CN101001174A - Method and system for implementing integral dispatching in network element management system - Google Patents
Method and system for implementing integral dispatching in network element management system Download PDFInfo
- Publication number
- CN101001174A CN101001174A CN 200610063754 CN200610063754A CN101001174A CN 101001174 A CN101001174 A CN 101001174A CN 200610063754 CN200610063754 CN 200610063754 CN 200610063754 A CN200610063754 A CN 200610063754A CN 101001174 A CN101001174 A CN 101001174A
- Authority
- CN
- China
- Prior art keywords
- task
- control centre
- scheduling
- batch operation
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
This invention discloses a method for realizing central dispatch in a NE management system including: receiving batch operation and resolving it to a task to be dispatched in concentration according to exterior events to execute said task in terms of the dispatch. This invention also discloses a system for realizing centralized dispatch including: a service executing module used in receiving batch operation to be resolved to task, a dispatch center used in dispatching said task in concentration and a database used in storing task data from the center and the service executing module carries out said task according to the dispatch of the center.
Description
Technical field
The present invention relates to communication technical field, relate in particular to a kind of method and system that in Element management system, realize centralized dispatching.
Background technology
(Element Management System EMS) generally adopts client/server (C/S) pattern to manage to present Element management system, may have the situation of a plurality of user's parallel work-flows; As the underlying network guard system of direct managing hardware device, the number of objects that the EMS system need manage is very huge (for example the adsl port quantity in Access Network is generally in 1,000,000 ranks).This just may bring following problem:
1, all consuming time usually very long to the bulk management operation of great amount of hardware resources, if use common client operation mode, the interface may get clogged, and the user can only wait for, can't do other operation.
When if 2 a plurality of users carry out time-consuming operation simultaneously, because the independence of client, these operations may be initiated simultaneously, cause clashing between the operation of each client, take the server computational resource in a large number.
3, the server computational resource uses imbalance in each time period, and in the overload operation of peak hours/period possibility, having nothing to do can appear again in section at one's leisure.
Summary of the invention
In view of this, the invention provides a kind of method and system of centralized dispatching, thereby can effectively manage concentratedly the batch operation among the EMS.
The method that the embodiment of the invention provided comprises:
Receive batch operation, batch operation is decomposed into task;
According to external event, described task is carried out centralized dispatching;
According to the described task of scheduled for executing.
The system that the embodiment of the invention provided comprises:
Business execution module is used to receive batch operation, and described batch operation is resolved into task;
The control centre is used for described task is carried out centralized dispatching;
Database is used to store the task data that comes from the control centre;
Described business execution module is according to the described task of the scheduled for executing of described control centre.
The beneficial effect of the embodiment of the invention:
1, batch operation unification consuming time in the backstage scheduled for executing, has strengthened the friendly of user's operation by the control centre, has avoided time-consuming operation to block the interface.
2, owing to introduced centralized dispatching, can be placed on idle period to batch operation and regularly carry out, realize the reasonable utilization of computational resource.
3, can manage the current operation that does not possess executive condition by the control centre, judge according to external event whether executive condition possesses by the control centre, when conditions being possessed, carry out automatic scheduled for executing, realized the intellectuality of operation, improved the flexibility that operation is carried out.
Description of drawings
The key step schematic diagram of Fig. 1: the inventive method embodiment;
The detailed step schematic diagram of Fig. 2: the inventive method embodiment;
Fig. 3: the system configuration schematic diagram of the embodiment of the invention.
Embodiment
The main thought of the embodiment of the invention is to introduce the control centre in Element management system.The control centre provides interface to be used for creation task to other Service Component as a stand-alone assembly among the EMS; Service Component is no longer directly carried out batch operation consuming time, but these time-consuming operations are created as task, unifies scheduled for executing by the control centre; Simultaneously, the control centre provides independently client end interface, with convenient the task of described establishment is carried out maintenance management.
See also Fig. 1, show the key step of the inventive method embodiment:
Receive batch operation, batch operation is decomposed into task;
According to external event, described task is carried out centralized dispatching;
According to the described task of scheduled for executing.
