CN100595601C - 抽水蓄能电站发电机定子瞬变时间常数测试方法 - Google Patents

抽水蓄能电站发电机定子瞬变时间常数测试方法 Download PDF

Info

Publication number
CN100595601C
CN100595601C CN200810015879A CN200810015879A CN100595601C CN 100595601 C CN100595601 C CN 100595601C CN 200810015879 A CN200810015879 A CN 200810015879A CN 200810015879 A CN200810015879 A CN 200810015879A CN 100595601 C CN100595601 C CN 100595601C
Authority
CN
China
Prior art keywords
time
stator
constant
transient time
time period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810015879A
Other languages
English (en)
Other versions
CN101266285A (zh
Inventor
张维超
谢峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority to CN200810015879A priority Critical patent/CN100595601C/zh
Publication of CN101266285A publication Critical patent/CN101266285A/zh
Application granted granted Critical
Publication of CN100595601C publication Critical patent/CN100595601C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

本发明公开了一种抽水蓄能电站发电/电动机定子瞬变时间常数测试方法,具有节省试验费用、降低被试机组风险、减少工作量等诸多优点。其步骤为:1)直接截获并控制励磁可控硅整流器控制量,使发电机转子电压产生一个阶跃量;2)在转子电压阶跃产生后的平稳时间段,采用插值算法计算开路、短路瞬变时间常数,其中,定子开路、短路瞬变时间常数T为:2e-t1/T-e-t2/T=1。

