CN100589639C - 时分-同步码分多址移动通信系统中的接力切换方法 - Google Patents

时分-同步码分多址移动通信系统中的接力切换方法 Download PDF

Info

Publication number
CN100589639C
CN100589639C CN200610090408A CN200610090408A CN100589639C CN 100589639 C CN100589639 C CN 100589639C CN 200610090408 A CN200610090408 A CN 200610090408A CN 200610090408 A CN200610090408 A CN 200610090408A CN 100589639 C CN100589639 C CN 100589639C
Authority
CN
China
Prior art keywords
rnc
target cell
cell
origin
sfn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200610090408A
Other languages
English (en)
Other versions
CN101094507A (zh
Inventor
万建超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Information Technology Co Ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CN200610090408A priority Critical patent/CN100589639C/zh
Publication of CN101094507A publication Critical patent/CN101094507A/zh
Application granted granted Critical
Publication of CN100589639C publication Critical patent/CN100589639C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

本发明公开了一种时分-同步码分多址移动通信系统中的接力切换方法,不需要对现有接力切换的协议和流程做修改,通过将UE向RNC上报的测量报告中是否携带目标小区和源小区的SFN差值作为UE是否支持接力切换的判断标准,并且在接力切换中采用定时维持硬切换的方式,在目标小区建立RL时,采用目标小区和源小区的SFN差值计算出新建无线链路时,需要的帧偏移,保证源小区和目标小区两条RL的CFN一致,从而避免了现有接力切换方法在默认的条件不满足时,出现接力切换失败,导致掉话的问题,保证了在任何组网方式下,接力切换的成功实现。

