CN101018386B - 一种加快切换后用户终端测量的处理方法 - Google Patents

一种加快切换后用户终端测量的处理方法 Download PDF

Info

Publication number
CN101018386B
CN101018386B CN200710078180A CN200710078180A CN101018386B CN 101018386 B CN101018386 B CN 101018386B CN 200710078180 A CN200710078180 A CN 200710078180A CN 200710078180 A CN200710078180 A CN 200710078180A CN 101018386 B CN101018386 B CN 101018386B
Authority
CN
China
Prior art keywords
network
message
network side
physical channel
measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200710078180A
Other languages
English (en)
Other versions
CN101018386A (zh
Inventor
陈贤亮
郑焕平
李贵勇
李小文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Keen (Chongqing) Microelectronics Technology Co., Ltd.
Original Assignee
Chongqing Cyit Communication Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Cyit Communication Technologies Co Ltd filed Critical Chongqing Cyit Communication Technologies Co Ltd
Priority to CN200710078180A priority Critical patent/CN101018386B/zh
Publication of CN101018386A publication Critical patent/CN101018386A/zh
Application granted granted Critical
Publication of CN101018386B publication Critical patent/CN101018386B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

本发明处理方法不因CNF状态下长时间等待网络证实而延迟处理目标小区上的测量控制消息,使UE能快速执行目标小区上的测量,克服了现有技术处理方法因网络证实丢失造成的测量控制消息被延迟以及UE长时间(等待网络证实)没有执行目标小区测量的不足,使下一次切换能快速准确地执行,降低了掉话的可能,特别是在UE快速移动时,保证了通话的连续性。

Description

一种加快切换后用户终端测量的处理方法
技术领域
本发明涉及到第三代移动通信系统中加快切换后用户终端(简称为UE)测量的处理方法,特别涉及到一种UE在切换成功后快速处理接收到的测量控制消息并及时向网络侧发送测量报告消息的处理方法。
背景技术
在第三代移动通信系统中,协议栈按功能和任务可划分为3层,物理层(简称为L1)、数据链路层(简称为L2)和网络层(简称为L3),其中:L3又分为无线资源控制(简称为RRC)、移动性管理(简称为MM)和连接管理(简称为CM)等若干子层。
在连接模式下,UE的RRC负责处理接收到的来自网络侧的测量控制消息,并根据消息内容向物理层配置相关的测量参数。网络侧的测量控制消息中包含了发送测量报告的触发条件,RRC将根据测量结果判断是否满足触发条件,如果满足触发条件,说明有信号质量更好的小区存在,UE就向网络侧发送相应的测量报告消息,也即向网络侧传送这个质量更好的小区的相关参数。网络侧根据测量报告消息的内容,发现有比当前服务小区(原小区)信号质量更好的小区(目标小区)存在时,通过物理信道重配置过程要求UE从原小区切换到目标小区。根据UE切换前后的频点是否相同通常将切换划分为同频切换和异频切换,所谓同频切换是指切换前后服务小区的频点相同,而异频切换是指切换前后服务小区的频点不同。在切换过程中UE不执行测量,特别是网络侧要求执行异频切换时,原小区的同频和异频测量信息都不可用,在接收到新的测量控制消息之前UE的所有测量过程都将被停止,也就是说在整个异频切换过程中UE没有执行相关测量,网络侧也就不能及时再次发起相关的切换过程,这对一个正在通话中且快速移动的UE来说就很容易造成通讯中断(通常简称为“掉话”)。
另外,UE切换到目标小区后,将向网络侧发送物理信道重配置完成的消息,网络侧收到物理信道重配置完成消息后,立即发送已经接收该消息的网络证实(以下简称为网络证实)给UE,表明切换成功并发送测量控制消息要求UE执行目标小区上的测量。而此时RRC进入等待接收网络证实的状态(简称为CNF状态)。根据3GPP协议TS 25.331文档的描述,在没有收到网络证实的CNF状态期间,UE将一直处于等待接收网络证实的CNF状态,其间将延迟处理接收到的测量控制等L3的消息,只有在接收到网络证实后,UE才开始处理延迟的测量控制消息,进入小区专用信道状态CELL_DCH(简称为DCH状态)。为确保UE能收到网络证实,网络侧发送网络证实之后,开启一个定时器(简称为Timer),网络侧通过该定时器周期性地向UE发送网络证实。如果网络证实在传输过程中丢失,则在Timer超时后,网络侧才再次发送网络证实。显然,UE在等待网络证实期间(即处于CNF状态期间),小区切换过程并没有完全完成,不执行目标小区上的相关测量过程,不能向网络侧发送测量报告消息,即使有更好的小区存在时网络侧也无法再次发起切换。如果没有切换过程,UE也就不能快速切换到一个质量更好的小区上去。相反,这个质量更好的小区还会对当前的服务小区形成较大干扰,恶化了通讯质量,且极有可能造成掉话,增加了掉话率。
发明内容
为克服UE在切换过程中的不足,减少掉话率,使UE在切换后快速执行测量,本发明提出一种加快切换后UE测量的处理方法。本发明处理方法在UE的RRC等待接收网络证实的CNF状态期间,如果接收到测量控制消息,表明网络侧已成功接收到了物理信道重配置完成消息,并要求UE执行目标小区上的测量,UE就进入DCH状态,立即处理测量控制消息并执行相关测量,如果测量结果满足发送测量报告的触发条件,UE则发送相应的测量报告消息给网络侧,通知网络侧有质量更好的小区存在。网络侧依据测量报告消息的内容判断需要执行切换时,通过物理信道重配置过程再次发起切换,UE向网络侧发送第二次切换物理信道重配置完成的消息,网络侧接收到第二次切换的物理信道重配置完成消息后,停止对上次网络证实进行监视的Timer,向UE发送本次物理信道重配置完成消息的接收网络证实(简称为最新网络证实),并重新开启Timer,监视该最新的网络证实。依此不断进行,直到UE成功接收到最新网络证实,及时切换到质量更好的小区上,保持通话的顺利进行,而现有技术的处理方法不能这样及时执行切换。
本发明处理方法不因CNF状态下长时间等待网络证实而延迟处理目标小区上的测量控制消息,使UE能快速执行目标小区上的测量,克服了现有技术处理方法因网络证实丢失造成的测量控制消息被延迟以及UE长时间(等待网络证实)没有执行目标小区测量的不足,使下一次切换能快速准确地执行,降低了掉话的可能,特别是在UE快速移动时,保证了通话的连续性。
附图说明
图1:现有技术处理方法的流程框图;
图2:本发明处理方法的流程框图。
下面结合附图对本发明方法作进一步地说明。
附图1是现有技术处理方法的流程框图,由图可知,现有技术处理方法包括以下主要步骤:
1、UE收到物理信道重配置消息,指示发生了切换(服务小区发生改变),UE停止所有测量;
2、UE的RRC完成本地配置后,向网络侧发送物理信道重配置完成消息,并进入CNF状态,等待网络侧对接收该消息的网络证实;
3、CNF状态下,UE收到测量控制等RRC消息时,将消息放入延迟队列,不立即进行处理,直到收到网络证实,才执行下一步骤;
4、UE收到网络证实后,处理延迟队列中的测量控制等RRC消息,RRC进入DCH状态,开始执行相关测量,测量结果满足发送测量报告的触发条件时,即发现有更好的小区存在,UE向网络侧发送测量报告消息,网络侧据此可以发起切换过程。
附图2是本发明处理方法的流程框图。由图可知,主要包括以下步骤:
1、UE收到物理信道重配置消息,指示发生了切换(服务小区发生改变),UE停止所有测量;
2、UE的RRC完成本地配置后,向网络侧发送物理信道重配置完成消息,并进入CNF状态,等待网络侧对接收该消息的网络证实;
3、在CNF状态下,UE收到网络侧发送的测量控制消息时,RRC直接进入DCH状态,执行DCH状态下的正常处理流程,即:立即分析处理该测量控制消息并执行相关测量,如果测量结果满足发送测量报告的触发条件,则发送相应的测量报告消息给网络侧,向网络侧报告有信号质量更好的小区存在。
4、网络侧再次发起切换过程,收到UE发送的物理信道重配置完成消息后,网络侧发送对接收该消息的网络证实,UE成功接收到该最新网络证实,切换到更好的小区上。
根据两种方法的处理流程和图示可知,现有技术的处理方法在步骤3等待网络证实过程中,无法及时处理测量控制消息,延迟了下一次切换的及时执行;本发明的处理方法则弥补了这个不足,使UE能及时准确地切换到更好的小区上。这样,不仅改善了通讯质量,而且降低了掉话的可能,特别是在UE快速移动时,保证了通话的连续性和良好的通话质量。

Claims (1)

1.一种加快切换后用户终端UE测量的处理方法,UE切换到目标小区后向网络侧发送物理信道重配置完成的消息,其特征在于:在UE的无线资源控制RRC等待接收网络证实的CNF状态期间,如果接收到测量控制消息就进入小区专用信道状态CELL_DCH,即DCH状态,立即处理测量控制消息并执行相关测量,如果测量结果满足发送测量报告的触发条件,就向网络侧发送相应的测量报告消息,网络侧依据测量报告消息的内容判断需要执行切换时,通过物理信道重配置过程再次发起切换,UE向网络侧发送第二次切换的物理信道重配置完成的消息,网络侧接收到第二次切换的物理信道重配置完成消息后,停止对上次网络证实进行监视的Timer,向UE发送本次物理信道重配置完成消息的网络证实,即最新网络证实,并重新开启Timer,监视该最新的网络证实,依此不断进行,直到UE接收到最新网络证实。
CN200710078180A 2007-02-07 2007-02-07 一种加快切换后用户终端测量的处理方法 Active CN101018386B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710078180A CN101018386B (zh) 2007-02-07 2007-02-07 一种加快切换后用户终端测量的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710078180A CN101018386B (zh) 2007-02-07 2007-02-07 一种加快切换后用户终端测量的处理方法

Publications (2)

Publication Number Publication Date
CN101018386A CN101018386A (zh) 2007-08-15
CN101018386B true CN101018386B (zh) 2010-05-26

Family

ID=38727092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710078180A Active CN101018386B (zh) 2007-02-07 2007-02-07 一种加快切换后用户终端测量的处理方法

Country Status (1)

Country Link
CN (1) CN101018386B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101610536B (zh) * 2008-06-20 2012-04-18 中兴通讯股份有限公司 一种在测量中控制多个测量结果上报的方法及终端
CN101686504B (zh) * 2008-09-22 2012-07-18 中兴通讯股份有限公司 一种控制测量恢复的方法
US8582530B2 (en) * 2010-12-30 2013-11-12 Intel Corporation Expedited reporting of neighbor cell signal strength
CN103621159A (zh) * 2011-06-21 2014-03-05 瑞典爱立信有限公司 用于小区更改信息的记帐的方法和设备
US8989042B2 (en) * 2012-02-03 2015-03-24 Mediatek Inc. Method and apparatus for triggering and reporting diverse traffic information in cellular networks
CN104113874B (zh) * 2013-04-16 2019-06-25 电信科学技术研究院 一种进行测量上报的方法及装置
CN105594248B (zh) * 2013-10-09 2019-08-20 华为技术有限公司 一种负载均衡方法和节点
CN109792667B (zh) 2016-09-30 2022-03-25 瑞典爱立信有限公司 用于基于测量的移动性的方法和设备
CN109792305B (zh) 2016-09-30 2020-12-11 瑞典爱立信有限公司 用于无线电链路测量配置的方法和设备
WO2018058512A1 (en) * 2016-09-30 2018-04-05 Telefonaktiebolaget Lm Ericsson (Publ) Methods and arrangements for measurement based mobility
CN110351789A (zh) * 2018-04-03 2019-10-18 维沃移动通信有限公司 用于小区变换的方法和设备

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1578490A (zh) * 2003-06-26 2005-02-09 北京三星通信技术研究有限公司 Rnc控制频率间及系统间切换测量的方法
CN1665342A (zh) * 2005-03-30 2005-09-07 中兴通讯股份有限公司 一种接力切换的实现方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1578490A (zh) * 2003-06-26 2005-02-09 北京三星通信技术研究有限公司 Rnc控制频率间及系统间切换测量的方法
CN1665342A (zh) * 2005-03-30 2005-09-07 中兴通讯股份有限公司 一种接力切换的实现方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
.Radio Resource Control (RRC)
3rd Generation Partnership Project
3rd Generation Partnership Project TechnicalSpecification;Group Radio Access Network;.Radio Resource Control (RRC);Protocol Specification(Release 7).3GPP TS 25.331 V7.3.0.2006,3(25331730),1-1316. *
Group Radio Access Network
Protocol Specification(Release 7).3GPP TS 25.331 V7.3.0.2006,3(25331730),1-1316.
TechnicalSpecification

Also Published As

Publication number Publication date
CN101018386A (zh) 2007-08-15

Similar Documents

Publication Publication Date Title
CN101018386B (zh) 一种加快切换后用户终端测量的处理方法
US10039025B2 (en) Method and apparatus for transmitting channel measurement information in mobile communication system
CN105636111B (zh) 发现无线网络问题的方法、装置及系统
US9386498B2 (en) Detection of early inter-radio access technology (IRAT) handover triggering
EP2188911B1 (en) Transfer of uplink power contorl parameters during handovers
EP1845749B1 (en) Method and apparatus for setting up radio resource control connection
JP5946765B2 (ja) セル間ハンドオーバのための品質制御
CN100463564C (zh) 接力切换失败后回切的方法
KR101950666B1 (ko) 통신 시스템에서의 연결 재수립을 위한 방법 및 구조
EP2845415B1 (en) Method and apparatus for performing communication by a ue in a wireless communication system supporting circuit switched fallback service
CN104170469A (zh) 用于检测不同无线电接入技术的可能重复切换的方法和装置
CN114900839A (zh) 传输信息的方法和装置
EP2417797A1 (en) Method for handover problem identification
CN112042226B (zh) 基站的切换方法、设备及存储介质
CN101296459A (zh) 一种测量控制方法、用户终端、网络侧设备及系统
CN101827384B (zh) 一种小区切换的方法和基站
WO2018053770A1 (zh) 用于管理链路的方法和装置
CN113055955A (zh) 一种切换控制装置及方法
CN102892130A (zh) 一种切换参数调整方法
CN101170799B (zh) 一种tdd系统终端在不同频点之间的切换方法
CN102014445A (zh) 一种切换过程中终端测量报告的处理方法、装置及系统
CN102984775B (zh) 无线接入网络信息管理信息的获取方法
WO2020168913A1 (zh) 切换方法、装置及通信设备
EP3860222B1 (en) Method for enhancing continuity of data transmissions and/or for reducing interruption or interruption periods of data transmissions between a user equipment and a mobile communication network, system, user equipment, program and computer-readable medium
CN100461961C (zh) 一种长期演进系统的切换控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHONGQING CYIT COMMUNICATION TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: CHONGQING CHONGYOU XINKE (GROUP) CO., LTD.

Effective date: 20081017

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20081017

Address after: Chongqing city Nangang District Wu Bao Huang Jue Park No. 1 post encoding: 400065

Applicant after: Chongqing City Communication & Technology Co., Ltd.

Address before: Information technology building, Chongqing Institute of Posts and telecommunications, Nan'an District, Chongqing, China: 400065

Applicant before: Chongqing Chongyou Xinke (Group) Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A processing method for speeding up the user terminal measurement after switching

Effective date of registration: 20141117

Granted publication date: 20100526

Pledgee: Chongqing cyit (Group) Limited by Share Ltd

Pledgor: Chongqing City Communication & Technology Co., Ltd.

Registration number: 2014500000017

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20161020

Granted publication date: 20100526

Pledgee: Chongqing cyit (Group) Limited by Share Ltd

Pledgor: Chongqing City Communication & Technology Co., Ltd.

Registration number: 2014500000017

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170426

Address after: Nanping Street 400060 Chongqing Nan'an District Nancheng Road No. 199 left attached to the floor 403

Patentee after: Keen (Chongqing) Microelectronics Technology Co., Ltd.

Address before: 400065 Chongqing Nan'an District huangjuezhen pass Fort Park No. 1

Patentee before: Chongqing City Communication & Technology Co., Ltd.

TR01 Transfer of patent right