Description

抽水蓄能电站发电机定子瞬变时间常数测试方法
技术领域
本发明涉及大型发电/电动机技术性能参测试试验方法,尤其涉及一种抽水蓄能电站发电/电动机定子瞬变时间常数测试方法。
背景技术
随着电力工业的发展,电网容量和覆盖范围迅速扩大,电网调峰、事故紧急备用和黑启动等问题越来越突出。我国的经济发展和水电资源的地域分布很不平衡,给水电资源稀少的东部地区电网带来更大的调峰困难。建设抽水蓄能电站是解决上述问题的经济、高效的办法。另外,核电机组的建设也要求有抽水蓄能电站来配合。近几年来我国已有很多抽水蓄能电站陆续投产;参照国外抽水蓄能电站占电网总容量的比例,今后一个时期内还应大力建设抽水蓄能电站。
抽水蓄能机组在设计时要结合上、下水库、引水管道以及地下厂房的地理、地质等自然条件,并考虑所在电网的具体情况以及整个工程经济性等方面的因素,因此,主设备的设计、制造基本上是按“量体裁衣”的模式来进行地;同时,这些大型机电设备一般都是在使用(安装)现场组装的,这就要求在抽水蓄能电站建成后的试运行阶段进行设备技术参数的现场测试试验和设备性能测试试验。
国标以及相关国际标准和以往的生产实践中利用电机转子回路突然短路试验的方法测量电机开路、短路瞬变时间常数。这种方法要求在转子回路中临时接入大容量的短路开关并在短路开关的外侧临时接入限流电阻来保护励磁可控硅整流柜和励磁变压器。这不仅需要大容量开关设备,极大地增加试验费用,并且在电机转子回路进行大量的拆、装和改造工作,工作量很大,短短几十分钟的试验过程需花1-2天的时间来做准备和恢复工作。试验本身给发电机励磁系统的大容量可控硅整流柜以及励磁变压器带来额外的、潜在的危险,在电机转子回路进行拆、装和改造工作也给转子回路造成潜在的危险。
发明内容
本发明的目的就是为了解决上述问题,提供一种不需任何大容量设备也不需对被试机组机组进行任何的改造;节约试验成本、时间且不会带来额外的、潜在的危险等优点的抽水蓄能电站发电/电动机定子瞬变时间常数测试方法。
为实现上述目的,本发明采用如下技术方案:
1)直接截获并控制励磁可控硅整流器控制量,使发电机转子电压产生一个阶跃量;
2)在转子电压阶跃产生后的平稳时间段,采用插值算法计算开路、短路瞬变时间常数,其中,定子开路、短路瞬变时间常数T为:2e-t1/T-e-t2/T=1。
所述步骤2)的具体过程为,在定子电压或定子短路电流衰减过程录波图上的转子电压平稳时间段内以定子电压或定子短路电流开始衰减的时刻为起始点,选择两个时间段t1、t2,选择的原则是t2时间段内的衰减幅度是t1时间段内的衰减幅度的2倍;
从录波图上测量t1、t2的实际值,利用t2、t1时间段内的衰减幅度的倍数关系和逐步逼近的插值算法计算时间常数,从而得到具有足够精度的定子开路瞬变时间常数、定子短路瞬变时间常数。
本发明根据同步电机的运行理论和定子开路瞬变时间常数、定子短路瞬变时间常数的定义,机组在额定转速下旋转且定子绕组开路的情况下,在转子回路中施加转子电压阶跃激励时,定子电压的响应是按以时间为自变量的指数函数的规律从一个稳态值缓慢、连续变化到另一个稳态值。这个以时间为自变量的指数函数的时间常数就是电机的定子开路瞬变时间常数。同理,在定子绕组短路的情况下,在转子回路中施加转子电压阶跃激励时,定子电流的响应是按以时间为自变量的指数函数的规律从一个稳态值缓慢、连续变化到另一个稳态值。这个以时间为自变量的指数函数的时间常数就是电机的定子短路路瞬变时间常数。考虑到电机磁路饱和的非线性因素,一般施加转子空载额定电压至零的阶跃激励,录取在这种激励下,定子电压的响应过程计算时间常数。
为了获取转子电压阶跃激励,在传统的试验方法中采用外接大容量短路开关的方法给转子回路突然施加一个短路点获取转子电压从一稳定值突然至零阶跃激励,这种方法具有技术背景一节中叙述种种缺点。本实用新型提出直接截获并控制励磁可控硅整流器控制量的方法,使发电机转子电压产生一个阶跃量,记录转子电压和定子电压(或定子短路电流)的衰减过程测量开路、短路瞬变时间常数。截获、控制励磁可控硅整流器控制量的手段要根据机组励磁系统的具体品牌和型号而定,一般不需增加任何硬件设备和任何硬件改动。这种试验方法仅需十几分钟即可完成试验准备工作。节约大量物力、人力和时间。
由于可控硅整流器换弧压降的影响,转子电压阶跃产生后,转子电压稳定在某一较小的负值,为此选择转子电压阶跃产生后的平稳时间段,采用插值算法计算开路、短路瞬变时间常数。具体方法是:在定子电压(或定子短路电流)衰减过程录波图上的转子电压平稳时间段内以定子电压(或定子短路电流)开始衰减的时刻为起始点,选择两个时间段t1、t2,选择的原则是t2时间段内的衰减幅度是t1时间段内的衰减幅度的2倍。从录波图上测量t1、t2的实际值,利用t2、t1时间段内的衰减幅度的倍数关系和逐步逼近的插值算法计算时间常数。从而得到具有足够精度的定子开路瞬变时间常数、定子短路瞬变时间常数。
本发明的有益效果是:试验方法简单,不需任何大容量设备也不需对被试机组进行任何的改造;节约试验成本、时间且不会带来额外的、潜在的危险。
附图说明
图1为定子开路时的录波图;
图2为定子短路时的录波图。
具体实施方式
下面结合实施例对本发明做进一步说明。
图1、图2为泰安泰山抽水蓄能电站2号机组试验结果:
本发明测试抽水蓄能机组的发电/电动机的定子开路瞬变时间常数、定子短路瞬变时间常数的方法,并非涉及发电/电动机所有的技术性能参测试试验,而只是用来测试发电/电动机的定子开路瞬变时间常数、定子短路瞬变时间常数,其具体过程为:
1)直接截获并控制励磁可控硅整流器控制量,使发电机转子电压产生一个阶跃量;
2)在转子电压阶跃产生后的平稳时间段,采用插值算法计算开路、短路瞬变时间常数,其中,定子开路、短路瞬变时间常数T为:2e-t1/T-e-t2/T=1。
所述步骤2)的具体过程为,在定子电压或定子短路电流衰减过程录波图上的转子电压平稳时间段内以定子电压或定子短路电流开始衰减的时刻为起始点,选择两个时间段t1、t2,选择的原则是t2时间段内的衰减幅度是t1时间段内的衰减幅度的2倍;
从录波图上测量t1、t2的实际值,(定子开路时采用图1,定子短路时采用图2)利用t2、t1时间段内的衰减幅度的倍数关系和逐步逼近的插值算法计算时间常数,从而得到具有足够精度的定子开路瞬变时间常数、定子短路瞬变时间常数。
图1中,t1=2.5s,t2=6s,则定子开路瞬变时间常数2e-2.5/T-e-6/T=1,T=8.85S
图2中,t1=0.98s,t2=2.38s,则定子短路瞬变时间常数2e-0.98/T-e-2.38/T=1,T=3.3s。

