CN100564978C - A kind of bellows and end mould fixing method - Google Patents

A kind of bellows and end mould fixing method Download PDF

Info

Publication number
CN100564978C
CN100564978C CNB2008100472098A CN200810047209A CN100564978C CN 100564978 C CN100564978 C CN 100564978C CN B2008100472098 A CNB2008100472098 A CN B2008100472098A CN 200810047209 A CN200810047209 A CN 200810047209A CN 100564978 C CN100564978 C CN 100564978C
Authority
CN
China
Prior art keywords
bellows
connecting tube
side template
end mould
fixing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2008100472098A
Other languages
Chinese (zh)
Other versions
CN101266007A (en
Inventor
赵海莲
李忠
吴红来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CNB2008100472098A priority Critical patent/CN100564978C/en
Publication of CN101266007A publication Critical patent/CN101266007A/en
Application granted granted Critical
Publication of CN100564978C publication Critical patent/CN100564978C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joints Allowing Movement (AREA)

Abstract

The invention belongs to the prestressed concrete box girder technical field of construction, be specifically related to a kind of bellows and end mould fixing method.A kind of bellows and end mould fixing method, it is characterized in that it comprises the steps: to choose the connecting tube (3) of external diameter less than inside diameter of bel, go up bellows quantity and each the bellows core coordinate position of pressing case beam section at the Side Template (1) of end mould and on Side Template, draw a hole circle (2) with chalk, each hole on Side Template (1) circle (2) is located spot welding and is connected connecting tube (3) then, makes the centre coordinate position of pore of connecting tube (3) corresponding with the centre coordinate position of Kong Quan (2); The end of bellows is enclosed within outside the connecting tube (3), outside, the end of bellows compresses with iron wire again.That method of the present invention has is easy to connect, reduce the characteristics of repairing and damaging.

