CN100564546C - A kind of earlier stage slag-smelting method for pre-smelting electric furnace - Google Patents

A kind of earlier stage slag-smelting method for pre-smelting electric furnace Download PDF

Info

Publication number
CN100564546C
CN100564546C CNB2008100547770A CN200810054777A CN100564546C CN 100564546 C CN100564546 C CN 100564546C CN B2008100547770 A CNB2008100547770 A CN B2008100547770A CN 200810054777 A CN200810054777 A CN 200810054777A CN 100564546 C CN100564546 C CN 100564546C
Authority
CN
China
Prior art keywords
slag
electric furnace
lime
steel
decarburization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2008100547770A
Other languages
Chinese (zh)
Other versions
CN101255486A (en
Inventor
段建平
李宏
张振祥
杨红岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CNB2008100547770A priority Critical patent/CN100564546C/en
Publication of CN101255486A publication Critical patent/CN101255486A/en
Application granted granted Critical
Publication of CN100564546C publication Critical patent/CN100564546C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

A kind of earlier stage slag-smelting method for pre-smelting electric furnace, it comprises following sequential steps: one, make the high-temperature liquid state pre-melted slag, the rhombspar that in the molten iron that is added to the hot metal pretreatment stove, adds molten iron 16kg per ton~20kg lime and 3kg~4kg, carry out adding again after the decarburization hyperthermic treatment rhombspar of molten iron 16kg per ton~40kg lime and 3kg-6kg, add molten iron 16kg per ton~40kg lime behind the 13min-15min once more, blowing back carbon content 1.5%~2.5%, 1530~1560 ℃ of temperature; Two, electric furnace charging: at the steel scrap that empty stove adds, pack into then decarburization molten iron and high-temperature liquid state pre-melted slag; Three, electrosmelting: the electric furnace hot metal charging begins to send electricity, oxygen blast to flux, molten steel C:0.09~0.15%, Si≤0.10%, P≤0.015%, 1670 ℃~1700 ℃ electric furnace steel tappings of temperature after finishing.This earlier stage slag-smelting method for pre-smelting electric furnace improves the dephosphorization utilization ratio of lime, shortens the tap to tap time of electric furnace.

Description

A kind of earlier stage slag-smelting method for pre-smelting electric furnace
Technical field
The present invention relates to a kind of earlier stage slag-smelting method for pre-smelting electric furnace.
Background technology
Along with the utilization of electric furnace hot metal charge technology, electric furnace hot metal charge technology has also obtained very big development, and molten steel decarburization hyperthermic treatment method is exactly one of them.The main purpose that electric furnace is made the slag in early stage is that dephosphorization, decarburization, removal are mingled with.Dephosphorization, these two reactions of decarburization all require slag to have higher oxidisability and flowability.The main method that existing electric furnace is made the slag in early stage is to add 1~1.5% slag making material into the stove metal charge at furnace bottom before charging, at scrap melting process fusing slag making materials, and takes the limit to add slag charge limit stream slag operation simultaneously.Electrosmelting a part of heat in earlier stage is used to melt slag making materials like this, part heat is used for melting waste steel, and the physics of electric furnace slag at this moment, electrochemical conditions and dynamic conditions are relatively poor, and the lime in the slag is fusing fully not, can not effectively finish the high efficiency dephosphorating task.Influence the rhythm of production of electric furnace, consumed a large amount of physics heat simultaneously, increased lime consumption.
Summary of the invention
Make the deficiency of slag method in early stage in order to overcome above-mentioned existing electric furnace, the invention provides a kind of earlier stage slag-smelting method for pre-smelting electric furnace, this earlier stage slag-smelting method for pre-smelting electric furnace improves the dephosphorization utilization ratio of lime, shortens the tap to tap time of electric furnace.
This earlier stage slag-smelting method for pre-smelting electric furnace comprises following sequential steps:
One makes the high-temperature liquid state pre-melted slag
1250~1400 ℃ blast-melted or melten iron in hot-metal mixer is added to the hot metal pretreatment stove, change the hot metal pretreatment stove over to molten steel decarburization intensification station, add lime and rhombspar by high hopper, it is the rhombspar that molten iron per ton adds 16kg~20kg lime and 3kg~4kg that first slag charge adds pan feeding, begin to carry out the decarburization hyperthermic treatment after the adding, add second batch of slag charge behind 9min~12min, molten iron per ton adds the rhombspar of 16kg~40kg lime and 3kg~6kg, add the 3rd batch of slag charge behind 13min~15min, molten iron per ton adds 16kg~40kg lime, continue blowing 10min~15min, the thermometric sampling, when carbon content 1.5~2.5%, 1530~1560 ℃ of temperature, offer electric furnace and use.The summation of three add-ons of slag making materials is to handle 6%~10% of iron water amount weight.
The charging of two electric furnaces:
Before the electric furnace charging is empty stove, and furnace bottom does not overlay the bedstone ash, adorns steel scrap earlier, and the steel scrap amount of adding is for adding the 40%-50% of the total iron and steel stock weight of electric furnace.The decarburization molten iron and the high-temperature liquid state pre-melted slag of packing into then and being provided by the decarburization heat riser, high-temperature liquid state pre-melted slag are the 6.7%-9% of the blast-melted or melten iron in hot-metal mixer weight of decarburization.Convert and forbid slag to flow out in the iron process from the electric furnace fire door;
Three electrosmeltings:
After the electric furnace hot metal charging finishes, begin to send electricity, oxygen blast flux (blowing oxygen quantity during by oxygen gun blowing gas flow and the carbon content that will oxidize away calculate and obtain, usually consume 40~60 cubic metres of/ton steel in whole electrosmelting process), do not add the lime residue adjustment between melting period, do not flow slag operation, when liquid steel temperature reaches 1560 ℃ yet, steel scrap in the electric furnace all melts, be generally 1560 ℃~1580 ℃, sampling analysis, and begin to flow slag operation.If P in the molten steel 〉=0.025% enters oxidation period and begins to add lime and rhombspar slag making materials, molten steel per ton adds 10Kg~15Kg lime and 4~6Kg rhombspar, if P in the molten steel≤0.025% is then no longer added lime and rhombspar slag making materials.In whole smelting process, keep foamy slag height 〉=500mm, be generally 500mm~1000mm.Require C:0.09~0.15%, Si≤0.10%, P≤0.015% below the satisfying of carbon in the molten steel, silicon and phosphorus, electric furnace steel tapping during 1670 ℃~1700 ℃ of temperature.
Above-mentioned molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace, it is characterized in that: at step 2 electric furnace when filling with substance, after adding decarburization molten iron and high-temperature liquid state pre-melted slag, be blended into untreated blast-meltedly again, the untreated blast-melted amount that is blended into is 30%~50% of a decarburization weight of molten iron.
This molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace has following advantage:
1. electric furnace slag in early stage dissolves back power supply stove use by the decarburization heat riser, alleviates the furnace melting burden, has improved the effect of utilizing of lime, improves the dephosphorization utilization ratio of lime, shortens the tap to tap time of electric furnace, improves the rhythm of production of electric furnace; 2. the high-temperature liquid state slag of electric furnace employing molten steel decarburization heat riser generation has reduced electric furnace lime adding amount 25~30Kg/ ton steel as slag use in early stage, simultaneously owing to contain a large amount of Fe 2O 3Help the dephosphorization and the formation of electric furnace foamy slag in early stage of electric furnace Deng oxide compound, shortened tap to tap time, reduced power consumption; 3. electric furnace employing molten steel decarburization heat riser is that electric furnace is made the slag in early stage, can obviously reduce smelting cost, does not adopt molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace to compare with existing, and general every stove can reduce by 800 yuan.
Embodiment
Describe the embodiment of this molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace in detail below in conjunction with embodiment, but the embodiment of this molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace is not limited to following embodiment.
Embodiment one
Present embodiment is to adopt steel scrap to add decarburization intensification molten iron smelting with 50 tons of electric furnaces.
This molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace embodiment is a following sequential steps:
One makes the high-temperature liquid state pre-melted slag
The blast-melted hot metal pretreatment stove that is added to 30 tons 1310 ℃ changes the hot metal pretreatment stove over to molten steel decarburization intensification station, is added the rhombspar of 500Kg lime and 100Kg by high hopper, begin to carry out the decarburization hyperthermic treatment, add second batch of slag charge behind the 10min, add-on is 1000Kg lime and 200Kg rhombspar, adds the 3rd batch of slag charge behind the 15min, add-on is a 1000Kg lime, continue blowing 12min, thermometric sampling, carbon content 2.1%, during 1530 ℃ of temperature, offer electric furnace and use.
The charging of two electric furnaces:
Before the electric furnace charging is empty stove, and furnace bottom does not overlay the bedstone ash, adorns 25 tons of steel scraps earlier, the decarburization molten iron and the high-temperature liquid state pre-melted slag of packing into then and providing by the decarburization heat riser, 30 tons of iron water amounts, 2.7 tons of high-temperature liquid state pre-melted slags are converted and are forbidden slag to flow out from the electric furnace fire door in the iron process;
Three electrosmeltings:
After the electric furnace hot metal charging finishes, begin to send electricity, oxygen blast to flux (consuming 40 cubic metres of/ton steel), do not add the lime residue adjustment between melting period, also do not flow slag operation in whole electrosmelting process, 1560 ℃ of liquid steel temperatures, sampling analysis, and begin to flow slag operation.P in the molten steel 〉=0.025% enters oxidation period and begins to add lime 12Kg/ ton steel, rhombspar 5Kg/ ton steel slag making materials.P in the molten steel≤0.025% is not then being added lime and rhombspar slag making materials.In whole smelting process, keep the foamy slag height greater than 500mm (be controlled at 500mm~1000mm), require C:0.09%, Si≤0.10%, P≤0.015% below the carbon in the molten steel, silicon and phosphorus are satisfied, during 1690 ℃ of temperature, electric furnace steel tapping.
Embodiment two
Present embodiment is to adopt steel scrap to add decarburization intensification molten iron smelting with 50 tons of electric furnaces.
This molten steel decarburization heat riser earlier stage slag-smelting method for pre-smelting electric furnace embodiment is a following sequential steps:
One makes the high-temperature liquid state pre-melted slag
25 tons 1270 ℃ melten iron in hot-metal mixer is added to the hot metal pretreatment stove, changes the hot metal pretreatment stove over to molten steel decarburization intensification station, add 500Kg lime and 100Kg rhombspar by high hopper, begin to carry out the decarburization hyperthermic treatment, add second batch of slag charge behind the 10min, add-on is 500Kg lime and 100Kg rhombspar, adds the 3rd batch of slag charge behind the 15min, add-on is a 1000Kg lime, continue blowing 10min, thermometric sampling, carbon content 1.5%, during 1530 ℃ of temperature, offer electric furnace and use.
The charging of two electric furnaces:
Before the electric furnace charging is empty stove, furnace bottom does not overlay the bedstone ash, adorn 10 tons of steel scraps earlier, the decarburization molten iron and the high-temperature liquid state pre-melted slag of packing into then and providing by the decarburization heat riser, wherein iron water amount is 25 tons, 2.7 tons of high-temperature liquid state pre-melted slags, be blended into again 10 tons untreated blast-melted, convert and forbid slag to flow out in the iron process from the electric furnace fire door;
Three electrosmeltings:
After electric furnace is converted the iron end, begin to send electricity, oxygen blast to flux (consuming 50 cubic metres of/ton steel), do not add the lime residue adjustment between melting period, also do not flow slag operation in whole electrosmelting process, 1560 ℃ of liquid steel temperatures, sampling analysis, and begin to flow slag operation.P in the molten steel 〉=0.025% enters oxidation period and begins to add lime 400Kg/ stove (8~12Kg/ ton steel), rhombspar 200Kg/ stove (3~5Kg/ ton steel) slag making materials.In whole smelting process, keep foamy slag height 〉=500mm (to be controlled at 500mm~1000mm).Below satisfying, carbon in the molten steel, silicon and phosphorus requires C: when≤0.09%, Si≤0.10%, P≤0.015%, 1690 ℃ of temperature, and electric furnace steel tapping.
Note:
The steely iron water that the said composition blast-melted or melten iron in hot-metal mixer of 1 present specification complies with the national standard requirements requires (weight proportion) to be to carbon, silicon, phosphorus and sulphur in the molten iron:
Carbon: 3.50%~4.50%, silicon: be not more than 0.80%, phosphorus is not more than 0.40%, and sulphur is not more than 0.07%.
The 2 decarburization molten iron that provided by the decarburization heat riser and the method for high-temperature liquid state pre-melted slag are that the hot metal pretreatment stove is weighed by the on-line weighing device before pack into blast furnace or melten iron in hot-metal mixer, the molten iron of packing into is skimmed earlier (after skimming, molten iron is not with slag substantially), and then weigh, the difference after weighing for twice is an iron water amount.Add slag charge (lime, rhombspar etc.) through metering in to the molten iron treating processes at the hot metal pretreatment stove, after the hot metal pretreatment stove finished the molten iron processing, the slag making material total amount of adding was the quantity of slag.
The said steel scrap of 3 present specification is people's steel products that can not re-use in the life of working.At steelworks is a kind of raw material of converter, electrosmelting.There are two portions in its source, and some is the outsourcing steel scrap, out of use steel product in the daily life, and as iron pan, bicycle frame etc., the iron and steel support of dismounting, steel pipeline, reinforcing bar, waste and old equipment, foundry goods etc.; Another part be steel mill in process of production, the waster that can not sell.Steel scrap is divided into ordinary scrap steel, special steel scrap by kind after returning steelworks, and ordinary scrap steel is meant that sulphur content below 0.050%, does not contain the steel scrap of special elements, and steel scrap is meant ordinary scrap steel here.

Claims (2)

1, a kind of earlier stage slag-smelting method for pre-smelting electric furnace, it comprises following sequential steps:
One makes the high-temperature liquid state pre-melted slag
1250~1400 ℃ blast-melted or melten iron in hot-metal mixer is added to the hot metal pretreatment stove, change the hot metal pretreatment stove over to molten steel decarburization intensification station, add lime and rhombspar by high hopper, it is the rhombspar that molten iron per ton adds 16kg~20kg lime and 3kg~4kg that first slag charge adds pan feeding, begin to carry out the decarburization hyperthermic treatment after the adding, add second batch of slag charge behind 9min~12min, molten iron per ton adds the rhombspar of 16kg~40kg lime and 3kg~6kg, add the 3rd batch of slag charge behind 13min~15min, molten iron per ton adds 16kg~40kg lime, continue blowing 10min~15min, thermometric sampling is when carbon content 1.5%~2.5%, 1530 ℃~1560 ℃ of temperature, offer electric furnace and use, the summation of three add-ons of slag making materials is to handle 6%~10% of weight of molten iron;
The charging of two electric furnaces:
Before the electric furnace charging is empty stove, and furnace bottom does not overlay the bedstone ash, adorns steel scrap earlier, and the steel scrap amount of adding is for adding 40%~50% of the total iron and steel stock of electric furnace; The decarburization molten iron and the high-temperature liquid state pre-melted slag of packing into then and being provided by the decarburization heat riser, high-temperature liquid state pre-melted slag are 6.7%~9% of the blast-melted or melten iron in hot-metal mixer weight of decarburization, convert and forbid slag to flow out from the electric furnace fire door in the iron process;
Three electrosmeltings:
The electric furnace hot metal charging begins to send electricity, oxygen blast to flux after finishing, and does not add the lime residue adjustment between melting period, does not also flow slag operation, and when liquid steel temperature reached 1560 ℃~1580 ℃, the steel scrap in the electric furnace all melted, sampling analysis, and begin to flow slag operation; If P in the molten steel 〉=0.025% enters oxidation period and begins to add lime and rhombspar slag making materials, molten steel per ton adds 10Kg~15Kg lime and 4Kg~6Kg rhombspar, if P in the molten steel≤0.025% is then no longer added lime and rhombspar slag making materials; In whole smelting process, keep foamy slag height 〉=500mm; Carbon in the molten steel, silicon and phosphorus require C:0.09~0.15%, Si≤0.10%, P≤0.015%, 1670 ℃~1700 ℃ electric furnace steel tappings of temperature below satisfying.
2, earlier stage slag-smelting method for pre-smelting electric furnace according to claim 1, it is characterized in that: at step 2 electric furnace when filling with substance, after adding decarburization molten iron and high-temperature liquid state pre-melted slag, be blended into untreated blast-meltedly again, the untreated blast-melted amount that is blended into is 30%~50% of a decarburization weight of molten iron.
CNB2008100547770A 2008-04-11 2008-04-11 A kind of earlier stage slag-smelting method for pre-smelting electric furnace Expired - Fee Related CN100564546C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2008100547770A CN100564546C (en) 2008-04-11 2008-04-11 A kind of earlier stage slag-smelting method for pre-smelting electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2008100547770A CN100564546C (en) 2008-04-11 2008-04-11 A kind of earlier stage slag-smelting method for pre-smelting electric furnace

Publications (2)

Publication Number Publication Date
CN101255486A CN101255486A (en) 2008-09-03
CN100564546C true CN100564546C (en) 2009-12-02

Family

ID=39890582

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2008100547770A Expired - Fee Related CN100564546C (en) 2008-04-11 2008-04-11 A kind of earlier stage slag-smelting method for pre-smelting electric furnace

Country Status (1)

Country Link
CN (1) CN100564546C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824508B (en) * 2010-02-24 2011-09-21 南京钢铁股份有限公司 Slagging method for electrosmelting
CN108950133A (en) * 2018-08-16 2018-12-07 江苏久华环保科技股份有限公司 A kind of full steel scrap electric arc furnace smelting slagging method
CN114959181B (en) * 2022-05-31 2023-06-27 宝武集团鄂城钢铁有限公司 Quick temperature rise refining method for deformed steel bar, deformed steel bar production method and deformed steel bar

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4447265A (en) * 1983-06-27 1984-05-08 Schwer John W Method and composition for foaming slag in electric arc furnace

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4447265A (en) * 1983-06-27 1984-05-08 Schwer John W Method and composition for foaming slag in electric arc furnace

Also Published As

Publication number Publication date
CN101255486A (en) 2008-09-03

Similar Documents

Publication Publication Date Title
CN105256152B (en) The method of quick reduction melting Ti-containing slag
CN108085577B (en) A kind of smelting process improving ton steel scrap ratio
CN106544467B (en) A kind of high alloy Low-phosphorus Steel method in high molten iron proportion electric furnace smelting
CN106045301B (en) A method of producing mineral wool using converter molten state early period slag
Eissa et al. Conversion of mill scale waste into valuable products via carbothermic reduction
CN101684507B (en) Direct steel making technique by reducing iron ore with gas
CN106348626A (en) Method for recovering converter molten steel slag to produce concrete admixture
CN101665849B (en) Continuous steel making process for iron ore
CN106086608A (en) A kind of method utilizing carbon manganese slag to produce low Carbon Manganese silicon alloy
CN104762488B (en) A kind of method of direct vanadium alloying in esr process
CN102559984B (en) Method for producing high carbon steel through double-slag high drawing carbon tapping
CN102534093A (en) Control method of two-stage auxiliary material module in revolving furnace smelting process
CN103627846B (en) The method of molybdenum oxide DIRECT ALLOYING steel-making
CN103667590B (en) Electric-arc furnace converter process for smelting steel and iron slag
CN103643056B (en) The smelting process of low carbon ferromanganese
CN100564546C (en) A kind of earlier stage slag-smelting method for pre-smelting electric furnace
CN104769136B (en) Refine method of hot metal
CN105132605A (en) Process for pressing slag and removing foam of converter slag tank by using blast furnace gas ash
CN103031401A (en) Method for converter steelmaking by LF (Ladle Furnace) refining furnace reducing slag
CN101532071B (en) Converter dephosphorization complex slag former and slagging technology
CN103643094B (en) The smelting process of high carbon ferromanganese
CN102146500A (en) Fluxing agent for smelting steel as well as preparation and use methods thereof
CN104789736B (en) Method for reducing chromium element in electric arc furnace slag
CN103031409B (en) Novel process of steelmaking deoxidization by utilizing precipitator dust of refining furnace
CN102634634A (en) Method for producing high-alloy low-phosphorous steel used for boiler tube by adopting electric-arc furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091202

Termination date: 20160411