CN100489773C - Method and system for generating quality management test program - Google Patents

Method and system for generating quality management test program Download PDF

Info

Publication number
CN100489773C
CN100489773C CNB01101282XA CN01101282A CN100489773C CN 100489773 C CN100489773 C CN 100489773C CN B01101282X A CNB01101282X A CN B01101282XA CN 01101282 A CN01101282 A CN 01101282A CN 100489773 C CN100489773 C CN 100489773C
Authority
CN
China
Prior art keywords
test
archives
plan
test plan
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB01101282XA
Other languages
Chinese (zh)
Other versions
CN1366235A (en
Inventor
张明智
金兰刚
范宝之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Compal Electronics Inc
Original Assignee
Compal Electronics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Compal Electronics Inc filed Critical Compal Electronics Inc
Priority to CNB01101282XA priority Critical patent/CN100489773C/en
Publication of CN1366235A publication Critical patent/CN1366235A/en
Application granted granted Critical
Publication of CN100489773C publication Critical patent/CN100489773C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A plan for testing product with tree-like structure includes a first top layer, a first intermediate layer and a first bottom layer. The first top layer records the topic of a product testing plan; the first intermediate layer contains at least one testing report archive of a product testing plan; the first bottom layer contains at least one testing item file of testing report archive. The first top layer retrieves the testing report archive of a product tesing plan, and each testing report archive retrieves its relevant testing item file. The invention also includes a template file that contains templates, selection system and conversion system. The template file contains templates of integrated testing product plan for data reference. The selection system lets the user select template from the template file, then hierarchically selecting the testing report archive and testing item file. The conversion system converts selected results to the relevant product testing plan.

Description

Produce the method and system of quality management test program
The invention provides a kind of quality control test procedure, refer to a kind of method and system that produces the production test plan that is used for the quality control program via database especially.
Concerning the manufacturer of any product, the quality control of product definitely is most important problem, and the consumer also gets used to buying the product that prestige better products manufacturer is produced.In order to ensure the product of producing strict quality control is arranged, the goods producer needs to possess complete product quality control program.
A kind of new product, especially electronic product, in process of production must be by just can guarantee the quality of this product as compatibility test or applied environment test or the like different test procedure, and above-mentioned many test procedures are responsible for by special QC quality control and are carried out, to finish all test procedures smoothly and to make product can reach the standard of quality control.Traditionally, the QC quality control is necessary for each product individual design one cover test procedure.When this type of test procedure of design, the QC quality control it should be noted that the complete of whole test procedure, and the test that is necessary all must can not be omitted comprehensively in test procedure to some extent.Generally speaking, all will be during the design test program by senior and veteran QC quality control's supervision, to guarantee the integrality of whole test procedure.Simultaneously, the QC quality control also will be with reference to the test procedure that had before carried out at like product, and correct, so that apply mechanically the test procedure to new product.Clearly, the process of above-mentioned design test program can cause unnecessary time waste, and close product redesigns almost brand-new test procedure because the QC quality control must constantly be a character.Moreover knowledge and experience to previous product design qualitative control test is accumulated can not run off because record is not thorough yet, cause the careless omission and the mistake that are difficult to avoid in the above-mentioned design process.
Therefore, fundamental purpose of the present invention is providing a kind of method and system that is used for producing product quality control program test plan.
For realizing above-mentioned purpose of the present invention, according to one aspect of the present invention, provide a kind of method that is used for a kind of production test plan of generation of quality control program, this production test plan has a pyramid structure to include:
One first top layer is used for confirming this production test plan;
One first intermediary layer includes the test report archives of at least one this production test plan; And
One first bottom includes at least one test event archives at these test report archives, and each these test event archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this first top layer is that to be used for access and related these test report archives of this first top layer and this test report archives be to be used for access and related these test event archives of this test report archives;
This method includes:
One panel clamp is provided, and this panel clamp includes at least one model, and this each model all has a pyramid structure to include:
One second top layer is used for confirming this model;
One second intermediary layer is used for confirming a minimum subroutine of this model; And
One second bottom includes at least one pressure project archives at this subroutine, and each these pressure project archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this second top layer is to be used for the subroutine of access and related this model of this second top layer, and this subroutine is to be used for access and related these pressure project archives of this subroutine;
One selective system is provided, chooses a model, a subroutine and a model project file;
One converting system is provided; And
Use this converting system model project file that selective system is selected to convert a corresponding production test plan to, these pressure project archives are to be stored in the subroutine of a model in this panel clamp;
Wherein this production test plan has the test event archives at these pressure project archives, and this production test plan is a corresponding pyramid structure.
In addition, according to another aspect of the present invention, provide a kind of system that is used for a kind of production test plan of generation of quality control program, this production test plan has a pyramid structure to include:
One first top layer is used for confirming this production test plan;
One first intermediary layer includes the test report archives of at least one this production test plan; And
One first bottom includes at least one test item day archives at these test report archives, and each these test event archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this first top layer is that to be used for access and related these test report archives of this first top layer and this test report archives be to be used for access and related these test event archives of this test report archives;
This system includes:
One panel clamp, this panel clamp includes at least one model, and this each model all has a pyramid structure to include:
One second top layer is used for confirming this model;
One second intermediary layer is used for confirming a minimum subroutine of this model; And
One second bottom includes at least one pressure project archives at this subroutine, and each these pressure project archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this second top layer is to be used for the subroutine of access and related this model of this second top layer, and this subroutine is to be used for access and related these pressure project archives of this subroutine; And
One selective system is chosen a model, a subroutine and a model project file;
One converting system is used for the model project file that selective system is selected to convert a corresponding production test plan to, and these pressure project archives are to be stored in the subroutine of a model in this panel clamp;
Wherein this production test plan has the test event archives at these pressure project archives, and this production test plan is a corresponding pyramid structure.
With respect to prior art, the method and system of above-mentioned generation production test plan of the present invention can produce production test plan when needed automatically.The database of test plan model of the present invention and selective system can allow the user select the interior modular individually production test plan element of arbitrary test plan model.Comprehensive these production test plan elements that are selected just can produce brand-new production test plan, if such computer system is combined with Internet, the QC quality control just can directly check and edit this production test plan on the networking.Because the test report archives are a set form,, be used for capturing stored data in the test report archives simultaneously so the software developer can design corresponding package software very simply.
To the detailed description of a preferred embodiment of the present invention, it is more obvious that above-mentioned purpose of the present invention and advantage will become by with reference to the accompanying drawings, in the accompanying drawing:
Fig. 1 is the calcspar of production test plan structure of the present invention;
Fig. 2 is the part calcspar of the production test plan of the present invention's one hypothesis;
Fig. 3 is the synoptic diagram of test event archive content of the present invention;
Fig. 4 is the synoptic diagram of test report archive content of the present invention;
Fig. 5 is the calcspar of panel clamp of the present invention;
Fig. 6 has described to utilize a browser to browse the situation of panel clamp of the present invention;
Fig. 7 is the flow path switch figure of converting system of the present invention;
Fig. 8 utilizes the present invention to produce the calcspar of a production test plan; With
Fig. 9 is the calcspar that utilizes a computer system of the present invention.
Various piece in the accompanying drawing is described as follows:
100,400,509 production test plans 12,12a first top layer
14,14a first intermediary layer 16,16a first bottom
20,20e, 20s, 420,511 test report archives
22,22h, 22s, 422,422d, 422h, 422s link
24,24h, 24s, 424d, 424h, 424s cuit
30,20h, 30s, 430d, 430h, 430s, 513 test event archives
30r block read test 30w block writes test
32,32s testing procedure 34 test input results
100 test plan panel clamps, 110 test plan models
112 test plan themes, 120 subroutines
130 test plan project files, 200 browsers
210 indexs, 220 picks symbols
300 converting systems
310,320,330,340,350 switch process
401 production test plan themes, 500 computer systems
501a option 501 models
502 panel clamps, 504 selective systems
506 check systems
See also Fig. 1, Fig. 1 is the structure calcspar of production test plan 10 of the present invention.Production test plan 10 is the control test procedures that are used at specific products test quality, and its structure is a tree structure, includes one first top layer 12, one first intermediary layer 14 and one second bottom 16.First top layer 12 has been set the theme (i.e. this specific products) of production test plan 10, and can access first intermediary layer 14.Set the theme of production test plan 10 simultaneously.First intermediary layer 14 includes a series of test report archives 20, each test report archives 20 all has the tested field of certain needs of pairing this product of this specific products, and comprehensively all test report archives 20 just form the needed complete field tests of this product.Each test report archives 20 can access be arranged in one or more test event archives 30 of first bottom 16.Corresponding to the test report archives 20 on upper strata, each test event archives 30 has all write down the tested project of certain needs of this product in certain upper strata test report archives 20 of its corresponding product.Test event archives 30 include and tested corresponding items testing procedure 32 and the test input results 34 of needs that is used for testing this product, are used for allowing the QC quality control write down every test result of this product.
Consult Fig. 1 and Fig. 2 (and simultaneously with reference to figure 1) in order more clearly to describe so that understand the structure of production test plan 10 of the present invention more, please to merge.Fig. 2 is the part calcspar of the production test plan 10a of the present invention's one hypothesis.The production test plan 10a of described hypothesis is designed at the hard disk of a kind of HD16GBX by name.Set at the first top layer 12a of production test plan 10a and to be the theme, and the first top layer 12a is used for the access first intermediary layer 14a with hard disk HD16GBX.For the purpose of simplifying the description, the first intermediary layer 14a only has test report archives 20e and 20s (may there be a lot of test report archives 20 in certain first intermediary layer 14a to finish the test of hard disk HD16GBX) in the present embodiment.Test report archives 20e is one " operating environment " test report archives, and test report archives 20s is one " Win95 " test report archives.Operating environment test report archives 20e is used for access and is positioned at a plurality of test event archives of the first bottom 16a, and these test event archives are corresponding to the different test results of hard disk HD16GBX under the different operating environment.For instance, test event archives 30s rocks the test result of operation down corresponding to hard disk HD16GBX in the concussion of the external world of burst, and test event archives 30h then is the test result of hard disk HD16GBX under abnormal high humidity environment.Similarly, Win95 test report archives 20s includes block read test project file 30r and block writes test event archives 30w, is used for the operation that the block of testing hard disk HD16GBX when operating system is Win95 reads and block writes.
Each test event archives 30 includes the testing procedure corresponding to this test event.For instance, test event archives 30s includes several and is used for allowing the testing procedure 32s of QC quality control's testing hard disk HD16GBX.See also Fig. 3, Fig. 3 is the synoptic diagram of test event archives 30s content.Testing procedure 32s rocks the testing procedure of operation down corresponding to hard disk HD16GBX in the external world concussion of burst, as also connecing at hard disk HD16GBX make under the situation that electricity operates its with power cord from and fall the result that testing hard disk HD16GBX afterwards operates again from certain altitude.After testing procedure 32s finishes or when testing, these test results can be recorded in the test input results 34s.The content that please notes each testing procedure 32s among Fig. 3 and test input results 34s only be purport of the present invention for convenience of description for example, the actual certain visual actual needs of content and freely setting.
Please merge and consult Fig. 1, Fig. 2 and Fig. 4 (and simultaneously with reference to figure 1 and Fig. 2).Fig. 4 is the synoptic diagram of test report archives 20e content.Each test report archives 20 can come the suitable test event archives 30 of access by means of link 22.For instance, test report archives 20e includes link 22s and 22h, respectively can access corresponding test event archives 30s and 30h.Certainly, the number of link can optionally freely be set at arbitrary value, even but the test event archives that test report archives 20 are not associated still need a link existence.Test report archives 20 have cuit 24, corresponding to the test event archives 30 that are associated with it, are used for offerings matter managerial personnel to insert data after the test of finishing product.For instance, test report archives 20e has the cuit 24s at test event archives 30s, and at the cuit 24h of test event archives 30h.So test report archives 20 can present the complete complete test report that product one is arranged by the demonstration of cuit 24, the QC quality control also can recognize the whole test process of product easily by the content of audit report.
In order to reach purpose of the present invention, the present invention is designed to need a test plan panel clamp.See also Fig. 5, Fig. 5 is the calcspar of test plan panel clamp 100 of the present invention.Panel clamp 100 includes a plurality of test plan models 110.Each test plan model 110 just equals the complete test plan of a certain product.The structure of test plan model 110 is almost completely identical with the structure of the production test plan of Fig. 1 10.Each test plan model 110 has a tree structure equally, and it includes one second top layer, to include a test plan theme 112, is used for planning each subroutine 120 of the test plan model 110 in access second intermediary layer.The subroutine 120 of second intermediary layer is just as the test report archives 20 among Fig. 1, but these subroutines 120 are the part of entire database 100, and not necessarily resembles shown in Fig. 1, and each test report archives 20 are the archives that separate.Each subroutine 120 can be used at least one the pressure project archives 130 in access second bottom, and the status of pressure project archives 130 is just as the test event archives 30 among Fig. 1.These pressure project archives 130 include testing procedure, are used for carrying out the test job of production test plan model 110, equally also include cuit, are used for allowing the QC quality control import data.Test plan panel clamp 100 is exactly all knowledge and a technology contents of representing tester's relevant product Quality Control control and management that is accumulated to of collecting in year after year test process day by day.As aforementioned, each test plan model 110 all is to set for the product of a particular types.At its corresponding product, each test plan model 110 all should as far as possible correctly intactly be included relevant test knowledge and technology.But in test plan model 110, it is blank that the projects such as actual test result of each model project file 130 should keep, because the purpose that whole test plan model 110 is provided with is that a model will be provided, so that for congener new product provides a test plan, actual test result will be as the criterion with the new product practical test result certainly.As for the method and the step that are produced new test plan by the test plan model, emphasis just of the present invention will describe in detail below.
(as the QC quality control) uses test plan model of the present invention for the convenience of the users, the invention provides a browser, it is to be used to allow the user browse test plan panel clamp 100 equally that this browser is provided, and can choose project from test plan panel clamp 100 simultaneously.Please merge and consult Fig. 5 and Fig. 6 (simultaneously with reference to figure 5).Fig. 6 has described to utilize a browser 200 to browse the situation of test plan panel clamp 100 of the present invention.For instance, if test plan panel clamp 100 is used at the test electronic product, then uses browser 200 to browse test plan panel clamp 100 and will find and send the test plan that wherein includes at as hard disk or CD player or the like multiple different electronic products.When using browser 200, the theme that equals each test plan model 110 just represented in production test plan theme 112.Click after the test plan model 110, the user can see a certain subroutine 120 that comprises for 110 times with respect to the test plan model, continue to click after the subroutine 120, the user can see the pressure project archives 130 with respect to subroutine 120, click after the pressure project archives 130, the user just can see the content of pressure project archives 130 again.Although do not show the content of pressure project archives 130 in Fig. 6, but its content and Fig. 3 are similar.By moving up and down index 210, the user can open, closes or choose test plan model 110, subroutine 120 or pressure project archives 130.The test plan model that can indicate that to be selected with picks symbols 220.Can indicate with picks symbols 220 and be selected or choose project afterwards, also can be reduced into the state that is not selected again.Described above only is a preferred embodiment of the present invention, man-computer interface between user and the browser is not the emphasis that the present invention asks, as long as the user can browse test plan panel clamp 100 by browser 200, and can select pressure project 130 at least, understand the action of being carried out and why get final product.Browse test plan panel clamp 100 and in wherein choosing project, the user has equaled to set up a hierarchy type option table that tree structure is arranged by browser 200.That is to say, select a test plan model 110, just have a subroutine that is selected 120 under it at least, and also have pressure project archives 130 that are selected under the subroutine 120 that this is selected at least.In other words, when certain project was selected, browser 200 can be selected the complete tree structure of this project upper strata or lower floor automatically.For instance, when the user had chosen a certain pressure project archives 130, browser 200 had just equaled to choose automatically the subroutine 120 of these pressure project archives 130 last layers and this is selected the test plan model 110 of subroutine 120 last layers.
Also be provided with a converting system among the present invention, be used for the project that viewed device 200 in the browser 200 is chosen is changed, form a brand-new test plan with conversion.See also Fig. 7 (and Fig. 1, Fig. 5 and Fig. 6 are consulted in merging).Fig. 7 is the flow path switch synoptic diagram of a converting system 300.Converting system 300 must include following steps necessary, and the precedence between step is unimportant comparatively speaking.
Step 310: accept the user via the selected option of browser 200.An emphasis of the present invention is exactly to accept the pressure project archives 130 that the user selects by converting system 300.When converting system 300 has been accepted the selected test plan pressure project archives 130 of user, the subroutine 120 of test plan model archives 130 last layers that this is selected is equally also chosen automatically, also is like this even if the user does not have reality to choose corresponding subroutine 120 veritably.
Step 320: duplicate the test plan pressure project archives 130 that have been selected, be used for producing the test event archives 30 of a new production test plan.So long as comprised under the complete situation of complete content that test detail and test action are guided at test plan pressure project archives 130, as long as these contents are come out by 100 acquisitions of test plan panel clamp, the content of test plan pressure project archives 130 just can be captured test plan panel clamp 100, just can produce the test event archives 30 of a new production test plan.The practical methods of acquisition test plan pressure project archives 130 contents also can include and decompresses or the operation of decoding, is and these operations belong to the technology category of data base administration, thereby does not repeat them here.
Step 330:, produce the test report archives 20 of a new product test plan for each subroutine that has been selected 120 or for for no other reason than that the test plan model archives 130 of its following one deck are selected and are equal to the subroutine 120 that is selected.Each new test report archives 20 includes the theme identical with the subroutine that is selected 120, also includes link 22 certainly.Each link 22 is linked to the test event archives 30 of a production test plan, to guarantee that the whole tree structure that utilizes browser 200 to choose can intactly be transplanted in this new production test plan.Cuit 24 is inserted in the test report archives 20 of production test plan equally, and each cuit 24 all is linked in the test report archives 20, and is relevant with the test event archives 30 that corresponding quilt links.
Step 340: generation one has first top layer 12 of production test plan theme.The user (for example: the title of new product) will be required the suitable theme of new for this reason test plan input one this production test plan, and be equally the new test report archives 20 that produce will with this new theme connection that is relative to each other, this new theme of first top layer 12 also can be used for access test and report archives 20 afterwards.
Step 350: whole switch process is finished end.
To consult Fig. 6, Fig. 7 and consult Fig. 8 (and simultaneously with reference to figure 6 and Fig. 7) in order more clearly to explain to understand above-mentioned switch process, please merge, Fig. 8 utilizes the present invention to produce the calcspar of a new product test plan 400.Production test plan 400 is produced according to the project that is selected among Fig. 6 by converting system 300.The pressure project archives 130 of " test is rocked in concussion ", " humidity measurement " and " Electro-Static Discharge test " have been selected in Fig. 6, these pressure project archives 130 are replicated, to produce new test event archives 430s, 430h and the 430d in the new product test plan 400.Each test event archives 430s, 430h and 430d include the testing procedure 432 and the test input results input 434 of duplicating from corresponding pressure project archives 130.Because these selecteed pressure project archives 130 are under the subroutine 120 of " operating environment test ", it is the new test report archives 420 that are named as " operating environment test " equally that converting system 300 also can produce one.Afterwards, converting system 300 is inserted link 422 and cuit 424 in these test report archives 420.Link 422 includes the link 422s that is linked to test event archives 430s, the link 422d that is linked to the link 422h of test event archives 430h and is linked to test event archives 430d, and cuit 424s, 424h and 424d then correspond to test event archives 430s, 430h and 430d respectively.As previously mentioned, cuit 424s, 424h and 424d can be used to put down in writing fast the state outcome of test event archives 430s, 430h and 430d.Afterwards, converting system 300 requires the user at this new production test plan 400 inputs one production test plan theme 401, this production test plan theme 401 will with test report archives 420 connection that is relative to each other.The whole tree structure that browser 200 is chosen will intactly be transplanted in this new production test plan 400, makes that the pyramid structure of production test plan will be identical with the selected tree structure of browser 200.
See also Fig. 9, Fig. 9 utilizes the present invention to produce the calcspar of the production test plan method that is used for the quality control program with a computer system 500.Computer system 500 includes a processor 520 and a storer 510.The storer (as random access memory) that storer 510 uses in the time of can being processor 520 computings or be used for permanent storage memory of data (as magnetic or optical media, such as hard disk, tape or CD).Printer 530 is electrically connected with computer system 500, is used for the file of printing calculator system 500.And include a test plan panel clamp 502, a selective system 504, a converting system 506, a check system 508 and a production test plan 509 in the storer 510.Wherein selective system 504, converting system 506 and check system 508 are all carried out by processor 520, reach purpose of the present invention and operation thereof with actual.Test plan panel clamp 502 is databases, includes a plurality of test plan models 501, and the form of test plan model 501 and function are shown in Figure 5 as described above.Selective system 504 allows the user can check and select at least one test plan model 501 from test plan panel clamp 502, thereby check and option 501a, these projects 501a can be a subroutine or a model project file, the just related content of being discussed as reference Fig. 6.506 of converting systems are from selective system 504 input option 501a, and convert thereof into suitable production test plan 509, just the content of being discussed as reference Fig. 1 and Fig. 7.Importantly, production test plan 509 has a pyramid structure based on test report archives 511 and test event archives 513.At last, check system 508 allows the user can check and edit test report archives 511 and test event archives 513.The user test report archives 511 and test event archives 513 can be printed for 530 of printers.
When the user utilizes check system 508 to check test report archives 511, link in these test report archives 511 can demonstrate and be expressed as a hyperlink (hyperlink), when the user clicked hyperlink, check system 508 can allow the user can continue to check the test event archives 513 relevant with this test report archives 511.By such mode, the user can browse the content of test report archives 511 and test event archives 513 apace.
In the computer system 500 of preferred embodiment of the present invention, test plan panel clamp 502, selective system 504, converting system 506, check system 508 and production test plan 509 can be by obtaining in the database that is stored in distributed network, and production test plan 509 just can be utilized rapidly and fully by majority via the networking thus.When arbitrary QC quality control wants to understand the content of production test plan 509, can directly obtain needed information by the networking, and do not need to obtain by the mode of retaining with first preceding document.
Therefore, with respect to prior art, the method for above-mentioned generation production test plan provided by the invention and system can produce production test plan when needed automatically.The database of above-mentioned test plan model provided by the invention and selective system can allow the user select the interior modular individually production test plan element of arbitrary test plan model.Comprehensive these production test plan elements that are selected just can produce a brand-new production test plan, if such computer system is combined with Internet, the QC quality control can directly check and edit this production test plan on the networking.Because the test report archives are a set form,, be used for capturing stored data in the test report archives simultaneously so the software developer can design corresponding package software very simply.
The above only is preferred embodiment of the present invention, and all equalizations of doing according to the scope of claim of the present invention change and modify the covering scope that all should belong to patent of the present invention.

Claims (11)

1. method that is used for a kind of production test plan of generation of quality control program, this production test plan has a pyramid structure to include:
One first top layer is used for confirming this production test plan;
One first intermediary layer includes the test report archives of at least one this production test plan; And
One first bottom includes at least one test event archives at these test report archives, and each these test event archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this first top layer is that to be used for access and related these test report archives of this first top layer and this test report archives be to be used for access and related these test event archives of this test report archives;
This method includes:
One panel clamp is provided, and this panel clamp includes at least one model, and this each model all has a pyramid structure to include:
One second top layer is used for confirming this model;
One second intermediary layer is used for confirming a minimum subroutine of this model; And
One second bottom includes at least one pressure project archives at this subroutine, and each these pressure project archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this second top layer is to be used for the subroutine of access and related this model of this second top layer, and this subroutine is to be used for access and related these pressure project archives of this subroutine;
One selective system is provided, chooses a model, a subroutine and a model project file;
One converting system is provided; And
A model project file that uses this converting system that selective system is chosen converts a corresponding production test plan to, and these pressure project archives are to be stored in the subroutine of a model in this panel clamp;
Wherein this production test plan has the test event archives at these pressure project archives.
2. the method for a kind of production test plan of generation as claimed in claim 1, wherein the pyramid structure of this production test plan is a tree structure.
3. the method for a kind of production test plan of generation as claimed in claim 1, wherein this converting system is to duplicate the content of these pressure project archives to produce the test event archives of this production test plan.
4. the method for a kind of production test plan of generation as claimed in claim 1, wherein this converting system is to produce test report archives at the subroutine of having chosen.
5. the method for a kind of production test plan of generation as claimed in claim 4, wherein this converting system all is provided with a link in these test report archives, and this link is to be used for access one test event archives.
6. system that is used for a kind of production test plan of generation of quality control program, this production test plan has a pyramid structure to include:
One first top layer is used for confirming this production test plan;
One first intermediary layer includes the test report archives of at least one this production test plan; And
One first bottom includes at least one test event archives at these test report archives, and each these test event archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this first top layer is that to be used for access and related these test report archives of this first top layer and this test report archives be to be used for access and related these test event archives of this test report archives;
This system includes:
One panel clamp, this panel clamp includes at least one model, and this each model all has a pyramid structure to include:
One second top layer is used for confirming this model;
One second intermediary layer is used for confirming a minimum subroutine of this model; And
One second bottom includes at least one pressure project archives at this subroutine, and each these pressure project archives all includes the test that at least one testing procedure is used for carrying out a project;
Wherein, this second top layer is to be used for the subroutine of access and related this model of this second top layer, and this subroutine is to be used for access and related these pressure project archives of this subroutine; And
One selective system is chosen a model, a subroutine and a model project file;
One converting system is used for the model project file that selective system is selected to convert a corresponding production test plan to, and these pressure project archives are to be stored in the subroutine of a model in this panel clamp;
Wherein this production test plan has the test event archives at these pressure project archives.
7. the system of a kind of production test plan of generation as claimed in claim 6, wherein this panel clamp is to be stored in the computer system.
8. the system of a kind of production test plan of generation as claimed in claim 6, wherein the pyramid structure of this production test plan is a tree structure.
9. the system of a kind of production test plan of generation as claimed in claim 6, wherein this converting system is to produce test report archives at the subroutine of having chosen.
10. the system of a kind of production test plan of generation as claimed in claim 9, wherein this converting system all is provided with a link in these test report archives, is used for access one test event archives.
11. the system of a kind of production test plan of generation as claimed in claim 6 more includes a printing system, is used for printing at least one test report archives or at least one test event archives.
CNB01101282XA 2001-01-17 2001-01-17 Method and system for generating quality management test program Expired - Fee Related CN100489773C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB01101282XA CN100489773C (en) 2001-01-17 2001-01-17 Method and system for generating quality management test program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB01101282XA CN100489773C (en) 2001-01-17 2001-01-17 Method and system for generating quality management test program

Publications (2)

Publication Number Publication Date
CN1366235A CN1366235A (en) 2002-08-28
CN100489773C true CN100489773C (en) 2009-05-20

Family

ID=4652010

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB01101282XA Expired - Fee Related CN100489773C (en) 2001-01-17 2001-01-17 Method and system for generating quality management test program

Country Status (1)

Country Link
CN (1) CN100489773C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100353327C (en) * 2005-11-07 2007-12-05 华为技术有限公司 Method for realizing product automatic test by test environment composed of test set
CN100377109C (en) * 2005-11-07 2008-03-26 华为技术有限公司 Method for completing product automation test utilizing test kit

Also Published As

Publication number Publication date
CN1366235A (en) 2002-08-28

Similar Documents

Publication Publication Date Title
CN101295173B (en) Simulation device for programmable controller
TWI431528B (en) Apparatus and method for selectively dispensing soft assets via subtractive installation
CN100368987C (en) Editing device and storage medium for storage editor program
US5539869A (en) Method and system for processing and presenting on-line, multimedia information in a tree structure
US20030221172A1 (en) System and method for design, procurement and manufacturing collaboration
US20010052910A1 (en) Method and system for generating display screen templates
CN101617316A (en) Intelligence is produced station and production method
WO2012063070A1 (en) A method of automatically testing different software applications for defects
CN102023861A (en) Method and system for generating test script and test suite
Price et al. Computer-based diagnostic systems
WO2006135607A2 (en) Method and system for rapid deployment and development of application and test software and documentation
US6308288B1 (en) Testing method of the integrity of the software pre-installed in a computer hard disk
CN100489773C (en) Method and system for generating quality management test program
US20020082846A1 (en) Method and system for generating quality control testing procedures
CN101727384B (en) Control method for automatically testing application software
JP2001184232A (en) Software test case evaluating device, and software failure tree device and software hazard device, and software behavior describing device
JPH08235024A (en) Automatic test device for software
KR100429957B1 (en) Program development apparatus, program development method, and storage medium storing program development program
JP3464159B2 (en) Test specification creation device and storage medium storing the program
CN114895877B (en) Method and device for establishing enterprise ERP (Enterprise resource planning) in low-code modularization mode based on webpage
JP2003241628A (en) Method and program for supporting generation of program for achieving target
TW502155B (en) Method and system for generating quality control testing procedure
WO2007072309A1 (en) Apparatus and method for selectively dispensing soft assets via subtractive installation
Korhonen et al. The reuse of tests for configured software products
Misra et al. An assessment of CASE technology for software design

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090520

Termination date: 20130117