Description

A kind of bellows and end mould fixing method
Technical field
The invention belongs to the prestressed concrete box girder technical field of construction, be specifically related to a kind of bellows and end mould fixing method.
Background technique
The end mould is formed by panel (Side Template), vertical rib and cross rib assembly welding, all adopts between end mould and bed die and the external mold to regulate the screw mandrel support and split bolt is connected.In the prestressed concrete box girder work progress, bellows is fixed with the end mould, traditional way is that (generally being large-scale Sheet Steel Form) cuts the hole on Side Template, then bellows is aimed at corresponding hole on the Side Template, bellows is with outside the traversing through end pattern hole, because in standard was striden, the position of the bellows of each section of every case beam was all inequality, hole site on the Side Template will occur and constantly cut the phenomenon in hole, Side Template can be destroyed maybe and need be repaired; This method of construction can cause the damage of Side Template bigger, and the workload of repairing is big, even can increase the tricks of end mould.
Summary of the invention
The object of the present invention is to provide a kind of easy to connect, bellows and end mould fixing method that reduce to repair and damage.
To achieve these goals, technological scheme of the present invention is: a kind of bellows and end mould fixing method, it is characterized in that it comprises the steps: to choose the connecting tube of external diameter less than inside diameter of bel, on the Side Template of end mould, press bellows quantity and each bellows core coordinate position of case beam section and on Side Template, draw a hole circle with chalk, the spot welding of on Side Template each hole circle place connects connecting tube then, and the centre coordinate position that centre coordinate position and the hole of the pore of connecting tube are enclosed is corresponding; The end of bellows is enclosed within outside the connecting tube, the outside, end of bellows compresses with iron wire again.
At connecting tube external application glue bond one circle soft rubber, soft rubber outside, enclose sponge around one again, sponge is fixed on the connecting tube with thin wire.
The invention has the beneficial effects as follows: adopt each circle place, the hole spot welding on the Side Template to connect connecting tube, operate so conveniently, because this method is not cut the hole on Side Template, so Side Template is close to not damage (also need not repair); Connecting tube adopts spot welding to be connected with Side Template simultaneously, during the demoulding, be easy to Side Template is separated with bellows, and Side Template is injury-free, and Side Template can be repeatedly used.Adopt the internal diameter of the external diameter of connecting tube less than bellows, because connecting tube is littler than bellows, this is convenient to butt joint (easy to connect); When bellows core coordinate and drawn hole circle centre coordinate depart from, because connecting tube is littler than bellows,, little error do not influence connection even taking place yet, significantly reduced the patch work of Sheet Steel Form, the while also alleviates the damaged condition of Sheet Steel Form.Adopt soft rubber, sponge to carry out encapsulation process, cement slurry infiltrates in the bellows in the time of can preventing concrete vibrating.
Description of drawings
Fig. 1 is a fixedly schematic representation of the present invention;
Fig. 2 is the left view (in order to clearly illustrate structure, the part bellows does not draw) of Fig. 1;
Among the figure: 1-Side Template, 2-hole circle, 3-connecting tube (black pipe), 4-soft rubber, 5-sponge, 6-bellows, 7-iron wire.
Embodiment
As shown in Figure 1 and Figure 2, a kind of bellows and end mould fixing method, it comprises the steps: to choose external diameter, and (as: diameter of bellows 6 is 100mm less than the connecting tube 3 of inside diameter of bel, the diameter of connecting tube 3 is 95mm, the length of connecting tube 3 is 50mm), described connecting tube 3 is a black pipe, because black pipe is littler than bellows, this is convenient to butt joint.On the Side Template 1 of end mould, press bellows quantity and each bellows core coordinate position of case beam section and on Side Template, draw a hole circle 2 with chalk, each hole on Side Template 1 is enclosed 2 places spot welding and is connected connecting tube 3 then, and it is corresponding to make centre coordinate position and the hole of the pore of connecting tube 3 enclose 2 centre coordinate position; Only need 3 of connecting tubes (black pipe) be burn-on by the centre coordinate difference of bellows to different sections, operate so conveniently, Side Template is close to not damage (also need not repair).Cement slurry infiltrates in the bellows when preventing concrete vibrating, at first at the thick soft rubber 4 of connecting tube 3 external application glue bonds, one circle 2mm, outside soft rubber 4, enclose thick 10mm sponge 5 again around one, sponge 5 usefulness thin wires are fixed on the connecting tube (black pipe) 3, the end of bellows is enclosed within outside the connecting tube, the outside, end of bellows compresses with 22# iron wire 7 again.

Claims (4)

1. bellows and end mould fixing method, it is characterized in that it comprises the steps: to choose the connecting tube (3) of external diameter less than inside diameter of bel, go up bellows quantity and each the bellows core coordinate position of pressing case beam section at the Side Template (1) of end mould and on Side Template, draw a hole circle (2) with chalk, each hole on Side Template (1) circle (2) is located spot welding and is connected connecting tube (3) then, makes the centre coordinate position of pore of connecting tube (3) corresponding with the centre coordinate position of Kong Quan (2); The end of bellows is enclosed within outside the connecting tube (3), outside, the end of bellows compresses with iron wire again.
2. a kind of bellows according to claim 1 and end mould fixing method, it is characterized in that: at connecting tube (3) external application glue bond one circle soft rubber (4), again outside soft rubber (4) around one the circle sponge (5), sponge (5) is fixed on the connecting tube (3) with thin wire.
3. a kind of bellows according to claim 1 and end mould fixing method is characterized in that: the diameter of described bellows is 100mm, and the diameter of connecting tube (3) is 95mm, and the length of connecting tube (3) is 50mm.
4. a kind of bellows according to claim 1 and end mould fixing method is characterized in that: described connecting tube (3) is a black pipe.
CNB2008100472098A 2008-04-01 2008-04-01 A kind of bellows and end mould fixing method Expired - Fee Related CN100564978C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008100472098A CN100564978C (en) 2008-04-01 2008-04-01 A kind of bellows and end mould fixing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008100472098A CN100564978C (en) 2008-04-01 2008-04-01 A kind of bellows and end mould fixing method

Publications (2)

Publication Number Publication Date
CN101266007A CN101266007A (en) 2008-09-17
CN100564978C true CN100564978C (en) 2009-12-02

Family

ID=39988603

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100472098A Expired - Fee Related CN100564978C (en) 2008-04-01 2008-04-01 A kind of bellows and end mould fixing method

Country Status (1)

Country Link
CN (1) CN100564978C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322139A (en) * 2011-06-27 2012-01-18 中冶建工集团有限公司 End head formwork for T-shaped beam formed by casting moulding
CN106944517B8 (en) * 2017-04-13 2020-02-18 泉州台商投资区忆品茶业有限公司 End top pressure fixing structure suitable for steel pipe wave making

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
后张法预应力箱梁施工工艺. 周永福.水运工程,第4期. 1998
后张法预应力箱梁施工工艺. 周永福.水运工程,第4期. 1998 *
大跨度后张曲线预应力现浇框架梁的施工工艺. 吴锦霞,姜丽.安阳工学院学报,第6期. 2005
大跨度后张曲线预应力现浇框架梁的施工工艺. 吴锦霞,姜丽.安阳工学院学报,第6期. 2005 *
怎样安装好曲线预应力筋成孔波纹管. 王朝熙.工业建筑,第9期. 1993
怎样安装好曲线预应力筋成孔波纹管. 王朝熙.工业建筑,第9期. 1993 *
某框架预应力梁的施工方法. 唐志兵.福建建筑,第3期. 2004
某框架预应力梁的施工方法. 唐志兵.福建建筑,第3期. 2004 *
波纹管成孔法预应力施工. 武峻岭.安徽建筑,第1期. 2001
波纹管成孔法预应力施工. 武峻岭.安徽建筑,第1期. 2001 *

Also Published As

Publication number Publication date
CN101266007A (en) 2008-09-17

Similar Documents

Publication Publication Date Title
CN101182773A (en) Railway large-bore tunnel oval-shaped table-board cap brim bias-cutting type hole-door construction method
CN108179842B (en) Assembled steel tube confined concrete column and production process thereof
CN105269717B (en) Wind-powered blade mold and its manufacture method
CN201783541U (en) Repairing tooling for internal wall of pipe orifice
CN100564978C (en) A kind of bellows and end mould fixing method
CN100564984C (en) The method for restoring old pipe end head of inner lining glass fiber reinforced plastic by overturn connecting means
CN204109193U (en) Wind-powered blade mold
CN105625191A (en) Construction method of segment girder prestressed pipeline
CN201170400Y (en) Fixed device for accordion pipe and terminal modulo
WO2022021105A1 (en) Prefabricated beam column sleeved with corrugated pipe
CN202240287U (en) Internal support fixture for splicing large flanges
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN207419858U (en) Bar connecting component and assembly concrete component
CN203626237U (en) Steel-wood square column for supporting and forming reinforced concrete member in building construction
CN206765041U (en) A kind of mounting structure of the reserving hole in prefabricated concrete elements
CN204934365U (en) A kind of anchor ear makes hydraulic tool
CN216194911U (en) A pull rod device for utility tunnel side wall concrete form is fixed
CN202299429U (en) Circulation adjustable angle iron stiffening system
CN212224627U (en) Pipeline preformed hole plugging die
CN103104099A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN102926544A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN202039862U (en) Concrete curved surface shaping template
CN202591304U (en) Shape righting aligning machine
CN206477862U (en) Tunnel lining trolley steel end mould
CN106545158B (en) A kind of square column concrete component Wood-plastic formwork reinforces fixture and its application method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA FIRST METALLURGICAL GROUP CO., LTD.

Free format text: FORMER NAME: CHINA FIRST METALLURGICAL CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee before: China First Metallurgical Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091202

Termination date: 20190401