CN100496123C - Control method for monitored and controlled point, monitoring system and monitored point - Google Patents

Control method for monitored and controlled point, monitoring system and monitored point Download PDF

Info

Publication number
CN100496123C
CN100496123C CNB200610112250XA CN200610112250A CN100496123C CN 100496123 C CN100496123 C CN 100496123C CN B200610112250X A CNB200610112250X A CN B200610112250XA CN 200610112250 A CN200610112250 A CN 200610112250A CN 100496123 C CN100496123 C CN 100496123C
Authority
CN
China
Prior art keywords
control
user
candidate user
control point
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CNB200610112250XA
Other languages
Chinese (zh)
Other versions
CN1917633A (en
Inventor
罗曼
赵钢
刘洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Uniview Technologies Co Ltd
Original Assignee
Hangzhou H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou H3C Technologies Co Ltd filed Critical Hangzhou H3C Technologies Co Ltd
Priority to CNB200610112250XA priority Critical patent/CN100496123C/en
Publication of CN1917633A publication Critical patent/CN1917633A/en
Application granted granted Critical
Publication of CN100496123C publication Critical patent/CN100496123C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The method comprises: a) after candidate management server logs on successfully, the management server returns control information to the client side where the candidate user locates at; b) the candidate user sends the control instruction carrying the control information to the monitory point through the client side; after conforming that the control right of the monitory point is assigned to the candidate user according the control information, the monitory point executes the relevant operation. The invention also reveals a monitoring system comprising client side, management server and monitory point.

Description

A kind of control method of control point, supervisory control system and control point
Technical field
The present invention relates to monitoring technique, relate in particular to a kind of control method, supervisory control system and control point of control point.
Background technology
Because the needs of social safety, road traffic and urban construction, at present locations such as important enterprises and institutions, traffic main artery are selected as key point in existing numerous buildings and the road in countries in the world in the city, set up supervisory control system, surrounding environment is monitored in real time.For example, be example with China, the municipal public security bureau in the city has a plurality of branch offices under its command, and each branch office has 25 local police stations under its command, thousands of cameras of each local police station's management.Like this, the personnel in municipal public security bureau, branch office and the local police station can check the picture that camera obtains according to user right and guarded region, thereby can make a response to abnormal conditions rapidly.
Fig. 1 shows present supervisory control system, and this system mainly comprises control point, management server and client.Audio frequency or vision signal can be gathered in control point wherein, the audio frequency or the vision signal of being gathered is converted to digital signal, and sends in the network, and the control point comprises acquisition module, The Cloud Terrace and coding controller etc. usually; Management server can manage the resource of supervisory control system, for example carries out user's registration, control point registration, distributing user permission etc.; Client be for having access to audio frequency or vision signal from the control point, for example computer etc.
Fig. 2 shows the flow chart of the control method of existing control point.Referring to Fig. 2, this method comprises:
In step 201~202, the user sends the request of landing by client to management server, and management server is verified user profile, and by after verifying, notified client to land success.
In step 203~204, the user by client to the management server transmitting control commands, request is controlled the control point, management server is according to the current state of a control of this control point and the user right of client, judge whether to give this user with control, if then execution in step 205; Otherwise, execution in step 207.
Here, if the control point is under other higher users of user right the control, then judge control not to be given this user; If the user's of control control point user right is lower than the user who sends control command, the user who control is sent control command is judged in the perhaps unmanned control in control point so.
In step 205~206, management server is transmitted to the control point with control command, and the action of this control command correspondence is carried out in the control point, and implementation status is returned to client by management server, and finishes this control flow.
In step 207, management server returns the information of rejecting to client.
So far, finish existing control point control flow.
By above-mentioned control flow as seen, management server is managed concentratedly a plurality of control points and client, is responsible for the distribution of control and the forwarding of control command.Because the task that management server need be handled is numerous, it is bigger therefore to control time delay, and from the angle of client, the response time of control point is longer, and user experience is relatively poor.In addition, because management server is born the management work of whole supervisory control systems, it is heavier to load; And management server is the unique path between control point and the client, occurs when unusual at management server, can't communicate by letter between client and the control point, and the control point will be in uncontrolled state, thereby cause the paralysis of system.
Summary of the invention
In view of this, the invention provides a kind of control method of control point, can reduce the control time delay effectively.
For achieving the above object, the invention provides a kind of control method of control point, this method may further comprise the steps:
A. management server is after candidate user is successfully landed, and client is returned control information to the candidate user place;
B. candidate user sends the control command carry control information by client to the control point, and when determining that according to the control information that receives the control of control point distributed to this candidate user in the control point, the action of control command correspondence is carried out in the control point.
Wherein, the described control information of steps A comprises the Permission Levels and the affiliated area of candidate user, and then the described control point of step B determines that according to the control information that receives the control of control point is distributed to this candidate user is:
B1. the control point parses the Permission Levels and the affiliated area of candidate user from control command, the Permission Levels of judging candidate user whether greater than, be equal to or less than the current controlling grade of control point, if greater than, execution in step B3 then; If equal, execution in step B2 then; If less than, judge that then candidate user haves no right to obtain the control of control point, and finish this control allocation flow;
Whether the affiliated area of B2. judging candidate user is identical with the current region of control point, if, execution in step B3 then; Otherwise the judgement candidate user haves no right to obtain the control of control point, and finishes this control allocation flow;
B3. the control of control point gives candidate user, and the current control hierarchy of control point equals the Permission Levels of candidate user, and finishes this control allocation flow.
Wherein, further comprise in the described control command: the Internet Protocol IP address of candidate user, if step B1 is described equal after, further comprise:
Whether the affiliated area of judging candidate user is identical with the user's who has control affiliated area, if, then according to the IP address of candidate user with have the user's IP address of control, determine the distribution of control, and when described control is assigned to described candidate user, carry out described step B3; Otherwise, carry out described step B2.
Wherein, described IP address and the user's IP address that has control according to candidate user, determine being assigned as of control:
Whether the IP address of judging candidate user greater than the user's IP address that has control, if greater than, then judge control is distributed to this candidate user; If less than, judge that then candidate user haves no right to obtain the control of control point.
Wherein, whether the described IP address of judging candidate user further comprises greater than after the user's IP address that has control:
If the IP address of candidate user equals to have the user's IP address of control, then judge whether to give described candidate user with described control according to the user name of candidate user and the user name that has a user of control, if, execution in step B3 then; Otherwise the judgement candidate user haves no right to obtain the control of control point, and finishes this control allocation flow.
Wherein, the described control point of step B parses after the Permission Levels and affiliated area of candidate user, further comprises:
Whether the Permission Levels of judging this candidate user greater than 0, if, the then described judgement of execution in step B1; Otherwise, judge that this candidate user haves no right to obtain the control of control point, and finish this control allocation flow.
Wherein, described judgement candidate user haves no right to obtain further to comprise after the control of control point: determine that control obtains failure cause, and with described failure cause as the information of rejecting, return to client.
Wherein, before the described steps A, further comprise:
Candidate user is passed through the place client, sends the request of landing to management server, and management server is verified described candidate user according to the request of landing that receives, and by checking the time, the judgement candidate user is successfully landed.
Wherein, the described control point of step B is carried out after the action of control command correspondence, further comprises: the control point will move implementation status information and return to described client.
Wherein, set in advance control hierarchy thresholding recovery time, after the described step B, further comprise:
After described candidate user discharged control, if reach control hierarchy thresholding recovery time and do not have the control of the described control point of candidate user acquisition request, then this control point reduced to 1 with the current control hierarchy of self.
Wherein, set in advance waiting list and control hierarchy restore cycle, after the described step B, further comprise: when existence and candidate user are sent control command simultaneously but do not obtained the user of control, described user's user information corresponding is put into waiting list;
Described control point reduces to 1 with the current control hierarchy of self:
C1. judge whether there is the user in the waiting list, if, execution in step C2 then; Otherwise under the situation without any user's acquisition request control, directly the current control hierarchy with this control point is reduced to 1, and finishes to reduce the flow process of current control hierarchy;
C2. judge whether there be the user of Permission Levels in the waiting list more than or equal to the control hierarchy of control point, if, then with Permission Levels more than or equal to the user of the control hierarchy of control point as candidate user, and return and carry out described step B; Otherwise, execution in step C3;
Whether the current control hierarchy of C3. judging the control point greater than 1, if, then reaching control hierarchy during the restore cycle, the current control hierarchy of this control point is subtracted 1, and return execution in step C2; Otherwise end reduces the flow process of current control hierarchy.
The present invention also provides a kind of supervisory control system, can reduce the control time delay effectively.Supervisory control system among the present invention comprises:
Client, management server and control point, wherein,
Described client is used to receive the control information of the candidate user that comes from management server, and the control information of candidate user is carried in the control command, sends to the control point;
Described management server is used to preserve the candidate user control information corresponding, and control information is returned to the client at candidate user place;
Described control point is used to receive the control command that carries control information that comes from client, when giving this candidate user according to the definite control with the control point of the control information that receives, carries out the action of control command correspondence.
Wherein, described control point is further used for sending log-on message to management server, receives to come from the current region information of described management server, and stores;
Described management server is used to receive next in the log-on message of control point, is that this control point distributes current region, and described current region information is sent to the control point.
The present invention provides a kind of control point again, can reduce the control time delay effectively.Control point among the present invention comprises:
Transceiver module and control module, wherein,
Described transceiver module is used to receive the control command that comes from client, and the control command that receives is transmitted to control module;
Described control module is used to receive the control command that comes from transceiver module, from control command, parse control information, current state of a control information according to control information and control point, determine whether to transfer control, when determining to transfer control, the action message in the control command is sent.
Wherein, described control point further comprises: memory module, and the current state of a control information that is used to store the control point, and the current monitor state information of being stored sent to described control module.
Wherein, described control point further comprises: Executive Module is used to receive the action message that comes from control module, and carries out the action of the action message correspondence that receives.
Wherein, described control module is further used for determining to reject reason when resolved friendship control, and with the determined reason of rejecting as the information of rejecting, send to described transceiver module;
Described transceiver module is used to receive the information of rejecting that comes from control module, and the information of rejecting that will receive sends to described client.
Wherein, described Executive Module is further used for action implementation status information is sent to control module;
Described control module is used to receive the action implementation status that comes from Executive Module, and the action implementation status information that will receive sends to transceiver module;
Described transceiver module is further used for receiving the action implementation status information that comes from control module, and the action implementation status information that will receive returns to described client.
Wherein, described control module is further used for sending simultaneously under the situation of control command a plurality of users, after distributing control, the user profile of will sending control command but not obtaining control sends to memory module, after the user who obtains control discharges control, from memory module, read waiting list, carry out the reduction of current control hierarchy;
Described memory module also is used to receive the user profile that comes from control module, and the user profile that receives is kept in the waiting list that sets in advance.
Use the present invention, can reduce the control time delay the when control point controlled effectively.Particularly, the present invention has following beneficial effect:
1. the control command of sending by each control point direct reception client end among the present invention, and the distribution of responsible relevant control with this control point.Like this, therefore concentrating on originally in the management server of task changes by sharing each control point, and task amount is less relatively in each control point so, and the response delay of the control command that the user is sent by client is less, improve the control messages of supervisory control system, strengthened user experience.And, because control command can directly arrive the control point from client among the present invention, and need not forwarding through management server, therefore can further reduce the response delay of control command.
2. because client can be directly and the control point intercommunication among the present invention, further alleviated the load of management server, and when management server occurs when unusual, the client that has obtained control information still can normally be carried out control to the control point, has improved the anti-disaster ability of supervisory control system effectively.
Description of drawings
To make clearer above-mentioned and other feature and advantage of the present invention of those of ordinary skill in the art by describe exemplary embodiment of the present invention in detail with reference to accompanying drawing below, in the accompanying drawing:
Fig. 1 is the structural representation of existing supervisory control system;
Fig. 2 is the flow chart of the control method of existing control point;
Fig. 3 is the exemplary process diagram of the control method of control point among the present invention;
Fig. 4 is the flow chart of the control method of control point in the embodiment of the invention;
Fig. 5 determines the method flow diagram that control is distributed for control point in the embodiment of the invention;
Fig. 6 is the structural representation of supervisory control system in the embodiment of the invention.
Embodiment
For making purpose of the present invention, technical scheme clearer, below with reference to the accompanying drawing embodiment that develops simultaneously, the present invention is described in further detail.
For the control method of control point among the present invention, its basic thought is: by the distribution of control point decision control authority.
Based on above-mentioned thought, Fig. 3 shows the exemplary process diagram of the control method of control point among the present invention.Referring to Fig. 3, this method comprises:
In step 301, management server is after candidate user is successfully landed, and client is returned control information to the candidate user place;
In step 302, candidate user sends the control command that carries control information by client to the control point, when determining that according to the control information that receives control with the control point gives this candidate user in the control point, the action of control command correspondence is carried out in the control point.
Be example with the audio/video monitoring below, the control point controlling schemes among the present invention is elaborated.
Fig. 4 shows the flow chart of control point control method in the present embodiment.Referring to Fig. 4, this method comprises:
In step 401~402, the user sends the request of landing that carries username and password by client to management server, and request is landed; Management server verifies that to username and password after by checking, the notice client is landed success and returned control information.
In the present embodiment, set up the user rights database be used to preserve user profile in the management server in advance, whether user profile wherein comprises user name, password, user right grade, user's affiliated area, activate and on-line time etc.In addition, the user right grade here is the grade that management server is provided with for the ease of the authority height of distinguishing each user, for example, the user right grade is minimum to be 0, is up to 15, and numeral is big more, grade is high more, and the possibility that obtains the control point control is also big more.
When management server receive come from client land request after, land from this and to parse username and password request, then with user's index by name, the retrieval user rights database, retrieving under this user name respective items purpose situation, judging whether the password that receives is consistent with the password in the project that retrieves, if, then decision verification passes through, otherwise the decision verification failure.In addition, if can't retrieve the project of user name correspondence, also decision verification failure.
If the user has passed through the checking of management server, then management server as control information, returns to the user with this user's Permission Levels and affiliated area, so as in the subsequent step control point with control information as the foundation that whether gives control.And after this this user can be used as the control that candidate user is grabbed the control point.
In step 403, candidate user sends the control command that carries control information by client to the control point, and request obtains the control of this control point.
When candidate user need obtain the control of control point, in this step by client to the control point transmitting control commands.For instance, present embodiment can adopt the control command of all forms as shown in table 1 to come control right request.
Header The IP address User name Permission Levels The user area Action
8 bytes 4 bytes 16 bytes 4 bytes 4 bytes 16 bytes
Table 1
In table 1, header can be User Datagram Protocol (UDP) header, the action representative of consumer needs the performed action in control point, for example: certain camera that the control point connected turn to, adjust that aperture, numeral become doubly, the starting or stoping etc. of focusing, rain brush/spraying, the turning to of the microphone The Cloud Terrace that perhaps control point connected, volume or the like.
In step 404~405, the control point judges whether to give this candidate user with control, if then execution in step 406 according to self current state of a control and the control command that receives; Otherwise the control point returns the information of rejecting to client, rejects the request of user about the acquisition control, and finishes this control flow.
Here when the user can't obtain the control of control point, the control point returns rejects and includes control in the information and obtain failure cause, so that improve service quality, strengthens user experience.
In step 406, the action of control command correspondence is carried out in the control point, and returns implementation status information to client.
Successfully get access to the control of control point when candidate user after, candidate user becomes the user of user's control, and corresponding action is carried out according to control command in this step in the control point, and will reflect that the execution result of implementation status returns to client, so that the user checks.Particularly, when the action in the control command when audio frequency or vision signal are provided, client is given with the image or the sound feedback that collect in the control point; When the action in the control command when adjusting in to the control point, what then returned to this moment is the information that representative is adjusted successfully or failed.
So far, finish control point control flow in the present embodiment.
For above-mentioned steps 404, conduct determines whether that the factor that gives control can comprise: user's Permission Levels and user's affiliated area in the present embodiment.Fig. 5 shows the method flow diagram that control point in the present embodiment determines that control is distributed.Referring to Fig. 5, the distribution of this control comprises:
In step 501~503, the control point parses the Permission Levels and the affiliated area of candidate user from control command, and whether the Permission Levels of judging this candidate user are greater than 0, if then execution in step 504; Otherwise the reason of control being obtained failure is defined as: the user haves no right to control the control point, and finishes this control allocation flow.
In the present embodiment, the acquiescence initial rights grade of control point is 1, promptly has only Permission Levels more than or equal to 1 the candidate user control of just having the right to obtain, and the user right grade is that 0 candidate user then haves no right any control is carried out in the control point.Therefore, be that the request that only need directly reject this candidate user get final product, and need not to carry out other follow-up relatively judgement under 0 the situation in the Permission Levels of candidate user.
In step 504~505, the Permission Levels of judging candidate user whether greater than, be equal to or less than the current controlling grade of control point, if greater than, then execution in step 507; If equal, then execution in step 506; If less than, the reason of then control being obtained failure is defined as: the control of control point is in the control of advanced level user, and finishes this control method flow.
In the present embodiment, the current controlling grade of so-called control point is meant the minimum user right grade that the full user of control that can obtain this control point should possess, usually this current controlling grade equals to hold the user's of control Permission Levels, and when the control of each control point ownership changed, the current controlling grade of this control point all became consistent with the user's who has control Permission Levels.So, when the Permission Levels of candidate user were lower than the user who has control, candidate user can't be grabbed control, therefore wanted monitored point to reject.In addition, for candidate user can clearly be rejected reason, then definite control is obtained the concrete reason of failure, so that return to client in step 405.
In step 506, judge whether the affiliated area of candidate user is identical with the current region of control point, if then execution in step 507; Otherwise, execution in step 508.
In supervisory control system, each control point can only be monitored the scope of self physical address corresponding representative, then adopts current region to represent the scope of setting up of control point correspondence.Here, when candidate user has identical Permission Levels with the user who has control,, determine whether to give control by comparing the current region of user's affiliated area and control point.For example, the current region of supposing the control point is the Haidian District, and the affiliated area of candidate user A is the Haidian District, and user's affiliated area of control owner user B is the Chaoyang District.Because when initial configuration, user's affiliated area is represented this user's compass of competency, and therefore, candidate user A needs to obtain the picture or the sound of the control point feedback of corresponding region more, then when candidate user A sent control command, the control point was preferentially controlled by user A.
In step 507, the control of control point gives candidate user, and the current control hierarchy of control point equals the Permission Levels of candidate user, and finishes this control allocation flow.
In the Permission Levels of candidate user current control hierarchy greater than the control point, perhaps the Permission Levels of candidate user equal the current region of the current control hierarchy of control point and affiliated area and control point when identical, the control of control point is transferred this candidate user to, and the Permission Levels that the current control hierarchy of control point also becomes with candidate user are consistent.
In step 508, the reason of control being obtained failure is defined as: the control of control point is in the user's at the same level control, and finishes this control allocation flow.
The current region that equals the current control hierarchy of control point and affiliated area and control point in the Permission Levels of candidate user not simultaneously, the control of control point can not be had by this candidate user, therefore, rejects request.
So far, finish control allocation flow in the present embodiment.
In addition, can set in advance waiting list, when having the control of a plurality of user's acquisition request control point simultaneously, according to definite candidate user such as Permission Levels, affiliated area, IP address and user name of all users.After control assigned, the user that the request of will initiating does not still obtain control joined in the waiting list.In addition, can also set in advance control hierarchy thresholding recovery time and control hierarchy restore cycle, after the user discharges control, reach control hierarchy thresholding recovery time, reduce the current control hierarchy of control point according to each following step:
A. judge whether there is the user in the waiting list, if, execution in step b then; Otherwise under the situation without any user's acquisition request control, directly the current control hierarchy with this control point is reduced to 1, and finishes to reduce the flow process of current control hierarchy;
B. judge whether there be the user of Permission Levels in the waiting list more than or equal to the control hierarchy of control point, if, then with Permission Levels more than or equal to the user of the control hierarchy of control point as candidate user, and return execution in step 404 and subsequent step; Otherwise, execution in step c;
Whether the current control hierarchy of c. judging the control point greater than 1, if, then reaching control hierarchy during the restore cycle, the current control hierarchy of this control point is subtracted 1, and return execution in step b; Otherwise end reduces the flow process of current control hierarchy.
Certainly, there are a plurality of users to send under the situation of control command at the same time, also can not adopt waiting list, and directly the current control hierarchy of control point is reduced to 1.No matter adopt which kind of mode, the purpose of the current control hierarchy of above-mentioned reduction is: after preventing that the higher user of Permission Levels from discharging control, the user that Permission Levels are lower can't control the control point.
According to above-mentioned Fig. 4 and flow process shown in Figure 5, the current control hierarchy of supposing the control point is 1, and current region is a.User X is to the control point transmitting control commands, and the Permission Levels that indicate user X are 4, affiliated area is e.Since the unmanned control in control point this moment, and the Permission Levels of user X are higher than the current control hierarchy of control point, and therefore, user X obtains control.When user X did not discharge control as yet, Permission Levels were respectively 1,0 and 3 user Y, Z, W and send control command in succession, but since their Permission Levels all less than the Permission Levels 4 of user X, so control is still had by user X.During user X has control, user V sends and requires to obtain control, because the Permission Levels of user V are the same with user X to be 4, whether the affiliated area of then judging user V is identical with the current region a of control point, and the affiliated area of user V is a, control is transferred user V to so, and this moment, the current control hierarchy of control point still was 4.When user V did not discharge control, user U sent control command, because the Permission Levels of user U are 6, greater than the current controlling grade 4 of control point, therefore, user U obtains control, and the current controlling grade of control point is updated to 6.
Suppose that control hierarchy thresholding recovery time is 5 seconds, the control hierarchy restore cycle is 3 seconds, if after then beginning 5 seconds from user U release control, and has the user to wait for the acquisition control in waiting list, be the cycle then, reduce the current control hierarchy of control point step by step with 3 seconds.Suppose that there is not 3 user T of Permission Levels in waiting list, then user T obtained the control of control point in 14 seconds after user U discharges control.Perhaps, after discharging control from user U and beginning 5 seconds, there is not the user in the waiting list and do not have other user's acquisition request controls yet, the current control hierarchy of control point directly is reduced to 1 from 6.
In addition, consider that candidate user may have identical Permission Levels and affiliated area with the user who has control, then can utilize the IP address in the control information in the present embodiment, further compare.In other words, when the Permission Levels of candidate user in the step 504 equal the current control hierarchy of control point, whether the affiliated area of judging candidate user is identical with the user's who has control affiliated area, if then carry out candidate user and the comparison that has the user's IP address of control; Otherwise, execution in step 506.When IP address relatively, whether the IP address of judging candidate user greater than the user's IP address that has control, if greater than, then give control in the execution in step 507 and make current control hierarchy equal the operation of the Permission Levels of this candidate user; If less than, such according to step 508, the reason of control being obtained failure is defined as: the control of control point is in the user's at the same level control.When the IP address equates, can judge further whether the letter or the phonetic of the user name correspondence of candidate user is positioned at before the user who has control in alphabet, if then execution in step 407; Otherwise, execution in step 508.
More than only there is a candidate user to send the situation of control command,, also can determines whether to give control according to above-mentioned thought if a plurality of user sends control command simultaneously for the same time.In other words, a plurality of candidate user are compared simultaneously with the user who has control.
By above-mentioned description as seen, when carrying out control point control, determine the ownership of control by each control point, but not carry out unified management in the present embodiment by management server.Like this, because the processing of the control relevant with self only is responsible in each control point, workload reduces greatly, thus the response time significantly reduce, response speed increases substantially.
In order to guarantee carrying out smoothly of above-mentioned control point control procedure, present embodiment also provides a kind of supervisory control system.Fig. 6 shows the system construction drawing of supervisory control system in the present embodiment.Referring to Fig. 5, this supervisory control system comprises: client, management server and control point.
In the supervisory control system of present embodiment, client is used to receive the control information of the candidate user that comes from management server, and the control information of candidate user is carried in the control command, sends to the control point.Management server is used to preserve the candidate user control information corresponding, and control information is returned to the client at candidate user place.The control point is used to receive the control command that carries control information that comes from client, when giving this candidate user according to the definite control with the control point of the control information that receives, carries out the action of control command correspondence.
Control point in the present embodiment comprises: transceiver module, memory module, control module and Executive Module.Wherein, transceiver module is used to receive the control command that comes from client, and the control command that receives is transmitted to control module.Memory module is used to store the current state of a control information of control point.Control module is used to receive the control command that comes from transceiver module, from control command, parse control information, and from memory module, obtain the current state of a control information of control point, current state of a control information according to control information and control point, determine whether to transfer control, when determining to transfer control, the action message in the control command is sent to Executive Module.Executive Module is used to receive the action message that comes from control module, carries out the action of the action message correspondence that receives.
In addition, control module can also determine to reject reason when resolved friendship control, and with the determined reason of rejecting as the information of rejecting, send to transceiver module.Executive Module can also send to control module with action implementation status information, and the action implementation status information that control module will receive again sends to transceiver module.At this moment, transceiver module receives and to come from the action implementation status information of control module or to reject information, and the action implementation status information that will receive or the information of rejecting return to client.
And, control module is under the situation of a plurality of users' while acquisition request controls, after distributing control, the user profile that to initiate request but not obtain control sends to memory module, after the user who obtains control discharges control, from memory module, read waiting list, carry out the reduction of current control hierarchy.Memory module also is used to receive the user profile that comes from control module, and the user profile that receives is kept in the waiting list that sets in advance.
Generally, the control point also needed to send log-on message to management server before using, management server is that the control point distributes current region, and the current region information of being distributed returned to the control point, set up the control point current region information that receives is stored in the memory module of self.
As seen from the above technical solutions, the control command of sending by each control point direct reception client end in the present embodiment, and the distribution of responsible relevant control with this control point.Like this, therefore concentrating on originally in the management server of task changes by sharing each control point, and task amount is less relatively in each control point so, and the response delay of the control command that the user is sent by client is less, improve the control messages of supervisory control system, strengthened user experience.In addition, because client can be directly and the control point intercommunication, further alleviated the load of management server, and occurred when unusual when management server, the client that has obtained control information still can normally be carried out control to the control point, has improved the anti-disaster ability of supervisory control system effectively.
The above only is preferred embodiment of the present invention, and is in order to restriction the present invention, within the spirit and principles in the present invention not all, any modification of being made, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (17)

1, a kind of control method of control point is characterized in that, this method comprises:
A. management server is after candidate user is successfully landed, and client is returned control information to the candidate user place, and this control information comprises the Permission Levels of candidate user;
B. candidate user sends the control command that carries control information by client to the control point, the Permission Levels of the candidate user in the control point basis control information that receives and the current control hierarchy of control point, when determining that the control of control point distributed to this candidate user, the action of control command correspondence is carried out in the control point;
After C, candidate user discharged control, if reach control hierarchy thresholding recovery time that sets in advance and the control that does not have the described control point of candidate user acquisition request, then the acquiescence initial rights was reduced to the current control hierarchy of self in the control point.
2, the method for claim 1 is characterized in that, the described control information of steps A further comprises the candidate user affiliated area, and then the described control point of step B determines that the control of control point is distributed to this candidate user is:
B1. the control point parses the Permission Levels and the affiliated area of candidate user from control command, the Permission Levels of judging candidate user whether greater than, be equal to or less than the current control hierarchy of control point, if greater than, execution in step B3 then; If equal, execution in step B2 then; If less than, judge that then candidate user haves no right to obtain the control of control point, and finish this control allocation flow;
Whether the affiliated area of B2. judging candidate user is identical with the current region of control point, if, execution in step B3 then; Otherwise the judgement candidate user haves no right to obtain the control of control point, and finishes this control allocation flow;
B3. the control of control point gives candidate user, and the current control hierarchy of control point equals the Permission Levels of candidate user, and finishes this control allocation flow.
3, method as claimed in claim 2 is characterized in that, further comprises in the described control command: the Internet Protocol IP address of candidate user, if step B1 is described equal after, further comprise:
Whether the affiliated area of judging candidate user is identical with the user's who has control affiliated area, if, then according to the IP address of candidate user with have the user's IP address of control, determine the distribution of control, and when described control is assigned to described candidate user, carry out described step B3; Otherwise, carry out described step B2.
4, method as claimed in claim 3 is characterized in that, being assigned as of control determined in described IP address and the user's IP address that has control according to candidate user:
Whether the IP address of judging candidate user greater than the user's IP address that has control, if greater than, then judge control is distributed to this candidate user; If less than, judge that then candidate user haves no right to obtain the control of control point.
5, method as claimed in claim 4 is characterized in that, whether the described IP address of judging candidate user further comprises greater than after the user's IP address that has control:
If the IP address of candidate user equals to have the user's IP address of control, then judge whether to give described candidate user with described control according to the user name of candidate user and the user name that has a user of control, if, execution in step B3 then; Otherwise the judgement candidate user haves no right to obtain the control of control point, and finishes this control allocation flow.
6, method as claimed in claim 2 is characterized in that, the described control point of step B parses after the Permission Levels and affiliated area of candidate user, further comprises:
Whether the Permission Levels of judging this candidate user greater than 0, if, the then described judgement of execution in step B1; Otherwise, judge that this candidate user haves no right to obtain the control of control point, and finish this control allocation flow.
7, as any described method in the claim 2 to 6, it is characterized in that described judgement candidate user haves no right to obtain further to comprise after the control of control point: determine that control obtains failure cause, and with described failure cause as the information of rejecting, return to client.
8, the method for claim 1 is characterized in that, before the described steps A, further comprises:
Candidate user is passed through the place client, sends the request of landing to management server, and management server is verified described candidate user according to the request of landing that receives, and by checking the time, the judgement candidate user is successfully landed.
9, the method for claim 1 is characterized in that, the described control point of step B is carried out after the action of control command correspondence, further comprises: the control point will move implementation status information and return to described client.
10, the method for claim 1 is characterized in that, the described control point of step C is reduced to the acquiescence initial rights with the current control hierarchy of self and is:
The control point reduces to 1 with the current control hierarchy of self.
11, the method for claim 1, it is characterized in that, set in advance waiting list and control hierarchy restore cycle, after the described step B, further comprise: when existence and candidate user are sent control command simultaneously but do not obtained the user of control, described user's user information corresponding is put into waiting list;
The acquiescence initial rights is reduced to the current control hierarchy of self in the described control point of step C:
C1. judge whether there is the user in the waiting list, if, execution in step C2 then; Otherwise under the situation without any user's acquisition request control, directly the current control hierarchy with this control point is reduced to 1, and finishes to reduce the flow process of current control hierarchy;
C2. judge whether there be the user of Permission Levels in the waiting list more than or equal to the control hierarchy of control point, if, then with Permission Levels more than or equal to the user of the control hierarchy of control point as candidate user, and return and carry out described step B; Otherwise, execution in step C3;
Whether the current control hierarchy of C3. judging the control point greater than 1, if, then reaching control hierarchy during the restore cycle, the current control hierarchy of this control point is subtracted 1, and return execution in step C2; Otherwise end reduces the flow process of current control hierarchy.
12, a kind of supervisory control system is characterized in that, this supervisory control system comprises: client, management server and control point, wherein,
Described client is used to receive the control information of the candidate user that comes from management server, and the control information of candidate user is carried in the control command, sends to the control point;
Described management server is used to preserve the candidate user control information corresponding, and control information is returned to the client at candidate user place, and this control information comprises the Permission Levels of candidate user;
Described control point is used to receive the control command that carries control information that comes from client, the Permission Levels of the candidate user in the basis control information that receives and the current control hierarchy of control point, when definite control with this control point gives this candidate user, carry out the action of control command correspondence; After candidate user discharges control,, then the current control hierarchy of this control point is reduced to the acquiescence initial rights if reach control hierarchy thresholding recovery time that sets in advance and the control that does not have this control point of candidate user acquisition request.
13, system as claimed in claim 12 is characterized in that, described control point is further used for sending log-on message to management server, receives to come from the current region information of described management server, and stores;
Described management server is used to receive next in the log-on message of control point, is that this control point distributes current region, and described current region information is sent to the control point.
14, a kind of control point is characterized in that, this control point comprises: transceiver module, control module and memory module, wherein,
Described transceiver module is used to receive the control command that comes from client, and the control command that receives is transmitted to control module;
Described control module is used to receive the control command that comes from transceiver module, from control command, parse control information, current state of a control information according to control information and control point, determine whether to transfer control, when determining to transfer control, the action message in the control command is sent; Send simultaneously a plurality of users under the situation of control command, after distributing control, the user profile of will sending control command but not obtaining control sends to memory module, after the user who obtains control discharges control, from memory module, read waiting list, carry out the reduction of current control hierarchy;
Described memory module is used to store the current state of a control information of control point, and the current monitor state information of being stored is sent to described control module; Reception comes from the user profile of control module, and the user profile that receives is kept in the waiting list that sets in advance.
15, control point as claimed in claim 14 is characterized in that, described control point further comprises: Executive Module is used to receive the action message that comes from control module, and carries out the action of the action message correspondence that receives.
16, control point as claimed in claim 15 is characterized in that, described control module is further used for determining to reject reason when resolved friendship control, and with the determined reason of rejecting as the information of rejecting, send to described transceiver module;
Described transceiver module is used to receive the information of rejecting that comes from control module, and the information of rejecting that will receive sends to described client.
17, control point as claimed in claim 15 is characterized in that, described Executive Module is further used for action implementation status information is sent to control module;
Described control module is used to receive the action implementation status that comes from Executive Module, and the action implementation status information that will receive sends to transceiver module;
Described transceiver module is further used for receiving the action implementation status information that comes from control module, and the action implementation status information that will receive returns to described client.
CNB200610112250XA 2006-08-29 2006-08-29 Control method for monitored and controlled point, monitoring system and monitored point Active CN100496123C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200610112250XA CN100496123C (en) 2006-08-29 2006-08-29 Control method for monitored and controlled point, monitoring system and monitored point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200610112250XA CN100496123C (en) 2006-08-29 2006-08-29 Control method for monitored and controlled point, monitoring system and monitored point

Publications (2)

Publication Number Publication Date
CN1917633A CN1917633A (en) 2007-02-21
CN100496123C true CN100496123C (en) 2009-06-03

Family

ID=37738504

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200610112250XA Active CN100496123C (en) 2006-08-29 2006-08-29 Control method for monitored and controlled point, monitoring system and monitored point

Country Status (1)

Country Link
CN (1) CN100496123C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102118648B (en) * 2009-12-31 2013-01-02 浙江宇视科技有限公司 Method, decoder and encoder for video monitoring
CN102739449A (en) * 2012-06-29 2012-10-17 浪潮电子信息产业股份有限公司 Self-protection system based on infrared monitoring server authorization
CN109144739A (en) * 2018-08-08 2019-01-04 上海电气集团股份有限公司 A kind of method and system of multi-user's contention control based on Argus video monitoring
CN110225297B (en) * 2019-04-26 2021-09-28 安徽四创电子股份有限公司 Control method for operation authority of dome camera

Also Published As

Publication number Publication date
CN1917633A (en) 2007-02-21

Similar Documents

Publication Publication Date Title
CN100490425C (en) Multicast network deploying method and multicast network
KR101703446B1 (en) Network capable of detection DoS attacks and Method for controlling thereof, Gateway and Managing server comprising the network
CN103457967B (en) Service node switching method and system
CN106296394B (en) Financial product over-the-counter trading method and system
CN100496123C (en) Control method for monitored and controlled point, monitoring system and monitored point
CN101053211B (en) Method and apparatus for configuring and managing a robust overlay multicast tree
CN101753832A (en) Cloud mirror control method in video monitoring system, system and central platform server
CN101714996A (en) Authentication system and method based on peer-to-peer computing network
CN108965297A (en) A kind of access control equipment management system
CN101304381B (en) Method, system and apparatus for transmitting files of P2P network
CN102984031A (en) Method and device for allowing encoding equipment to be safely accessed to monitoring and control network
US8386777B2 (en) Method and equipment for controlling access to multicast IP flows
EP2439881B1 (en) Cluster system and request message distribution method for processing multi-node transaction
CN105141526B (en) The method and device of virtual network communication
CN101360111A (en) Customer managing method, apparatus and system
CN114125005A (en) Data processing method and device based on intelligent building system
CN111327602B (en) Equipment access processing method, equipment and storage medium
CN106790411B (en) The non-polymeric port cascade system and method for virtual switch and physical switches
CN103414648B (en) A kind of communication flow rate control method and system
CN105429823A (en) Method and device for detecting multicast traffic in distributed communication equipment
CN105227455A (en) A kind of method and system of batch user web authentication active-standby switch
CN101296196A (en) Authentication method and authentication device
CN101997860B (en) Method and device for communication link detection management in NGN network architecture
CN103414653B (en) A kind of flow control methods and system
CN103414652B (en) A kind of communication message processing method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHEJIANG UNIVIEW TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: HUASAN COMMUNICATION TECHNOLOGY CO., LTD.

Effective date: 20120220

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120220

Address after: Hangzhou City, Zhejiang province 310053 Binjiang District Dongxin Road No. 66 building two or three layer A C

Patentee after: Zhejiang Uniview Technology Co., Ltd.

Address before: 310053 Hangzhou hi tech Industrial Development Zone, Zhejiang province science and Technology Industrial Park, No. 310 and No. six road, HUAWEI, Hangzhou production base

Patentee before: Huasan Communication Technology Co., Ltd.