See also Fig. 2, at length show the task scheduling process of the inventive method embodiment:
Step 201, user initiate the request of batch operation;
Step 202, business execution module are decomposed into fine-grained task with described batch operation, i.e. the less relatively task of amount of calculation;
Step 203, the business execution module task after with described decomposition is issued to the control centre;
After the task data that business execution module sends is received by step 204, control centre, carry out suitable processing after, deposit database in;
Step 205, control centre carry out centralized dispatching according to external event and handle;
Step 206, when task need begin to carry out (regularly to start is example, when the task start time arrives), the control centre reads task data to database;
Step 207, database are to control centre's return data;
The task that step 208, control centre will need to carry out is issued to business execution module;
Step 209, business execution module are carried out the described task of needing execution;
Step 210, business execution module are returned execution result to the control centre;
Step 211, control centre are recorded in results of task execution in the daily record;
Above-mentioned steps has been finished the main process that task scheduling is carried out, and as user during to control centre's query task implementation status, can also may further comprise the steps:
The result that step 212, user carry out to control centre's query task;
Step 213, control centre are to the data base querying mission bit stream;
Step 214, database return the mission bit stream that the user needs to the control centre;
Step 215, control centre return results of task execution to the user.
Embodiments of the invention also provide the implementation of control centre:
See also Fig. 3, show the system configuration schematic diagram of the embodiment of the invention, mainly comprise business execution module, be used to receive batch operation, described batch operation is resolved into task;
The control centre is used for described task is carried out centralized dispatching;
Database is used to store the task data that comes from the control centre;
Described business execution module is according to the described task of the scheduled for executing of described control centre.
Wherein, the control centre comprises task management entity and task scheduling entity, and these two entities are by the database interface accessing database, communicates by communication interface and business execution module and user;
Wherein, the task management entity can receive requests such as coming from the outside establishment to task, inquiry, deletion, modification, and to database increase accordingly, inquiry, deletion, retouching operation, task data is complete, correctly be stored in the database.In actual application, generally carry out the establishment of task by business execution module, by the user to task inquire about, delete, operation such as modification.
The task scheduling entity is the nucleus module of control centre, finishes the centralized dispatching to the batch operation task.The task scheduling entity comprises scheduling events fructification and scheduling strategy management fructification.
The scheduling events fructification is responsible for the reception and the preliminary treatment of external event, and external event comprises the scheduling trigger event that timer event and other are relevant, device events such as for example add that equipment, equipment are reached the standard grade.After receiving external event, the scheduling events fructification parses event content, is converted to reference format, is stored into database, and notice scheduling strategy fructification is handled.External event can be expanded by the mode of registration.
The scheduling strategy fructification is responsible for the management of scheduling rule, and scheduling rule is used for can executing the task under clear and definite what condition.The scheduling strategy fructification comprises event response module, the external condition module that presets, and can increase new policy module as required.The event response module is the nucleus module in the scheduling strategy fructification, is used for according to scheduling rule, takes which type of action when specifying the task of certain state to receive certain incident, realizes in the mode of state machine; It is state machine that the external condition module can on-the-fly modify the event response module according to current system status, and for example the external condition module can be judged the CPU occupation rate of system, when cpu load during greater than certain threshold value, just no longer carries out the startup of task.Can introduce new scheduling strategy as required, new policy module is the same with the external condition module, is that state machine plays a role by on-the-fly modifying the event response module.
After the task scheduling entity is made scheduling decision, can send concrete task scheduling order to business execution module by communication interface.Correlated process is exemplified below:
The scheduling events fructification will receive timer event when arriving the task start time;
After the scheduling events fructification was carried out preliminary treatment to timer event, notice scheduling strategy fructification was carried out subsequent treatment;
Event response module (state machine) is according to the incident of input, initiating task;
The scheduling strategy fructification reads task data to database, sends to business execution module by communication interface then and carries out described task.
By the application of the embodiment of the invention, user's operation consuming time is created as task, and by control centre's centralized dispatching, the task executions process can all be finished at server end, and client no longer participates in, and has avoided the obstruction of user interface; Time-consuming operation is all unified scheduled for executing with the task form by the control centre, can also avoid competitive resource between task, and the possibility that clashes can drop to minimum; Task can be carried out with timing mode, can be created as the task that idle period is carried out for non-emergent operation like this, can make full use of computational resource, the calculated load of balance busy period; Can increase the flexibility that batch operation is carried out, having of task may not possess by executive condition when the user starts, carry out immediately and can fail, can be created as control centre's task to these operations, carry out scheduled for executing when the conditions being possessed by the control centre, the intellectuality operated can be realized, the flexibility that operation is carried out can be improved.
The above is preferred embodiment of the present invention only, is not to be used to limit protection scope of the present invention, all any modifications of being made within the spirit and principles in the present invention, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (8)
1, a kind of method that realizes centralized dispatching in Element management system is characterized in that, comprising:
Receive batch operation, batch operation is decomposed into task;
According to external event, described task is carried out centralized dispatching;
According to the described task of scheduled for executing.
2, the method for claim 1 is characterized in that, described batch operation is decomposed into task after, also comprise:
Deposit the related data of described task in database.
3, the method for claim 1 is characterized in that, after the described task of scheduled for executing, also comprises:
Results of task execution is recorded in the daily record.
4, a kind of system that realizes centralized dispatching in Element management system is characterized in that, comprising:
Business execution module is used to receive batch operation, and described batch operation is resolved into task;
The control centre is used for described task is carried out centralized dispatching;
Database is used to store the task data that comes from the control centre;
Described business execution module is according to the described task of the scheduled for executing of described control centre.
5, system as claimed in claim 4 is characterized in that, described control centre comprises:
The task management entity, be used for to described database increase, inquiry, deletion or retouching operation, task data is deposited in the described database;
The task scheduling entity is used for described task is carried out centralized dispatching.
6, system as claimed in claim 5 is characterized in that, described task scheduling entity comprises:
The scheduling events fructification is used for external event is received and preliminary treatment;
The scheduling strategy fructification is used for the management and dispatching rule, according to scheduling rule described task is carried out centralized dispatching.
7, system as claimed in claim 6 is characterized in that, described scheduling strategy fructification comprises:
The event response module is used for according to scheduling rule, the corresponding actions of taking when specifying the task of certain state to receive described external event;
The external condition module is used for on-the-fly modifying described event response module according to the present situation of system.
8, system as claimed in claim 7 is characterized in that, described event response module realizes with the form of state machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100637547A CN100525211C (en) | 2006-12-31 | 2006-12-31 | Method and system for implementing integral dispatching in network element management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100637547A CN100525211C (en) | 2006-12-31 | 2006-12-31 | Method and system for implementing integral dispatching in network element management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101001174A true CN101001174A (en) | 2007-07-18 |
CN100525211C CN100525211C (en) | 2009-08-05 |
Family
ID=38692993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100637547A Expired - Fee Related CN100525211C (en) | 2006-12-31 | 2006-12-31 | Method and system for implementing integral dispatching in network element management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100525211C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102118261A (en) * | 2009-12-30 | 2011-07-06 | 中兴通讯股份有限公司 | Method and device for data acquisition, and network management equipment |
CN102393822A (en) * | 2011-11-30 | 2012-03-28 | 中国工商银行股份有限公司 | Batch scheduling system and method |
CN101140528B (en) * | 2007-08-31 | 2013-03-20 | 中兴通讯股份有限公司 | Method and device for realizing timing tasks load in cluster |
CN103761144A (en) * | 2013-12-31 | 2014-04-30 | 曙光云计算技术有限公司 | Batch operation management method and device |
CN105260248A (en) * | 2014-07-15 | 2016-01-20 | 中国银联股份有限公司 | Task scheduling system with dynamic regulation function and scheduling method |
CN107918579A (en) * | 2016-10-09 | 2018-04-17 | 北京神州泰岳软件股份有限公司 | A kind of method and apparatus of Mass production base-line data |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6708226B2 (en) * | 1994-02-28 | 2004-03-16 | At&T Wireless Services, Inc. | Multithreaded batch processing system |
US7219345B2 (en) * | 2002-12-17 | 2007-05-15 | Hewlett-Packard Development Company, L.P. | System and method for terminating processes in a distributed computing system |
CN100511274C (en) * | 2005-11-15 | 2009-07-08 | 中国工商银行股份有限公司 | System and method for centralized managing and dispatching of batch work |
CN100563253C (en) * | 2006-03-23 | 2009-11-25 | 杭州华三通信技术有限公司 | A kind of data processing method in client |
-
2006
- 2006-12-31 CN CNB2006100637547A patent/CN100525211C/en not_active Expired - Fee Related
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101140528B (en) * | 2007-08-31 | 2013-03-20 | 中兴通讯股份有限公司 | Method and device for realizing timing tasks load in cluster |
CN102118261A (en) * | 2009-12-30 | 2011-07-06 | 中兴通讯股份有限公司 | Method and device for data acquisition, and network management equipment |
WO2011079614A1 (en) * | 2009-12-30 | 2011-07-07 | 中兴通讯股份有限公司 | Data collecting method, data collecting apparatus and network management device |
CN102118261B (en) * | 2009-12-30 | 2014-11-26 | 上海中兴软件有限责任公司 | Method and device for data acquisition, and network management equipment |
US8954971B2 (en) | 2009-12-30 | 2015-02-10 | Zte Corporation | Data collecting method, data collecting apparatus and network management device |
CN102393822A (en) * | 2011-11-30 | 2012-03-28 | 中国工商银行股份有限公司 | Batch scheduling system and method |
CN102393822B (en) * | 2011-11-30 | 2014-03-12 | 中国工商银行股份有限公司 | Batch scheduling system and method |
CN103761144A (en) * | 2013-12-31 | 2014-04-30 | 曙光云计算技术有限公司 | Batch operation management method and device |
CN105260248A (en) * | 2014-07-15 | 2016-01-20 | 中国银联股份有限公司 | Task scheduling system with dynamic regulation function and scheduling method |
CN105260248B (en) * | 2014-07-15 | 2019-02-19 | 中国银联股份有限公司 | A kind of task scheduling system and dispatching method being dynamically adapted |
CN107918579A (en) * | 2016-10-09 | 2018-04-17 | 北京神州泰岳软件股份有限公司 | A kind of method and apparatus of Mass production base-line data |
Also Published As
Publication number | Publication date |
---|---|
CN100525211C (en) | 2009-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100525211C (en) | Method and system for implementing integral dispatching in network element management system | |
CN108920261B (en) | Two-stage adaptive scheduling method suitable for massive parallel data processing tasks | |
WO2020151177A1 (en) | Method for scheduling application task based on big data behavior, server and storage medium | |
CN100484017C (en) | Method for statistics of mass performance data in network element management system | |
CN101882161B (en) | Application level asynchronous task scheduling system and method | |
CN100556038C (en) | A kind of content distribution method based on outer condition trigger node action | |
CN103825964B (en) | SLS (Service Level Specification) scheduling device and SLS scheduling method based on cloud computing PaaS (platform-as-a-service) platform | |
CN106375241B (en) | Batch data processing method, front-end system, host and batch data processing system | |
WO2014173339A1 (en) | Task scheduling service system and method | |
CN101393527A (en) | Centralized polling service | |
CN101771723A (en) | Data synchronization method | |
CN102567086A (en) | Task scheduling method, equipment and system | |
CN101937474A (en) | Mass data query method and device | |
CN104333573B (en) | A kind of processing method and processing system of large concurrent request | |
CN103516585A (en) | Method and system for distributing messages according to priorities | |
CN103793275A (en) | System and processing method for achieving load balance | |
CN110287206A (en) | Method of the building for the distributed lock of Redis database | |
CN106383668A (en) | Information storage method, storage management device and client | |
CN108681481A (en) | The processing method and processing device of service request | |
CN101754169B (en) | Service management method and system for received instructions of home location register | |
CN101778131A (en) | Data synchronization system | |
CN102098170B (en) | Data acquisition optimization method and system | |
CN101789963A (en) | Data synchronization system | |
CN109756565A (en) | A kind of Multitask Data method for pushing based on statistical form | |
CN105446812A (en) | Multitask scheduling configuration method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090805 Termination date: 20141231 |
|
EXPY | Termination of patent right or utility model |