Claims (2)

1、一种抽水蓄能电站发电机定子开路瞬变时间常数测试方法,其特征是,它的步骤为,
1)直接截获并控制励磁可控硅整流器控制量,使发电机转子电压产生一个阶跃量;
2)在转子电压阶跃产生后的平稳时间段,采用插值算法计算开路瞬变时间常数,即在定子电压衰减过程录波图上的转子电压平稳时间段内以定子电压开始衰减的时刻为起始点,选择两个时间段t1、t2,选择的原则是t2时间段内的衰减幅度是t1时间段内的衰减幅度的2倍;
从录波图上测量t1、t2的实际值,利用t2、t1时间段内的衰减幅度的倍数关系和逐步逼近的插值算法计算时间常数,从而得到具有足够精度的定子开路瞬变时间常数T使得:2e- t1/T-e-t2/T=1。
2.一种抽水蓄能电站发电机定子短路瞬变时间常数测试方法,其特征是,它的步骤为,
1)直接截获并控制励磁可控硅整流器控制量,使发电机转子电压产生一个阶跃量;
2)在转子电压阶跃产生后的平稳时间段,采用插值算法计算短路瞬变时间常数,即在定子短路电流衰减过程录波图上的转子电压平稳时间段内以定子短路电流开始衰减的时刻为起始点,选择两个时间段t1、t2,选择的原则是t2时间段内的衰减幅度是t1时间段内的衰减幅度的2倍;
从录波图上测量t1、t2的实际值,利用t2、t1时间段内的衰减幅度的倍数关系和逐步逼近的插值算法计算时间常数,从而得到具有足够精度的定子短路瞬变时间常数T使得:2e-t1/T-e-t2/T=1。
CN200810015879A 2008-05-09 2008-05-09 抽水蓄能电站发电机定子瞬变时间常数测试方法 Active CN100595601C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810015879A CN100595601C (zh) 2008-05-09 2008-05-09 抽水蓄能电站发电机定子瞬变时间常数测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810015879A CN100595601C (zh) 2008-05-09 2008-05-09 抽水蓄能电站发电机定子瞬变时间常数测试方法

Publications (2)

Publication Number Publication Date
CN101266285A CN101266285A (zh) 2008-09-17
CN100595601C true CN100595601C (zh) 2010-03-24

Family

ID=39988837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810015879A Active CN100595601C (zh) 2008-05-09 2008-05-09 抽水蓄能电站发电机定子瞬变时间常数测试方法

Country Status (1)

