CN101022220A - 配电网无功潮流优化调度方法 - Google Patents

配电网无功潮流优化调度方法 Download PDF

Info

Publication number
CN101022220A
CN101022220A CNA2007100909508A CN200710090950A CN101022220A CN 101022220 A CN101022220 A CN 101022220A CN A2007100909508 A CNA2007100909508 A CN A2007100909508A CN 200710090950 A CN200710090950 A CN 200710090950A CN 101022220 A CN101022220 A CN 101022220A
Authority
CN
China
Prior art keywords
node
reactive
power
loss
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007100909508A
Other languages
English (en)
Inventor
刘倬云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Zhuoyun
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007100909508A priority Critical patent/CN101022220A/zh
Publication of CN101022220A publication Critical patent/CN101022220A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明属于一种电力调度方法,特别涉及一种对配电网进行无功潮流调度的方法。它在配电网主干线负荷中心[n]设置一个容量可多级调节的无功补偿装置[C],在各节点[1,2,…,n-1,n]设置带无线数据通信功能的电气数据采集器,采集所在节点[1,2,…,n-1,n]的电压Ui、有功负荷Pi、无功负荷Qi、流向下一节点的有功功率Pi,i+1与无功功率Qi,i+1;计算得出总有功功率损耗值ΔP,试算将无功分界点由初始无功分界点[j]挪至其邻近的节点[j+1];计算得到在新的无功分界点[j+1]下总有功功率损耗值ΔP’,根据ΔP’与ΔP的差值,调整无功补偿装置[C]的出力。应用本发明,可以使配电网主干线的线损大幅度降低,并接近于最优,同时可以提高供电质量。

Description

配电网无功潮流优化调度方法
技术领域
本发明属于一种配电网电力调度方法,特别涉及一种对农村配电网进行无功潮流调度的方法。
背景技术
目前我国10kv与380v电网,特别是农村电网都未进行无功潮流的优化调度,从而电网线损较高,用户端电压质量较差。
发明内容
本发明的目的是:提供一种配电网无功潮流优化调度方法,以减低损耗,提高电网供电质量。
本发明的技术方案是:一种配电网无功潮流优化调度方法,包括以下步骤:
a)在配电网主干线的负荷中心设置一个容量可多级调节的无功补偿装置,将其视为无功电源;在配电网主干线变电所到负荷中心的各节点处,设置带无线数据通信功能的电气数据采集器,采集所在节点的电压Ui、有功负荷Pi、无功负荷Qi、流向下一节点的有功功率Pi,i+1与无功功率Qi,i+1
b)从变电所开始,分段计算所述各节点间的电阻值Ri,i+1和电抗值Xi,i+1
Ri,i+1=ri,i+1Li,i+1                          (1)
Xi,i+1=xi,i+1Li,i+1                          (2)
式中,ri,i+1、xi,i+1分别为i至i+1节点间线路的单位电阻值和单位电抗值,Li,i+1为i至i+1节点间的线路长度,i=1,2,…,n-1;
c)从变电所开始,逐段计算所述各节点间的电压损耗ΔUi,i+1和末端节点电压Ui+1
ΔUi,i+1=(Pi,i+1Ri,i+1+Qi,i+1Xi,i+1)/Ui    (3)
Ui+1=Ui-ΔUi,i+1                               (4)
d)从变电所开始,逐段计算所述各节点间的有功损耗Δ Pi,i+1和无功损耗ΔQi,i+1,流入下一节点的有功功率P’i+1和无功功率Q’i+1,下一节点流出的有功功率Pi+1,i+2和无功功率Qi+1,i+2
ΔPi,i+1=(P2 i,i+1+Q2 i,i+1)Ri,i+1/U2 i        (5)
ΔQi,i+1=(P2 i,i+1+Q2 i,i+1)Xi,i+1/U2 i        (6)
P’i+1=Pi,i+1-ΔPi,i+1                        (7)
Q’i+1=Qi,i+1-ΔQi,i+1                        (8)
Pi+1,i+2=P’i+1-Pi+1                           (9)
Qi+1,i+2=Q’i+1-Qi+1                           (10)
e)将各段有功损耗ΔPi,i+1相加,得出总有功功率损耗值:
Δ P Σ = Σ i = 1 n - 1 Δ P i , i + 1 - - - ( 11 )
f)比较测量所得所述各节点电压值Ui,视有电压最低值U1的节点为初始无功分界点;
g)试算将无功分界点由初始无功分界点挪至其邻近的节点;
从变电所开始,以原测量值Q1,2与通过测量得到的初始无功分界点的无功负荷Qj之和替代原测量值Q1,2,通过(3)至(11)式,计算得到在新的无功分界点下总有功功率损耗值Δ P’;
h)将ΔP’减去ΔP
若≈0,则不作任何调整,并返回c)步骤;
若<<0,则降低所述无功补偿装置的出力,将无功分界点调整至其邻近节点,并转至c)步骤;
若>>0,则提高所述无功补偿装置的出力,将无功分界点调整至其另一侧邻近节点,并转至c)步骤。
应用本发明,可以使配电网主干线的线损大幅度降低,并接近于最优,同时可以提高供电质量。
附图说明
附图1为本发明所使用的配电网主干线模型示意图;
附图2为本发明中所述各电气参数关系示意图。
具体实施方式
实施例1:参见附图,一种配电网无功潮流优化调度方法,包括以下步骤:
a)在配电网主干线的负荷中心n设置一个容量可多级调节的无功补偿装置C,将其视为无功电源;在配电网主干线变电所1到负荷中心n的各节点1,2,…,n-1,n处,设置带无线数据通信功能的电气数据采集器,采集所在节点1,2,…,n-1,n的电压Ui、有功负荷Pi、无功负荷Qi、流向下一节点的有功功率Pi,i+1与无功功率Qi,i+1
b)从变电所1开始,分段计算所述各节点1,2,…,n-1,n间的电阻值Ri,i+1和电抗值Xi,i+1
Ri,i+1=ri,i+1Li,i+1                          (1)
Xi,i+1=xi,i+1Li,i+1                          (2)
式中,ri,i+1、xi,i+1分别为i至i+1节点间线路的单位电阻值和单位电抗值,Li,i+1为i至i+1节点间的线路长度,i=1,2,…,n-1;
c)从变电所1开始,逐段计算所述各节点1,2,…,n-1,n间的电压损耗ΔUi,i+1和末端节点电压Ui+1
ΔUi,i+1=(Pi,i+1Ri,i+1+Qi,i+1Xi,i+1)/Ui    (3)
Ui+1=Ui-ΔUi,i+1                               (4)
d)从变电所1开始,逐段计算所述各节点1,2,…,n-1,n间的有功损耗ΔPi,i+1,和无功损耗ΔQi,i+1,流入下一节点的有功功率P’i+1和无功功率Q’i+1,下一节点流出的有功功率Pi+1,i+2和无功功率Qi+1,i+2
ΔPi,i+1=(P2 i,i+1+Q2 i,i+1)Ri,i+1/U2 i        (5)
ΔQi,i+1=(P2 i,i+1+Q2 i,i+1)Xi,i+1/U2 i        (6)
P’i+1=Pi,i+1-ΔPi,i+1                        (7)
Q’i+1=Qi,i+1-ΔQi,i+1                        (8)
Pi+1,i+2=P’i+1-Pi+1                           (9)
Qi+1,i+2=Q’i+1-Qi+1                           (10)
e)将各段有功损耗ΔPi,i+1相加,得出总有功功率损耗值:
Δ P Σ = Σ i = 1 n - 1 Δ P i , i + 1 - - - ( 11 )
f)比较测量所得所述各节点1,2,…,n-1,n电压值Ui,视有电压最低值U1的节点j为初始无功分界点;
g)试算将无功分界点由初始无功分界点j挪至其邻近的节点j+1;
从变电所1开始,以原测量值Q1,2与通过测量得到的初始无功分界点j的无功负荷Qj之和替代原测量值Q1,2,通过(3)至(11)式,计算得到在新的无功分界点j+1下总有功功率损耗值ΔP’;
h)将ΔP’减去ΔP
若≈0,则不作任何调整,并返回c)步骤;
若<<0,则降低所述无功补偿装置C的出力,将无功分界点调整至其邻近节点j+1,并转至c)步骤;
若>>0,则提高所述无功补偿装置C的出力,将无功分界点调整至其另一侧邻近节点j-1,并转至c)步骤。
实施例2:在实施例1所述配电网无功潮流优化调度方法中,所述运算过程使用电子计算装置完成。

Claims (2)

1.一种配电网无功潮流优化调度方法,包括以下步骤:
a)在配电网主干线的负荷中心[n]设置一个容量可多级调节的无功补偿装置[C],将其视为无功电源;在配电网主干线变电所[1]到负荷中心[n]的各节点[1,2,…,n-1,n]处,设置带无线数据通信功能的电气数据采集器,采集所在节点[1,2,…,n-1,n]的电压Ui、有功负荷Pi、无功负荷Qi、流向下一节点的有功功率Pi,i+1与无功功率Qi,i+1
b)从变电所[1]开始,分段计算所述各节点[1,2,…,n-1,n]间的电阻值Ri,i+1和电抗值Xi,i+1
Ri,i+1=ri,i+1Li,i+1    (1)
Xi,i+1=xi,i+1Li,i+1    (2)
式中,ri,i+1、xi,i+1分别为i至i+1节点间线路的单位电阻值和单位电抗值,Li,i+1为i至i+1节点间的线路长度,i=1,2,…,n-1;
c)从变电所[1]开始,逐段计算所述各节点[1,2,…,n-1,n]间的电压损耗ΔUi,i+1和末端节点电压Ui,i+1
ΔUi,i+1=(Pi,i+1Ri,i+1+Qi,i+1Xi,i+1)/Ui    (3)
Ui+1=Ui-ΔUi,i+1                               (4)
d)从变电所[1]开始,逐段计算所述各节点[1,2,…,n-1,n]间的有功损耗ΔPi,i+1,和无功损耗ΔQi,i+1,流入下一节点的有功功率P’i+1和无功功率Q’i+1,下一节点流出的有功功率Pi+1,i+2和无功功率Qi+1,i+2
ΔPi,i+1=(P2 i,i+1+Q2 i,i+1)Ri,i+1/U2 i    (5)
ΔQi,i+1=(P2 i,i+1+Q2 i,i+1)Xi,i+1/U2 i    (6)
P’i+1=Pi,i+1-ΔPi,i+1                    (7)
Q’i+1=Qi,i+1-ΔQi,i+1                    (8)
Pi+1,i+2=P’i+1-Pi+1                       (9)
Qi+1,i+2=Q’i+1-Qi+1                       (10)
e)将各段有功损耗ΔPi,i+1相加,得出总有功功率损耗值:
Δ P Σ = Σ i = 1 n - 1 Δ P i , i + 1 - - - ( 11 )
f)比较测量所得所述各节点[1,2,…,n-1,n]电压值Ui,视有电压最低值U1的节点[j]为初始无功分界点;
g)试算将无功分界点由初始无功分界点[j]挪至其邻近的节点[j+1];
从变电所[1]开始,以原测量值Q1,2与通过测量得到的初始无功分界点[j]的无功负荷Qj之和替代原测量值Q1,2,通过(3)至(11)式,计算得到在新的无功分界点[j+1]下总有功功率损耗值ΔP’;
h)将ΔP’减去ΔP
若≈0,则不作任何调整,并返回c)步骤;
若<<0,则降低所述无功补偿装置[C]的出力,将无功分界点调整至其邻近节点[j+1],并转至c)步骤;
若>>0,则提高所述无功补偿装置[C]的出力,将无功分界点调整至其另一侧邻近节点[j-1],并转至c)步骤。
2.根据权利要求1所述的配电网无功潮流优化调度方法,其特征是:所述运算过程使用电子计算装置完成。
CNA2007100909508A 2007-03-29 2007-03-29 配电网无功潮流优化调度方法 Pending CN101022220A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007100909508A CN101022220A (zh) 2007-03-29 2007-03-29 配电网无功潮流优化调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007100909508A CN101022220A (zh) 2007-03-29 2007-03-29 配电网无功潮流优化调度方法

Publications (1)

Publication Number Publication Date
CN101022220A true CN101022220A (zh) 2007-08-22

Family

ID=38709902

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007100909508A Pending CN101022220A (zh) 2007-03-29 2007-03-29 配电网无功潮流优化调度方法

Country Status (1)

Country Link
CN (1) CN101022220A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582589B (zh) * 2009-06-18 2011-10-19 华东电网有限公司 基于负荷裕度最大化的有功出力方式优化方法
CN101728833B (zh) * 2008-10-16 2012-01-11 上海思南电力通信有限公司 一种低压配电线路无功补偿方法
CN102738803A (zh) * 2011-04-11 2012-10-17 山东迪生电气股份有限公司 一种10kV或20kV线路为供电区域的电压无功优化补偿方法
CN103124075A (zh) * 2013-03-20 2013-05-29 东南大学 一种风电基地无功配置方法
CN103246802A (zh) * 2013-03-29 2013-08-14 上海申瑞继保电气有限公司 基于地理信息的不规则区域用电线损计算方法
CN103529708A (zh) * 2013-09-25 2014-01-22 江苏省电力公司 配电网的预操作仿真系统及仿真分析方法
CN107947192A (zh) * 2017-12-15 2018-04-20 西安理工大学 一种下垂控制型孤岛微电网的无功优化配置方法
CN112039082A (zh) * 2020-08-28 2020-12-04 国网青海省电力公司果洛供电公司 基于损耗最小的配电网低电压调节设备优化配置方法及系统
CN114358432A (zh) * 2022-01-07 2022-04-15 国网山东省电力公司青岛供电公司 计及需求响应与碳交易的多能源系统优化调度方法及装置

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101728833B (zh) * 2008-10-16 2012-01-11 上海思南电力通信有限公司 一种低压配电线路无功补偿方法
CN101582589B (zh) * 2009-06-18 2011-10-19 华东电网有限公司 基于负荷裕度最大化的有功出力方式优化方法
CN102738803A (zh) * 2011-04-11 2012-10-17 山东迪生电气股份有限公司 一种10kV或20kV线路为供电区域的电压无功优化补偿方法
CN103124075A (zh) * 2013-03-20 2013-05-29 东南大学 一种风电基地无功配置方法
CN103246802A (zh) * 2013-03-29 2013-08-14 上海申瑞继保电气有限公司 基于地理信息的不规则区域用电线损计算方法
CN103246802B (zh) * 2013-03-29 2016-03-23 上海申瑞继保电气有限公司 基于地理信息的不规则区域用电线损计算方法
CN103529708A (zh) * 2013-09-25 2014-01-22 江苏省电力公司 配电网的预操作仿真系统及仿真分析方法
CN103529708B (zh) * 2013-09-25 2015-12-23 江苏省电力公司 配电网的预操作仿真系统及仿真分析方法
CN107947192A (zh) * 2017-12-15 2018-04-20 西安理工大学 一种下垂控制型孤岛微电网的无功优化配置方法
CN112039082A (zh) * 2020-08-28 2020-12-04 国网青海省电力公司果洛供电公司 基于损耗最小的配电网低电压调节设备优化配置方法及系统
CN114358432A (zh) * 2022-01-07 2022-04-15 国网山东省电力公司青岛供电公司 计及需求响应与碳交易的多能源系统优化调度方法及装置

Similar Documents

Publication Publication Date Title
CN101022220A (zh) 配电网无功潮流优化调度方法
CN106655207B (zh) 基于多数据分析的配电网无功优化系统及方法
CN102033999B (zh) 基于负荷分布计算中压配网近期规划年线损的方法
CN103326348B (zh) 一种提高地区电网供电能力分析及全过程在线监测的系统
CN106505579A (zh) 一种电动汽车参与配电网电压调节的调度控制方法
CN104063808B (zh) 一种跨省送电梯级水电站群调峰调度两阶段搜索方法
CN104375035B (zh) 一种节能设备能效测试方法
CN106655209B (zh) 城市电网无功电压的数据处理方法及数据处理系统
CN103259267A (zh) 一种用于风电场集群的分模式电压控制方法
CN104362650B (zh) 一种考虑成本因素的电力系统无功优化方法
CN102244384A (zh) 一种基于经济当量分析的主变压器优化运行方法
CN105046584A (zh) 一种基于k-means算法的理想线损率的计算方法
CN103036245A (zh) 一种互联电网新型交直流协同降低网损的方法及系统
CN107294081A (zh) 线损率影响因素的相关性确定方法
CN110829473A (zh) 考虑功率四象限输出的配电网储能优化配置方法及系统
CN103824124B (zh) 一种针对电网公司的节能潜力评估方法
CN114462811A (zh) 基于智能融合终端的配电变压器经济运行评价方法
CN107944680A (zh) 一种基于智能电能表的变电站电能量平衡监测方法
CN109617066A (zh) 基于电价体系的储能配置方法
CN106505608A (zh) 计及短路容量约束的分布式电源准入容量计算方法
CN109742776A (zh) 一种基于排序算法的三相不平衡台区用户调整方法
CN103944177A (zh) 混合储能微网系统截止频率确定方法及输出功率控制方法
CN113794200A (zh) 一种用于虚拟电厂的多类型负荷资源聚合方法
CN106296002A (zh) 一种基于全寿命周期模型的配电网节能效益评测方法
CN111027886A (zh) 一种考虑单位成本效用的低电压治理方案的评估方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20070727

Address after: Beijing City, Haidian District Qinghe EPRI old cadres

Applicant after: Liu Zhuoyun

Co-applicant after: Beijing Hongyuan Hongyuan Energy Saving Technology Co., Ltd.

Address before: Beijing City, Haidian District Qinghe EPRI old cadres

Applicant before: Liu Zhuoyun

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20070822