CN100512543C - Method for setting wireless access load - Google Patents

Method for setting wireless access load Download PDF

Info

Publication number
CN100512543C
CN100512543C CNB2004100043821A CN200410004382A CN100512543C CN 100512543 C CN100512543 C CN 100512543C CN B2004100043821 A CNB2004100043821 A CN B2004100043821A CN 200410004382 A CN200410004382 A CN 200410004382A CN 100512543 C CN100512543 C CN 100512543C
Authority
CN
China
Prior art keywords
network controller
wireless network
base station
service wireless
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004100043821A
Other languages
Chinese (zh)
Other versions
CN1658542A (en
Inventor
许炳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing wisdom partner Technology Co., Ltd.
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CNB2004100043821A priority Critical patent/CN100512543C/en
Publication of CN1658542A publication Critical patent/CN1658542A/en
Application granted granted Critical
Publication of CN100512543C publication Critical patent/CN100512543C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

This invention discloses a method founding wireless switch-in bearing. This method includes: after SRNC receiving the request of establishing wireless switch-in bearing of CN, start up the user surface transmission bearing founding process of In interface; SRNC sends the request of establishing RB to the user terminal; and SRNC sends the information of equipping wireless chain resource to its subordinate base station; as the user terminal receiving the request of establishing RB, finish the founding of RB; as the base station receiving the re-collocation of wireless chain, re-distribute the wireless chain-channel resources, SRNC and the base station synchronize the transmitting channels and inform the launching signal of the base station; after the re-collocation of wireless chain-channel and receiving the information of complementation of RB, SRNC informs CN wireless switch-in bearing establishment. This invention adopts the establishment processes of Iub interface bearing and Uu interface bearing in RAB founding process, it greatly reduces the founding time of RAB, therefore, it improves the information continuing and delaying index.

Description

A kind of method of setting up RAB
Technical field
The present invention relates to the technology of setting up of RAB, be meant a kind of method of in Wideband Code Division Multiple Access (WCDMA) (WCDMA)/TD SDMA (TD-SCDMA) system, setting up RAB especially.
Background technology
In the WCDMA/TD-SCDMA system, the user sets up a service needed and carries out several signaling procedures, comprises the process of Access Network and non-access net, initiates professional set up the temporal summation that the business of asking sets up successfully to be spent and be referred to as the signaling time delay from the user.The signaling time delay is an important indicator of 3G network, and Virtual network operator and equipment manufacturers very pay close attention to it, therefore, the optimization of signaling time delay index is had crucial meaning.
Introduce a parameter relevant below: activationary time with time delay.
Here said activationary time be meant by network regulation, UE and network enable moment of identical, new parameter configuration simultaneously.Referring to shown in Figure 1, set up in the process in business, exist radio bearer setting (RADIO BEARER SETUP) message and radio bearer setting to finish (RADIO BEARER SETUP COMPLETE) message between UE and the universal terrestrial access network (UTRAN).When user terminal (UE) receive RADIO BEARER SETUP message in the RRC message that contains activationary time numerical value Toffset that UTRAN issues after, carry out the configuration and the professional foundation of relevant parameter.After finishing dealing with, the activationary time that UE issues at UTRAN is to UTRAN response RADIOBEARER SETUP COMPLETE message.
From above-mentioned example as can be seen, wireless link synchronization reshuffle finish after, and must reach activationary time the time, UE could be sent completely message to UTRAN, therefore the activationary time here is to the obvious effect of the time delay that continues.The numerical value of activationary time is big more, and connecting time is long more.But this numerical value again can not be too little, if too little, will cause UE to have little time to finish configuration, thereby cause the failure that continues.
The following describes and in the signaling handshaking procedure, account for long RAB of time (RAB) and set up process.
RAB is meant the carrying of user plane, is used for transmitting voice, data and multimedia service between UE and the core net (CN).The signaling process of RAB comprises the processing procedure of terrestrial interface (Iu interface and Iub interface) and air interface (Uu interface).
UE could set up RAB after at first will finishing Radio Resource control (RRC) connection foundation then.The foundation of RAB is to be initiated by CN, the function that UTRAN carries out, and basic procedure is:
CN sends the RAB assignment request message to UTRAN, and request UTRAN sets up RAB; After UTRAN received this RAB assignment request message, service wireless network controller wherein (SRNC) initiated to set up the bearer context for data transmission of Iu interface and Iub interface (Iur interface); SRNC initiates radio bearer (RB) to UE and sets up request; UE finishes RB and sets up, and responds RB foundation to SRNC and finishes message; SRNC replys RAB assignment response message to CN, finishes RAB and sets up flow process.After RAB sets up successfully, a basic call setup, UE enters communication process.
According to the Radio Resource operating position, i.e. Radio Resource state when Radio Resource state when RRC connection is set up and RAB set up can be divided into following three kinds of situations with the flow process of setting up of RAB:
1) DCH-DCH:RRC uses DCH, and RAB prepares to use DCH;
2) RACH/FACH-RACH/FACH:RRC uses control channel (CCH), and RAB prepares to use CCH;
3) RACH/FACH-DCH:RRC uses CCH, and RAB prepares to use DCH.
In above-mentioned three kinds of situations, first kind is the most frequently used.Here this situation of main explanation.Referring to shown in Figure 2, it is as follows that the RAB under the DCH-DCH synchronous situation sets up flow process:
Step 201:CN sends the RAB assignment message (Radio Access Bearer Assignment Request) that wireless access network is used (RANAP) agreement to UTRAN, initiates RAB and sets up request;
After step 202:SRNC receives RAB foundation request, with the Quality of Service parameter maps of RAB is AAL2 link characteristic parameters and Radio Resource characterisitic parameter, and user's face transmission bearer that the Access Link Control Application Protocol of Iu interface (ALCAP) is initiated the Iu interface according to ATM Adaptation Layer type 2 (AAL2) link characteristic parameters is wherein set up process;
Step 203:SRNC prepares (Radio Link Reconfiguration Prepare) message to the radio link reconfiguration that subordinate's base station (Node B) sends base station applies agreement (NBAP), and request subordinate's Node B prepares to increase by the DCH of one or more carrying RAB on existing Radio Link;
Step 204:Node B redistributes air-link resources according to the message of receiving, sends (Radio Link Reconfiguration Ready) message to affiliated SRNC then, and notice SRNC radio link reconfiguration is ready to complete;
User's face transmission bearer of the ALCAP of Iub interface initiation Iub interface is set up process among the step 205:SRNC, and Node B and SRNC set up synchronously by the up-downgoing synchronization frame of exchange dedicated transmission channel (DCH) Frame Protocol;
Step 206:SRNC sends radio link reconfiguration to subordinate's Node B and carries out message (RadioLink Reconfiguration Commit);
Step 207:SRNC sets up (Radio Bearer Setup) message to the RB that UE sends the RRC agreement;
After step 208:UE carries out RB foundation, send radio bearer foundation to SRNC and finish (RadioBearer Setup Complete) message;
Step 209:SRNC receives after radio bearer sets up the message finish, and responds RAB assignment response (Radio Access Bearer Assignment Response) message to CN, finishes RAB and sets up flow process.
In said process, step 203~206 are used to set up the carrying of Iub interface, and step 207~208 are used to set up the carrying of Uu mouth.These two kinds of operations are serials, and promptly 203~208 priorities are finished the foundation of the carrying of Iub interface, Uu interface.If the time period that the Iub interface carrying is set up is A, the Uu interface time period is B, and then 303~308 needed times of completing steps are A+B.Obviously, in time period A, the Uu mouth is not do any operation.And in time period B, the carrying of Iub has been set up and has been finished, and is just waiting for.Therefore, this serial operation mechanism is very big to the influence of the time delay that continues.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of method of setting up RAB, make it can reduce the time delay that continues of RAB.
In order to achieve the above object, the invention provides a kind of method of setting up RAB, this method comprises:
A. after service wireless network controller receives the request of setting up RAB of core net initiation, initiate user's face transmission bearer of Iu interface and set up process;
B. service wireless network controller sends the message that reconfigures Radio Link to subordinate's base station when the request message of radio bearer is set up in the user terminal transmission; Perhaps, service wireless network controller is after the request message of radio bearer is set up in the user terminal transmission, and before described radio bearer foundation was finished, service wireless network controller sent to subordinate's base station and reconfigures Radio Link message; Perhaps, service wireless network controller to subordinate's base station send reconfigure Radio Link message after, and described base station finish redistribute air-link resources before, service wireless network controller sends the request message of setting up radio bearer to user terminal;
C. after user terminal is received the request message of setting up radio bearer, finish the foundation of radio bearer; And, after the message that reconfigures Radio Link is received in the base station, redistribute air-link resources, after resource allocation was finished, the synchronous and informing base station of finishing transmission channel between service wireless network controller and the base station transmitted on the Radio Link of reshuffling;
D. service wireless network controller notice core net RAB is set up.
In execution in step C, also further comprise:
Whether C1, service wireless network controller judge whether user terminal is finished between the foundation of radio bearer and base station and the service wireless network controller and finish synchronously, if, execution in step D, otherwise, execution in step C1.
After user terminal is set up radio bearer, further comprise among the step C:
User terminal sends radio bearer to service wireless network controller and sets up the information of finishing,
Then whether to finish the foundation of radio bearer be service wireless network controller to user terminal described in the step C1 sets up the information of finishing and judge by whether receiving this radio bearer.
Service wireless network controller sends to subordinate's base station that to reconfigure Radio Link message be to prepare message by the radio link reconfiguration of base station applies agreement NBAP agreement to realize among the step B;
Then step C redistributes resource in the base station, and and service wireless network controller between finish synchronous process and comprise:
Air-link resources is redistributed after receiving that radio link reconfiguration is prepared message in C21, base station, and notification service radio network controller radio link reconfiguration is ready to complete;
User's face transmission bearer of the Access Link Control Application Protocol ALCAP of Iub interface initiation Iub interface is set up process in C22, the service wireless network controller, and base station and service wireless network controller are set up synchronously by the up-downgoing synchronization frame of exchange dedicated transmission channel DCH Frame Protocol;
C23, service wireless network controller send radio link reconfiguration to subordinate's base station and carry out message.
Service wireless network controller reconfigures Radio Link message to the transmission of subordinate's base station when user terminal transmission radio bearer is set up message in step B.
In step B service wireless network controller to user terminal send set up the request message of radio bearer after, and RAB set up finish before, service wireless network controller sends to subordinate's base station and reconfigures Radio Link message.
In step B service wireless network controller to subordinate's base station send reconfigure Radio Link message after, and before service wireless network controller and base station were finished synchronously, service wireless network controller was set up message to user terminal transmission radio bearer.
Setting up process at user's face transmission bearer of initiating the Iu interface described in the steps A comprises:
A1, service wireless network controller are mapped as ATM Adaptation Layer type 2 AAL2 link characteristic parameters and Radio Resource characterisitic parameter with the mass parameter of RAB;
The ALCAP of the Iu interface of A2, service wireless network controller sets up process according to user's face transmission bearer that AAL2 link characteristic parameters is wherein initiated the Iu interface.
The present invention sets up in the process at RAB, the parallel process of setting up of Iub interface carrying and the process of setting up of Uu interface bearing of carrying out, and this method can greatly reduce RAB settling time, thereby has improved the signaling time delay index that continues.
Description of drawings
Fig. 1 sets up the process flow schematic diagram for RB;
The schematic flow sheet that Fig. 2 sets up for prior art RAB;
Fig. 3 is the schematic flow sheet of method of the present invention;
Fig. 4 is for realizing the specific embodiments of the invention schematic flow sheet.
Embodiment
The present invention sets up in the process at RAB, the parallel process of setting up of Iub interface carrying and the process of setting up of Uu interface bearing of carrying out.
Referring to shown in Figure 3, realize that method of the present invention may further comprise the steps:
After step 301:SRNC receives the request of setting up RAB of CN initiation, the qos parameter of RAB wherein is mapped as AAL2 link characteristic parameters and Radio Resource characterisitic parameter, and the ALCAP of the Iu interface of SRNC sets up process according to user's face transmission bearer that AAL2 link characteristic parameters is wherein initiated the Iu interface;
Step 302:SRNC sends RB to user terminal and sets up message, and SRNC sends radio link reconfiguration message to subordinate's base station;
Step 303: user terminal is finished the foundation of RB after receiving and setting up the RB request message; And, after radio link reconfiguration message is received in the base station, redistribute air-link resources, and SRNC and base station finish synchronously and after informing base station transmits of transmission channel on the Radio Link of reshuffling, SRNC notice CN RAB is set up.
Certainly, in execution in step 302, whether whether service wireless network controller can the real-time judge user terminal be finished between the foundation of radio bearer and base station and the service wireless network controller is finished synchronously, after definite both finishes, and execution in step 303.
Wherein, can comprise three kinds of situations in the step 302.First kind of situation is: when user terminal transmission RB set up message, SRNC notified subordinate's base station to reconfigure channel at SRNC.Second kind of situation is: send after RB sets up message to user terminal at SRNC, but before RB did not set up, SRNC notified subordinate's base station to reconfigure channel.The third situation is: notify after subordinate's base station begins to prepare to reconfigure channel at SRNC, but before not finishing channel configuration, SRNC sends RB to user terminal and sets up message.
Describe technical scheme of the present invention in detail below in conjunction with the drawings and specific embodiments.
Referring to shown in Figure 4, the detailed process of present embodiment is as follows:
Step 401:CN initiates RAB and sets up request to RAB assignment (the Radio AccessBearer Assignment Request) message that UTRAN sends RANAP;
After step 402:SRNC receives RAB foundation request, the qos parameter of RAB is mapped as AAL2 link characteristic parameters and Radio Resource characterisitic parameter, and the ALCAP of Iu interface sets up process according to user's face transmission bearer that AAL2 link characteristic parameters is wherein initiated the Iu interface;
Step 403:SRNC sets up (Radio Bearer Setup) message to the RB that UE sends the RRC agreement, and UE begins RB and sets up process;
Step 404:SRNC prepares (Radio Link Reconfiguration Prepare) message to the radio link reconfiguration that subordinate's Node B sends the NBAP agreement, and request subordinate's Node B prepares to increase by the DCH of one or more carrying RAB on existing Radio Link;
Step 405:Node B distributes air-link resources, sends (RadioLink Reconfiguration Ready) message to affiliated SRNC then, and notice SRNC radio link reconfiguration is ready to complete;
User's face transmission bearer of the ALCAP of Iub interface initiation Iub interface is set up process among the step 406:SRNC, and Node B and SRNC set up synchronously by the up-downgoing synchronization frame of exchange DCH Frame Protocol;
Step 407:SRNC sends radio link reconfiguration to subordinate's Node B and carries out (Radio LinkReconfiguration Commit) message;
After step 408:UE finishes RB foundation, send radio bearer foundation to SRNC and finish (RadioBearer Setup Complete) message;
Step 409:SRNC receives after radio bearer sets up the message finish, and responds RAB assignment response (Radio Access Bearer Assignment Response) message to CN, finishes RAB and sets up flow process.
Characteristics of the present invention are that the carrying of Iub interface and the carrying of Uu interface set up simultaneously.Usually B settling time of Uu interface is greater than A settling time of Iub interface.And, in the above-described embodiments can radio bearer set up that activationary time is set to B in the request message, therefore, SRNC is in UE sends the time period B that RB sets up request, and UE sends RB to SRNC and finishes message, and Iub interface was also set up and was finished this moment.
Certainly, if the Uu interface settling time B less than A settling time of Iub interface, two kinds of processing methods can be arranged.
First kind: the activationary time when the Uu interface bearing is set up is not provided with reference to B, and is provided with reference to A.Can guarantee that so still Radio Bearer Setup Complete message sends in step 408.In such cases, setting up Uu interface and Iub interface time is about time period A.
Second kind: only the Radio Bearer Setup Complete message in the step 408 in the above-mentioned flow process was sent before step 407.At this moment, setting up Uu interface and Iub interface time still is A.
In addition, also have a kind of processing method to be: no matter at first begin to set up wherein any of Uu interface or Iub interface, do not set up finish before, just begin to set up another kind of interface.In such cases, setting up Uu interface and Iub interface time will be less than A+B.
In sum, under the parallel processing situation, MAX{A, B}≤time delay<A+B, rather than the A+B under the prior art condition.So the present invention greatly reduces RAB settling time, thereby optimized the time delay that continues.
In a word, the above is preferred embodiment of the present invention only, is not to be used to limit protection scope of the present invention.

Claims (5)

1, a kind of method of setting up RAB, it is characterized in that: this method may further comprise the steps:
A. after service wireless network controller receives the request of setting up RAB of core net initiation, initiate user's face transmission bearer of Iu interface and set up process;
B. service wireless network controller sends the message that reconfigures Radio Link to subordinate's base station when the request message of radio bearer is set up in the user terminal transmission; Perhaps, service wireless network controller is after the request message of radio bearer is set up in the user terminal transmission, and before described radio bearer foundation was finished, service wireless network controller sent to subordinate's base station and reconfigures Radio Link message; Perhaps, service wireless network controller to subordinate's base station send reconfigure Radio Link message after, and described base station finish redistribute air-link resources before, service wireless network controller sends the request message of setting up radio bearer to user terminal;
C. after user terminal is received the request message of setting up radio bearer, finish the foundation of radio bearer; And, after the message that reconfigures Radio Link is received in the base station, redistribute air-link resources, after resource allocation was finished, the synchronous and informing base station of finishing transmission channel between service wireless network controller and the base station transmitted on the Radio Link of reshuffling;
D. service wireless network controller notice core net RAB is set up.
2, method according to claim 1 is characterized in that, in execution in step C, also further comprises:
Whether C1, service wireless network controller judge whether user terminal is finished between the foundation of radio bearer and base station and the service wireless network controller and finish synchronously, if, execution in step D, otherwise, execution in step C1.
3, method according to claim 2 is characterized in that, after user terminal is set up radio bearer in step C, further comprises:
User terminal sends radio bearer to service wireless network controller and sets up the information of finishing,
Then whether to finish the foundation of radio bearer be service wireless network controller to user terminal described in the step C1 sets up the information of finishing and judge by whether receiving this radio bearer.
4, method according to claim 1 and 2, it is characterized in that service wireless network controller sends to subordinate's base station that to reconfigure Radio Link message be to prepare message by the radio link reconfiguration of base station applies agreement NBAP agreement to realize among the step B;
Then step C redistributes resource in the base station, and and service wireless network controller between finish synchronous process and comprise:
Air-link resources is redistributed after receiving that radio link reconfiguration is prepared message in C21, base station, and notification service radio network controller radio link reconfiguration is ready to complete;
User's face transmission bearer of the Access Link Control Application Protocol ALCAP of Iub interface initiation Iub interface is set up process in C22, the service wireless network controller, and base station and service wireless network controller are set up synchronously by the up-downgoing synchronization frame of exchange dedicated transmission channel DCH Frame Protocol;
C23, service wireless network controller send radio link reconfiguration to subordinate's base station and carry out message.
5, method according to claim 1 is characterized in that, sets up process at user's face transmission bearer of initiating the Iu interface described in the steps A and comprises:
A1, service wireless network controller are mapped as ATM Adaptation Layer type 2 AAL2 link characteristic parameters and Radio Resource characterisitic parameter with the mass parameter of RAB;
The ALCAP of the Iu interface of A2, service wireless network controller sets up process according to user's face transmission bearer that AAL2 link characteristic parameters is wherein initiated the Iu interface.
CNB2004100043821A 2004-02-17 2004-02-17 Method for setting wireless access load Expired - Fee Related CN100512543C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100043821A CN100512543C (en) 2004-02-17 2004-02-17 Method for setting wireless access load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100043821A CN100512543C (en) 2004-02-17 2004-02-17 Method for setting wireless access load

Publications (2)

Publication Number Publication Date
CN1658542A CN1658542A (en) 2005-08-24
CN100512543C true CN100512543C (en) 2009-07-08

Family

ID=35007820

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100043821A Expired - Fee Related CN100512543C (en) 2004-02-17 2004-02-17 Method for setting wireless access load

Country Status (1)

Country Link
CN (1) CN100512543C (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100435596C (en) * 2005-09-02 2008-11-19 大唐移动通信设备有限公司 Method for rapid recovery of user's set communication
CN100461950C (en) * 2005-09-28 2009-02-11 华为技术有限公司 Method for shortening continuous time-delay under soft switching-over and wireless network controller
CN100569021C (en) * 2005-10-28 2009-12-09 华为技术有限公司 Link converting method in a kind of communication system
CN100426923C (en) * 2005-11-01 2008-10-15 华为技术有限公司 Method for storage configuration identification reallocation in mobile communication system
EP1943860A4 (en) * 2005-11-02 2012-11-21 Ericsson Telefon Ab L M Adaptive resource handling for radio link reconfigurations
WO2007062544A1 (en) * 2005-11-29 2007-06-07 Zte Corporation Method of realizing the asynchronous radio link reconfiguration process of base station synchronously
CN1992966B (en) * 2005-12-27 2010-07-14 中兴通讯股份有限公司 Private wireless link reconfigured method with renewable activation time
CN100401796C (en) * 2006-01-19 2008-07-09 华为技术有限公司 Method for assigning resource of base station node
CN100428858C (en) * 2006-02-07 2008-10-22 华为技术有限公司 Method and apparatus for shortening soft switch-over time delay
CN101115276B (en) * 2006-07-24 2010-04-21 展讯通信(上海)有限公司 Wireless bearing configuration method
CN101132620B (en) * 2006-08-23 2010-09-08 大唐移动通信设备有限公司 Signal channel regulation method
CN101267248B (en) * 2007-03-15 2012-09-05 中兴通讯股份有限公司 Synchronization method and device spanning across wireless network controller in broadcast service data
CN101193446B (en) * 2007-05-11 2010-08-04 华为技术有限公司 A signaling wireless network controller and UI management method
CN101128050B (en) * 2007-08-31 2010-04-14 华为技术有限公司 Wireless carrier control method, system and service wireless network controller
CN101400189A (en) * 2007-09-30 2009-04-01 华为技术有限公司 Method, system, base station and management node for core network node access
CN100581297C (en) 2008-02-04 2010-01-13 华为技术有限公司 Method and system for processing load bearing with ISR mechanism
CN101616135B (en) * 2008-06-25 2012-05-23 华为技术有限公司 Method, device and system for releasing bearing as well as wireless network controller
CN101686555B (en) * 2008-09-25 2013-06-05 中兴通讯股份有限公司 Method and device for processing uplink random access resources
EP2410809B1 (en) * 2009-03-17 2017-08-30 Huawei Technologies Co., Ltd. Method, device and system for setting up radio bearer
WO2011020230A1 (en) * 2009-08-17 2011-02-24 上海贝尔股份有限公司 Method and device for radio admission control
CN102227948B (en) * 2009-12-04 2014-04-30 华为技术有限公司 Method, base station and user equipment for connection reestablishment
CN102026129B (en) * 2010-12-24 2014-09-10 中兴通讯股份有限公司 Method and device for processing call delay information
CN103428715B (en) * 2012-05-17 2016-09-28 中兴通讯股份有限公司 Wireless link reconfigured method and device
WO2015139325A1 (en) * 2014-03-21 2015-09-24 华为技术有限公司 Configuration method, network device and user equipment
CN105101462A (en) * 2015-06-05 2015-11-25 上海华为技术有限公司 Message multiplexing transmission method, device and system based on Iub interface

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
3rd Generation Partnership Project,TechnicalSpecificationGroup Core Network,Application of the RadioAccess NetworkApplication Part(RANAP) onE-interface(Release1999). 3GPP TS 29.108 V3.3.0. 2003
3rd Generation Partnership Project,TechnicalSpecificationGroup Core Network,Application of the RadioAccess NetworkApplication Part(RANAP) onE-interface(Release1999). 3GPP TS 29.108 V3.3.0. 2003 *

Also Published As

Publication number Publication date
CN1658542A (en) 2005-08-24

Similar Documents

Publication Publication Date Title
CN100512543C (en) Method for setting wireless access load
CN101242645B (en) Method and system for mobile terminal to enter from free status to activated status
US8391241B2 (en) Inter-system handoff using circuit switched bearers for serving general packet radio service support nodes
JP5349600B2 (en) AT command processing technology for EPS packet domain
US7853257B2 (en) Method for fast call setup in a mobile communication system
US6944473B2 (en) Method for radio access bearer reconfiguration in a communications system
CN101438610B (en) Method for optimizing the load distribution between a first mobile radio network and a second mobile radio network
CN100442916C (en) Method of setting up master call
EP1834430B1 (en) System for channel allocation when radio resource connection is released in dual transfer mode
CN100493258C (en) Method for transferring wideband CDMA access equipment state
US6741860B1 (en) Signalling method
EP2104387B1 (en) Allocation of a radio access bearer with a lower rate than desired in case of lack of resources, if an indicator in the assignment request indicates that the communication rate is negotiable
TWI310287B (en) Transmission rate control method, transmission rate control system, and mobile station
CN1822684B (en) Transport bearer setting control system and method in a mobile communication system
CN101431783A (en) Method for implementing switching and switching equipment thereof
US7039416B2 (en) Method and apparatus for adapting a number of bearers to a service
WO2010135985A1 (en) Method, device and system for controlling allocation of credit resources of uplink enhanced dedicated channel
CN100411489C (en) Method of reporting stored configuration parameter information by mobile terminal
EP1599056B1 (en) Method and apparatus for call set up in a mobile communication system
EP1718099A2 (en) Method for controlling service priority in radio communication network, radio communication system, radio control apparatus, terminal unit and core network
EP1998587B1 (en) METHOD FOR COMPRESSING AND SETTING UP WIRELESS ACCESS BEARER AND METHOD FOR TRANSFERRING Iu RAB SETTING
CN102045794A (en) Call switching method between base station systems and mobile communication system
CN101163339B (en) Method, system and equipment for reducing load of RNC processor
CN101860926B (en) Method and system for establishing call in switch-in process
CN100558197C (en) The management of new and old link circuit resource and conversion method in a kind of communication system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING ZHIXUN HUOBAN TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: HUAWEI TECHNOLOGY CO., LTD.

Effective date: 20150605

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518129 SHENZHEN, GUANGDONG PROVINCE TO: 100193 HAIDIAN, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20150605

Address after: 100193 Beijing City, northeast of Haidian District, South Road, No. 29, building 3, room 4, room 4516

Patentee after: Beijing wisdom partner Technology Co., Ltd.

Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen

Patentee before: Huawei Technologies Co., Ltd.

DD01 Delivery of document by public notice

Addressee: Beijing wisdom partner Technology Co., Ltd.

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090708

Termination date: 20170217

CF01 Termination of patent right due to non-payment of annual fee