the time slot situation in the agreement, incidence is asked in foundation again thereby the optimum that improves base station assigns time slot and resource reduces cellular link, all is very helpful for improving base station performance and network performance.
Description of drawings
Figure 1 shows that the process of mobile phone and base station synchronization success.
Figure 2 shows that the unsuccessful process of mobile phone and base station synchronization.
Figure 3 shows that the aerial structure of time slot of PHS system.
Figure 4 shows that the carrier search process chart of mobile phone side of the present invention.
Figure 5 shows that the process chart of mobile phone of the present invention and base station calling link setup.
Figure 6 shows that base station side of the present invention works the link setup process process chart when exhaling.
Embodiment
The present invention will be described below in conjunction with accompanying drawing.
In the RCR STD-28 agreement, mobile phone mails to the request for building link message of base station and link establishment request message again, the Option (optional byte) of Octet5 (byte 5) generally is obsolete, therefore, the carrier frequency disturbed condition of 4 time slots when mobile phone can utilize 8 idle bit of Octet5 (byte 5) to report mobile phone to initiate request, like this base station when distributing time slot with reference to the situation of mobile phone side and the situation of base station side itself, distribute one for mobile phone, to disturb minimum time slot, so just can significantly reduce link establishment and ask incidence again.It also is same processing that link establishment is asked again.
Therefore, the present invention proposes a kind of mobile phone and initiatively reports the method for the CF signal situation of each time slot to reduce link establishment request incidence again.
The mobile phone side is divided into the carrier search process under the holding state during concrete enforcement, as shown in Figure 6; The mobile phone side works the link setup process when exhaling, as shown in Figure 7; Base station side works the link setup process when exhaling, as shown in Figure 8.
Mobile phone is under holding state, regularly and generally adopt interrupt mode to carry out carrier search, obtain the RSSI value under each carrier frequency of 4 time slots, get the minimum value of all carrier frequency, carrier frequency judgement threshold value according to regulation among the 23rd page of the RCR STD-28 (V4.0): Level1=26dbuv, Level2=44dbuv determines the disturbed condition of each time slot, and is as shown in table 1;
Table 1 carrier frequency level of interference
The minimum value interval Grade (value)
Be equal to or less than 26dbuv Disturb low (01)
Between 26dbuv and the 44dbuv Disturb moderate (10)
More than or equal to 44dbuv Serious interference (11)
The carrier search flow process of mobile phone side is supposed L1=26dbuv as shown in Figure 6, and L2=44dbuv regularly triggers by interrupt mode:
1, down trigger is closed and is interrupted;
2, begin to search for the RSSI value of the carrier frequency correspondence of removing 3 outer time slots of control time slot, if there is the record of this carrier frequency in the database, then upgrade, otherwise insert;
3, fetch data respectively and remove outer 3 time slots of control time slot in the storehouse and store the minimum value R of carrier frequency RSSI value i, subscript i is a timeslot number, value is 1,2,3,4;
If 4 according to table 1 judgement R iSpan, obtain level of interference, upgrade the time slot interference information slip, wherein control time slot and fill 00;
5, deposit time carrier frequency of search;
6, open interruption.
Mobile phone according to each time slot carrier frequency level of interference, is filled in the Linkchannel establishment request message body in the corresponding bit of the Octet5 position when initiating request for building link or link establishment and ask, and is as shown in table 2;
Table 2
Time slot 4 Time slot 3 Time slot 2 Time slot 1
?Bit8 ?Bit7 ?Bit6 ?Bit5 ?Bit4 ?Bit3 ?Bit1 ?Bit1
The value that two bit values of each time slot see Table behind 1 middle grade promptly is respectively 00,01,10,11.
The link setup process when exhaling is worked in mobile phone and base station, mobile phone effluent journey, as shown in Figure 7:
1, mobile phone makes a call, and closes to interrupt;
2 if dialing of caller off-hook or the called beep-page message of receiving are constructed Link channel establishmentrequest message, and the time slot interference information slip is filled into the corresponding time slot position of the Octet5 shown in the table 2, send a request message to the base station; If synchronization failure, handset configuration Link channel establishment rerequest message similarly, is filled into the corresponding time slot position of the Octet5 shown in the table 2 with the time slot interference information slip, sends request message again to the base station.
Following steps are carried out in the request for building link of receiving mobile phone or again behind the request message in the base station:
1, carries out behind the source codec according to the mobile phone side time slot option table that from Link channel establishment request message, obtains;
2, the base station again in conjunction with the time interval resource status list of inside of base station, is selected the idle time slot of an optimum according to mobile phone side time slot option table, and selects an optimum carrier frequency in this time slot;
3, the base station is filled into time slot and carrier frequency in the Link channel assignment message, sends this message to mobile phone.
Base station side Link channel establishment request Message Processing flow process:
1, the Link channel establishment request message of mobile phone is received in the base station;
2, from the Octet5 of message, extract mobile phone side time slot interference situation, obtain the time slot option table according to level of interference;
3, according to the time interval resource table of the sequential query inside of base station from excellent to bad in the time slot option table, if find idle time slot, jump to step 4, otherwise jump to step 6;
4, because the carrier frequency resource of this time slot according to the availability sequence arrangement, so sequential search available carrier frequencies if find, jumps to step 5; If can not find an available carrier frequencies, and all time slots all search and finish, and jump to step, if also have time slot not search as yet, jump to step 3;
5, structure Link channel assignment message is filled into time slot and the carrier frequency that finds in the message body, sends to mobile phone.
6, structure link assignment refuse information (Link channel assignment reject), Reason For Denial is no available time slot.
7, structure link assignment refuse information (Link channel assignment reject), Reason For Denial is no available carrier frequencies.
Base station side Link channel establishment rerequest Message Processing flow process:
1, the Link channel establishment rerequest message of mobile phone is received in the base station;
If 2 resources of being distributed for the Link channel establishment request message of this mobile phone do not discharge as yet, jump to step 3, otherwise jump to step 4;
3, select to remove the optimum carrier frequency of sub-distribution carrier frequency from former distribution time slot, structure Link channel assignment message is filled into time slot and the carrier frequency that finds in the message body, sends to mobile phone;
4, the handling process according to Link channel establishment request message is that mobile phone carries out resource allocation.

Claims (5)

1, the method for setup requests in a kind of PHS network is characterized in that, said method comprising the steps of:
(1) mobile phone is under holding state, and each carrier frequency of each time slot of adversary's pusher side is searched for, and obtains each carrier frequency disturbed condition;
(2) mobile phone is in caller off-hook dialing or called when receiving beep-page message, and described mobile phone sends request for building link message to the base station, and described request for building link message comprises each carrier frequency disturbed condition of each time slot of mobile phone side.
(3) base station is according to each carrier frequency disturbed condition of each time slot of mobile phone side, and the time slot and the carrier frequency situation of base station itself, determine the optimum carrier frequency of an idle time slot, and send link assignment message to mobile phone, described link assignment message comprises the optimum carrier frequency of above-mentioned idle time slot;
(4) mobile phone and base station synchronization success, step finishes; Synchronization failure then continues following steps;
(5) mobile phone sends link establishment request message again to the base station, and described link establishment request message again comprises each carrier frequency disturbed condition of each time slot of mobile phone side;
(6) the base station link establishment request message again of receiving mobile phone, if being the resource of handset allocation, the base station do not discharge as yet, the optimum carrier frequency of sub-distribution carrier frequency is selected to remove in the base station from former distribution time slot, structure link assignment message, the time slot and the carrier frequency that find are filled in the message body, send to mobile phone, return step (4) then; The link establishment that mobile phone is received in the base station is request message again, discharges if the base station is the resource of handset allocation, returns step (3).
3, the method for setup requests in a kind of PHS network as claimed in claim 1, it is characterized in that, described step (1) is specially, mobile phone is under holding state, carrier search is carried out in timing or not timing, obtain the RSSI value under each carrier frequency of 4 time slots, the minimum value of getting all carrier frequency is determined the disturbed condition of each time slot.
4, the method for setup requests in a kind of PHS network as claimed in claim 1, it is characterized in that: described step (2) is specially following steps:
A, mobile phone make a call;
B, handset configuration request for building link message are filled into the corresponding time slot position of Octet5 in the described request for building link message (byte 5) with the time slot interference information slip, send request for building link message to the base station.
5, the method for setup requests in a kind of PHS network as claimed in claim 2, it is characterized in that: described step (5) is specially, the handset configuration link establishment is request message again, the time slot interference information slip is filled into the described link establishment corresponding time slot position of Octet5 (byte 5) in the request message again, sends link establishment request message again to the base station.
6, the method for setup requests in a kind of PHS network as claimed in claim 2, it is characterized in that: described step (3) is specially following steps:
(A) the request for building link message of mobile phone is received in the base station;
(B) from the Octet5 (byte 5) of message, extract mobile phone side time slot interference situation, obtain the time slot option table according to level of interference;
(C) according to the time interval resource table of the sequential query inside of base station from excellent to bad in the time slot option table, if find idle time slot, jump to step D, otherwise jump to step F;
(D) carrier frequency resource of described idle time slot is according to the availability sequence arrangement, and the sequential search available carrier frequencies if find, jumps to step e; If can not find an available carrier frequencies, and all time slots all search and finish, and jump to step F, if also have time slot not search as yet, jump to step C;
(E) structure link assignment message is filled into time slot and the carrier frequency that finds in the message body, sends to mobile phone;
(F) structure refusal link assignment message, Reason For Denial is no available time slot;
(G) structure refusal link assignment message, Reason For Denial is no available carrier frequencies.
CNA2006100663289A 2006-03-28 2006-03-28 Method for call setting request in PHS network Pending CN101047954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2006100663289A CN101047954A (en) 2006-03-28 2006-03-28 Method for call setting request in PHS network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2006100663289A CN101047954A (en) 2006-03-28 2006-03-28 Method for call setting request in PHS network

Publications (1)

Publication Number Publication Date
CN101047954A true CN101047954A (en) 2007-10-03

Family

ID=38772078

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2006100663289A Pending CN101047954A (en) 2006-03-28 2006-03-28 Method for call setting request in PHS network

Country Status (1)

Country Link
CN (1) CN101047954A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719963A (en) * 2009-11-17 2010-06-02 四川长虹电器股份有限公司 Method for eliminating noise from dialing audio frequency of mobile phone
WO2010124569A1 (en) * 2009-04-29 2010-11-04 中兴通讯股份有限公司 Method and system for user access control
WO2011015014A1 (en) * 2009-08-06 2011-02-10 中兴通讯股份有限公司 Method and terminal for terminal access
WO2011113317A1 (en) * 2010-03-17 2011-09-22 Qualcomm Incorporated Reducing in-device interference between multiple wireless communications of a multi-mode mobile device
WO2012062070A1 (en) * 2010-11-09 2012-05-18 中兴通讯股份有限公司 Method, system and server for feeding back state of receiving end
CN102598767A (en) * 2010-03-17 2012-07-18 高通股份有限公司 Reducing In-device Interference Between Multiple Wireless Communications Of A Multi-mode Mobile Device
WO2012151928A1 (en) * 2011-08-08 2012-11-15 中兴通讯股份有限公司 Method and system for triggering terminal group
WO2012171395A1 (en) * 2011-06-17 2012-12-20 电信科学技术研究院 Method, system, and device for allotting and determining pdcch
US8725145B2 (en) 2011-01-25 2014-05-13 Qualcomm Incorporated Mobile device requests of non-communication time periods to a wireless communication network
WO2014110727A1 (en) * 2013-01-16 2014-07-24 华为技术有限公司 Positioning processing method, device, and system

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010124569A1 (en) * 2009-04-29 2010-11-04 中兴通讯股份有限公司 Method and system for user access control
WO2011015014A1 (en) * 2009-08-06 2011-02-10 中兴通讯股份有限公司 Method and terminal for terminal access
CN101990309A (en) * 2009-08-06 2011-03-23 中兴通讯股份有限公司 Terminal access method and terminal
US8582601B2 (en) 2009-08-06 2013-11-12 Zte Corporation Terminal access method and terminal
CN101719963A (en) * 2009-11-17 2010-06-02 四川长虹电器股份有限公司 Method for eliminating noise from dialing audio frequency of mobile phone
US9179329B2 (en) 2010-03-17 2015-11-03 Qualcomm Incorporated Apparatus and method for interference mitigation
WO2011113317A1 (en) * 2010-03-17 2011-09-22 Qualcomm Incorporated Reducing in-device interference between multiple wireless communications of a multi-mode mobile device
CN102598767A (en) * 2010-03-17 2012-07-18 高通股份有限公司 Reducing In-device Interference Between Multiple Wireless Communications Of A Multi-mode Mobile Device
CN102598767B8 (en) * 2010-03-17 2016-08-03 高通股份有限公司 Reduce the equipment internal interference between multiple radio communications of multimode mobile device
US9264916B2 (en) 2010-03-17 2016-02-16 Qualcomm Incorporated Reducing in-device interference between multiple wireless communications of a multi-mode mobile device
CN102598767B (en) * 2010-03-17 2016-02-03 高通股份有限公司 Interference in equipment between multiple radio communications of minimizing multimode mobile device
KR101403976B1 (en) * 2010-03-17 2014-06-05 퀄컴 인코포레이티드 Reducing in-device interference between multiple wireless communications of a multi-mode mobile device
WO2012062070A1 (en) * 2010-11-09 2012-05-18 中兴通讯股份有限公司 Method, system and server for feeding back state of receiving end
US9420438B2 (en) 2010-11-09 2016-08-16 Zte Corporation Method, system and server for feeding back state of receiving end
US8725145B2 (en) 2011-01-25 2014-05-13 Qualcomm Incorporated Mobile device requests of non-communication time periods to a wireless communication network
WO2012171395A1 (en) * 2011-06-17 2012-12-20 电信科学技术研究院 Method, system, and device for allotting and determining pdcch
WO2012151928A1 (en) * 2011-08-08 2012-11-15 中兴通讯股份有限公司 Method and system for triggering terminal group
US9525980B2 (en) 2011-08-08 2016-12-20 Zte Corporation Method and system for triggering terminal group
CN104054376A (en) * 2013-01-16 2014-09-17 华为技术有限公司 Positioning processing method, device, and system
WO2014110727A1 (en) * 2013-01-16 2014-07-24 华为技术有限公司 Positioning processing method, device, and system
US9699760B2 (en) 2013-01-16 2017-07-04 Huawei Technologies Co., Ltd. Positioning processing method, apparatus, and system

Similar Documents

Publication Publication Date Title
CN101047954A (en) Method for call setting request in PHS network
CN1199480C (en) Method and device for executing voice dispatching call in digital communication system
CN1097412C (en) Management method for extra expenses channel in mobile telecommunication system
CN1141004C (en) System and method for time slot and frequency allocation in radio communication system
CN1741679A (en) Accidental access method in multi-cell ofdma networks
CN1917409A (en) Method for extending channel of shared data in HSDPA communication system in multiple frequency points
CN101080046A (en) A quick call establishment method of TD-SCDMA cluster communication system
CN1275478C (en) A wireless resource distribution method for mobile communication system
CN1400805A (en) Movable communication system, base station equipment and movable communication system controlling method
CN1388663A (en) Method for establishing communication channel to reduce interference of inter communication system and communication control equipment
CN101039468A (en) Apparatus and method for scheduling service
CN1856136A (en) Method for uplink rob of user getting in cluster group latterly
CN1297163C (en) Higher-priority user upstream seizing method
CN103491633B (en) The channel arrangement method of TD group system and device, cluster implementation method
CN1310533C (en) Method for priority holding up service channel by group user
CN1592436A (en) Resource allocation method for cellular cluster communication system
CN1287561C (en) Auxiliary channel sharing algorithm
CN1195387C (en) Dynamic allocation method for communication channel in time-division duplex communication system
CN1441564A (en) Base station and radio resource distribution method
CN100344169C (en) Method for controlling reverse service channel in digital honeycomb cluster system
CN1816197A (en) Method for insuring super wireless-user immediatly accessing internet
CN1286328C (en) PHS system frequency point distribution method
CN1747592A (en) Configuration of special channel with multiple carrier frequency
CN1241450C (en) Method for assigning radio resources
CN1848978A (en) Method for realizing user sending up cut-in request in cluster group

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication