CN101046190A CNA2006100660717A CN200610066071A CN101046190A CN 101046190 A CN101046190 A CN 101046190A CN A2006100660717 A CNA2006100660717 A CN A2006100660717A CN 200610066071 A CN200610066071 A CN 200610066071A CN 101046190 A CN101046190 A CN 101046190A
Authority
CN
China
Prior art keywords
wind
tunnel
wheel
fan blade
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2006100660717A
Other languages
Chinese (zh)
Other versions
CN101046190B (en
Inventor
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2006100660717A priority Critical patent/CN101046190B/en
Publication of CN101046190A publication Critical patent/CN101046190A/en
Application granted granted Critical
Publication of CN101046190B publication Critical patent/CN101046190B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/74Wind turbines with rotation axis perpendicular to the wind direction

Abstract

The present invention is wind driven generator combination utilizing self-generated wind, rather than natural wind, for generating electricity. The wind driven generator combination includes a wind tunnel of 20-30 m diameter and 80-100 m height to generate stable upward wine in the wind speed over 8-10 m/s; wind wheels with balanced vanes of wind accepting area of 40 sq m each, wind blocking caps and properly designed wind guide angle; and generators. The present invention can generate strong stable current.

Description

Self-control wind, wind-tunnel, wind wheel, wind-driven generator combination
The present world of technical field has become the world of the energy, if there is not the energy, in the life in our modern times, can't imagine simply, it is fewer and feweri that but the present energy has become, and conventional energy resource is based on coal, oil, rock gas, through human development and utilization, not only cause many pollutions to environment, and the mankind's long term growth brought adverse influence, so people develop renewable energy sources with being unable to hold oneself back now, such as: clean energy resourcies such as solar energy, water energy, wind energy.
Human when developing the energy of oneself, what expect at first is wind energy, before 3,000 years, the working people in ancient times of China just navigates with sail, in 16th century, the Dutchman fetches water with windmill and irrigates land, the 19th-century posterior lobe, people have invented wind-driven generator, produce electric energy with wind, nearly 20 years, developed country obtained huge achievement in technical field of wind power generation.The wind power generating set single-machine capacity that is incorporated into the power networks has developed into MW class from initial tens of kilowatts, has developed into intelligent wind power generating set now; Operational reliability was brought up to more than 98% from 50% of early 1980s, and all realized centralized control and telecontrol at the wind-driven generator of wind energy turbine set operation.
Wind-power electricity generation, at first the resource that will have is a wind, and the advanced person is also of no use again not have your technology of wind, and the uncertainty of wind-force is a lot, big, sometimes little sometimes, and south is northern sometimes sometimes, brings very big resistance to wind-power electricity generation, and how can we just overcome these resistances?
" self-control wind, wind-tunnel, the wind wheel wind-driven generator combination " that I invented can solve the difficult point of wind-power electricity generation fully, and wind-force can reach the 6-8 level, and wind direction is constant, most suitable generator wind wheel is arranged again, and wind-force changes little, and endurance is good, send electricity and come, that is just than being easier to.
What the present wind power generating set of background technique adopted is: horizontal axis, that three blade wind wheels (the wind wheel material: the light plastic plate adds carbon fiber) come wind-engaging to try hard to recommend is moving, and this blade has certain pliability, has rotated noise.Connecing speed increaser again, generally is exactly the epicyclic gearbox of compact structure, and then connects phase asynchronous double speed generator, and the controlled blade tip flow spoiler of hydraulic transmission type is adopted in braking, carries out the aerodynamic force brake, stops with low speed reel or break after rotating speed slows down.
In recent years, the wind-power electricity generation mainstream model mainly contained three kinds of (1) fixed pitch Stall Type units, and typical case's representative is a NEG MICON 600/700/750KW unit.(2) pitch-controlled wind-driven generator group.(3) Variable Speed Wind Power Generator: capacity is from 600KW to 1500KW.
To highlight below: V47-660/200KW pitch-controlled wind-driven generator group.
Starting wind velocity: 3.5m/s rated wind speed 16m/s cut-out wind speed 25m/s
Wind wheel: horizontal axis, three blades, upwind are arranged, full blade displacement
The diameter 47m rotating speed 20-26r/min number of blade 3
Power adjustments: feather/rotational speed regulation
Pitch-changing mechanism: the connecting rod that hydraulic pressure drives
Generator: main generator induction generator ten best revolutional slip controls
Rated power: the 660KW fast 1515-1650r/min that walks around
Small generators: induction generator rated power 200KW rotating speed 1500-1516r/min
Step-up gear: structure planetary pinion+parallel-axes gears speed increasing ratio 1: 75
Control system: based on control system+OPTLSLIP (the rotational speed regulation)+OPTITIP (displacement adjusting) of microprocessor
These several wind-driven generators all need can generate electricity by way of merging two or more grid systems hundred with the high-altitude that column the rises up into 40-50 rice wind-force that generates electricity, but wind-force has been lower than the wind speed off-grid, and dead halt.
The generation of summary of the invention wind-tunnel, wind
In daily life, there is many wind to be utilized by the mankind, also ignored by the mankind, such as chimney, it can make boiler (on-mechanical boiler) produce blast, makes stove fire more vigorous, more oxygen is combined with coal, and generation heat energy is considered toward big aspect again, is exactly the cooling tower of power station, diameter 40-50 rice, about 50-70 rice,, enter in the tower highly greatly if you are at a bright and sunny fair weather, the outside is calm, but very strong wind is arranged in the tower, can upward and your hand roll your cap or the less sand grains of diameter from your head, have wind here why? can such wind utilize? what is wind?
Atmosphere has pressure, and the pressure of atmosphere is different (because height sunlight degrees of absorption of landform etc.) in each place.Different air will flow to flowing of the low local this air of air pressure from the high place of air pressure and just produce wind, can so why, wind-tunnel produce wind? through my examining, although find that air can flow, but wind is that very big resistance is arranged from first ground to second ground, resistance wherein is exactly an air oneself, the blower that the imagination people use, when certain distance is arrived in wind, will be imperceptible or the slight existence that can feel wind? it limited wind-force stopped that by air wind has just scattered.So produce bigger wind, certain or fairly large power will be arranged, could produce wind.For another example: we ride bicycle or motorcycle, will can feel that also very big head-on wind blows on the calm date, and the speed of a motor vehicle is fast more, and wind-force is big more.This wind is exactly the resistance of air.Supposing does not have resistance of air, and we have only the frictional force on some tires and ground by bike so, and how very fast how light this is,!
Why can wind-tunnel produce wind upwards? have with regard to the resistance of this and air and to have concerned, we use circular wind-tunnel, very big resistance of air around having blocked, make it be in a space that relative resistance of air is very little, the atmospheric density of wind-tunnel outside will uprise relatively so, and the atmospheric density in the wind-tunnel will diminish relatively.If we open many intake grills in the bottom of wind-tunnel, air will flow to the low wind-tunnel inside of atmospheric density from the high outside of atmospheric density, again because wind-tunnel inner air resistance is little and barometric pressure lower is bigger than the atmospheric pressure of eminence, under the effect of above several power, wind will enter from the wind-tunnel bottom, and gush out from the top, so wind has just produced in artificial wind-tunnel.And (area of wind-tunnel is big more, and the height of wind-tunnel is high more, and the wind-force of generation is also just big more) (remaining be experimental results show that) annotates: the big and height of wind-tunnel is proportional, effective ratio in, above-mentioned situation just appears.
One, wind-tunnel design scheme:
Wind-tunnel can be divided into three kinds of specifications, can and highly come according to the diameter of wind-tunnel to determine
Small-sized wind-tunnel: wind-tunnel diameter 10-20 rice (internal diameter) wind-tunnel height 60-80 rice
Medium-sized wind-tunnel: wind-tunnel diameter 20-30 rice (internal diameter) wind-tunnel height 80-100 rice
Large tunnel: the wind-tunnel diameter more than 30 meters (internal diameter) wind-tunnel height more than 100 meters
Highlight medium-sized wind-tunnel below: (Fig. 1)
23.5 meters positions of 22 meters outer diameters of wind-tunnel inner diameter: wind-tunnel bottom
Outside 21 meters portions of 20 meters outer diameters of wind-tunnel inner diameter: upper shed place of wind-tunnel
100 meters of wind-tunnel height overalls, its middle and lower part intake grill is high 3 meters
Girth in the wind-tunnel: 69.12 meters (bottom)
Wind-tunnel outer perimeter: 73.83 meters (bottom)
Girth in the wind-tunnel: 62.83 meters (top)
Wind-tunnel outer perimeter: 65.97 meters (top)
Produce wind speed 8-10m/s (minimum value)
Wind-tunnel has formed, because wind-tunnel enough high (100 meters) enough big (22 meters of diameters) is so the wind that produces is also bigger, because there is not the medium-sized wind-tunnel of this moulding, we can take present common chimney to compare: there are 1.5 meters square air port wind speed>6m/s (in calm test down) 35 meters lower ends of 2 meters (lower end) height of common chimney internal diameter
Medium-sized wind-tunnel is 10 times of common chimney internal diameter, highly is 3 times of common chimney, so the minimum windspeed 8-10m/s that draws.Such wind speed drives the wind wheel rotation and generating just becomes very desirable.
Two, wind wheel design proposal
During the design wind wheel, I expect the wind wheel of existing wind-driven generator at the very start, but in limited space, how many huge like this wind wheels can be installed again in the wind-tunnel? what does the electricity that such wind wheel sends have again? the electricity that it sends can not be directly proportional with the big wind-tunnel of our investment, no benefit, just do not utilize its value yet.
Is the power that how just can make wind promote wind wheel strengthened, and the negative resistance of fan blade can dwindle? can this situation occur? can this have become this technology really successful key, also is the difficult point of this innovation.I have thought for a long time, one day when scratching on paper, why not expect family to a wind sheltering of fan blade peace suddenly? during a fan blade job, the wind sheltering of all staying at home of other three fan blades, when another fan blade came out work, just first fan blade just arrived the entrance, so I have just designed four fan blades, and also have the family of their wind sheltering, be installed in the outer surface of wind-tunnel.This can save in the wind-tunnel widely, the space of the leaf that is used for leaking informaton.Four fan blades, man-to-man being equal in weight, four fan blade weight equate that also this just like the lever principle of seesaw, slightly firmly, just turns.Two weight reach balance, can reduce the resistance of self, increase the band effect to generator.The generator that this fan blade also can be used for natural wind uses.As Fig. 4
We know that the wind in the wind-tunnel upwards advances, fan blade in being in wind-tunnel is subjected to power when up changeing, other three suffered resistances of fan blade are very little, because the family wind of fan blade is very little, can disregard, 6. fan blade has begun stressedly when 5. fan blade changes 30 °, so just may guarantee that fan blade can rotate soon.1. and 2. 1. effect adds that the barge board (not marking among the figure) of both sides forms the plate of a back-off, strengthens the control to wind among the figure.1. reinforce the effect of fan blade in addition.2. can also on turn over 90 °, the hydraulic transmission bar carries out transmission, the barge board of both sides also has this function, is in order to slow down, to brake.3. the effect at wind-guiding angle is used for blocking following wind, allows wind less enter the family of fan blade, and it can also be kept watch and be sent on the blade face of the fan blade of working its can regulate.4. air blocking cap, its effect of front indication " family of fan blade " just is the impeller mouth that is used for sealing wind-tunnel, can also make the fan blade that returns to home reduce resistance, it is installed in the outer surface of wind-tunnel.
Attention: the both sides of fan blade all are equipped with less barge board, and it can be controlled with hydraulic pressure pole in the rotation of upper and lower 90 degree.
Three, the quantity of wind wheel and installation position
But wind-tunnel Anduo County wind wheel, this can and highly come according to the inner diameter of wind-tunnel to decide.
1, small-sized wind-tunnel inner diameter 10-20 rice, height 60-80 rice can be pacified 8 typhoons wheel.As Fig. 2
1. begin azel: 17 meters of wind-tunnel diameters, 80 meters of height, on a circular holes left side, on the summit of right two diameters, first typhoon wheel is installed at 14 meters, the left side that with the rotor shaft are altitude line, the right 20 meter amperes are adorned second typhoon wheel, be later on 26 meters, a left side successively, 38 meters, 50 meters, right 32 meters, 44 meters, 56 meters, each installs typhoon wheel, (what indicate among the figure is first, two, 1. in three installations diagram is the support post of outer air blocking cap) can be with the phase asynchronous double speed generator of two 650/350kw, 8 typhoons wheel, totally 16 generators (also can install relatively in twos)
Shown in Figure 2
1. wind wheel is installed to stagger and is carried out, because small-sized wind-tunnel diameter is less, the flow of wind is also less, can keep certain wind flow constant like this.
2. the resistance of fan blade is temporary transient, and fan blade is given next fan blade by the turning handle hearsay, and the suction of wind-tunnel also can quicken the wind by fan blade once more.
3. the distance between wind wheel and the wind wheel is big more, and the effect of wind-power electricity generation is good more.
4. control the rotation order of wind wheel, allow wind wheel successively up, begin to rotate.
5. 1. the support post of outer air blocking cap among the figure.
Medium-sized wind-tunnel, construction of wind tunnel schematic representation
The bottom of wind-tunnel, available reinforced concrete, on the basis of circle, rise three meters high columns, per two meters one, and then build circular circular beam, connect in this circle on three summits of equilateral triangle, draw with the summit is the center, with the opposite side is 7.5 meters sinusoidal line of parallel lines, two ends from these 7.5 meters sinusoidal line, rise twice reinforced concrete knee wall, and then on the elongation line at these sinusoidal line two ends of 7.5 meters, respectively get 3 meters (3 meters distances comprise the thickness of first road and the second road wall) and build two road reinforced concrete knee walls again, be raised to 20 meters at body of wall, respectively build a platform on the knee wall on both sides, the width of knee wall and platform can exceed the body of wall width of wind-tunnel, platform is the position that generator and other accessory are installed, with the rotor shaft center, each 9 meters up and down, Jian Erdao is used for connecting two cement beams between the platform.At the remaining part that does not have wind wheel and generator, build for thorough of available light flyash aerating, can select per ten meters to add an arc cement beam, guarantee the whole firm of wind-tunnel, also be the wind-tunnel main body.
As 1. cement column (high 3 meters, per 2 meters) of Fig. 1;
2. circular collar tie beam;
3. reinforced concrete knee wall;
4. connect two cement beams between the platform;
5. 20 meters platforms are installed generator and other accessory;
6. wind-tunnel main body.
3 wind wheels on three summits can be installed in 20 meters, and 3 wind wheels can drive 6 generators, to 55 meters of wind-tunnel, build 3 same wind wheels again, can drive 6 generators again.
To 85 meters, build 3 same wind wheels again, can drive 6 generators.
Also can increase and decrease the height of generator and wind-tunnel from actual demand.
Medium-sized wind-tunnel, wind wheel scheme of installation Fig. 3
1. be that generator and other accessory are installed, have two road reinforced concrete walls to support.
2. be the blade of wind wheel, it is formed by four, and horizontal two, perpendicular two, and also four weight length all equate.(the detail introduction is arranged later on)
3. be the wind-tunnel main body, with the thorough fly ash aerated construction of light body.
4. the control wind part of fan blade front portion, but upper, middle and lower 90 degree take exercises, regulate and control wind-force size and brake usefulness, come actuating with hydraulic pressure pole.Also there is less barge board the fan blade both sides, but also upper, middle and lower 90 degree are controlled wind.
5. air blocking cap, semicircle, skeleton add iron sheet weldering system, are contained on the outer wall of wind-tunnel, can take suitable support below.
6. the main shaft that connects fan blade and generator, square-outside and round-inside, high strength, two connects circular pipe, links to each other with the planetary gearbox device of generator front.
Because medium-sized wind-tunnel diameter is bigger, can be simultaneously, the isoplanar drives three groups of turbo dynamo groups, generate electricity, medium-sized wind-tunnel height has 100 meters simultaneously, can also (55 meters) and top (85 meters) same two-layer wind wheel be set at the middle part, but will note keeping the flow velocity and the flow of the wind of wind-tunnel, take certain measure in case of necessity.
8.5 meters of 22 meters fan blade length of wind-tunnel inner diameter (fan blade is to the distance in axle center) fan blade width 8 meters (containing the both sides barge board) is narrow when wide 5 meters.
3, large tunnel, inner diameter are more than 30 meters, and height can be pacified 12-16 typhoon wheel, azel more than 100 meters.Example: 40 meters of inner diameters, 120 meters of height, in circular wind-tunnel, connect on foursquare four summits, with the wind wheel is 20 meters of height, one deck 4 typhoons wheel is installed, the second layer 4 typhoons wheel is installed at 45 meters, the 3rd layer of 4 typhoons wheel is installed at 70 meters, the 4th layer of 4 typhoons wheel or 2 typhoons wheel are installed at 95 meters, can select to reduce two typhoons wheel because highly increase, 2 in the phase asynchronous double speed generator of every typhoon wheel band 850/400kw, 14-16 typhoon wheel, 32 generators (length of fan blade should correspondingly increase by 1.5 meters, and width increases by 1 meter)
Because large tunnel is complicated, we therefrom, little wind-tunnel is built and use in obtain experience, and then carry out the construction of large tunnel.
Four, the making of fan blade, wind wheel and installation
The making of fan blade, material are very crucial, adopt the intensity height, light weight, the material that plasticity is good, what selected for use here is aluminum alloy, if processing conditions is good, can adopt the way on block cast leeward blade face, the fan blade face is frivolous as far as possible, and available many little ligaments and four big ligaments are strengthened the inside on leeward blade face, arrived and total shaft connection place, can thicken, widen, and leave plane and screw, can carry out screw with the plane on the axle and be connected.Push rod and frame all will adopt circular hollow.As Fig. 5-3
Main blade is connected with preceding fan blade, the round bar of main blade round bar and preceding fan blade is adjoint, upper lateral part at the main blade round bar, two sections axle sleeves are installed, a steel axle is fixed by the round bar portion of fan blade in the past, extend in the middle of two shaft sleeve part, and be connected with transverse axis in the axle sleeve, the crosswind leaf on both sides also connects in this way, preceding fan blade has tie point everywhere, on one side the crosswind leaf has two, the braking point of brake device or three positions can be installed in the axle sleeve that connects on the main blade round bar, the angle of fan blade and crosswind leaf before adjusting, fixedly the angle of fan blade is constant.Fig. 5-2
1, preceding fan blade round bar;
2, main blade round bar;
3, main blade axle sleeve;
4, the blade face of preceding fan blade, it and preceding fan blade round bar are once cast.
After the brake in whole tie points of fan blade and the axle sleeve uses pipeline and various terminal all fixedly to finish, the back aluminium alloy plate on blade face is built, be fixed on the ligament with aluminum rivet, such air blade has just been carried out.
If the condition of processing aluminum alloy is bad, can not block cast, can also be various piece, each parts such as tough greatly, little ligament, panel are carried out, and assemble again, because tie point is many, the method is not really firm.Ligament cross section: as Fig. 5-1
After fan blade is carried out, can be connected with main shaft, the main shaft of wind wheel outside is foursquare, so that fixing fan blade is inside circular, for alleviating its weight, and main shaft surpasses the two ends of fan blade and arrived the speed increaser place, if the outside is just circular, is convenient to installation.Can directly connect as Fig. 6-1 circular shaft and to connect disc type brake on the high speed shaft in the planet gear speed increaser, meet phase asynchronous biobelt generator rating power (750/400) kw again, the hydraulic press of fan blade and crosswind leaf before the hydraulic operation is installed.Fig. 6
Five, the making of the arc plate of angle in the impeller
Wind wheel has been carried out, and four interior angles of wind wheel have a small-sized arc aluminium alloy plate in my design, and its making method is: we can connect the 145 ° of curved pull bars in both sides made of iron earlier on the ligament between the angle of fan blade.Then curved part of coming is separately fixed on 4 ligaments as Fig. 7-1, makes the impeller can be firmer, can bear bigger power, cloth one deck aluminium sheet be in the above done camber then.As Fig. 7-2
Six, the design and the installation of the outer air blocking cap of wind wheel
Air blocking cap adopts light body and solid material as far as possible, and we adopt medium-sized channel-section steel to make frame now, and the stria steel is made the making method of support: take medium-sized channel-section steel to make a rectangular frame earlier.Then the hat brim of two semicircles is erected as Fig. 8-2. and to link to each other, at last iron sheet is fixed on two semicircles and the attachment portion in the middle of it.Lifting: the cement column around the dress wind wheel is reserved many screw rods, and (screw rod gos deep into the inside of concrete column, the kerve steel is cut the hole, align after slinging, fix with nut, because weight is not light, can draw last two root posts at the bottom of the ground and support, withstand on the outer below of air blocking cap, simultaneously also can make scalariform, electric power supply plant personnel use up and down.
Seven, power generating equipment and other accessory
A wind wheel left side, all there is generator right both sides, many variations are just arranged during setting power, if with medium-sized wind-tunnel is example: the phase asynchronous double speed generator that adopts 750/400kw, regulation and control just can be switched in two ends, when wind speed was big, two ends switched to 750kw entirely, during middle wind speed, one is 750kw, the other end is 400kw, and when hanging down wind speed, two all switches to 400kw, because the minimum wind force value of wind-tunnel, the minimum value that just drives generator is 800kw, so each 400kw of two can advance microcomputer and automatically switch, two connects again then, speedup epicyclic gearbox, speedup should reach or near 1: 50, two ends are a disk type braker that overlaps on high speed shaft respectively, hydraulic pressure is transferred wind system, on fan blade and crosswind leaf are done before turning round, following 90 ° fan blade rotates and the aerodynamic force brake.
A medium-sized wind-tunnel can drive minimum nine typhoons wheel, 18 typhoon power generators, and total installation of generating capacity can reach 13500kw, estimates per hour 9000-11000kw/h of generated energy.
A small-sized wind-tunnel, but the two sides respectively is with four, totally eight typhoons are taken turns, and 16 typhoon power generators can be with the phase asynchronous double speed generator of 650/350kw, total installation of generating capacity 10400kw.Estimate per hour 7000-8000kw/h of generated energy.
Large tunnel can be with 16 typhoons wheel, 32 generators, and total installation of generating capacity can reach 27200kw, estimates per hour 20000kw/h of generated energy.
After the embodiment wind-tunnel is built up, should fix outer air blocking cap from top to bottom earlier, carry out wind speed then, the side of air quantity is fixed, after reaching standard>12m/s, carry out slinging and placing of two generators and epicyclic gearbox again, hang in the blade of impeller from the maintenance doorway then, dress up a complete tape spool wind wheel in the wind-tunnel bottom group and sling and be installed between two epicyclic gearboxes.(stay the next one can transport the gate of air blade below liftoff nearest one, installation now and future are useful when overhauling).Fix two gear-boxes then, disk type braker on the high speed shaft is installed again, install and fix generator and hydraulic pressure control wind system at last, it is connected with hydraulic tube on the wind wheel, (when fan blade is installed, having installed) in the part on the fan blade.
Debugging before the generating: 1, whether the debugging hydraulic system has leakage of oil earlier.2. before carrying out during the parking of fan blade and crosswind leaf, whether whether running is flexible and have fixedly the time loosening again.3. carry out the generator debugging, power transmitting device is installed, the epicyclic gearbox lubricating oil filling.4. wheel rotation test, generator power is all switched to 400kw, then, unclamp disk type braker, with hydraulic pressure control wind system, operation front vane and lateral lobe sheet carry out 90 ° of angles downwards, impeller begins slow rotation, if change fast more more, and no abnormal situation, one side generator power slowly can be switched to 750kw, try out for a long time then.As no abnormal situation in three to five days, can try an opposite side and also switch to 750kw, if All going well can carry out installation, the debugging of next wind wheel unit.Can begin the Installation and Debugging of carrying out of past next platform earlier from the top of wind-tunnel.
Description of drawings 1. is building structure figure (overground part) and wind wheel generator orientation schematic representation of medium-sized wind-tunnel.
Fig. 2. the dynamic figure when being small-sized wind-tunnel wind wheel scheme of installation and its motion.
Fig. 3. be that three isoplanar wind wheel generators are installed plan view in the medium-sized wind-tunnel.
Fig. 4. be wind wheel design profile figure and motion state diagram.
Fig. 5. be the making and the internal structure figure of wind wheel sheet.
Fig. 5-the 1st, the ligament sectional view.
Fig. 5-the 2nd, the connecting means of preceding control aerofoil and side barge board and frame.
Fig. 5-the 3rd, wind wheel sheet overall diagram.
Fig. 6. be four fan blade wind driven generators assembling one figure.
Fig. 6-the 1st, impeller line shaft figure.
Fig. 7. be the making of interior angle between blade and the installation construction drawing of arc plate.
Fig. 8. be that outer air blocking cap is made split figure.

Claims (5)

1. wind-tunnel generation wind is used for generating electricity
Generation by wind-tunnel has produced wind, has overcome in the past that wind-power electricity generation relies on nature fully, by the old tradition of wind field generating, artificially makes wind-tunnel, and produces the stable wind energy that certain strength is arranged, and this wind energy is used for generating electricity.Just produce the method and the technology of the wind that is used for generating electricity by wind-tunnel.
2. four fan blade wind wheels
Although this stress surface of taking turns has only a blade wind-wheel 40m 2Size, but also be three fan blade lifting surface areas of present institute's use generator wind wheel summation 5-6 doubly, four leaf weights of this wind wheel equate, equity fan blade weight also equates, making two fan blades of equity can reach a kind of is the balance at center with the axle, wind-force will be broken this balance and be very easy to, and drops to self resistance of fan blade minimum.
3. air blocking cap and wind-guiding angle
The wind wheel of wind-power electricity generation in the past; be exposed under the air port fully; wind wheel is when generating is rotated; also produce bigger resistance, influence the stable operation of unit, and air blocking cap and wind-guiding angle have been arranged; making wind wheel simultaneously be subjected to wind-force rotates; and the one side of returning is subjected to the protection at air blocking cap and wind-guiding angle and the resistance that is subjected to is very little, and wind wheel could be turned over fast like this, and the effect at this explanation air blocking cap and wind-guiding angle is extremely important.
4. self-control wind, wind-tunnel, wind wheel, wind-driven generator combination
By above 1. 2. 3. a whole set of the electricity-generating method that combines of a content, solved the difficult point of many wind-power electricity generations.1. wind come source problem, produce wind energy by wind-tunnel, wind speed is stable at 8-10m/s (minimum value) and wind regime, is subjected to extraneous wind-force variable effect little, endurance and directivity are all fine.2. new-type wind wheel stress surface is big, and resistance is little when returning, and the strength that drives the generator rotation is big, and speed is fast.3. typhoon wheel can drive two generators, and two generators also can be allocated mutually.4. the generator installation total amount of a medium-sized wind-tunnel reaches 13500kw, estimates that generated energy can reach per hour 9000-11000kw/h.
5. make other use of wind, wind-tunnel, wind wheel, wind-driven generator combination by oneself
As long as this invention is changed slightly, just can be used for present natural wind generating, its content is: 1. wind-tunnel is made into big flared horn shape, lie against the aerial of 30-40 rice, be used for collecting natural wind, become cylindrical at the wind-tunnel least significant end, two groups or three groups of wind wheels and air blocking cap, wind-guiding angle are set in cylindrical, establish equipment such as step-up gear and induction generator again.(two generators of a wind wheel) have so just become natural wind, wind-tunnel, wind wheel wind-driven generator and have made up.2. also can place a typhoon wheel and air blocking cap, wind-guiding angle separately, place eminence, also can drive generator for electricity generation.
CN2006100660717A 2006-03-29 2006-03-29 Wind, wind tunnel, wind wheel and wind driven generator combination Expired - Fee Related CN101046190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006100660717A CN101046190B (en) 2006-03-29 2006-03-29 Wind, wind tunnel, wind wheel and wind driven generator combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006100660717A CN101046190B (en) 2006-03-29 2006-03-29 Wind, wind tunnel, wind wheel and wind driven generator combination

Publications (2)

Publication Number Publication Date
CN101046190A true CN101046190A (en) 2007-10-03
CN101046190B CN101046190B (en) 2010-09-01

Family

ID=38771054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006100660717A Expired - Fee Related CN101046190B (en) 2006-03-29 2006-03-29 Wind, wind tunnel, wind wheel and wind driven generator combination

Country Status (1)

Country Link
CN (1) CN101046190B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850207A (en) * 2010-06-23 2010-10-06 高训棋 Device for collecting and separating air by using natural wind
CN102374129A (en) * 2010-08-20 2012-03-14 邱垂南 Vertical-shaft wind-driven kinetic energy generating device
CN109578216A (en) * 2017-09-29 2019-04-05 刘明成 Air duct type air operated machine
CN110131006A (en) * 2019-06-18 2019-08-16 浙江元能电力设备有限公司 A kind of multistage Synthesis study and Powered Air energy generating set step by step

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3330722A1 (en) * 1983-08-25 1985-03-07 Walter Martin 7880 Bad Säckingen Eismann WIND TURBINE FOR POWER GENERATION
CN2086319U (en) * 1991-02-03 1991-10-09 徐子瑜 Windproof breast wheel machine
CN1130239A (en) * 1994-07-08 1996-09-04 侯梓胜 Infinite energy source generating set device
CN1405448A (en) * 2001-08-16 2003-03-26 苗伯霖 Chimney type wind-driven generator
CN1632307A (en) * 2004-06-28 2005-06-29 周继明 Wind power propulsion device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850207A (en) * 2010-06-23 2010-10-06 高训棋 Device for collecting and separating air by using natural wind
CN101850207B (en) * 2010-06-23 2012-04-11 高训棋 Device for collecting and separating air by using natural wind
CN102374129A (en) * 2010-08-20 2012-03-14 邱垂南 Vertical-shaft wind-driven kinetic energy generating device
CN102374129B (en) * 2010-08-20 2013-10-23 邱垂南 Vertical-shaft wind-driven kinetic energy generating device
CN109578216A (en) * 2017-09-29 2019-04-05 刘明成 Air duct type air operated machine
CN110131006A (en) * 2019-06-18 2019-08-16 浙江元能电力设备有限公司 A kind of multistage Synthesis study and Powered Air energy generating set step by step

Also Published As

Publication number Publication date
CN101046190B (en) 2010-09-01

Similar Documents

Publication Publication Date Title
Eriksson et al. Evaluation of different turbine concepts for wind power
Ragheb Vertical axis wind turbines
US20100187828A1 (en) Wind energy harnessing apparatuses, systems, methods, and improvements
CN206942928U (en) A kind of H types vertical shaft wind light generator
CN202117850U (en) Fluid energy boosting and conversion device
CN1730934A (en) Vane speed regulator for electricity generation by wind power and ocean current
CN101046190A (en) Wind driven generator combination
CN2784609Y (en) Wind power generator combined with blastoff balloon
CN203175751U (en) Wind power driving device
Divone Evolution of modern wind turbines part A: 1940 to 1994
CN204627851U (en) Vertical axis aerogenerator
CN208431103U (en) A kind of small-sized wind power generator tower height regulating device
El Bassam Wind energy
CN102926938A (en) Wind power generation system applied between two high-rise buildings or two alpine and gorge regions
CN102979675A (en) Wind-collecting type housing building group and open-field structure group wind junction generating station and power station
CN2471963Y (en) Oscillating blade wind motor
EP3214303B1 (en) Rotor vertical axis wind turbine
US20190277252A1 (en) Systems and Methods for Maximizing Wind Energy
JP2003239842A (en) Wind power generator for storing wind force energy as potential energy and simultaneously extracting as electric power energy
CN103244356A (en) Circular air duct fan-made wind, wind wheel, wind flow diverter and wind driven generator set
CN100422548C (en) Two-tube-shelving plat form type wind-power generating system
CN104153944B (en) A kind of Large marine vertical axis aerogenerator group
CN102168655A (en) Resistance difference type synchronous linkage integrated wind wave and light heat electromechanical energy conversion system
AU2011101237A4 (en) Method and apparatus for enhancing energy generation
CN209557155U (en) Wind and solar integrated cage efficient generating apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100901