Country Link
CN (1) CN100595601C (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719753B (zh) * 2009-12-30 2012-05-23 国网电力科学研究院 抽水蓄能电站静止变频启动电机转子初始位置检测方法
CN106501719B (zh) * 2016-11-01 2019-02-12 广东电网有限责任公司电力科学研究院 一种发电机系统等效时间常数测试方法
CN110646730B (zh) * 2018-06-27 2022-04-12 北京自动化控制设备研究所 一种估计电机机电时间常数的方法
CN113809964B (zh) * 2021-08-23 2023-08-01 长江三峡能事达电气股份有限公司 一种给定值减幅阶跃的起励控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5594670A (en) * 1993-09-03 1997-01-14 Kabushiki Kaisha Meidensha Apparatus for measuring circuit constant of induction motor with vector control system and method therefor
CN1866038A (zh) * 2005-07-07 2006-11-22 高政 发电厂、变电站大型接地网检测技术及其检测系统
CN1904623A (zh) * 2005-07-25 2007-01-31 华东电力试验研究院 同步相量测量装置的性能测试方法及测试系统
CN101017191A (zh) * 2007-03-01 2007-08-15 华北电力大学 一种汽轮发电机转子绕组匝间短路故障在线诊断方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5594670A (en) * 1993-09-03 1997-01-14 Kabushiki Kaisha Meidensha Apparatus for measuring circuit constant of induction motor with vector control system and method therefor
CN1866038A (zh) * 2005-07-07 2006-11-22 高政 发电厂、变电站大型接地网检测技术及其检测系统
CN1904623A (zh) * 2005-07-25 2007-01-31 华东电力试验研究院 同步相量测量装置的性能测试方法及测试系统
CN101017191A (zh) * 2007-03-01 2007-08-15 华北电力大学 一种汽轮发电机转子绕组匝间短路故障在线诊断方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
华北电网大容量发电机励磁系统建模与参数辨识测试. 刘永奇等.电网技术,第31卷第5期. 2007
华北电网大容量发电机励磁系统建模与参数辨识测试. 刘永奇等.电网技术,第31卷第5期. 2007 *
同步发电机阶跃响应最优控制方法的研究与实验. 彭济湘.中国优秀硕士学位论文全文数据库(电子期刊). 2006
同步发电机阶跃响应最优控制方法的研究与实验. 彭济湘.中国优秀硕士学位论文全文数据库(电子期刊). 2006 *

Also Published As

Publication number Publication date
CN101266285A (zh) 2008-09-17

Similar Documents

Publication Publication Date Title
Ma et al. Sub-synchronous control interaction studies between full-converter wind turbines and series-compensated AC transmission lines
CN100573078C (zh) 抽水蓄能电站发电/电动机转子转动惯量测试方法
CN103366064A (zh) 风电场动态模型参数测试方法
CN203967764U (zh) 一种风力发电机组双模式变流器
CN100595601C (zh) 抽水蓄能电站发电机定子瞬变时间常数测试方法
Maharjan et al. Real-time simulation for active and reactive power control of doubly fed induction generator
Molotov et al. Modeling processes in microgrids with renewable energy sources
CN203365567U (zh) 一种模拟风电现场运行工况的风力发电变流器测试平台
Rajvikram et al. Fault ride-through capability of permanent magnet synchronous generator based wind energy conversion system
CN106406272A (zh) 一种风电场中静止无功发生器的控制器性能测试方法
CN103730896B (zh) 主动配电网分布式电源的运行控制方法
CN104795842B (zh) 一种含双馈风电场和永磁直驱风电场的混合风电场群的对称故障穿越控制方法
Ahsan et al. Reactive power compensation for integration of wind power in a distribution network
Ouhrouche Transient analysis of a grid connected wind driven induction generator using a real-time simulation platform
Biglari et al. Steady-state analysis and voltage control of self-excited induction generator (SEIG)
Erlich et al. Modelling and performance analysis of wind farms: A case study of the Ashegoda wind farm in Ethiopia
Mirsaeidi et al. Power system load regulation by pumped storage power plants
Khan et al. Investigation on resonating behaviour of a self excited induction generator
Qian et al. Review on modeling of wind power generation systems
Sharma et al. Role of Reactive Power Source on Power Quality of Three-Phase Self-Excited Induction Generator
Ansel et al. Variable speed small hydro plant connected to power grid or isolated loads
Jin et al. Research on dynamic simulation technology and fault characteristics of Pumped Storage Power Station
Zhao et al. Model validation of solar PV plant with hybrid data dynamic simulation based on fast-responding generator method
Bu et al. Control strategy of AC&DC hybrid generating system based on dual stator-winding induction generator for micro-grid application
Kabashia et al. Modelling, simulation and analysis of full power converter wind turbine with permanent synchronous generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121225

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121225

Address after: 250002 Shandong Province, Ji'nan City Central Ring Road East

Patentee after: SHANDONG ELECTRIC POWER Research Institute

Patentee after: State Grid Corporation of China

Address before: 250002 Shandong Province, Ji'nan City Central Ring Road East

Patentee before: SHANDONG ELECTRIC POWER Research Institute

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: Shandong Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 250002 east end of south 2nd Ring Road, Shizhong District, Shandong, Ji'nan

Patentee before: Shandong Electric Power Research Institute

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: SHANDONG ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220129

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA