- CN100499478C CN100499478C CNB03145190XA CN03145190A CN100499478C CN 100499478 C CN100499478 C CN 100499478C CN B03145190X A CNB03145190X A CN B03145190XA CN 03145190 A CN03145190 A CN 03145190A CN 100499478 C CN100499478 C CN 100499478C
- Authority
- CN
- China
- Prior art keywords
- loading
- upgrading
- management system
- element device
- network management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Computer And Data Communications (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention discloses a method of locking network cell device loading/upgrading, making it able to solve the problem that network management system monitors the loading/upgrading course of many devices, increasing the success rate of device loading/upgrading course and simultaneously reducing the influence of the device loading/upgrading course on normal managing course of the network management to the lowest. The method contains the steps: A. as network cell device starts loading/upgrading, it sends trap information about starting loading/upgrading to server end; B. the server end notifies client end to lock the network cell device; C. the client end locks the network cell device.
Description
Technical field
The present invention relates to the network management technology of communication system, particularly the locking means in the net element device loading/upgrading process.
Background technology
Network management is the important component part of the communication technology, be guarantee that communication system is efficient, reliable, the important foundation of economy and safe operation, therefore become the focus of communications field development in recent years.According to of the management of at present general network management system to network element device, if be at network element device under the situation of loading/upgrading these network element devices are carried out operation such as resetting, write configuration data, might cause the loading/upgrading failure, serious meeting causes the unusual of network element device.Therefore, network management system must monitor the loading/upgrading process of network element device and control.
Present network management system usually adopts the mode of progress bar to monitor and controls the loading/upgrading process of network element device.In this mode, when the network element device in the communication system is in the loading/upgrading state, will produce a progress bar in network management system client, the progress of display device loading/upgrading locks network management system client simultaneously in real time, and the user can't operate.Therefore, before the device loading/upgrading operation was finished, the user can't operate whole system by network management system client, after the device loading/upgrading process finishes, just allowed the user that system is operated again.
In actual applications, there is following problem in such scheme: at first, a plurality of network element devices begin to carry out under the situation of loading/upgrading operation simultaneously in communication system, network management system has to produce simultaneously a plurality of progress bars, therefore the loading/upgrading progress that shows corresponding network element device respectively causes network management system client interface confusion easily.When the network element device of while loading/upgrading reaches hundreds of or more for a long time, can not produce the progress bar of respective numbers basically simultaneously, have influence on the success rate of net element device loading/upgrading thus.
Secondly, generally speaking, a network management system is being managed a plurality of network element devices simultaneously.In system, there is a network element device to begin the loading/upgrading operation, just produce corresponding progress bar in each network management system client, the locking user finishes the loading/upgrading operation to the operation of equipment up to this network element device, does not allow the user that other equipment of this system are operated therebetween.As seen the way to manage of progress bar brings very big influence for the normal management of system and operation.
The 3rd, when a network management system server end has a plurality of network management system client, if equipment is carried out the loading/upgrading operation by a client, to on each client, all form progress bar, and lock of the operation of each client to system, will cause having a strong impact on Network Management like this.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of locking means of net element device loading/upgrading, this method can solve the monitoring problem of network management system to a plurality of device loading/upgrading processes, improve the success rate of device loading/upgrading process, simultaneously the device loading/upgrading process is reduced to minimum level to the normal management process influence of webmaster.
In order to solve the problems of the technologies described above, the locking means of net element device loading/upgrading provided by the invention comprises following steps:
When the A network element device begins loading/upgrading, send the trap message that loading/upgrading begins to the network management system server end;
The described network management system server end of B responds the trap message that described loading/upgrading begins, and notice network management system client locking user is to all operations of described network element device;
The C network management system client responds the notice of described network management system server end, and the locking user is to all operations of described network element device;
The D network management system client is with the latch-release of user to all operations of this network element device.
Wherein, described step D comprises following steps:
When D1 finished when loading/upgrading, this network element device sent the trap message that loading/upgrading finishes to the network management system server end;
D2 network management system server end responds the trap message that described loading/upgrading finishes, and notifies each network management system client with the latch-release of user to all operations of this network element device;
The described notice of D3 network management system client response network management system server end is with the latch-release of user to all operations of this network element device.
Described step D2 also comprises following steps:
When described network management system server end was not received the trap message that finishes from the loading/upgrading of described network element device in predefined a period of time, the notice network management system client was with the latch-release of user to all operations of this network element device.
Described step C also comprises following steps:
This network element device reports the trap message of loading/upgrading progress to the network management system server end.
The trap message of described loading/upgrading progress, is sent to the network management system server end according to certain time interval by this network element device, and the described time interval can be set as required.
Described step C also comprises following steps:
When the network management system server is not received trap message from the loading/upgrading progress of network element device in the predefined time, notify each network management system client with the latch-release of user to all operations of this network element device.
According to said method of the present invention, owing to no longer produce progress bar in the gateway system client, therefore a plurality of network element devices begin to carry out under the situation of loading/upgrading operation simultaneously in communication system, and network management system can not cause network management system client interface confusion owing to producing the loading/upgrading progress that a plurality of progress bars show corresponding network element device respectively simultaneously.Secondly, method of the present invention has also been avoided when a network management system is being managed a plurality of network element device simultaneously owing to deleted progress bar, the phenomenon that does not allow the user that other equipment of this system are operated owing to a network element device begins the loading/upgrading operation.The 3rd, the method according to this invention, when a network management system server end has a plurality of network management system client, if equipment is carried out the loading/upgrading operation by a client, because therefore the problem that does not exist each client to be locked by progress bar avoids the influence of the loading/upgrading of network element device to network management.
Description of drawings
Fig. 1 is the flow chart of the locking means of net element device loading/upgrading according to an embodiment of the invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with accompanying drawing.
Shown in the locking means flow chart of net element device loading/upgrading among Fig. 1, in step 100, when network element device began loading/upgrading, network element device sent the trap message that loading/upgrading begins to the network management system server end.
This trap message is used to notify the network management system server end, and described network element device has begun loading/upgrading.Wherein, trap message is the interaction protocol of network management system and network element device, is initiatively reported to the network management system server end by network element device.
After this process enters step 200, in this step, the trap message that the response of described network management system server end begins from the loading/upgrading of network element device, notice network management system client locking user enters step 300 to all operations of this network element device.Need to prove that if the network management system server end has a plurality of network management system client, it will send this notice to all network management system client.
In step 300, the notice of described network management system client response network management system server end, the locking user is to all operations of this network element device.In actual applications, the network element device on the interface of network management system client contains a sign, and whether be used for indication equipment locked, thereby the user can see the loading/upgrading state of this network element device intuitively.When the notice of network management system client response network management system server end, the locking user is during to all operations of this network element device, and this sign can change the blocked state of expression into.
After this, process enters step 400, and in this step, described network element device reports the trap message of loading/upgrading progress to the network management system server end.
This trap message, is sent to the network management system server end according to certain time interval by described network element device, and the time interval can be set as required artificially.Like this, when the user wishes to know the progress of loading/upgrading of blocked network element device, just can be by network management system client to the relevant progress message of network management system server end request.This step can increase or delete as required, does not influence substantial effect of the present invention.
Then, in step 500, when net element device loading/upgrading finished, this network element device sent the trap message that loading/upgrading finishes to the network management system server end; After this enter step 600.
In step 600, when the network management system server end is received the trap message that described loading/upgrading finishes, or when the network management system server end is not received the trap message that finishes from the loading/upgrading of network element device in predefined a period of time, notify each network management system client with the latch-release of user to all operations of this network element device.
Wherein, why when the network management system server end is not received the trap message that loading/upgrading finishes in the predefined time, own to network management system client transmission message, notify it with the latch-release of user to all operations of this network element device, its reason is, might be in the information receiving and transmitting process, middle dropped communication link, or network element device is owing to some reasons can't be sent the trap message that loading/upgrading finishes, in this case, system can not allow network element device locate forever and lock-out state, therefore has a timeout treatment, avoids taking place above-mentioned situation.In addition, for reaching this purpose, also can uniformly-spaced report the trap message of loading/upgrading progress to realize to the network management system server end by the monitoring network element device, promptly when the network management system server is not received trap message from the loading/upgrading progress of network element device in predefined a period of time, notify each network management system client with the latch-release of user to all operations of this network element device.
Then enter step 700, the described notice of network management system client response network management system server end is with the latch-release of user to all operations of this network element device.Accordingly, on the network management system client interface, this network element device is represented that the sign of loading/upgrading state also will correspondingly change into and is not in the lock state.
Need in addition to illustrate, when the user is not locked to the operation of network element device, if the user chooses an equipment in network management system client, carry out the operation that needs, this operation will send to the network management system server end by network management system client, this server end of network management system sends to network element device with the message that this message transformation becomes network element device to be familiar with, by the network element device complete operation; On the other hand, when the user is locked to the operation of network element device, if the user operates this locking device by network management system client, when promptly choosing this equipment and carrying out the operation that needs, network management system client can eject a prompting frame, tells the user, and this network element device is just at loading/upgrading, locked, thus stop the user that this network element device is operated.
Though by reference some preferred embodiment of the present invention, the present invention is illustrated and describes, but those of ordinary skill in the art should be understood that, can do various changes to it in the form and details, and the spirit and scope of the present invention that do not depart from appended claims and limited.
Claims (6)
1. the locking means of a net element device loading/upgrading is characterized in that comprising following steps:
When the A network element device begins loading/upgrading, send the trap message that loading/upgrading begins to the network management system server end;
The described network management system server end of B responds the trap message that described loading/upgrading begins, and notice network management system client locking user is to all operations of described network element device;
The C network management system client responds the notice of described network management system server end, and the locking user is to all operations of described network element device;
The D network management system client is with the latch-release of user to all operations of this network element device.
2. the locking means of net element device loading/upgrading according to claim 1 is characterized in that step D comprises following steps:
When D1 finished when loading/upgrading, this network element device sent the trap message that loading/upgrading finishes to the network management system server end;
D2 network management system server end responds the trap message that described loading/upgrading finishes, and notifies each network management system client with the latch-release of user to all operations of this network element device;
The described notice of D3 network management system client response network management system server end is with the latch-release of user to all operations of this network element device.
3. the locking means of net element device loading/upgrading according to claim 2 is characterized in that, described step D2 also comprises following steps:
When described network management system server end was not received the trap message that finishes from the loading/upgrading of described network element device in predefined a period of time, the notice network management system client was with the latch-release of user to all operations of this network element device.
4. the locking means of net element device loading/upgrading according to claim 1 is characterized in that, described step C also comprises following steps:
This network element device reports the trap message of loading/upgrading progress to the network management system server end.
5. the locking means of net element device loading/upgrading according to claim 4, it is characterized in that, the trap message of described loading/upgrading progress, is sent to the network management system server end according to certain time interval by this network element device, and the described time interval can be set as required.
6. the locking means of net element device loading/upgrading according to claim 4 is characterized in that, described step C also comprises following steps:
When the network management system server is not received trap message from the loading/upgrading progress of network element device in the predefined time, notify each network management system client with the latch-release of user to all operations of this network element device.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101530753A CN101217395A (en) | 2003-07-02 | 2003-07-02 | A locking means of net element device loading/upgrading |
CNB03145190XA CN100499478C (en) | 2003-07-02 | 2003-07-02 | Locking method for loading/upgrading of net element equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB03145190XA CN100499478C (en) | 2003-07-02 | 2003-07-02 | Locking method for loading/upgrading of net element equipment |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007101530753A Division CN101217395A (en) | 2003-07-02 | 2003-07-02 | A locking means of net element device loading/upgrading |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1567836A CN1567836A (en) | 2005-01-19 |
CN100499478C true CN100499478C (en) | 2009-06-10 |
Family
ID=34471374
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB03145190XA Expired - Fee Related CN100499478C (en) | 2003-07-02 | 2003-07-02 | Locking method for loading/upgrading of net element equipment |
CNA2007101530753A Pending CN101217395A (en) | 2003-07-02 | 2003-07-02 | A locking means of net element device loading/upgrading |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007101530753A Pending CN101217395A (en) | 2003-07-02 | 2003-07-02 | A locking means of net element device loading/upgrading |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN100499478C (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100382506C (en) * | 2005-09-20 | 2008-04-16 | 华为技术有限公司 | Method for verifying network-unit server in network management system |
CN100384151C (en) * | 2005-11-16 | 2008-04-23 | 华为技术有限公司 | Upgrade maintaining method for Iu interface and its system |
CN101141282B (en) * | 2006-09-07 | 2010-05-12 | 中兴通讯股份有限公司 | Network management system and its management method |
CN101207522B (en) * | 2007-12-18 | 2011-01-26 | 杭州华三通信技术有限公司 | Method and apparatus for implementation of collocation task scheduling |
CN101400062B (en) * | 2008-10-23 | 2010-07-14 | 中兴通讯股份有限公司 | Updating method and system for network locking terminal |
-
2003
- 2003-07-02 CN CNB03145190XA patent/CN100499478C/en not_active Expired - Fee Related
- 2003-07-02 CN CNA2007101530753A patent/CN101217395A/en active Pending
Also Published As
Publication number | Publication date |
---|---|
CN1567836A (en) | 2005-01-19 |
CN101217395A (en) | 2008-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101515926B (en) | Device management method for device management system | |
US8396818B2 (en) | Operating a communications network | |
JP5096374B2 (en) | Method and communication terminal for managing communication terminal devices | |
CN109412833A (en) | A kind of management system and method for shared device | |
US8812628B2 (en) | Method and system for remote configuration of a device | |
US6854011B2 (en) | System and method for controlling trap generation of simple network management protocol (SNMP) by defining and using a trapflag field and a trappeer field in the managed information base (MIB) | |
US9374269B2 (en) | Method and devices for matching data between a manager and an agent in a management network | |
CN100479380C (en) | Network device managing method, network device and network managing system | |
CN100499478C (en) | Locking method for loading/upgrading of net element equipment | |
CN101547122A (en) | Method, device and system for recovering terminal configuration | |
CN101212346B (en) | Software version management method and device for network element management system | |
CN100514915C (en) | Device management system and device management command scheduling method thereof | |
KR100276882B1 (en) | Integrated operation management device and method of broadband access device | |
CN101753330A (en) | Method for managing equipment based on VRF interface | |
CN100586076C (en) | Interface hanging up method in network managing system | |
CN100589387C (en) | Method and system for managing equipment administrator information | |
CA2331899C (en) | Method and communications system for processing state information in a management network having a number of management levels | |
CN102111783A (en) | Primary subcommand rollback method and terminal | |
RU2337489C1 (en) | System of device control and its method for device control command scheduling | |
CN101902762B (en) | Download control method, system and associated device | |
KR100259867B1 (en) | Interface method | |
CN1332531C (en) | A method for dynamically adjusting system service performance on service management point | |
Andrei et al. | „The architecture of a software module, supporting vertical handover in heterogenous networks” | |
CN100461703C (en) | Intelligent virtual exchange method and system | |
KR100544680B1 (en) | Apparatus and method for managing timer and gathering information using management object instance in network management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |