CN100546944C - The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component - Google Patents

The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component Download PDF

Info

Publication number
CN100546944C
CN100546944C CNB2007101217646A CN200710121764A CN100546944C CN 100546944 C CN100546944 C CN 100546944C CN B2007101217646 A CNB2007101217646 A CN B2007101217646A CN 200710121764 A CN200710121764 A CN 200710121764A CN 100546944 C CN100546944 C CN 100546944C
Authority
CN
China
Prior art keywords
precast body
charcoal
temperature
electric heating
graphite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB2007101217646A
Other languages
Chinese (zh)
Other versions
CN101157563A (en
Inventor
罗瑞盈
李强
李进松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beihang University
Original Assignee
Beihang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beihang University filed Critical Beihang University
Priority to CNB2007101217646A priority Critical patent/CN100546944C/en
Publication of CN101157563A publication Critical patent/CN101157563A/en
Application granted granted Critical
Publication of CN100546944C publication Critical patent/CN100546944C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to the technology of the long-pending preparation of a kind of electric heating process orienting infiltration charcoal/charcoal component, this technology comprises three partial contents: the design of electric heating process CVI cvd furnace; The preparation of precast body; The densification of precast body and high-temperature heat treatment.Specifically be that precast body self directly is used as heating element, as the electrode of power supply, add electric current at the two ends of precast body in cvd furnace, the self-resistance generation heat by precast body reaches more than the pyrolysis temperature of reactant gases furnace chamber.

Description

The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component
(1) technical field:
The invention provides the technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component, belong to the carbon/carbon composite technical field.
(2) background technology:
Charcoal/charcoal (C/C) matrix material has high specific strength and specific modulus under hot environment, low density and good anti-ablation, hot physics, mechanical behavior under high temperature, particularly they can keep very reasonably frictional coefficient in very big range of temperature, be successfully used to the guided missile nose cone of strategic nuclear weapons, the jet pipe throat lining of rocket engine, the nose cone of space shuttle and military affairs such as the leading edge of a wing and aeroplane brake discs, aerospace field, but this material causes cost very high because the price of charcoal fiber raw material is high and preparation technology's cycle is long, so far they also do not obtain widespread use in industry and the civilian field of waiting, and therefore research and develop fast and low-cost densification new technology and be one of key subjects that present international C/C matrix material studies.
Aspect the densification of C/C matrix material, main both at home and abroad at present resin method and long-pending (CVI) method of chemical vapor infiltration of adopting.Resin method generally needs repeatedly circulation to immerse resin or pitch carries out charing and greying then, isothermal CVI method precast body then needs densification more than 1000 hours, these caused the C/C Composite Preparation cycle long, cost is high, and greatly limited its range of application, thereby a large amount of manpower and materials research quick densifying technology have all been dropped into both at home and abroad, thermal gradient CVI, novel procesies such as forced convection thermal gradient CVI, directly-heated CVI have been proposed in succession, but these methods for various reasons, all do not obtain big application in industry.
Electric heating process (electrified perform heating CVI method, be called for short ECVI) be by to temperature, pressure, contact area and free space volumes than isoparametric control, the residence time of pilot-gas, it is long-pending to realize that deposit carbon successively oozes to outside disposable from precast body inside, make the long-pending speed of oozing of carbon improve an order of magnitude, reduce the densification cost greatly.In conjunction with to RESEARCH OF PYROCARBON type, weave construction, Interface Design, improve mechanical property, tribological property and material self resistance of oxidation simultaneously, for good basis is established in the actual application of C/C matrix material (particularly using as aeroplane brake discs).
(3) summary of the invention:
The object of the present invention is to provide the technology of the long-pending preparation of a kind of electric heating process orienting infiltration charcoal/charcoal component, solve long, defect of high cost of C/C Composite Preparation cycle in the prior art, prepare fast have strong mechanical performance, the C/C matrix material of good heat physical properties, to reduce cost.
The technology of the long-pending preparation of a kind of electric heating process orienting infiltration of the present invention charcoal/charcoal component, its technical scheme is divided into following a few part: the preparation of precast body, the design of electric heating process CVI cvd furnace, the densification of precast body and high-temperature heat treatment; Its technical process is as shown in Figure 1:
1. the preparation of precast body
At first, adopt whole Nomex as precast body, its structural unit is one deck net tire+two-layer no latitude cloth, and the macrofiber between two layers of no latitude cloth adopts quadrature (90 °) shop layer, lays evenly; The shop number of plies should be not less than 15 layers; No latitude cloth adopts the T300PAN based carbon fiber, and the ratio that its weight accounts for overall weight is 〉=75%; The net tire also adopts the T300PAN based carbon fiber, and its weight ratio is≤25%; Initial density is 0.5g/cm 3About.Then, the Nomex precast body is fixed on the homemade graphite anchor clamps, in the groove of graphite body, precast body is fixed.These graphite anchor clamps mainly are made up of graphite body and isolator two parts, two of the bottom independently graphite body and two copper electrodes be spirally connected fixingly respectively, the graphite body at top is by the isolator fixed support, as shown in Figure 2.
2. electric heating process CVI cvd furnace design
Electric heating process CVI cvd furnace as shown in Figure 3.Electrical insulator and two copper electrodes are installed in the bottom of body of heater, the inwall of body of heater is installed cooling system, and be provided with thermofin and avoid the furnace body outer wall temperature too high, but viewport has been installed on the body of heater, be used to observe the intravital various phenomenons of stove, inlet mouth is installed in the bottom of body of heater, the air outlet is installed in the top of body of heater, precast body is fixed in the graphite anchor clamps of being made by graphite body, the isolator fixed support graphite body of body of heater center, and cooling system is installed at the center of isolator, thermocouple is installed on the precast body surface, be used to measure the temperature on precast body surface, thermocouple is installed on the precast body centre portions, is used to measure the temperature of precast body centre portions.
3. the densification of precast body and high-temperature heat treatment
At first vacuumize to check and whether leak gas, feed nitrogen then and purify body of heater, continue to feed nitrogen and reach a normal atmosphere up to the intravital air pressure of stove; Then precast body being heated to surface temperature is 700~800 ℃, will continue to feed nitrogen simultaneously, and the effect of nitrogen is to prevent the precast body oxidation.The temperature of the temperature of precast body outside surface and inside center part utilizes two thermocouple to test, and one is fixed on the precast body surface, and another is fixed on precast body central part office.When the temperature at center reaches 900~1100 ℃, feed the mixed gas of Sweet natural gas and nitrogen.Carry out along with sedimentary, the temperature that measures in the thermocouple of surface portion can slowly rise, and levels off to the temperature at precast body center, but depositing temperature still remains on 900~1100 ℃ in whole deposition process, depositing time 80 hours, the precast body densification finishes; Then, the material through densification is carried out high-temperature heat treatment: material is placed in the vacuum carburization stove, under the state of nitrogen or argon shield, with the temperature rise rate of 30~50 ℃/h, is warmed up to 2000-2500 ℃, and is incubated 3~5 hours, get product.
Wherein, self directly is used as heating element this precast body, in cvd furnace as the electrode of power supply.
Wherein, add electric current, by the self-resistance generation heat of precast body at the two ends of this precast body.
Wherein, these graphite anchor clamps mainly are made up of graphite body and isolator two parts, two of the bottom independently graphite body and two copper electrodes be spirally connected fixingly respectively, the graphite body at top is by the isolator fixed support.
Wherein, the flow velocity of the gas mixture of feeding Sweet natural gas and nitrogen is 351/min.
Wherein, vacuumize to check that the speed that should guarantee to leak gas is less than 0.13Pa/min in the step of whether leaking gas at this
The technology of the long-pending preparation of a kind of electric heating process orienting infiltration of the present invention charcoal/charcoal component, its advantage and effect are:, the preparation cycle length of charcoal/charcoal component, cost are low, and the charcoal/charcoal component of preparing has strong mechanical performance, good heat physical properties.
(4) description of drawings:
The process flow sheet of the long-pending preparation of Fig. 1 electric heating process orienting infiltration charcoal/charcoal component
The homemade graphite anchor clamps of Fig. 2 synoptic diagram
Fig. 3 electric heating process CVI cvd furnace synoptic diagram
Concrete label and symbol are as follows:
1, air outlet 2, isolator 3, cooling system
4, thermocouple 5, graphite body 6, electrical insulator
But 7, copper electrode 8, precast body 9 viewports
10, thermocouple 11, cooling system 12, thermofin
13, inlet mouth
° degree, ℃ degree centigrade, ℃/h degree centigrade/hour,
The Pa/min handkerchief/minute, the 1/min liter/minute
(5) embodiment:
The technology of the long-pending preparation of a kind of electric heating process orienting infiltration of the present invention charcoal/charcoal component, its embodiment is described below in conjunction with the accompanying drawings:
1. the preparation of precast body
At first, adopt whole Nomex as precast body, precast body is of a size of 1100 * 500 * 35mm, and the volume content of charcoal fiber is 40%.Its structural unit is one deck net tire+two-layer no latitude cloth, and the macrofiber between two layers of no latitude cloth adopts quadrature (90 °) shop layer, lays evenly; The shop number of plies should be not less than 15 layers; No latitude cloth adopts the T300PAN based carbon fiber, and the ratio that its weight accounts for overall weight is 〉=75%; The net tire also adopts the T300PAN based carbon fiber, and its weight ratio is≤25%; Initial density is 0.5g/cm 3About.Then, the Nomex precast body is fixed on the homemade graphite anchor clamps, in the groove of graphite body, precast body is fixed.These graphite anchor clamps mainly are made up of graphite body 5 and isolator 2 two partss, two of the bottom independently graphite body 5 be and two copper electrodes 7 fixed that is spirally connected respectively that the graphite body at top is by isolator 2 fixed supports, as shown in Figure 2.
2. electric heating process CVI cvd furnace design
Electric heating process CVI cvd furnace as shown in Figure 3.Electrical insulator 6 and two copper electrodes 7 are installed in the bottom of body of heater, the inwall of body of heater is installed cooling system 11, and be provided with thermofin 12 and avoid the furnace body outer wall temperature too high, but viewport 9 has been installed on the body of heater, be used to observe the intravital various phenomenons of stove, inlet mouth 13 is installed in the bottom of body of heater, air outlet 1 is installed in the top of body of heater, precast body 8 is fixed in the graphite anchor clamps of being made by graphite body 5, the isolator 2 fixed support graphite bodies 5 of body of heater center, cooling system 3 is installed at the center of isolator 2, thermocouple 4 is installed on the precast body surface, be used to measure the temperature on precast body surface, thermocouple 10 is installed on the precast body centre portions, is used to measure the temperature of precast body centre portions.
3. the densification of precast body
Electric heating process CVI cvd furnace as shown in Figure 3, as presoma, the gas flow amount is 351/min with Sweet natural gas.Whether the first step of experiment is depositing device to be vacuumized inspection leak gas; The speed that guarantees to leak gas feeds nitrogen and purified body of heater in about 30 minutes less than 0.13Pa/min, feeds nitrogen then and reaches a normal atmosphere up to the intravital air pressure of stove.Then heat precast body; the temperature of the temperature of its outside surface and inside center part utilizes two thermocouple to test; a thermocouple is fixed on the precast body surface; another is fixed on the central part office of precast body thickness; control precast body core temperature is 900~1100 ℃, and surface temperature is 700~800 ℃, makes that thermograde is 200~300 ℃; will continue to feed nitrogen simultaneously, the effect of nitrogen is the anti-oxidation that plays a protective role.By the time after depositing temperature had been stablized 30 minutes, the mixed gas of Sweet natural gas and nitrogen fed in the cvd furnace.Carry out along with sedimentary; the temperature that measures in the thermocouple of surface portion can slowly rise, and levels off to the temperature at precast body center, but depositing temperature still remains on 900~1100 ℃ in whole deposition process; treat that depositing time reaches 80 hours; the precast body densification finishes, and then the material through densification is carried out high-temperature heat treatment: material is placed in the vacuum carburization stove, under the state of nitrogen protection; temperature rise rate with 30 ℃/h; be warmed up to 2500 ℃, and be incubated 3 hours, get product.

Claims (5)

1, the technology of the long-pending preparation of a kind of electric heating process orienting infiltration charcoal/charcoal component, it is characterized in that: its preparation technology is:
(1) preparation of precast body
At first, adopt whole Nomex as precast body, its structural unit is one deck net tire+two-layer no latitude cloth, and the macrofiber between the two-layer no latitude cloth adopts quadrature shop layer, lays evenly; The shop number of plies should be not less than 15 layers; No latitude cloth adopts T300 PAN based carbon fiber, and the ratio that its weight accounts for overall weight is 〉=75%; The net tire also adopts T300 PAN based carbon fiber, and its weight ratio is≤25%; Initial density is 0.5g/cm 3About; Then, the Nomex precast body is fixed on the homemade graphite anchor clamps, in the groove of graphite body, precast body is fixed;
Described homemade graphite anchor clamps mainly are made up of graphite body and isolator two parts, two of the bottom independently graphite body and two copper electrodes be spirally connected fixingly respectively, the graphite body at top is by the isolator fixed support;
(2) the long-pending cvd furnace design of electric heating process chemical vapor infiltration
Electrical insulator and two copper electrodes are installed in the bottom of body of heater, the inwall of body of heater is installed cooling system, and be provided with thermofin and avoid the furnace body outer wall temperature too high, but viewport is installed on the body of heater, be used to observe the intravital various phenomenons of stove, inlet mouth is installed in the bottom of body of heater, the air outlet is installed in the top of body of heater, precast body is fixed in the graphite anchor clamps of being made by graphite body, the isolator fixed support graphite body of body of heater center, and cooling system is installed at the center of isolator, a thermocouple is installed on the precast body surface, be used to measure the temperature on precast body surface, another thermocouple is installed on the precast body centre portions, is used to measure the temperature of precast body centre portions;
(3) densification of precast body and high-temperature heat treatment
At first vacuumize to check and whether leak gas, feed nitrogen then and purify body of heater, continue to feed nitrogen and reach a normal atmosphere up to the intravital air pressure of stove; Then precast body being heated to surface temperature is 700~800 ℃, will continue to feed nitrogen simultaneously; The temperature of the temperature of precast body outside surface and inside center part utilizes two thermocouple to test, and one is fixed on the precast body surface, and another is fixed on precast body central part office; When the temperature at center reaches 900~1100 ℃, feed the mixed gas of Sweet natural gas and nitrogen; Carry out along with sedimentary, the temperature that measures in the thermocouple of surface portion can slowly rise, and levels off to the temperature at precast body center; Depositing temperature remains on 900~1100 ℃ in the whole deposition process, depositing time 80 hours, and the precast body densification finishes; Then, the material through densification is carried out high-temperature heat treatment: material is placed in the vacuum carburization stove, under the state of nitrogen or argon shield, with the temperature rise rate of 30~50 ℃/h, is warmed up to 2000-2500 ℃, and is incubated 3~5 hours, get product.
2, the technology of the long-pending preparation of electric heating process orienting infiltration according to claim 1 charcoal/charcoal component, it is characterized in that: self directly is used as heating element this precast body, in cvd furnace as the electrode of power supply.
3, the technology of the long-pending preparation of electric heating process orienting infiltration according to claim 1 charcoal/charcoal component, it is characterized in that: the two ends at this precast body add electric current, by the self-resistance generation heat of precast body.
4, the technology of the long-pending preparation of electric heating process orienting infiltration according to claim 1 charcoal/charcoal component, it is characterized in that: the flow velocity that feeds the gas mixture of Sweet natural gas and nitrogen is 35l/min.
5, the technology of the long-pending preparation of electric heating process orienting infiltration according to claim 1 charcoal/charcoal component is characterized in that: vacuumize to check that the speed that should guarantee to leak gas is less than 0.13Pa/min in the step of whether leaking gas at this.
CNB2007101217646A 2007-09-13 2007-09-13 The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component Active CN100546944C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007101217646A CN100546944C (en) 2007-09-13 2007-09-13 The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007101217646A CN100546944C (en) 2007-09-13 2007-09-13 The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component

Publications (2)

Publication Number Publication Date
CN101157563A CN101157563A (en) 2008-04-09
CN100546944C true CN100546944C (en) 2009-10-07

Family

ID=39305813

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007101217646A Active CN100546944C (en) 2007-09-13 2007-09-13 The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component

Country Status (1)

Country Link
CN (1) CN100546944C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101617491B1 (en) * 2009-12-02 2016-05-02 비코 인스트루먼츠 인코포레이티드 Method for improving performance of a substrate carrier and a substrate carrier

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101306811B (en) * 2008-07-10 2010-06-02 西北工业大学 Method for preparing large-sized isotropic decomposition charcoal
CN101386547B (en) * 2008-08-21 2012-11-14 湖南金博复合材料科技有限公司 Carbon/carbon compound material heating element and production technology thereof
CN101691684B (en) * 2009-09-23 2011-02-09 北京航空航天大学 Preparation and carbonization method of needle-punched pre-oxidative fiber prefabricated part
CN101798078B (en) * 2010-04-22 2011-11-09 航天材料及工艺研究所 Quick carbon deposition method of carbon/carbon material member
CN102330070A (en) * 2011-10-20 2012-01-25 西安航空制动科技有限公司 Preheating device for chemical vapor deposition furnace
CN104926349A (en) * 2015-07-02 2015-09-23 华东交通大学 Method and depositing furnace for rapidly depositing and preparing C/C composite material by direct heating method
CN105967715B (en) * 2016-05-06 2019-02-01 湖南东映碳材料科技有限公司 A kind of preparation method of high thermal conductivity carbon/carbon composite
CN106966752B (en) * 2017-03-30 2020-04-17 中南大学 Carbon-based composite material with flatting paint and preparation method and application thereof
CN110514005A (en) * 2019-07-09 2019-11-29 绵阳宸和电工科技有限公司 A kind of cvd furnace of Hybrid Heating
AU2020360751A1 (en) * 2019-10-01 2022-03-03 Haldor Topsøe A/S Cyanide on demand
CN112457038A (en) * 2020-11-13 2021-03-09 甘肃新西北碳素科技有限公司 Preparation method of carbon/carbon composite material thin-wall cylinder

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
坯体结构对炭/炭复合材料增密速率的影响. 陈腾飞等.材料工程,第8期. 2002
坯体结构对炭/炭复合材料增密速率的影响. 陈腾飞等.材料工程,第8期. 2002 *
生命周期评价法在炭/炭复合材料制备中的应用研究. 徐松华等.炭素技术,第5期. 2003
生命周期评价法在炭/炭复合材料制备中的应用研究. 徐松华等.炭素技术,第5期. 2003 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101617491B1 (en) * 2009-12-02 2016-05-02 비코 인스트루먼츠 인코포레이티드 Method for improving performance of a substrate carrier and a substrate carrier

Also Published As

Publication number Publication date
CN101157563A (en) 2008-04-09

Similar Documents

Publication Publication Date Title
CN100546944C (en) The technology of the long-pending preparation of electric heating process orienting infiltration charcoal/charcoal component
CN105110809B (en) The preparation method of the modified high heat conductance three-dimensional carbon/carbon composite of Graphene
CN101698975B (en) Method for modifying carbonized pre-oxidized fiber preform interface by carbon nanotube
CN108975922B (en) Carbon/carbon composite material heating body with pyrolytic carbon coating on surface and preparation method thereof
CN103951470B (en) Hafnium carbide nanowire-toughened ceramic coating layer of surface of carbon/carbon composites and preparation method thereof
CN105016760B (en) A kind of preparation method of the modified C/C composites of superhigh temperature ceramics
CN100501185C (en) Process for preparing carbon/carbon braking material for high speed train
CN103193497B (en) Sticky product with silicon erosion resistance of carbon/carbon composite material and preparation method thereof
CN102126859B (en) Method for preparing bamboo-shaped SiC nanowire-toughened HfC ceramic
CN103936464A (en) Preparation method of HfC-SiC modified carbon/carbon composite material
CN103724055B (en) Hot matching coating of a kind of SiC/HfC/ZrC and preparation method thereof
CN103613400A (en) Preparation method of carbon fiber reinforced carbon-silicon carbide dual-ceramic based gradient composite material
CN104446585B (en) The method that batch quickly prepares high-density carbon/carbon composite material
CN105541416A (en) Preparation method for HfC-SiC coating on C/C composite material surface
Zhu et al. A gradient composite coating to protect SiC-coated C/C composites against oxidation at mid and high temperature for long-life service
Xue-Song et al. Microstructure, thermophysical property and ablation behavior of high thermal conductivity carbon/carbon composites after heat-treatment
CN104402483A (en) Preparation method of carbon fiber silicon carbide composite material
CN107084922A (en) Silicon carbide fibre high temperature water oxygen environment analogy method
CN115028472A (en) Preparation method of oxidation-resistant ablation coating on surface of C/C composite material
CN105712746A (en) Method of preparing Si-Mo-Cr coating with excellent heat shock resistance on surface of C/C composite material
CN102603344A (en) Preparing process of silicon carbide whisker toughened zirconium diboride ceramic
CN106631078A (en) Preparation method of silicon carbide composite cladding pipe
CN105601311B (en) A kind of highly-textured based composite material of carbon and preparation method
CN1241878C (en) Preparation for carbon/carbon composite material solid cylindric workpieces with self-heating method
CN104926349A (en) Method and depositing furnace for rapidly depositing and preparing C/C composite material by direct heating method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Tianniao High Technology Co., Ltd.

Assignor: Beihang University

Contract record no.: 2011990000461

Denomination of invention: Process for preparing charcoal/charcoal component by electrothermy orienting infiltration

Granted publication date: 20091007

License type: Exclusive License

Open date: 20080409

Record date: 20110615