Description

时分-同步码分多址移动通信系统中的接力切换方法
技术领域
本发明涉及移动通信系统中的切换技术,特别涉及一种时分-同步码分多址(TD-SCDMA)移动通信系统中的接力切换方法。
背景技术
在TD-SCDMA系统中,基站控制器(RNC)内的切换有两种方式:硬切换和接力切换。硬切换的本质是:切换时,将终端设备(UE)在源小区的上下行数据同时切换到目标小区;而接力切换的本质是:切换时,分别将UE在源小区的上下行数据先后切换到目标小区,先将上行数据切换到目标小区,然后再将下行数据切换到目标小区。
两种切换方式比较而言,接力切换的切换性能较好,但对UE的要求也更高,UE必须具备支持接力切换的能力,才能成功实现接力切换。
在TD-SCDMA系统中,现有实现接力切换的方法存在两个比较显著的问题:
1)现有实现接力切换的方法中,在RNC作切换判决时,没有对UE是否具有支持接力切换的能力进行判决,而是默认UE具有支持接力切换的能力。因此,当UE实际上不具备支持接力切换能力时,RNC仍然可能判决执行接力切换,在源小区和目标小区同时发送下行数据。在这种情况下,UE无法在目标小区接收数据,因此,RNC向目标小区发送的下行数据不能起到任何作用,反而在目标小区对其它UE造成无意义的干扰。
在实现接力切换时,为了达到不丢数据或者少丢数据的目的,UE需要在下行连续的两个传输时间间隔(TTI)中完成如下动作:前一个TTI在源小区接收下行数据,后一个TTI在目标小区接收下行数据,与此同时,UE的上行一直在向目标小区发送数据,那么这就要求切换中的CFN保持连续。为了达到在接力切换中,维持CFN连续的目的,RNC需要维护源小区和目标小区两条无线链路(RL)的CFN取值一致。而现有实现接力切换的方法中,RNC维护源小区和目标小区RL上的CFN取值一致,是在两个默认条件满足的情况下实现的。因此现有实现接力切换的方法中,存在的第二个问题就是:
2)现有实现接力切换的方法中,只有在两个默认条件满足的情况下,才能保证RNC维护的源小区和目标小区RL上的CFN取值一致。
第一个默认条件是:TD-SCDMA系统中使用的是同一设备商的基站(NodeB)产品,同一设备商的基站产品的SFN取值方式一致,因此,源小区和目标小区的SFN不存在差值;
第二个默认条件是:在接力切换的执行过程中,RNC在目标小区和源小区上建立RL时,帧偏移(Frame Offset)的取值都为0。
当以上两个默认条件都满足时,根据CFN=(SFN-DOFF)mod 256,就可以保证在源小区和目标小区的RL上的CFN取值一致,从而保证在空口实现时,接力切换在目标小区和源小区的两条RL上,相同CFN传输的数据是相同的。
而实际应用中,TD-SCDMA系统中使用的并不一定是同一设备商的基站(NodeB)产品,组网时可能存在如下情况:
a.在一个RNC下连接不同厂商的NodeB,而不同厂商的NodeB取SFN的方式不同;
b.系统中在一个RNC连接的NodeB取SFN的方式相同,但RNC在源小区和目标小区建立RL时,取的帧偏移的值不相同;
c.系统中一个RNC在不同的两个NodeB上为同一个UE建无线链路时,采用了帧偏移。
如果TD-SCDMA系统中存在上述三种情况中的任何一种,则在该系统中执行接力切换时,目标小区和源小区RL上的CFN取值会产生不一致的问题,从而导致接力切换的失败。
发明内容
有鉴于此,本发明的主要目的在于提供一种TD-SCDMA移动通信系统中的接力切换方法,无论采用何种组网方式,都可以保证接力切换的成功实现。
为了实现上述的主要目的,本发明提供了一种时分-同步码分多址移动通信系统中的接力切换方法,该方法包括以下步骤:
A、RNC接收UE上报的测量报告,如果测量报告中携带目标小区和源小区的系统帧号SFN的差值或目标小区的SFN和连接帧号CFN的差值,RNC在作切换判决时,将接力切换作为可选方式;否则,RNC在作切换判决时,判决接力切换为不可选方式,在RNC判决执行接力切换时,执行步骤B;
B、RNC在目标小区建立无线链路时,利用UE上报的目标小区和源小区的SFN的差值或目标小区的SFN和CFN的差值,计算出在目标小区新建无线链路时的帧偏移,发送给目标小区所在的基站;
C、RNC通过源小区的无线链路向UE发送物理信道重配置消息,该物理信道重配置消息中指示UE使用维持方式向目标小区做切换;所述维持方式为在进行接力切换的过程中维持CFN取值的连续;
D、RNC接收到UE返回的物理信道重配置完成消息后,停止向源小区发送下行数据,与UE只通过目标小区进行数据传输。
步骤A所述的RNC接收UE上报的测量报告之前,进一步包括:UE与RNC之间建立RRC连接,如果RRC承载在专用信道上,则RNC向UE发送测量控制消息。
步骤D所述的RNC接收UE返回的物理信道重配置完成消息包括:UE通过目标小区的无线链路向RNC返回物理信道重配置完成消息。
步骤D所述的停止向源小区发送下行数据后,进一步包括:RNC删除在源小区建立的无线链路。
本发明提供的TD-SCDMA移动通信系统中的接力切换方法实现简单,不需要对现有接力切换的协议和流程做修改,只是将UE向RNC上报的测量报告中是否携带目标小区和源小区的SFN差值或者目标小区的SFN与CFN的差值,作为UE是否支持接力切换的判决条件,并且通过在接力切换中采用维持硬切换的方式,在目标小区建立RL时,采用目标小区和源小区的SFN差值或者目标小区的SFN与CFN的差值,计算出在目标小区新建无线链路时的帧偏移,发送给目标小区所在的基站,从而保证了源小区和目标小区的RL上的CFN取值一致,避免了现有接力切换方法在默认条件不满足时,出现接力切换失败,导致掉话的问题,保证了在任何组网方式下,接力切换的成功实现。
附图说明
图1为本发明TD-SCDMA移动通信系统中的接力切换方法的流程图。
具体实施方式
为使本发明的目的、技术方案和有益效果更加清楚明白,下面结合实施例和附图,对本发明做进一步地详细说明。
本发明提供的TD-SCDMA移动通信系统中的接力切换方法,将UE在测量报告中是否携带目标小区和源小区的SFN差值或目标小区的SFN与CFN的差值,作为UE是否支持接力切换的判断标准,并且当RNC在目标小区建立RL时,使用目标小区和源小区的SFN差值或目标小区的SFN与CFN的差值,计算出在Iub口建立RL需要使用的帧偏移的值,以保证源小区和目标小区RL上的CFN取值一致。
参见图1,图1为本发明TD-SCDMA移动通信系统中的接力切换方法的流程图。如图1所示,该流程包括以下步骤:
步骤101,在UE和RNC之间完成RRC连接建立后,如果RRC承载在专用信道上,RNC向UE发送测量控制消息。
步骤102,UE接收RNC发送的测量控制消息,按照RNC的要求执行各种测量,并将测量报告上报给RNC。
步骤103,RNC收到UE上报的测量报告后,对测量报告进行分析,如果测量报告中携带了目标小区与源小区SFN的差值或者目标小区SFN与CFN的差值,RNC在作切换判决时,将接力切换作为可选方式;否则,RNC在作切换判决时,判决接力切换为不可选方式。
当RNC判决执行接力切换时,执行步骤104。
步骤104,RNC向目标小区所在NodeB发送RL建立请求消息,该消息中携带在目标小区新建无线链路时的帧偏移的值;目标小区的RL建立完成后,目标小区向RNC返回RL建立响应消息。
RNC利用UE上报的目标小区和源小区的系统帧号SFN的差值或者目标小区的系统帧号SFN和连接帧号CFN的差值,计算出在目标小区新建无线链路时的帧偏移值,并将计算出的帧偏移值携带在发送给目标小区所在基站的RL建立请求消息中。
步骤105,RNC通过源小区的无线链路向UE发送物理信道重配置消息,该物理信道重配置消息中指示UE使用维持(maintain)方式来做切换。
这里,所述维持方式是指:在进行接力切换的过程中维持CFN取值的连续。
步骤106,UE在目标小区发送物理信道重配置完成消息,RNC从目标小区接收到该物理信道重配置完成消息后,执行步骤107。
步骤107,RNC向源小区发送RL释放请求消息,源小区接收该RL释放请求消息后,向RNC返回RL释放响应消息,删除源小区的RL。
本发明提供的RNC在目标小区建立RL时,通过UE上报的目标小区和源小区的SFN的差值或者目标小区的SFN与CFN的差值,计算在目标小区新建无线链路时的帧偏移值的方式,也可以应用到在Iur接口建立RL的过程中。
由上述实施例可见,本发明的TD-SCDMA移动通信系统中的接力切换方法实现简单,只需要在切换判决时增加对UE是否支持接力切换的判决。对于UE而言,所作的测量都属于常规测量,容易实现,且不会给UE带来过多的测量开销。同时在接入侧,即RNC,使用UE上报的测量值,可以很方便地计算出新建无线链路需要的帧偏移值,避免了接入侧在实现中的复杂性。

Claims (4)

1、一种时分-同步码分多址移动通信系统中的接力切换方法,其特征在于,该方法包括以下步骤:
A、RNC接收UE上报的测量报告,如果测量报告中携带目标小区和源小区的系统帧号SFN的差值或目标小区的SFN和连接帧号CFN的差值,RNC在作切换判决时,将接力切换作为可选方式;否则,RNC在作切换判决时,判决接力切换为不可选方式,在RNC判决执行接力切换时,执行步骤B;
B、RNC在目标小区建立无线链路时,利用UE上报的目标小区和源小区的SFN的差值或目标小区的SFN和CFN的差值,计算出在目标小区新建无线链路时的帧偏移,发送给目标小区所在的基站;
C、RNC通过源小区的无线链路向UE发送物理信道重配置消息,该物理信道重配置消息中指示UE使用维持方式向目标小区做切换;所述维持方式为在进行接力切换的过程中维持CFN取值的连续性;
D、RNC接收到UE返回的物理信道重配置完成消息后,停止向源小区发送下行数据,与UE只通过目标小区进行数据传输。
2、如权利要求1所述的方法,其特征在于,步骤A所述的RNC接收UE上报的测量报告之前,进一步包括:UE与RNC之间建立RRC连接,如果RRC承载在专用信道上,则RNC向UE发送测量控制消息。
3、如权利要求1或2所述的方法,其特征在于,步骤D所述的RNC接收UE返回的物理信道重配置完成消息包括:UE通过目标小区的无线链路向RNC返回物理信道重配置完成消息。
4、如权利要求1或2所述的方法,其特征在于,步骤D所述的停止向源小区发送下行数据后,进一步包括:RNC删除在源小区建立的无线链路。
CN200610090408A 2006-06-23 2006-06-23 时分-同步码分多址移动通信系统中的接力切换方法 Expired - Fee Related CN100589639C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200610090408A CN100589639C (zh) 2006-06-23 2006-06-23 时分-同步码分多址移动通信系统中的接力切换方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200610090408A CN100589639C (zh) 2006-06-23 2006-06-23 时分-同步码分多址移动通信系统中的接力切换方法

Publications (2)

Publication Number Publication Date
CN101094507A CN101094507A (zh) 2007-12-26
CN100589639C true CN100589639C (zh) 2010-02-10

Family

ID=38992454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200610090408A Expired - Fee Related CN100589639C (zh) 2006-06-23 2006-06-23 时分-同步码分多址移动通信系统中的接力切换方法

Country Status (1)

Country Link
CN (1) CN100589639C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107154860A (zh) * 2016-03-03 2017-09-12 中国移动通信集团公司 一种保护倒换方法及系统

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8712415B2 (en) 2008-03-20 2014-04-29 Interdigital Patent Holdings, Inc. Timing and cell specific system information handling for handover in evolved UTRA
CN101360128B (zh) * 2008-09-12 2012-11-21 华为终端有限公司 参数维护方法及装置
WO2010142075A1 (zh) * 2009-06-09 2010-12-16 华为技术有限公司 支持多媒体广播多播业务同步发送的方法及装置
CN102036328B (zh) * 2009-09-30 2014-01-01 中兴通讯股份有限公司 一种s1切换中业务准备失败的处理方法及系统
WO2011057451A1 (zh) * 2009-11-13 2011-05-19 中兴通讯股份有限公司 基站子系统获取移动终端帧映射支持能力的方法和系统
CN102421087B (zh) * 2010-09-28 2015-10-21 中兴通讯股份有限公司 一种系统帧号更新方法及系统
CN105636095A (zh) * 2014-10-27 2016-06-01 中兴通讯股份有限公司 确定漏配邻区的方法及装置
CN106686669B (zh) * 2015-11-11 2021-01-26 中兴通讯股份有限公司 同步方法及装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107154860A (zh) * 2016-03-03 2017-09-12 中国移动通信集团公司 一种保护倒换方法及系统

Also Published As

Publication number Publication date
CN101094507A (zh) 2007-12-26

Similar Documents

Publication Publication Date Title
CN100589639C (zh) 时分-同步码分多址移动通信系统中的接力切换方法
US9980309B2 (en) Cell measurement and special function small cell selection method and apparatus for use in a mobile communication system
JP5976742B2 (ja) 無線システムのためのラジオリソース接続(rrc)の確立
CN102238666B (zh) 多载波切换处理方法及系统
RU2008141773A (ru) Способ обеспечения передачи обслуживания в системе мобильной связи
JP4939529B2 (ja) 専用及び高速共有チャネルのハードハンドオフ手順
WO2010078729A1 (zh) 一种多载波小区切换方法、装置及系统
US9992807B2 (en) Method and apparatus for improved mobile communications in heterogeneous wireless networks
WO2009154038A1 (ja) 基地局制御モジュール、無線基地局、基地局制御装置および基地局制御方法
CN101119570B (zh) 将压缩模式参数发送到移动站的方法
CN102196499A (zh) 实现接入控制的方法、中心控制器及接入点设备
WO2010002324A1 (en) A method and arrangement for supporting fast carrier reselection
WO2014076551A1 (en) Method for device-to-device communicaiton and a corresponding control method
CN103167423A (zh) 集群系统中监听用户终端的小区切换方法、设备和系统
WO2006037861A1 (en) Hard handover method, controller and communication system
CN102123458A (zh) 无线链路失败的处理方法及终端
CN108810968A (zh) 执行连接移动性调整的方法和设备
CN101772093A (zh) 用户上下行不同步切换的方法和装置
CN100466788C (zh) 一种切换技术中的测量控制和测量报告方法
GB2427788A (en) Inter-mode handover
CN102300277B (zh) 异频硬切换方法及设备
US8089932B2 (en) Handover method in a wireless access network
CN101365167B (zh) 传递连续分组连接的不连续发送和不连续接收参数的方法
CN101300880A (zh) 用于无线链路重配置的自适应资源
CN101426249B (zh) 上行软切换的方法、装置及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA POTEVIO CO., LTD.

Free format text: FORMER OWNER: PUTIAN IT TECH INST CO., LTD.

Effective date: 20130503

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER NAME: PUTIAN INST. OF INFORMATION TECHNOLOGY

CP03 Change of name, title or address

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100085, No. two, 2 street, base of information industry, Beijing

Patentee before: POTEVIO Institute of Information Technology

TR01 Transfer of patent right

Effective date of registration: 20130503

Address after: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee after: CHINA POTEVIO CO.,LTD.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER OWNER: CHINA POTEVIO CO., LTD.

Effective date: 20130522

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130522

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee before: CHINA POTEVIO CO.,LTD.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Relay switching method in mobile communication system of time division synchronization code division multiple access

Effective date of registration: 20131210

Granted publication date: 20100210

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee

Owner name: POTEVIO INFORMATION TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: PUTIAN IT TECH INST CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20151102

Granted publication date: 20100210

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20151102

Registration number: 2013990000954

Pledgor after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Pledgor before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Relay switching method in mobile communication system of time division synchronization code division multiple access

Effective date of registration: 20151105

Granted publication date: 20100210

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20161008

Granted publication date: 20100210

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Relay switching method in mobile communication system of time division synchronization code division multiple access

Effective date of registration: 20161011

Granted publication date: 20100210

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170802

Granted publication date: 20100210

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210

CF01 Termination of patent right due to non-payment of annual fee