CN100516377C - 带有扩大头的预制管桩的施工方法 - Google Patents

带有扩大头的预制管桩的施工方法 Download PDF

Info

Publication number
CN100516377C
CN100516377C CNB2005100948518A CN200510094851A CN100516377C CN 100516377 C CN100516377 C CN 100516377C CN B2005100948518 A CNB2005100948518 A CN B2005100948518A CN 200510094851 A CN200510094851 A CN 200510094851A CN 100516377 C CN100516377 C CN 100516377C
Authority
CN
China
Prior art keywords
pile
prefabricated tubular
tubular pile
enlarged footing
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100948518A
Other languages
English (en)
Other versions
CN1749484A (zh
Inventor
卫龙武
徐冬生
吕福明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wei Longwu
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005100948518A priority Critical patent/CN100516377C/zh
Publication of CN1749484A publication Critical patent/CN1749484A/zh
Application granted granted Critical
Publication of CN100516377C publication Critical patent/CN100516377C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

带有扩大头的预制管桩的施工方法是一种用于建筑基础工程中对地基进行加固的方法,在施工工艺中,在桩端形成扩大头的方法为:1)利用沉桩机械将预制管桩(1)和空心桩尖(2)沉至预定标高,2)在预制管桩(1)中,用压杆(3)向下锤击使空心桩尖(2)继续向下压,3)在空心桩尖(2)与预制管桩(1)之间投放填料(4),4)再用压杆(3)向下锤击使投放填料向下和向周围扩大,并夯实,5)重复3、4两步,直至形成桩端扩大加强区,在桩端形成扩大头。用该方法极大地提高了桩的承载力,改善了桩端土的物理力学指标,避免了桩端土的软化,降低工程造价。

Description

带有扩大头的预制管桩的施工方法
技术领域
本发明是一种用于建筑基础工程中对地基进行加固的方法,属于土木工程桩基础施工方法的技术领域。
背景技术
在建筑基础工程中,大量采用各种桩结构,由于预制管桩具有强度高、材料省、施工速度快、造价相对较低、质量易保证等诸多优点,因此应用最为广泛。管桩分为预应力管桩、高强薄壁管桩等多种形式。因预制管桩多是通过静压或锤击的方法沉入土中的,因此其全为直线式。为了增加预制管桩的承载力,目前有少数的技术可以在桩底端的地基中施工扩大头,但这些施工方法要么需要带水成孔,这给混凝土的灌注带来困难,要么是在将混凝土投入在管内进行夯扩,这容易造成预制管桩的损坏,而桩尖下沉很少,难以形成扩大头,工程的质量难以保证。
发明内容
技术问题:本发明的目的是针对桩端带有扩大头的预制管桩,提供一种带有扩大头的预制管桩的施工方法,使用该方法可以极大地提高桩的承载力,改善桩端土的物理力学指标,避免桩端土的软化,施工方便,降低工程造价。
技术方案:本发明针对桩端带有扩大头的预制管桩的施工工艺进行设计。桩端带有扩大头的预制管桩的组成包括:管状预制桩身、空心桩尖、扩大头。
在施工工艺中,在桩端形成扩大头的方法可以为压扩法:
在施工工艺中,在桩端形成扩大头的方法为:
1)利用沉桩机械将预制管桩和空心桩尖沉至预定标高,
2)在预制管桩中,用压杆向下锤击使空心桩尖继续向下压,
3)在空心桩尖与预制管桩之间投放填料,
4)再用压杆向下锤击使投放填料向下和向周围扩大,并夯实,
5)重复3、4两步,直至形成桩端扩大加强区,在桩端形成扩大头。
有益效果:本发明为桩端带有扩大头的预制管桩,沉桩方式采用静压法或锤击法,施工快捷。由于桩端的扩孔采用压扩的形式,对于桩端土的挤密效果很好,从而为桩基工程增添了一种新的桩型。与普通的预制管桩相比,带扩大头的预制管桩的桩端面积增大,极大地提高了桩的承载力,其次,又因改善了桩端土的物理力学指标,对强风化岩,还避免了桩端土的软化,进一步减小了桩的沉降,减少了桩的数量,减小了承台的尺寸和配筋,降低了工程造价。
附图说明
图1是本发明压扩法施工工艺步骤的流程示意图。
图中有:预制管桩1,空心桩尖2,压杆3,填料4,扩大头5。
具体实施方式
压扩法实施例:预制管桩外径Φ500mm,内径Φ340mm,桩长12m,土层依次为:杂填土、粉质粘土、桩端持力层为可塑的粘土。在测量定位放线后,放好特制的桩尖,然后用400吨的静压桩机将预制管桩和特制的桩尖压至预定的标高,并用直径为300mm的重锤夯击桩尖,使桩尖下沉700mm(这样可使桩尖与管桩之间有700mm的间隙),然后填入800mm高的碎石,再用重锤夯击碎石,使其向四周延扩,如此反复多次,直至锤击贯入度达到设计标准,最后再灌放C30砼0.2立方米,这样就形成了扩大头,完成了带有扩大头的预制管桩的施工。

Claims (1)

1.一种带有扩大头的预制管桩的施工方法,其特征在于在施工工艺中,在桩端形成扩大头的方法为:
1)利用沉桩机械将预制管桩(1)和空心桩尖(2)沉至预定标高,
2)在预制管桩(1)中,用压杆(3)向下锤击使空心桩尖(2)继续向下压,
3)在空心桩尖(2)与预制管桩(1)之间投放填料(4),
4)再用压杆(3)向下锤击使投放填料向下和向周围扩大,并夯实,
5)重复3、4两步,直至形成桩端扩大加强区,在桩端形成扩大头。
CNB2005100948518A 2005-10-17 2005-10-17 带有扩大头的预制管桩的施工方法 Expired - Fee Related CN100516377C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100948518A CN100516377C (zh) 2005-10-17 2005-10-17 带有扩大头的预制管桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100948518A CN100516377C (zh) 2005-10-17 2005-10-17 带有扩大头的预制管桩的施工方法

Publications (2)

Publication Number Publication Date
CN1749484A CN1749484A (zh) 2006-03-22
CN100516377C true CN100516377C (zh) 2009-07-22

Family

ID=36605123

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100948518A Expired - Fee Related CN100516377C (zh) 2005-10-17 2005-10-17 带有扩大头的预制管桩的施工方法

Country Status (1)

Country Link
CN (1) CN100516377C (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100429353C (zh) * 2006-06-27 2008-10-29 中国矿业大学 一种爆扩桩施工工艺
CN101153489B (zh) * 2006-09-21 2010-06-16 王国奋 沉管预制钢砼扩底桩的爆破扩底、成桩方法
CN101153490B (zh) * 2006-09-21 2010-06-23 王国奋 沉管预制钢砼扩底桩的爆破扩底、成桩方法
CN101936004A (zh) * 2010-08-25 2011-01-05 张继红 一种预制挤扩桩及其施工方法与施工机械设备
CN102051877B (zh) * 2010-12-01 2012-05-30 张继红 一种预制挤扩桩及其施工方法
CN103290837B (zh) * 2013-06-06 2015-08-26 金陵科技学院 爆扩灌注桩的施工方法及其排气装置
CN103821146B (zh) * 2014-02-12 2015-08-19 杭州建工集团有限责任公司 一种pc管桩的爆破截桩施工工艺
CN104727309A (zh) * 2015-02-02 2015-06-24 中国电力工程顾问集团中南电力设计院有限公司 挤入式扩底型管桩施工工艺
CN105113501B (zh) * 2015-08-14 2017-05-31 太原理工大学 具有爆扩装置的外扩式大直径圆筒吸入桩
CN105649015B (zh) * 2016-02-01 2017-06-16 安徽理工大学 一种爆炸注浆防沉降管桩
CN112144522A (zh) * 2020-10-20 2020-12-29 王继忠 一种预应力管桩的施工方法及其特制预应力管桩
CN112482357B (zh) * 2020-12-04 2022-08-09 浙大城市学院 一种适用于硬土层的预爆破水泥搅拌桩钻具及其应用方法

Also Published As

Publication number Publication date
CN1749484A (zh) 2006-03-22

Similar Documents

Publication Publication Date Title
CN100516377C (zh) 带有扩大头的预制管桩的施工方法
WO2018210019A1 (zh) 潜孔冲击旋喷复合桩成桩方法
CN102011399B (zh) 一种基于phc桩的多重高喷扩底桩施工方法
CN104074186B (zh) 一种建筑地基中成孔的护筒装置及其施工方法
CN105544512A (zh) 埋设传热管的加筋布袋注浆碎石桩及施工方法
CN102733376A (zh) 复合桩及其施工方法
CN106192999A (zh) 抗拔桩的施工方法
CN103821138A (zh) 复合桩的施工方法
CN101298772A (zh) 静压沉管扩底混凝土桩的施工方法
CN102535458A (zh) 一种加筋水泥土锚杆及其施工方法
CN111794216A (zh) 抗拔载体桩的施工方法
CN101936004A (zh) 一种预制挤扩桩及其施工方法与施工机械设备
CN104762956A (zh) 一种基于建筑垃圾再生骨料新型桩的成桩方法
CN106759332A (zh) 桩的施工方法及施工设备
CN211646445U (zh) 抛石层桩
CN102477743A (zh) 一种小直径桩孔混凝土袋装浇筑施工方法
CN104988913A (zh) 一种大直径长桩的载体桩的施工方法
CN105064332A (zh) 一种方形桩身载体桩的施工方法
CN1827924A (zh) 静压置换地基处理法及其多用途压管
CN106759289A (zh) 一种桩的施工方法及施工设备
CN111636420A (zh) 一种抗缩颈的沉管灌注桩的施工设备及施工方法
CN101899827B (zh) 乱堆石填土地基中沉管内冲击锤破碎土振动挤密处理方法
CN105926621A (zh) 一种静压载体桩的施工方法
CN201762705U (zh) 一种预制挤扩桩
CN110029665B (zh) 抵御膨胀土地基不良工程特性的微型桩桩基及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 210037 Jiangsu Province, Nanjing City Central Lake Garden Room 401 13

Patentee after: Wei Longwu

Address before: 210037 Jiangsu Province, Nanjing City Central Lake Garden Room 401 13

Patentee before: Wei Longwu

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction method for prefabricated tubular pile with expanding head

Effective date of registration: 20120713

Granted publication date: 20090722

Pledgee: Bank of Communications Ltd Jiangsu branch

Pledgor: Wei Longwu

Registration number: 2012990000371

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090722

Termination date: 20121017

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20131106

Granted publication date: 20090722

Pledgee: Bank of Communications Ltd Jiangsu branch

Pledgor: Wei Longwu

Registration number: 2012990000371

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model