CN101008546A - Quick change method of RH vacuum chamber - Google Patents

Quick change method of RH vacuum chamber Download PDF

Info

Publication number
CN101008546A
CN101008546A CN 200710010171 CN200710010171A CN101008546A CN 101008546 A CN101008546 A CN 101008546A CN 200710010171 CN200710010171 CN 200710010171 CN 200710010171 A CN200710010171 A CN 200710010171A CN 101008546 A CN101008546 A CN 101008546A
Authority
CN
China
Prior art keywords
vacuum chamber
air
vacuum
vacuum room
baking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200710010171
Other languages
Chinese (zh)
Inventor
秦旭
王宝峰
周豪鸣
张凤心
李岩
祁林
杨绍华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN 200710010171 priority Critical patent/CN101008546A/en
Publication of CN101008546A publication Critical patent/CN101008546A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a RH vacuum room quick-change method, which uses air as energy medium, uses aerator for aerating the air, mixes the air and coke gas at (4-6):1 ration to burn and bake the vacuum room, to directly heat the lower part of vacuum room, arranges one injector at each waiting position of two, when the steel water is treated, the vacuum machine moves the vacuum room to the waiting position to be baked and maintained, while the vacuum machine moves the vacuum room from another waiting position to the treating position to treat the steel water; when one process is treated, the vacuum room is changed to the waiting position to be maintained. The invention improves the baking effect, improves the baking temperature, and shorten the prepare time of RH vacuum room.

Description

A kind of RH vacuum chamber quick change method
Technical field
A kind of RH application of vacuum of the present invention fast-change technology.
Background technology
In the prior art, the RH application of vacuum has one to handle the position, treats the seat in the plane for two.Vacuum chamber is produced handling the position, is treating that the seat in the plane toasts.Treat that the seat in the plane baking is to be heated by coal gas and 1: 1.1 proportioning of oxygen, the length of flame can only reach 1.2m, and the highest baking temperature of vacuum chamber can only reach 800 ℃, and temperature is evenly distributed.This temperature can not directly be handled molten steel, and the vacuum chamber that must will treat the seat in the plane moves to be handled the position and be baked to more than 1250 ℃ with RH top rifle and can handle molten steel.And RH top rifle baking temperature per hour can only improve 50 ℃, and being heated to 1250 ℃ by 800 ℃ like this needed with 4-5 hour, influenced RH application of vacuum production capacity so greatly and discharged.
After time (5-6 jar) watered in one of production, because inserting pipe, vacuum chamber corroded by molten steel, must carry out the spray repair reparation and water inferior the use in order to next.The spray repair time is about two hours.Because spray repair equipment is only being handled one of position, so must vacuum chamber be inserted pipe carry out the spray repair reparation handling the position after watering time at one.The RH application of vacuum must be shut down spray repair about two hours like this, can not produce, and restriction is produced and carried out continuously.
Summary of the invention
The purpose of this invention is to provide a kind of cured effect that improves, improve baking temperature, shorten the RH vacuum chamber and reorganize and outfit the time, realize producing continuous a kind of RH vacuum chamber quick change method, it is energy medium that this technology adopts air, increase the ratio that cooperates of air and coal gas, improve baking temperature, the increase length of flame; Vacuum chamber is treating that the seat in the plane carries out spray repair, has overcome to treat the low and discontinuous phenomenon of spray repair of seat in the plane baking temperature.
For achieving the above object, technical scheme of the present invention is described below:
A kind of RH vacuum chamber quick change method, it is characterized in that: this method uses air as energy medium, adopts the air blast air blast to blow into air, by air and coke-stove gas in (4-6): vacuum chamber is toasted in 1 ratio mixed combustion, strengthen the length of flame, directly be heated to the vacuum chamber bottom; Treat that at two the seat in the plane respectively is provided with a gun, handle the position and handle after the molten steel, by the vacuum chassis vacuum chamber is moved to from processing and treats the seat in the plane, carry out the spray repair baking; Simultaneously, by the vacuum chassis vacuum chamber is moved to from another standby and handles the position, handle molten steel, water time final vacuum chamber and change to the standby position soon and carry out spray repair by handling the position when producing one.
The invention has the beneficial effects as follows:
1) because air-energy medium addition is bigger, the vacuum chamber temperature is brought up to more than 1250 ℃ by former about 800 ℃, satisfies vacuum chamber and is moved to by standby and handles the temperature requirement that molten steel is directly handled in the position; Baking flame adds by original 1.2 meters and grows to 7.5 meters, but direct baking realizes along vacuum chamber short transverse uniformity of temperature profile to the vacuum chamber bottom.
2) treating that the seat in the plane carries out spray repair, overcoming, further discharging production capacity, RH steel production capacity is improved a lot handling the non-continuous event that spray repair is carried out in the position.
Description of drawings
Fig. 1 is the structural representation of roaster.
Fig. 2 is the structural representation of baking pipeline.
Among Fig. 1: 1-UV probe 2-gas passage 3-air duct 4-mixing chamber 5-burner block 6-igniter
Among Fig. 2: 7-igniting gas stop valve 8-gas control gas stop valve 9-gas regulator 10-air control valve
The specific embodiment
A kind of RH vacuum chamber quick change method, this method use air as energy medium, adopt the air blast air blast to blow into air, by air and coke-stove gas in (4-6): vacuum chamber is toasted in 1 ratio mixed combustion, and the increasing length of flame directly is heated to the vacuum chamber bottom; Treat that at two the seat in the plane respectively is provided with a gun, handle the position and handle after the molten steel, by the vacuum chassis vacuum chamber is moved to from processing and treats the seat in the plane, carry out the spray repair baking; Simultaneously, by the vacuum chassis vacuum chamber is moved to from another standby and handles the position, handle molten steel, water time final vacuum chamber and change to the standby position soon and carry out spray repair by handling the position when producing one.
See Fig. 1, Fig. 2, the accompanying drawings roaster course of work.When needs toast, will hang and treat the seat in the plane and connect various medium pipelines from the dried vacuum chamber in dry position, at first will toast clad manually lifts to limes superiors, on the baking operation screen, click under the auto state and start, master controller sends instruction control point fire gas stop valve (7) and opens, transmission instruction simultaneously allows igniter (6) work will put fire gas and lights, at this moment the probe of the UV above burner (1) detects the flame that the burner mouth has sustained combustion, UV probe (1) detected signal sends to master controller, master controller transmission instruction unpack gas control gas stop valve (8) starts the baking blower fan simultaneously and closes igniting gas stop valve (7), after the baking flame ignition, UV probe (1) detects the flame that the burner mouth has sustained combustion, UV probe (1) detected signal sends to master controller, and master controller sends instruction control gas control gas stop valve (8) and stays open state and control baking fan operation.The baking air quantity is regulated in 1: 4.3 ratio according to setting the coal gas amount, sets gas regulator opening degree 10% during igniting, and setting baking coal gas amount after the roaster work is 300Nm 3/ h baking vacuum chamber is temperature required to producing.Produce temperature required back and set and toast coal gas amount 200Nm when vacuum chamber reaches 3/ h is the vacuum chamber insulation.

Claims (1)

1, a kind of RH vacuum chamber quick change method, it is characterized in that: this method uses air as energy medium, adopts the air blast air blast to blow into air, by air and coke-stove gas in (4-6): vacuum chamber is toasted in 1 ratio mixed combustion, strengthen the length of flame, directly be heated to the vacuum chamber bottom; Treat that at two the seat in the plane respectively is provided with a gun, handle the position and handle after the molten steel, by the vacuum chassis vacuum chamber is moved to from processing and treats the seat in the plane, carry out the spray repair baking; Simultaneously, by the vacuum chassis vacuum chamber is moved to from another standby and handles the position, handle molten steel, water time final vacuum chamber and change to the standby position soon and carry out spray repair by handling the position when producing one.
CN 200710010171 2007-01-25 2007-01-25 Quick change method of RH vacuum chamber Pending CN101008546A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200710010171 CN101008546A (en) 2007-01-25 2007-01-25 Quick change method of RH vacuum chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200710010171 CN101008546A (en) 2007-01-25 2007-01-25 Quick change method of RH vacuum chamber

Publications (1)

Publication Number Publication Date
CN101008546A true CN101008546A (en) 2007-08-01

Family

ID=38697085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200710010171 Pending CN101008546A (en) 2007-01-25 2007-01-25 Quick change method of RH vacuum chamber

Country Status (1)

Country Link
CN (1) CN101008546A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892359A (en) * 2010-07-21 2010-11-24 中国重型机械研究院有限公司 Arrangement technology of multifunctional gun in refining outside RH furnace
CN102212654A (en) * 2011-05-26 2011-10-12 中国重型机械研究院有限公司 Arrangement structure of double-station RH multifunctional top lance
CN102978344A (en) * 2012-12-11 2013-03-20 中冶南方工程技术有限公司 RH vacuum chamber baking system
CN103981336A (en) * 2014-05-24 2014-08-13 北京首钢国际工程技术有限公司 Vacuum chamber bottom discharging type RH (Ruhstahl Hausen) process layout method
CN106544474A (en) * 2015-09-17 2017-03-29 鞍钢股份有限公司 A kind of method of operating of medium high carbon steel grade vacuum chamber quick change
CN114645111A (en) * 2022-03-25 2022-06-21 广东韶钢松山股份有限公司 Anti-blocking method for dip pipe of RH furnace

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892359A (en) * 2010-07-21 2010-11-24 中国重型机械研究院有限公司 Arrangement technology of multifunctional gun in refining outside RH furnace
CN102212654A (en) * 2011-05-26 2011-10-12 中国重型机械研究院有限公司 Arrangement structure of double-station RH multifunctional top lance
CN102212654B (en) * 2011-05-26 2012-12-19 中国重型机械研究院有限公司 Arrangement structure of double-station RH multifunctional top lance
CN102978344A (en) * 2012-12-11 2013-03-20 中冶南方工程技术有限公司 RH vacuum chamber baking system
CN102978344B (en) * 2012-12-11 2014-04-09 中冶南方工程技术有限公司 RH vacuum chamber baking system
CN103981336A (en) * 2014-05-24 2014-08-13 北京首钢国际工程技术有限公司 Vacuum chamber bottom discharging type RH (Ruhstahl Hausen) process layout method
CN106544474A (en) * 2015-09-17 2017-03-29 鞍钢股份有限公司 A kind of method of operating of medium high carbon steel grade vacuum chamber quick change
CN106544474B (en) * 2015-09-17 2018-11-06 鞍钢股份有限公司 A kind of operating method of medium high carbon steel grade vacuum chamber quick change
CN114645111A (en) * 2022-03-25 2022-06-21 广东韶钢松山股份有限公司 Anti-blocking method for dip pipe of RH furnace

Similar Documents

Publication Publication Date Title
CN101008546A (en) Quick change method of RH vacuum chamber
CN104235849A (en) Grading oxygen-enriched flameless combustion gas burner and control method thereof
CN101270235B (en) Reaction furnace for preparing soft hydrocarbon black
WO2017032138A1 (en) Closed loop control system for combustion and heating of gas burner
CN102287850B (en) Low-oxygen copper-rod continuous-casting continuous-rolling combustion-control system
CN109556416A (en) A kind of pure oxygen flue gas circular heating furnace control system and its control method
CN105385460A (en) Circulating structure and method for exhaust gas of coke oven
CN204220723U (en) Steel pipe preheating device
CN203807326U (en) Energy-saving fuel gas glass melting furnace
CN101929675B (en) Premixed type combustion system for heat treatment of outer surface of plastic pipe and gas nozzle
CN110608438A (en) Multi-stage burner, molten steel tank preheating equipment and using method thereof
CN105108128A (en) Energy-saving baking system for continuous casting tundish and using technology of energy-saving baking system
CN103922561A (en) Energy-saving gas glass melting furnace
CN2766577Y (en) Close packing tobacco flue-curing oven
KR100919285B1 (en) Temperature control method of kiln for ceramic ware using lng
CN208455014U (en) Hot-blast stove baking oven system and blast oven system
CN209944302U (en) Uniform-distribution biomass fuel combustion equipment
CN203728884U (en) Sucker rod heat treatment equipment
CN202039079U (en) Top combustion stove with gas fuel back-flushing, premixing and preheating functions
CN202066191U (en) Furnace profile device of air heating furnace
CN202813467U (en) Controllable mixed aeration type energy-saving gas stove
CN202419690U (en) Optimized combustion control device for industrial furnace kiln
CN201713551U (en) Three-stage pressure reducing and balancing gas supplying device used for thermal treatment furnace
CN2506877Y (en) Large power gas flame remelting device
CN115289461B (en) Resistance uniformity treatment structure and treatment method for air distribution plate of circulating fluidized bed boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication