CN100478159C - Method and apparatus for assembling a closure tab to a lid - Google Patents
Method and apparatus for assembling a closure tab to a lid Download PDFInfo
- Publication number
- CN100478159C CN100478159C CNB038245639A CN03824563A CN100478159C CN 100478159 C CN100478159 C CN 100478159C CN B038245639 A CNB038245639 A CN B038245639A CN 03824563 A CN03824563 A CN 03824563A CN 100478159 C CN100478159 C CN 100478159C
- Authority
- CN
- China
- Prior art keywords
- draw ring
- lid
- plastic sheet
- shearing
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Closures For Containers (AREA)
Abstract
A method and apparatus for assembling a first thermoformed workpiece (30, 32, 330, 332), such as a tab closure, to a second thermoformed workpiece (30, 32, 330, 332), such as a lid.
Description
Technical field
The present invention relates to a kind of disposable Reclosable lid, described lid has the sealing draw ring (closure tab) that is used for selectively the beverage port sealing of Reclosable lid.More precisely, the present invention relates to a kind of draw ring that will seal automatically and install to the apparatus and method that cover.
Technical background
Disposable cover is used to seal the top of container for drink for a long time, especially for " take-away ", as the beverage of buying from the fast food restaurant.The employed disposable cover of container that is used for hot beverage such as coffee etc. is typically provided with the sealing draw ring, the user can use the selectively beverage port on the closing cap of this draw ring, so just make the user in needs, drink hot beverage, otherwise keep the beverage port sealing to move cup and reduce it when causing beverage flow and overflow with the convection current cooling that reduces beverage and as the user.
This disposable cover by making a kind of suitable plastic, is made as high impact polystyrene (HIPS) hot forming usually.With other manufacturing technology, have the advantage that to produce high-quality, low-cost lid in enormous quantities as the injection-molded heat forming technology of comparing, and injection-moldedly can be made into the shape more complicated, but its productivity ratio is low and processing cost is higher usually than hot forming.
For most of hot formed Reclosable lids, sealing draw ring integral body forms the part of lid, and opening when at first so just needs the user to tear the sealing draw ring backward from covering when described Reclosable covers.The guide groove of tearing of some kind is formed at usually and covers, and tears the sealing draw ring backward to help the user.When the sealing draw ring along tearing after guide groove tears, even when the sealing of sealing draw ring, fracture also can be retained in tears between guide groove place lid and the sealing draw ring.Because beverage rocks beverage and will ooze out by this fracture place, the result causes suitable faulty sealing when user's mobile containers.
Therefore, expect to have a kind of disposable Reclosable lid, it has the cost and the production advantage of heat forming technology, makes the sealing ratio between sealing draw ring and the lid better by the sealing that the hot forming lid with integral sealing draw ring is obtained at present simultaneously.
Summary of the invention
The present invention solves the defective of prior art by a kind of method and apparatus that the first hot forming workpiece is installed to the second hot forming workpiece and do not need to store arbitrary workpiece as covering as the sealing draw ring is provided temporarily.Under the situation of draw ring and lid running, the sealing draw ring is installed to the apparatus and method that cover realize automation and be attached in traditional hot forming process for making cover, keep belonging to the cost advantage and the output of hot forming lid with this.
On the one hand, the present invention relates to a kind ofly cover and be made into the automatic assembly line of hot forming composite article by described draw ring and lid by draw ring is installed to automatically.This automatic assembly line is included in makes draw ring and the hot formed hot forming work station of lid on the plastic sheet, shear the shearing work station of draw ring (trim station) at least and be used for immediately the draw ring of shearing being transported to the draw ring of not shearing that covers and will shear from plastic sheet and be press-fit to the assembly work station that covers with the formation composite article.
The assembly work station can be adopted a variety of methods that draw ring is installed to and be covered, and comprising: be pressed into cooperation, be clasped (snap-fitting), bonding or ultrasonic bonding.
The assembly work station can be included in the instrument that transports that moves between the primary importance and the second place, and this transports instrument and picks up the draw ring of shearing immediately in primary importance after shearing, in the second place draw ring of shearing is installed to cover.A kind of aspirator can be increased to this transports instrument and keeps this draw ring when covering so that pick up this draw ring when shearing draw ring on slave plate and be transported at draw ring.In addition, a kind of power apparatus (force reliever) that unloads can be increased to this and transport instrument and transport the size of instrumental purpose in draw ring and the power that covers so that control this at assembling draw ring and Gai Shi.
The described instrument that transports can comprise a reciprocal arm that aspirator is installed at the one end.Unload power apparatus and can be used for aspirator is installed to the end of arm.This reciprocal arm moves back and forth between corresponding to the take-off location of primary importance and the rigging position corresponding to the second place.Reciprocating direction preferably is parallel to or transverse to the travel direction of plastic sheet by the assembly work station.
Can a plurality of instruments that transport be set with at least two groups, and no matter whether be the form of reciprocal arm, wherein another group of at least two groups is positioned at the second place when being arranged in primary importance for one group at least two groups, is installed into when covering to reach the draw ring that formerly picks up, and picks up draw ring simultaneously.
The shearing work station can comprise first cover drift and the punch die of shearing draw ring from plastic sheet.In this configuration, punch die includes an inlet and an outlet, and drift is contained in the inlet when plastic plate is between drift and punch die, and in order to shear draw ring from plastic sheet, when reciprocal arm was positioned at take-off location, reciprocal arm extended in the outlet, in order to pick up draw ring.
A kind of treadmill can be provided, be used to transport reciprocal arm and this flat board can reciprocal arm in the punch die outlet primary importance and the second place of reciprocal arm outside punch die exports between move.
On the other hand, the present invention relates to a kind of device of making composite article by hot formed draw ring of assembling and lid on public plastic sheet automatically, wherein said plastic sheet comprises a plurality of draw rings and lid, here, the assembly work station comprises: shear the cutter (trimmer) of at least one draw ring and the instrument that transports that can move from plastic sheet between the primary importance and the second place, this transports instrument and picks up a draw ring in primary importance, and this transports one that instrument then installs to draw ring on the plastic sheet and covers in the second place.
The instrument that transports preferably directly moves between first and second positions, needs to store draw ring to exempt before installing to a lid temporarily.The instrument that transports preferably is pressed into cooperation by draw ring and lid and draw ring is installed to one covers.
The invention still further relates to a kind of will installing to automatically from draw ring on the plastic sheet and cover the method that forms the hot forming composite article, wherein said plastic sheet comprises a plurality of draw rings and a plurality of lid.This method comprises: shear at least one draw ring from plastic sheet, to form the draw ring that at least one has been sheared, the draw ring that to shear immediately after shearing is transported to corresponding lid, and the draw ring that will shear is press-fit to corresponding covering, with formation hot forming composite article.
The method that the draw ring of having sheared is installed to corresponding lid can comprise be pressed into cooperation, be clasped, a kind of in the bonding or ultrasonic bonding.
Transporting the draw ring of having sheared can comprise with suction and pick up the draw ring of having sheared.Transporting the draw ring of having sheared further also can be included in to finish and stop suction when the draw ring that will shear installs to corresponding lid or aspirate strongly with pressure.This method can be included in the draw ring that will shear in addition and install to the corresponding time limit that covers and make draw ring and the corresponding power of having sheared that covers of using.
Shear step and can comprise and shear a plurality of draw rings, forming a plurality of draw rings of having sheared, and installation step can comprise in a plurality of draw rings each is installed to corresponding covering, to form a plurality of hot forming composite articles.
Can finish shearing by shearing a plurality of draw rings.Shear a plurality of draw rings and can comprise a part of shearing the draw ring sum from plastic sheet.The draw ring that forms the part of described draw ring sum can be sheared from plastic sheet simultaneously.Equally, the draw ring that forms the part of described draw ring sum can install to corresponding covering simultaneously.
This method also can comprise repeat pattern hot forming draw ring and the lid with predetermined unit.The part of described draw ring sum is preferably the integral multiple of this predetermined unit.This predetermined unit is delegation or row.
Draw ring and Gai Ke arrange by staggered row or column on plastic sheet.In this configuration, the optimal sequence of assembling comprises by the mode of a staggered row or column to be sheared draw ring and installs to covering of adjacent row or column.
Hot forming can comprise that also draw ring is a kind of hot forming sealing draw ring with first and second projectioies that link to each other with soft band, cover the hot forming lid that has lid depression and beverage port for a kind of, wherein being clasped comprises and will insert in the beverage port in the first projection insertion lid depression and with second projection.
Howsoever draw ring is installed to and cover, another step can comprise shear heat formed composite goods from the plastic sheet.
Change in the example at one, to install to the method that covers formation hot forming composite article automatically from draw ring on the plastic sheet comprises: shear at least one draw ring from plastic sheet, to form the draw ring that at least one has been sheared, the draw ring of having sheared is transported to corresponding lid, be press-fit to corresponding covering with the draw ring that will shear and form the hot forming composite article, wherein said plastic sheet comprises a plurality of draw rings and a plurality of lid.
This method also can be included in hot forming draw ring and lid on the plastic sheet, makes one of draw ring and lid have projection, and another has depression, and is pressed into to cooperate and comprises projection is inserted in the depression.Adopt this configuration, be pressed into cooperation and can comprise projection is snapped fit onto in the depression.Projection has than the bigger part of a part of size of depression, is clasped with realization.Draw ring and Gai Ke have many projection and depressions to correspondence.This method also can comprise by described of plastics width of cloth sheet (web) hot forming.
Description of drawings
Among the figure:
Fig. 1 is the schematic diagram of production line first embodiment, and described production line is used for hot forming and assembles according to lid of the present invention and comprise hot forming work station, perforate work station, assembly work station and shearing work station.
Fig. 2 is the plane that a width of cloth sheet contains the heat-formable material part of the lid that is applicable to first embodiment and corresponding sealing draw ring.
Fig. 3 is applicable to that lid of the present invention and draw ring are in they top perspective after width of cloth sheet shifts out.
Fig. 4 is the bottom view of Fig. 3 middle cover and draw ring.
Fig. 5 is the top view that is used for the forming tool of first embodiment, and this instrument is used for the hot forming work station and forms lid and sealing draw ring on width of cloth sheet.
Fig. 6 is the fragmentary, perspective view of lid shown in Figure 5 and the used forming tool of sealing draw ring.
Fig. 7 is the front view of the stamping tool assembly (punch toolassembly) that is used for the first embodiment assembly work station, and this assembly is used for installing to and supporting this lid when covering from hot forming width of cloth sheet upper punch means of press seals draw ring and will sealing draw ring.
Fig. 8 is the fragmentary, perspective view that is used for the stamping tool assembly of first embodiment, shows the drift used from hot forming sheet upper punch means of press seals draw ring and draw ring is being installed to the support member that supporting cover is used when covering.
Fig. 9 is the front view of the die arrangement (die assembly) that is used for the first embodiment assembly work station, this device cooperates with the stamping tool assembly of Fig. 7 and Fig. 8, be used for from hot forming sheet upper punch means of press seals draw ring, and comprise delegation corresponding to the capable ingate of support member (accessopening) and delegation corresponding to the capable die cavity of drift (die opening).
Figure 10 cuts open the cutaway view of getting along Fig. 9 center line 10-10, shows the cross section of ingate and die cavity.
Figure 11 is the fragmentary, perspective view that is used for the draw ring assemble mechanism of first embodiment, and this mechanism comprises a plurality of draw ring assembling devices, and each device has the sealing draw ring is transported and covers the reciprocal arm aim at from width of cloth sheet.
Figure 12 is the side view of a draw ring assembling device among Figure 11, show reciprocal arm, each reciprocal arm has by unloading draw ring receiver (receiver) assembly that each end of power apparatus and its links to each other, and the sealing draw ring that is used for selecting punching press from the hot forming sheet again with this draw ring of punching press install to and cover.
Figure 13 is the preceding perspective view of going up of a reciprocal arm, shows the draw ring receiver assembly in greater detail and links to each other with arm by unloading power apparatus.
Figure 14 is the back perspective view of going up of reciprocal arm among Figure 13.
Figure 15 is a draw ring receiver assembly and the broken section and the enlarged perspective that unload power apparatus in Figure 13 and 14.
Figure 16 is a schematic diagram, show a kind of be used for controlling synchronous (timing) that cover each parts of production line and transposition (indexing) may control scheme.
Figure 17 is the partial sectional view at the first embodiment assembly work station, and wherein the stamping tool assembly just near backstroke (back stroke) limit, just preparing to pick up the sealing draw ring by underarm, installs to and covers and upper arm is transporting draw ring.
Figure 18 is the partial sectional view similar to Figure 17, and only the draw ring assembling device is just advancing to long stroke (over-stroke) position, with remove any may not picked as yet sealing draw ring in a last periodic duty.
Figure 19 is the partial sectional view similar with 18 to Figure 17, just the stamping tool assembly is presented at impulse stroke (forward stroke) extreme position, here drift is sheared a sealing draw ring from width of cloth sheet, and the draw ring assembling device is presented at rigging position, here upper arm will seal draw ring and install to and cover, and underarm then picks up the sealing draw ring of having sheared.
Figure 20 is another optional configuration of production line shown in Fig. 1, and wherein perforate work station, assembly work station and shearing work station all are combined in the work station.
Figure 21 is the plane of a width of cloth sheet heat-formable material part, wherein contains the lid and the corresponding sealing draw ring that are applicable to second embodiment of the invention.
Figure 22 is the partial front elevation view that is used for the stamping tool assembly of second embodiment, and described assembly has the draw ring drift that is used for from hot forming width of cloth sheet upper punch means of press seals draw ring, be used for installing to the lid supporting component of supporting cover when covering and being used for punching press has been assembled from the hot forming sheet lid and the lid punch-head assembly of draw ring at the sealing draw ring.
Figure 23 is the fragmentary, perspective view of stamping tool assembly among Figure 22.
Figure 24 is the front view of the die shoe (die shoe) that is used for second embodiment, this die shoe cooperates with the stamping tool assembly of Figure 22 and Figure 23 and is used for from hot forming sheet upper punch means of press seals draw ring and the lid that assembled, and comprise first line interlacing corresponding to the capable ingate of lid supporting component and corresponding to the capable die cavity of draw ring drift and second row corresponding to the capable die cavity of lid punch-head assembly.
Figure 25 cuts open the cutaway view of getting along Figure 24 center line 25-25, shows the cross section of die cavity.
Figure 26 is the fragmentary, perspective view that is used for the draw ring assemble mechanism of second embodiment, and this mechanism comprises a plurality of draw ring assembling devices, and each device has and is used for the sealing draw ring is transported and covers the reciprocal arm aim at from width of cloth sheet side direction.
Figure 27 is the decomposition view of a draw ring assembling device among Figure 26, shows reciprocal receiver arm and the driven unit that transfer arm is used between draw ring die cavity and ingate.
Figure 28 is the forward sight elevation of a draw ring assembling device among Figure 26, shows the relative operating position of reciprocal arm.
Figure 29 is the partial sectional view at the second embodiment assembly work station, shows that the stamping tool assembly just is positioned in the backstroke limit near the backstroke limit and draw ring assembling device.
Figure 29 A is a partial sectional view, shows the relative position of stamping tool assembly, width of cloth sheet, die shoe and draw ring assembling device when watching above part shown in Figure 29.
Figure 30 is the partial sectional view similar to Figure 29, and just the draw ring assembling device is just advancing to long travel position, with remove any may not picked as yet sealing draw ring in a last periodic duty.
Figure 30 A is a partial sectional view, shows the relative position of stamping tool assembly, width of cloth sheet, die shoe and draw ring assembling device when watching above part shown in Figure 30.
Figure 31 is the partial sectional view similar with Figure 30 to Figure 29, only the stamping tool assembly is presented at the impulse stroke extreme position, here seal the draw ring drift and shear a sealing draw ring from sheet, the draw ring assembling device is presented at rigging position, here first reciprocal arm will seal draw ring and install to and cover, second reciprocal arm is then picked up the sealing draw ring of having sheared, and the lid drift is sheared the lid that has assembled from width of cloth sheet.
Figure 31 A is a partial sectional view, shows the relative position of stamping tool assembly, width of cloth sheet, die shoe and draw ring assembling device when watching above part shown in Figure 31.
Figure 32 is the perspective view of another optional lid supporting component, and this assembly has the area that dwindles, to be easy to dismounting lid, and supporting cover still in the process of fitting tight draw ring simultaneously.
The specific embodiment
Fig. 1 briefly shows the lid automatic assembly line 10 according to first embodiment of the invention.Lid production line 10 comprises hot forming workstation1 2, perforate workstation1 4, assembly work station 16 and lid shearing work station 18, and wherein plastics width of cloth sheet 20 is by these work stations.Lid production line 10 overall operation overviews will help to understand details of the present invention.Hot forming workstation1 2 forms draw ring and lid on plastics width of cloth sheet 20.When plastics width of cloth sheet 20 continues each work station by production line 10, for example, at perforate workstation1 4 at the sealing draw ring with cover punching, as beverage port and gas outlet.At assembly work station 16 draw ring shifted out to refill from plastics width of cloth sheet 20 and cover.The Pull ring cover that will assemble is transported to from assembly work station 16 and covers shearing work station 18 then, and here the lid that will assemble is sheared from width of cloth sheet, thereby finishes the production of Reclosable lid.
Fig. 2 illustrates an example of suitable plastic width of cloth sheet 20 parts by hot forming workstation1 2, wherein workstation1 2 make cover 30 and sealing draw ring 32 be formed on the plastics width of cloth sheet 20 and and arrange with the staggered craspedodromes that comprise five lids and five sealing draw rings.Width of cloth sheet constitutes as HIPS preferably by suitable plastic.
In Fig. 3 and Fig. 4, illustrate in greater detail a kind of exemplary lid 30 and sealing draw ring 32.Lid 30 comprises cup-shaped installing ring 34, has a peripheral wall 36 to extend and terminate on the upper surface 38 from cup-shaped installing ring 34, forms the beverage port shrinkage pool 41 of punching form in upper surface 38 negative areas bottom.The upper surface 38 of peripheral wall 36 carries out the transition to the end face 40 that is parallel to installing ring 34 usually.The D shape negative area of a formation liquid reservoir (reservoir) 42 is formed on the end face 40 together with groove 44.Locking depression 46 extends to the peripheral wall 36 from end face 40, and here it terminates in the pin 48 that extends internally relatively.
Installing stopper 50 and sealing-plug 52 fixing preferably by the sidewall for installing stopper 50, sealing-plug 52, liquid reservoir 42 and beverage port shrinkage pool 41 slight draft is set or tapering is realized.Liquid reservoir 42 and beverage port shrinkage pool 41 preferably have negative gradient, make sidewall extend back below end face 40 and upper surface 38 respectively.Installing stopper 50 and sealing-plug 52 have negative gradient equally.Preferably the following peripheral edge of installing stopper 50 and sealing-plug 52 has less times greater than the girth of liquid reservoir 42 and beverage port shrinkage pool 41 top edges in addition, this combines with negative gradient, installing stopper 50 and sealing-plug 52 can be pressed in liquid reservoir 42 and the beverage port shrinkage pool 41, cover 30 and will seal draw ring 32 and install to and cover on 30 the end face 40 so that the part by sealing draw ring 32 snaps fit onto.
It should be noted that, for this application, term " be pressed into cooperation " and be meant two parts by one of them at least a portion be contained in link to each other in another and part between the interaction that produced make any connection type that they couple together, and no matter described interaction is frictional property, mechanical or other connection type.Term " is clasped " and is used to represent to be pressed into the part of cooperation, and it has mechanical connection at least.
When sealing draw ring 32 installs to when covering on 30, thereby beverage port shrinkage pool 41 is drawn back draw ring part 51 or depress so that the sealing-plug in the beverage port shrinkage pool 41 52 is untied or is clasped selectively by the user and opens or closes.If wish that will seal draw ring 32 is fixed on open position, the user only needs around hinge 54 draw ring part 51 to be rotated in the locking depression 46, walks around locking pin 48 up to the edge of draw ring part 51.Sealing draw ring 32 intrinsic elasticity can make side deflection below locking pin 48 of draw ring part 51, and this will make draw ring part 51 remain on open position up to drawing back pin by the user.
Be important to note that lid 30 described in the present patent application and sealing draw ring 32 are lid and the sealing draw ring structure that any type can be assembled according to the present invention.Therefore, lid 30 and sealing draw ring 32 are as just example and help explanation the present invention, and the present invention are not carried out any type of restriction.
Though sealing draw ring 32 be described as being connected of lid 30 will sealing draw ring 32 a part be pressed into and cover in 30 the part, cover 30 and can be easy to equally be pressed onto and seal on the draw ring 32.For convenience and for simplicity, this paper that is connected of sealing draw ring 32 and lid 30 is described as sealing draw ring 32 is pressed into and covers in 30, is appreciated that still that this description is easy for lid 30 is pressed onto equally to seal on the draw ring 32.
Should also be noted that and are shaped exemplary lid 30 and sealing draw ring 32 producing is clasped is connected.But the present invention is not limited to this connection that is clasped.Any suitable connection all can be used for the present invention, for example, is pressed into cooperation, frictional fit, ultrasonic bonding or bonding.
The present invention also is not limited to draw ring installed to and covers.The present invention is equally applicable to assemble other parts, and is suitable for assembling a kind of goods that are formed at a plurality of workpiece on the width of cloth sheet that comprise most, and one of them shifts out and install on another workpiece from width of cloth sheet to the major general.
Fig. 5 illustrates the top view of hot forming workstation1 2 and a plurality of lid and draw ring model 62,64, and width of cloth sheet 20 is shaped by their, cover 30 and seal draw ring 32 to form.Model 62,64 with Fig. 2 in the form of width of cloth sheet 20 identical staggered rows arrange.Cover 30 and seal draw ring 32 in order to form on width of cloth sheet 20, width of cloth sheet 20 is heated and is placed on the top of model 62,64.Vacuum is put on the lower surface of width of cloth sheet 20,, forced air is applied on the top of width of cloth sheet 20 more simultaneously, force width of cloth sheet 20 to form the shape of models 62,64 width of cloth sheet 20 is drawn onto on the model 62,64.Then, width of cloth sheet 20 is raise, disengaging model 62,64 also advances.
The structure of hot forming workstation1 2 and operation are well-known in this area usually, thereby needn't be further described again.An example of suitable shaping work station is the IRAD type of being sold by Ai Erwen Societe Principia Research Development of the State of Washington (WA) subunit horse (Yakima) (Irwin Research andDevelopment) 44.
The model quantity that should be noted that every row is not limited the present invention.For this specification, every row is shown with five models.But every row can use any required model quantity.
With reference now to Fig. 6,, illustrates in greater detail the lid and the sealing draw ring model 62,64 of a pair of correspondence among the figure.Model 62,64 is consistent with the shape of previous described lid 30 and sealing draw ring 32.Therefore, will only simply describe them.
Cover mold type 62 comprises a plurality of surfaces of width of cloth sheet 20 relative its shapings.These surfaces comprise installing ring surface 74, peripheral wall surface 76, cover mold type upper surface 78, end face 80, beverage port surface 81, reservoir surface 82, groove surfaces 84 and locking sunk surface 86.Equally, sealing draw ring model 64 comprises protruding upper surface 88, sealing-plug surface 92 and the hinge surface 94 that wherein forms installing stopper surface 90.Sealing-plug surface 92 is formed on bossing 93, and its upper surface will form draw ring part 51.Equally, shear from width of cloth sheet 20 in case will seal draw ring 32, convex upper surface 88 just forms mounting portion 49.
In case cover 30 and sealing draw ring 32 on width of cloth sheet 20, forms, width of cloth sheet 20 just maximum advances to perforate workstation1 4, here formation beverage port and gas outlet on lid 30 and sealing draw ring 32.Perforate workstation1 4 is that those of ordinary skill in the art is well-known, therefore no longer describes in detail.For the present invention, only need to understand perforate workstation1 4 and remove material on the beverage port shrinkage pools 41 to form the beverage port through hole.Equally, perforate workstation1 4 also forms a gas outlet and forms another gas outlet in the bottom of installing stopper 50 in the bottom of liquid reservoir 42, so as will seal draw ring 32 install to form when cover on 30 one run through cover 30 with the gas outlet that seals draw ring 32.
A kind of suitable perforate workstation1 4 is IRAD types 44 of being sold by Ai Erwen Societe Principia Research Development of State of Washington subunit horse, and uses drift and punch die structure to form perforate.Form perforate also within the scope of the invention by hot forming workstation1 2.
Fig. 7 to 13 illustrates the details at assembly work station 16, will seal draw ring 32 here and shift out and it is snapped fit onto from width of cloth sheet 20 and cover on 30.From Fig. 7, assembly work station 16 comprises the assembly of shearing sealing draw ring 32 from the width of cloth sheet 20.This shearing component is the form of stamping tool assembly 100, extends delegation from it and is used to make width of cloth sheet 20 and seals draw ring punch-head assembly 102 that draw ring 32 separates and delegation is used for sealing the lid supporting component 104 that draw ring 32 installs to supporting cover 30 when covering on 30.
With reference to figure 7 and Fig. 8, each draw ring punch-head assembly 102 comprises draw ring drift 108 dresses pedestal 106 thereon.Draw ring drift 108 have with sealing draw ring 32 in the face of cover 30 surperficial consistent also corresponding drift upper surface 110.Drift upper surface 110 comprises surface 112, mounting portion and draw ring part surface 114, supports mounting portion 49 and draw ring part 51 above it respectively.Installing stopper depression 116, sealing-plug depression 118 and hinge pockets 120 are formed on the drift upper surface 110, and set the size and the position that when drift 108 contact width of cloth sheets 20, hold installing stopper 50, sealing-plug 52 and hinge 54 respectively, be not out of shape because of punch process to guarantee installing stopper 50, sealing-plug 52 and hinge 54.
Fig. 9 illustrates die arrangement 150, and this die arrangement cooperates with stamping tool assembly 100 to install to from the sealing draw ring 32 that shearing sealing draw ring 32 on the width of cloth sheet 20 allows will to have sheared subsequently simultaneously and covers on 30.Die arrangement 150 comprises die shoe 152, wherein forms two line entry holes 154.The quantity of ingate 154 is corresponding to the quantity of width of cloth sheet 20 middle covers 30 and sealing draw ring 32 in each row.Draw ring punch die 156 is installed on the die shoe 152 in each descending hole 154.Each draw ring punch die 156 comprises and is set at the die cavity 158 that the size of holding draw ring drift 108 and part are surrounded by support member 160, the effect of support member 160 is similar to the support member 128 of stamping tool assembly 100, because support member 160 supports on the width of cloth sheets 20 around will be stamped that part in zone of sealing draw ring 32.
Although about will be the sealing draw ring 32 of punching press be fixed to cover on 30 in situation that seals draw ring 32 of punching press preferred form of the present invention has been described, but, can increase other stamping tool assembly 100, die arrangement 150 and draw ring assemble mechanism 190, to reach the while a plurality of sealing draw rings 32 of punching press and to install on a plurality of lids 30, the back will explain these parts.For example, can increase other stamping tool assembly 100, die arrangement 150 and draw ring assemble mechanism 190, in order to sealing draw ring 32 that forms by hot forming workstation1 2 during width of cloth sheet 20 is operated corresponding to once-forming and part punching press simultaneously and the fitting tight draw ring 32 that covers 30 line numbers.Adopt this configuration, width of cloth sheet 20 will be by hot forming workstation1 2 sequential advancement or transposition.
With reference to Figure 10, the interior shape of ingate shown in the figure 154 and die cavity 158.Beginning is along with die cavity 158 runs through support member 160 and highly reduction.When die cavity 158 arrived the main part of draw ring punch die 156, the height of die cavity had increase slightly.Then, die cavity 158 leads to and runs through being lowered in the oral pore 154 of die shoe 152.
Install stamping tool assembly 100 with die arrangement 150 relative motions.When width of cloth sheet 20 was between stamping tool assembly 100 and die arrangement 150, drift 102 and support member 104 were aimed at so that be contained in respectively in die cavity 158 and the up ingate 154.When stamping tool assembly 100 during to die arrangement 150 motion, draw ring drift 108 is contained in the die cavity 158, so as from the width of cloth sheet 20 shearing sealing draw ring 32, and the back side of support member 128 supporting covers 30 installs to and covers on 30 will seal draw ring 32.
Stamping tool assembly 100 does not have substantial connection with respect to concrete mode and the present invention of die arrangement 150 motions, thereby no longer is elaborated.Those of ordinary skill in the art will be understood that have a variety of modes can realize the motion of stamping tool assembly 100.
Figure 11 represents as the instrument that transports with the sealing draw ring 32 that picks up punching press and be mounted to the draw ring assemble mechanism 190 that covers on 30.Draw ring assemble mechanism 190 comprises a plurality of draw ring assembling devices 192.Although Figure 11 only illustrates three draw ring assembling devices 192, can be lid 30 and the sealing draw ring 32 that every row interlock on the width of cloth sheet 20 draw ring assembling device 192 is set.Therefore, for width of cloth sheet 20, as shown in the figure, can use five draw ring assembling devices 192.
With reference to Figure 11 and Figure 12, each draw ring assembling device 192 comprises the center sill 196 that fixedly installs on the pedestal 198, and wherein pedestal 198 activities are contained on the closed slide 200 so that draw ring assembling device 192 moves back and forth with respect to die arrangement 150.A pair of receiver arm 204 links to each other with common axis 206, and common axis 206 utilizes axle journal to be contained in the center sill 196 by crank arm 208.One end of crank arm 208 fixedly installs on the axle 206, and the other end pivot of crank arm 208 installs on the receiver arm 204.
Therefore, the rotation of driving shaft 214 makes travelling gear 212 rotations of all draw ring assembling devices 192 simultaneously, and causes that spur gear 210 rotates simultaneously, to realize the reciprocating motion of receiver arm 204.Because receiver arm 204 links to each other by crank arm 208 with center sill 196, thus the rotation of spur gear 210 make receiver arm 204 the upper/lower positions of aiming at die cavity 158 and aim at up ingate 154 on move back and forth effectively between the position.Preferably there is a servomotor 216 (in Figure 11, being represented by dotted lines) to link to each other,, realizes the reciprocating motion of receiver arm 204 between upper/lower positions and last position so that driving shaft 214 back and forth rotates with driving shaft 214.
With particular reference to Figure 13 to Figure 15, generally with reference to Figure 11 and Figure 12, draw ring receiver 220 is contained in the top of receiver arm 204 by unloading power apparatus 260, impacts if draw ring receiver 220 is subjected to enough big power, and this unloads power apparatus then makes draw ring receiver 220 with respect to 204 motions of receiver arm.Each draw ring receiver arm 220 comprises the main body 222 with lower surface 224, is provided with the fluid flow port 240 that links to each other with air pipe line 254 (Figure 16) on lower surface 224.Main body 222 also has and the consistent upper surface 226 of sealing draw ring 32 upper surfaces.Upper surface 226 comprises corresponding to the draw ring part 228 of sealing draw ring 32 draw ring parts 51 with corresponding to the installing stopper part 230 that seals draw ring 32 mounting portions 49.
Draw ring suction inlet 232 is arranged on the draw ring part 228 and is shaped and is contained in the sealing-plug 52 of sealing draw ring 32.Equally, installing stopper suction inlet 234 is arranged on the mounting portion 230 and is shaped and is contained in the installing stopper 50 of sealing draw ring 32.Each suction inlet 232 and installing stopper inlet 234 comprise air duct 236,238 respectively, described air duct is connected to pump orifice 240 by pipeline, therefore fluidised form connects air pipe line 254 and suction inlet 232,234, so that when sealing-plug 52 and installing stopper 50 make sealing draw ring 32 be pressed in draw ring receiver 220 installing stopper 50 and sealing-plug 52 are aspirated picking up.
Unload power apparatus 260 and comprise dull and stereotypedly 261, it is fixedlyed connected with receiver arm 204 by the screw 262 that runs through arm and enter dull and stereotyped 261 sides.Dull and stereotyped 261 comprise pin-guide hole 264 at interval, are provided with air line passageway 266 therebetween, and when air pipe line 254 was installed to pump orifice 240, air pipe line 254 was by this passage.Pin-guide hole 264 comprises frustum of a cone countersunk head part 268 and equal-diameter part 270.
The mount pin 272 that comprises frustum of a cone mount pin head 274 and isometrical axle 276 is set at the size that is contained in the pin-guide hole 264, so that countersunk head part 268 covers of mount pin head 274 and pin-guide hole 264 are got up, and make the end of installation bearing pin 276 run through the equal-diameter part 270 of pin-guide hole 264 and contact draw ring receiver 220.Helical spring 278 is contained in each and extends above axle 276 and between draw ring receiver 220 and dull and stereotyped 261, so that an end of spring is near the lower surface 224 of draw ring receiver, and the other end is near dull and stereotyped 261.Screw 280 passes mount pin 272 and screws in the draw ring receiver 220 again, so that mount pin 272 is fixed on the draw ring receiver 220.
The function of unloading power apparatus 260 is from width of cloth sheet 20 upper punch means of press seals draw rings 32 and pick up by draw ring receiver 220 process of sealing draw ring 32 of punching press and alleviate any power that is applied on the draw ring receiver 220 by contact draw ring drift 108.If between draw ring drift 108 and draw ring receiver 220, come in contact, spring 278 will compress, and draw ring receiver 220 will slide to dull and stereotyped 261, so just make axle 276 in pin-guide hole 264, produce corresponding motion, prevent from other parts of draw ring receiver 220 and draw ring assemble mechanism 190 are caused damage to alleviate power.Because axle 276 slides with respect to dull and stereotyped 261, makes mount pin head 274 leave the countersunk head part 268 of pin-guide hole 264.
Between draw ring receiver 220 and draw ring drift 108 during relative separation, spring 278 bias voltage draw ring receivers 220 leave dull and stereotyped 261 and make mount pin 272 turn back to their previous positions.When they returned, mount pin head 274 was nested in the countersunk head part 268, and its effect is to make mount pin 272 with respect to pin-guide hole 264 centering and aligning.The possibility of clamping stagnation when in addition, countersunk head part 268 reduces axle 276 and slides in equal-diameter part 270.
Figure 16 is the schematic diagram of a kind of possibility method of control and synchronous stamping tool assembly 100 and draw ring assemble mechanism 190 (not shown in Figure 16) and lid production line 10 remainder operations.Two controllers preferably are set: a draw ring assembly controller 250 and a draw ring stamping tool controller 251, can operate the operation of control draw ring assemble mechanism 190 and stamping tool assembly 100 respectively with synchronously.Draw ring assembly controller 250 links to each other by data link (data link) 253 with draw ring stamping tool controller 251, and this data link 253 is Data transmission between controller 250,251 as required, as synchronous or position data.
Draw ring assembly controller 250 can be operatively connected vacuum source 252, and this vacuum source 252 links to each other with the pump orifice 240 of each draw ring receiver 220 of arm 204 ends by air pipe line 254.Air pipe line 254 preferably includes the mounting portion and the flexible pipe part that is connected this mounting portion and vacuum source 252 that links to each other with draw ring receiver 220.Draw ring assembly controller 250 also is connected to air pipe line 254 on the compressed air source 255.
Therefore, draw ring assembly controller 250 can be controlled vacuum or forced air are applied to draw ring receiver 220, so that keep sealing draw ring 32 or blow out any sealing draw ring of staying the die arrangement 150 32 after width of cloth sheet 20 is sheared at them.Draw ring assembly controller 250 also can be operationally connected to pedestal actuator 256, so that the pedestal 198 of draw ring assemble mechanism 190 is with respect to die shoe 152 reciprocating motions of die arrangement 150.Draw ring assembly controller 250 also links to each other with servomotor 216, with the reciprocating motion of realization driving shaft 214, thereby receiver arm 204 is moved back and forth between upper/lower positions and last position.Therefore, the operation of draw ring assembly controller 250 control draw ring assemble mechanisms 190 each parts is with the sealing draw ring 32 of realizing picking up punching press, promote the sealing draw ring 32 that picks up and cover 30 and aim at and will seal draw ring 32 and install to and cover on 30.
Draw ring stamping tool controller 251 can be operatively connected actuator 258, so that stamping tool assembly 100 is with respect to die shoe 152 reciprocating motions of die arrangement 150.Draw ring stamping tool controller 251 also control width of cloth sheet 20 by assembly work station 16 transposition and advance.Therefore, draw ring stamping tool controller 251 control width of cloth sheets 20 advance to the position of transposition, and here stamping tool assembly 100 advances, and from width of cloth sheet 20 upper punch means of press seals draw rings 32, seals draw ring 32 here and can be picked up by draw ring assemble mechanism 190 subsequently.
The pattern of actuator 256,258 can be any suitable actuator, for example, and hydraulic cylinder, pneumatic cylinder, thermo-mechanical drive and motor.And, if carrying out mechanically actuated, draw ring assemble mechanism 190 uses servomotor 216, actuator 256 even controller 250 also within the scope of the invention.If adopt this embodiment, suitable mechanical connection or linkage can be connected to draw ring assemble mechanism 190 on the stamping tool assembly 100, wherein the motion of stamping tool assembly 100 makes draw ring assemble mechanism 190 produce required being synchronized with the movement, and comprises the reciprocating motion of pedestal 198 and arm 204.Vacuum source 252 can be by 251 operations of draw ring stamping tool controller or directly by position sensor, for example limit switch operation.
If with one as required with respect to the operation of various parts in the plastics width of cloth sheet 20 control draw ring assembly work stations 10 and synchronous controller replace a plurality of controllers 250,251 with realize from plastics width of cloth sheet 20 upper punch means of press seals draw rings 32, pick up the draw ring 32 of punching press and the draw ring 32 of punching press install to and cover on 30 also within the scope of the invention.
Referring to figures 16 to Figure 19, the operation at assembly work station 16 is described comprehensively.For convenience of explanation, suppose when stamping tool assembly 100 and bring into operation during near its backstroke, upper and lower receiver arm 204 lays respectively at the upper and lower position, following receiver arm 204 does not transport sealing draw ring 32, is just transporting the sealing draw ring 32 that picks up in the periodic duty formerly and go up receiver arm 204.From this position, draw ring stamping tool controller 251 continues to make stamping tool assembly 100 stable states to move back and forth, and plastics width of cloth sheet 20 is advanced, and transposition next line lid 30 and sealing draw ring 32 make with ingate 154 and aim at.Then, draw ring assembly controller 250 starts pedestal actuator 256, so that draw ring assemble mechanism 190 advances to die arrangement 150.The pace of draw ring assemble mechanism 190 is greater than stamping tool assembly 100 substantially invariable travel speeds, and stamping tool assembly 100 begins from its backstroke position to die arrangement 150 reaches.
With reference to Figure 18, higher speed can make draw ring receiver 220 extend into and pass die cavity 158 when pedestal 198 moved on guide rail 200, exceeded support member 160 and entered the position that is called long travel position.At this moment in periodic duty, draw ring assembly controller 250 is opened vacuum source 252.The purpose of long travel position is to guarantee not seal draw ring 32 to stay in the die cavity 158 from previous periodic duty.If desired, draw ring assembly controller 250 can make a burst of forced air discharge from draw ring suction inlet 232 and installing stopper inlet 234, to blow out any sealing draw ring 32.
Then, draw ring assembly controller 250 makes the reversing of motion of the pedestal 198 of draw ring assemble mechanism 190, so that draw ring receiver 220 is returned to standby position from die cavity 158.At standby position, the pedestal 198 of draw ring assemble mechanism 190 is preferably in and is parked in this position on the guide rail 200, be that draw ring receiver 220 is positioned at the maximum insertion depth that draw ring punch-head assembly 102 can reach, so that closely contact between draw ring receiver 220 and draw ring drift 108, thereby improve the possibility that draw ring receiver 220 picks up sealing draw ring 32 smoothly.If exceed the impulse stroke limit of draw ring drift 108 owing to the position of what reason draw ring receiver 220, unloading power apparatus 260 will make draw ring receiver 220 along with moving with contacting of draw ring drift 108, can not be damaged, still make draw ring receiver 220 can pick up sealing draw ring 32 simultaneously.
With reference to Figure 19, when draw ring receiver 220 was positioned at standby position, controller 251 continued to make stamping tool assembly 100 stable advancing, and arrives its impulse stroke limit up to stamping tool assembly 100.When stamping tool assembly 100 moved to the impulse stroke limit, lid support 104 just is contained in covered in 30, at this moment, aimed at respect to upper inlet hole 154.Equally, draw ring punch-head assembly 102 begins to contact width of cloth sheet 20.Stamping tool assembly 100 continues to its impulse stroke limit and causes draw ring punch-head assembly 102 to extend in the die cavity 158, thus from the width of cloth sheet 20 shearing sealing draw ring 32, surround the zone of the sealing draw ring 32 of positive punching press simultaneously and support by support member 160.
When stamping tool assembly 100 arrives its impulse stroke limit, be under the vacuum condition, draw ring receiver 220 is just being waited for the arrival of the sealing draw ring 32 of punching press from the width of cloth sheet 20.When draw ring drift 108 arrived the impulse stroke limit, sealing draw ring 32 was pulled to draw ring receiver 220 by vacuum.Except picking up and keeping sealing the draw ring 32, when stamping tool assembly 100 arrived its impulse stroke limit, the draw ring receiver 220 that the advancing of the pedestal 198 of draw ring assemble mechanism 190 also causes being positioned at the receiver arm 204 of position compressed current fortune to the sealing draw ring 32 that is just supported the lids 30 of 104 supports by lid.Because draw ring receiver 220 is just keeping sealing draw ring 32, make installing stopper 50 and sealing-plug 52 aim at liquid reservoir 42 and beverage port 41 respectively, tightly suppress with sealing draw ring 32 and to cover 30 and cause installing stopper 50 and sealing-plug 52 to snap into respectively in liquid reservoir 42 and the beverage port 41, install to and cover on 30 thereby will seal draw ring 32, sealing draw ring 32 then is positioned at detent position.
Another advantage of unloading power apparatus 260 is, can control the draw ring assembling pressure by the spring force of selecting spring 278.In other words, transporting sealing draw ring 32 is used to be installed to the draw ring receiver 220 that covers and makes sealing draw ring 32 tightly suppress and cover 30.Be used to make sealing draw ring 32 to tightly suppress cover 30 power to control by the spring force of selection spring 278.
In case stamping tool assembly 100 begins from the impulse stroke limit to the backstroke extreme sport, the pedestal 198 of draw ring assemble mechanism 190 just moves to its backstroke position.When the motion of its backstroke position of pedestal 198 forwards, draw ring assembly controller 250 just starts servomotor 216 runnings, receiver arm 204 is moved on to their opposite location from their current position.In other words, the receiver arm 204 that is positioned at upper/lower positions at present moves on to the position, and the receiver arm 204 that is positioned at the position at present moves on to upper/lower positions.For fear of any potential contact between receiver arm 204 and die arrangement 150 die shoes 152, preferably to return the ingate 154 from the die shoe 152 fully up to draw ring receiver 220, servomotor 216 just begins startup.
When draw ring assembly controller 250 continued to make draw ring assemble mechanism 190 hyperphoric motions (syncopated movement), stamping tool controller 251 preferably continued to make stamping tool assembly 100 stable states to move back and forth.Like this, the draw ring receiver 220 that can finish upper/lower positions on the continuous basis draw ring receiver 220 that picks up sealing draw ring 32 and last position will seal draw ring 32 and snap fit onto and cover on 30.As long as plastics width of cloth sheet 20 is fed on the assembly work station 16, this a series of step will repeat as required continuously.
Will seal draw ring 32 install to cover on 30 after, plastics width of cloth sheet 20 advances to and covers shearing work station 18, lid 30 that has here now assembled and sealing draw ring 32 assemblys are sheared from plastics width of cloth sheet 20 in a well-known manner by drift and punch die, and this is similar to shearing sealing draw ring 32 from plastics width of cloth sheet 20.Therefore, will no longer describe in detail and cover shearing work station 18.Suitable shearing work station 18 is IRAD types 44 of being sold by Ai Erwen Societe Principia Research Development of State of Washington subunit horse, and uses drift and punch die structure to shear the lid 30 that has assembled from width of cloth sheet 20.
Generally speaking, the operation at assembly work station 16 can be thought the assembling process that a kind of machine is handled, here, when plastics width of cloth sheet 20 when 20 transpositions of width of cloth sheet being advanced with respect to each workstation1 2 to 18, sealing draw ring 32 is just sheared one of from a pair of row that comprises delegation's sealing draw ring 32 and adjacent lines lid 30.The sealing draw ring of having sheared 32 is installed into down on the lid 30 in a pair of sealing draw ring 32 and lid 30 row.In other words, the sealing draw ring of having sheared 32 is not to install on the lid 30 of first direct neighbor in capable, but installs on the capable lid of second direct neighbor 30.
Though this special assembling is preferred in proper order, it should not be regarded as limitation of the present invention.Can adopt other order.For example, can be by installing to cover and make stamping tool controller 251 keep stamping tool assemblies 100 will seal in the impulse stroke limit on the lid 30 that draw ring 32 installs to direct neighbor in 30 will seal draw ring 32 in receiver arm 204 position on upper/lower positions moves on to.In this configuration, draw ring assembling device 192 can only need a receiver arm 204.The defective of this assembling is that it is slower than the preferred embodiment operation.
Much can be combined into a work station in the single workstation1 2 to 18 that another possible variation example is a production line 10.For example, Figure 20 illustrates a kind of configuration, and wherein perforate workstation1 4, assembly work station 16 and lid shearing work station 18 are combined into a work station.Because whole three are used a kind of drift and punch die structure to finish perforate, sealing draw ring punching press and lid shearing function usually in these workstation1s 4 to 18, they are combined and will can not have any reluctant technology barrier.
Another variation example that be worth to propose is that draw ring assemble mechanism 190 also can be equipped with one and is used for sealing draw ring 32 is fixed to the supersonic welder that covers on 30.In this configuration, draw ring receiver 220 can also be used to supersonic welder to keep with respect to lid 30 and location sealing draw ring 32.In fact, supersonic welder can install in the part of draw ring receiver 220.Equally, draw ring assemble mechanism 190 can be equipped with a kind of adhesive applicating instrument, bonds to and covers on 30 will seal draw ring 32.
If will seal draw ring 32 installs to along the direction transverse to machine direction and covers on 30 also within the scope of the invention.In this configuration, lid 30 and sealing draw ring 32 will be according to file but not row shown in Figure 2 arrange.Draw ring assembling device 192 will need to rotate about 90 degree, make them at this moment will become in the motion between the upper and lower position and be the motion between the left and right position.Adopt this configuration, be mounted on the lid 30 of adjacent column from a sealing draw ring 32 that is listed as.The defective of comparing this configuration with first embodiment is may assemble less lid 30 to given width of cloth sheet 20 width.Concerning great majority lid production line 10, on the width of width of cloth sheet 20, there is actual restriction.Therefore, from the viewpoint of output, will be more favourable for the lid 30 that given width of cloth sheet 20 width assembling possibility as far as possible is many.
Stroke order and distance are also unrestricted.For example, not problem if sealing draw ring 32 is stuck in the die cavity 158, draw ring receiver 220 does not need to move into long travel position so.But they can directly move on to standby position.
Figure 21 to Figure 31 illustrates the second embodiment draw ring assembly line consistent with the assembly work station of combination shown in Figure 20 16 and final shearing work station 18, and here, draw ring side direction or level install to and cover.Because a large amount of differences between first and second embodiment occur on the assembly work station, therefore will only describe new assembly work station in detail, the explanation that should be appreciated that other work station that is used for first embodiment is applicable to second embodiment.
Figure 21 illustrates a part of plastics width of cloth sheet 320 that is applicable to second embodiment.Lid 330 and sealing draw ring 332 are formed on the plastics width of cloth sheet 320, and arrange with the staggered aligning file that comprises four draw ring row and four lid row.Lid 330 is identical with lid 30, and sealing draw ring 332 is identical with sealing draw ring 32, and just they revolve and turn 90 degrees, and are arranged into file, but not align, and this is the function of level assembling.
As first embodiment, plastics width of cloth sheet 320 preferably is made of suitable plastic, and the example is HIPS.Lid 330 and sealing draw ring 332 are formed on the hot forming workstation1 2, this hot forming workstation1 2 has cover mold type and the sealing draw ring model identical with the cover mold type 62 of first embodiment and sealing draw ring model 64, just in order to constitute the plastics width of cloth sheet 320 shown in Figure 21, model 62,64 is formed row and column.
Figure 22 and Figure 23 illustrate the details at the second embodiment assembly work station, will seal draw ring 332 here and shift out and install to from plastics width of cloth sheet 320 and cover on 330.With reference to Figure 22, the assembly work station comprises the shearing component of stamping tool assembly 300 forms, and this stamping tool assembly 300 comprises by constitute up of the staggered draw ring punch-head assembly 102 that is used to make plastics width of cloth sheet 320 to separate with sealing draw ring 332 and is used for sealing the lid supporting component 104 that draw ring 332 installs to supporting cover 330 when covering on 330.Stamping tool assembly 300 also comprises by being used for plastics width of cloth sheet 320 and band and has assembled descending that lid punch-head assembly 302 that the lid 330 of draw ring 332 separates constitutes.The lid punch-head assembly 302 be positioned at each supporting component 104 below.
Punch-head assembly 102 and lid supporting component 104 in first embodiment, have been described in detail.Unique difference between punch-head assembly 102 between first and second embodiment and lid supporting component 104 is, their direction of rotation and the best mode that is arranged as the carrying out horizontal assembling on stamping tool 300.
Lid punch-head assembly 302 is used for covering 330 from 320 shearings of plastics width of cloth sheet.In first embodiment, lid punch-head assembly 302 can be positioned on the first embodiment shearing work station 18.Lid punch-head assembly 302 comprises the pedestal 304 that is generally cylindricality, and circular lid drift 306 is housed on it.Lid drift 306 comprises annular installing ring 308, supports the neck 310 of annular shearing ring 312 and the guide rod (pilot) 314 that extends from shearing ring 312.
Lid punch-head assembly 302 and lid supporting component 104 perpendicular alignmnets.Installing ring 308 is near pedestal 304.Guide rod 314 is shaped to insert and covers in 330, and aims at and supporting cover 330 in shear history.Shearing ring 312 is used for from the plastics width of cloth sheet 320 actual the shearing and covers 330.
Figure 24 and Figure 25 illustrate and a kind ofly cooperate from the width of cloth sheet 320 shearing sealing draw ring 332 with stamping tool assembly 300, will seal draw ring 332 and install to the die arrangement 350 that covers on 330 and shear the lid 330 that has assembled from plastics width of cloth sheet 320.Die arrangement 350 comprises die shoe 352, forms a up ingate 154 and a downstream ingress hole 154 on it.The quantity of ingate 154 is at least corresponding to every capable width of cloth sheet 320 middle covers 330 and the quantity that seals draw ring 332 in up.The quantity of ingate 154 is at least corresponding to the quantity of the lid 330 that has assembled in every capable plastics width of cloth sheet 320 in descending.
Draw ring punch die 156 installs on the die shoe 352 at 154 places, line interlacing ingate.Like this, the up staggered ingate 154 that does not have punch die 156 and have punch die 156 of delegation that comprises.Lid punch die 340 installs on the die shoe 352 at descending each 154 place, ingate, and described lid punch die 340 is staggered with up draw ring punch die 156.Each lid punch die 340 comprises main body 346, and support member 344 extends from this main body 346, and support member 344 supports plastics width of cloth sheets 320 and surrounds that part of zone that the lid 330 that assembled will punching press.Lid punch die 340 comprise from first diameter transition to support member 344 with the die cavity 342 of bigger second diameter in main body 346 junctions.First diameter is set at the size of the shearing ring 312 that holds punch-head assembly 302.Bigger second diameter helps to remove the lid of having sheared 330 from lid punch die 340, because the lid of having sheared 330 unlikely is stuck in the hole.
Install stamping tool assembly 300 with die arrangement 350 relative motions.When plastics width of cloth sheet 320 is between stamping tool assembly 300 and die arrangement 350, draw ring punch-head assembly 102 and lid supporting component 104 are aimed at respectively and are contained in the die arrangement 350 up die cavity 158 and ingate 154, and lid drift 306 alignings are contained in the descending die cavity 342 of die arrangement 350.When stamping tool assembly 300 during to die arrangement 350 motion, draw ring drift 108 is contained in the die cavity 158, so that shearing sealing draw ring 332 from the plastics width of cloth sheet 320, the back side of lid supporting component 104 supporting covers 330 installs to and cover on 330 will seal draw ring 332, and covers that drift 306 is contained in the die cavity 342 so that the lid 330 that has assembled from 320 shearings of plastics width of cloth sheet.
Figure 26 illustrates among a kind of second embodiment in order to pick up the sealing draw ring 332 that separated and they are installed to draw ring assemble mechanism 354 on the adjacent lid of level 330.Draw ring assemble mechanism 354 comprises two draw ring assembling devices 356, and each draw ring assembling device 356 is corresponding to the two couples sealing draw ring 332 and the lid 330 that comprise plastics width of cloth sheet 320.That is to say that each draw ring assembling device 356 is designed to pick up two sealing draw rings 332 and once each draw ring 332 is put on the independent lid 330.
With reference now to Figure 26 to Figure 28,, each draw ring assembling device 356 comprises that slip installs to the base (base frame) 376 on the guide rail 200, and guide rail 200 is installed on the assembly work station 16, so that draw ring assembling device 356 moves back and forth with respect to die arrangement 350.Shown in base 376 be general slab structure, on it the fixed installation servomotor 372.
The upper plate driving wheel of a pair of synchronous pulley 364,365 forms is connected on the axle 370, and axle 370 connects and run through base 376 by axle journal, preferably along the consistent longitudinal axis of axle 370 and servomotor 372.Taking turns the lower plate driving wheel of 377 forms and driven gear 378 and be installed on the axle 370 of base 376 opposite sides and by suitable fasteners and be fastened on the axle 370, is retainer 382 shown in Figure 27.Wheel 377 installs on the synchronous pulley 365 dresses axle 370 thereon.Driven gear 378 installs on the synchronous pulley 364 dresses axle 370 thereon.When assembling like this, upper and lower plate driving wheel 364,365,377,378 and their corresponding axle 370 consistent rotations.
Travelling gear 380 is fixedly attached to as travelling gear retainer 381 on the output shaft 373 of servomotor 372 by suitable connector, with the rotation of the rotating band nutating gear 380 by servomotor 372.Travelling gear 380 and 378 engagements of lower plate driven gear are so that rotate lower plate driven gear 378 along with the driving of servomotor output shaft 373.The rotation of lower plate driven gear 378 also makes 364 rotations of upper plate synchronous pulley.Cog belt 366 connects upper plate synchronous pulley 364,365, makes the rotation of synchronous pulley 364 also make synchronous pulley 365 rotations.Because synchronous pulley 365 is connected with wheel 377, thereby take turns 377 along with synchronous pulley 365 rotations.Like this, the rotation of output shaft 373 makes all upper and lower plate driving wheel 364,365,377,378 rotations.
Draw ring assembling device 356 also is provided with tensioning pulley 374, it can regulate retaining ring around upper plate synchronous pulley 364,365 with 366 suitable tensioning degrees.
What link to each other with receiver jib 362 is a pair of receiver arm 360, this receiver arm 360 have connection draw ring receiver 220, unload power apparatus 260 and air pipe line 254 (for clarity, not shown air pipe line among Figure 27), they have structure and the configuration identical with first embodiment.Receiver arm 360 is spaced apart on receiver jib 362, makes each arm 360 and die shoe 352 hole 154 in up aim at.
It should be noted that, though being set at, each receiver jib 362 two receiver arms 360 are installed to reach the size of picking up and assembling two draw rings 332 simultaneously, but, if 362 of each receiver jibs are adorned a receiver arm 360 or two above receiver arms 360 also within the scope of the invention.If a plurality of receiver jibs 362 install on the base plate 376 also within the scope of the invention.And the present invention can have one, two or more draw ring assembling device 356.The quantity of receiver arm 360 and draw ring assembling device 356 can be regulated the needs of given assembling configuration according to the pattern and the size of assembled product.
Second embodiment of draw ring assemble mechanism 354 moves in the mode that is similar to first embodiment, just when plastics width of cloth sheet 320 moves both vertically by assembly work station 16 and also sealing draw ring 332 from draw ring punch-head assembly 102 pick up and horizontal movement to covering supporting component 104.In addition, up sealing draw ring 332 is installed to cover on 330 and pick up second sealing draw ring 332 from plastics width of cloth sheet 320 in, shear from plastics width of cloth sheet 320 occupying the plastics width of cloth sheet 320 descending lids that assembled 330.
Figure 29 to Figure 31 illustrates among second embodiment operating procedure with no less important described in first embodiment.Figure 29 to Figure 31 arranges with paired 29-29A, 30-30A and 31-31A.First width of cloth figure of each centering for example understands operational circumstances and demonstrates draw ring drift 108 and the operational circumstances of lid punch-head assembly 302 and corresponding punch die thereof from section line 25-25 or side view.Second width of cloth figure of each centering, promptly " A " figure for example understands operational circumstances and draw ring drift 108 is shown and the operational circumstances of lid supporting component 104 from top view.
In Figure 29 and Figure 29 A, first embodiment as shown in Figure 17 is assumed to when stamping tool assembly 300 and begins operation during near its backstroke.Draw ring punch-head assembly 102 and lid punch-head assembly 302 are positioned at draw ring punch die 156 exercisable and column positions, are used to stamp out up sealing draw ring 332 and the descending lid that has assembled 330.Receiver arm 360 on the last receiver frame 362 is aimed at draw ring punch die 156, to pick up the sealing draw ring 332 of punching press.Receiver arm 360 on the following receiver frame 362 has transported the sealing draw ring 332 of previous punching press and has installed to subsequently on the corresponding lid 330 will seal draw ring 332 with hole 154 alignings.Generally speaking, will seal draw ring 332 and separate with plastics width of cloth sheet 320, will seal draw ring 332 and remain on and will seal draw ring 332 on the draw ring receiver 220 again and install to and cover on 330 by applying vacuum, these are identical with the operation that first embodiment carries out.
Plastics width of cloth sheet 320 advances to index position, and here up with comprising die arrangement 350 respectively draw ring punch die 156 and the ingate 154 of delegation sealing draw ring 332 and lid 330 aimed at.Simultaneously, delegation's lid 330 lid punch die 340 descending with comprising die arrangement 350 of having a sealing draw ring 332 of assembling aimed at.
With reference to Figure 30 and Figure 30 A, draw ring assemble mechanism 354 advances to die arrangement 350 then, makes draw ring receiver 220 extend into and pass die cavity 158, to remove the sealing draw ring 332 that may stay in any operation formerly in the die cavity 158.Draw ring assemble mechanism 354 is return then, and so that draw ring receiver 220 is moved on to standby position, and stamping tool assembly 300 advances to die arrangement 350.
With reference to Figure 31 to Figure 31 A, when stamping tool assembly 300 is shifted to the impulse stroke limit, lid supporting component 104 is contained in and covers in 330, draw ring punch-head assembly 102 begins to contact plastics width of cloth sheet 320, to shift out sealing draw ring 332, and lid punch-head assembly 302 begins to contact plastics width of cloth sheet 320, to shift out the lid 330 that has assembled.The draw ring receiver 220 that sealing draw ring 332 shifts out and is installed on the receiver arm 360 that links to each other with last receiver jib 362 from plastics width of cloth sheet 320 picks up.In identical operations, the sealing draw ring 332 that is connected to down receiver arm 360 on the receiver jib 362 is installed into and covers on 330.In identical operations, the lid 330 that has assembled separates and makes with plastics width of cloth sheet 320 and passes the cover mold chamber.
Figure 32 illustrates another optionally lid supporting component 404, and it can be used for substituting any previous described lid supporting component 104.Lid supporting component 404 has the general structure identical with previous described lid supporting component 104, and this is the support member 428 that it has pedestal 426 and has outer surface 430.The main distinction of lid supporting component 404 is that outer surface 430 is inconsistent with the shape of lid.For example outer surface 430 comprises peripheral wall, and this peripheral wall has the diameter less than the lid internal diameter.Though outer surface 430 comprises end face support 436, liquid reservoir support 438 and beverage port and supports 440 that it does not have the upper support face 134 of existence in the formerly described lid supporting component 104.Lid supporting component 404 is such structures, i.e. those zones that the sealing draw ring will contact with lid in its common support assemblies process.This structure has reduced the surface area that lid supporting component 404 contacts with lid, is stuck in the possibility of covering on the supporting component 404 thereby reduced lid, makes that shifting out lid from lid supporting component 404 is more prone to.
Though the present invention has been described specially in conjunction with its some specific embodiment, should be appreciated that this is to illustrate for example and unrestricted, and the scope of appended claims should be construed to prior art allowed the same extensive.
Claims (60)
1. one kind covers and makes the automatic assembly line of composite article by described draw ring and lid by draw ring is installed to automatically, comprising:
Be used on public plastic sheet, making draw ring and the hot formed hot forming work station of lid;
Be used for the shearing work station of from described public plastic sheet, shearing draw ring at least; With
Assembly work station, its draw ring that is used for will having sheared immediately are transported to the draw ring of not shearing that covers and will shear and are press-fit to covering to form composite article of not shearing.
2. automatic assembly line according to claim 1, wherein being pressed into of draw ring and lid cooperates for being clasped.
3. automatic assembly line according to claim 1, wherein the assembly work station comprises the instrument that transports that can move between the primary importance and the second place, the wherein said instrument that transports picks up draw ring in primary importance, in the second place draw ring is installed to cover.
4. automatic assembly line according to claim 3, the instrument that wherein transports comprises aspirator, is used for picking up this draw ring when plastic sheet is sheared draw ring, and is transported at draw ring and keeps this draw ring when covering.
5. automatic assembly line according to claim 4, the instrument that wherein transports comprise and unload power apparatus (260), is used for transporting instrumental purpose in described draw ring with cover the size of power in assembling draw ring and Gai Shi control.
6. automatic assembly line according to claim 5, the instrument that wherein transports comprises reciprocal arm, aspirator is installed in the end of described reciprocal arm.
7. automatic assembly line according to claim 6, wherein aspirator is installed in the end of arm by unloading power apparatus.
8. automatic assembly line according to claim 6, wherein reciprocal arm moves back and forth between corresponding to the take-off location of primary importance and the rigging position corresponding to the second place.
9. automatic assembly line according to claim 8, wherein reciprocal arm moves back and forth between take-off location and rigging position along a direction, and this direction is parallel to or transverse to the travel direction of plastic sheet by the assembly work station.
10. automatic assembly line according to claim 8, wherein the shearing work station comprises first cover drift and the punch die of using from plastic sheet shearing draw ring.
11. automatic assembly line according to claim 10, wherein punch die includes an inlet and an outlet, when plastic sheet is between drift and punch die, drift is contained in the inlet, so that shear draw ring from plastic sheet, and when reciprocal arm was positioned at take-off location, reciprocal arm extended in the outlet, to pick up draw ring.
12. automatic assembly line according to claim 11, wherein the assembly work station also comprises the treadmill that transports reciprocal arm, and should flat board can reciprocal arm in the punch die outlet primary importance and the second place of reciprocal arm outside punch die exports between move.
13. automatic assembly line according to claim 12 wherein is provided with a plurality of reciprocal arm, when an arm was positioned at rigging position, the another one arm was positioned at take-off location at least, was installed into when covering to reach the draw ring that formerly picks up, and picked up draw ring simultaneously.
14. automatic assembly line according to claim 13, wherein the shearing work station comprises that also shearing the draw ring that has assembled from plastic sheet overlaps drift and punch die with second of lid usefulness.
15. automatic assembly line according to claim 3 wherein is provided with a plurality of instruments that transport.
16. automatic assembly line according to claim 15, wherein the mode with at least two groups is provided with a plurality of instruments that transport, wherein when being positioned at primary importance for one group at least two groups, another group at least two groups is positioned at the second place, be installed into when covering to reach the draw ring that formerly picks up, pick up draw ring simultaneously.
17. automatic assembly line according to claim 3 transports wherein that the motion of instrument between first and second positions is parallel to or transverse to the travel direction of plastic sheet by the assembly work station.
18. automatic assembly line according to claim 3, wherein the shearing work station comprises first cover drift and the punch die of using from plastic sheet shearing draw ring.
19. automatic assembly line according to claim 18, wherein punch die includes an inlet and an outlet, when plastic sheet is between drift and punch die, drift is contained in the inlet, so that shear draw ring from plastic sheet, and the instrument that transports extends in the outlet, to pick up draw ring.
20. automatic assembly line according to claim 18, wherein the shearing work station comprises that also shearing the draw ring that has assembled from plastic sheet overlaps drift and punch die with second of lid usefulness.
21. automatic assembly line according to claim 1 is wherein by a plastics width of cloth sheet described plastic sheet that is shaped.
22. one kind by being assemblied on the public plastic sheet by hot formed draw ring and lid and form the device of composite article automatically, wherein said plastic sheet comprises a plurality of draw rings and lid, and the assembly work station comprises:
Cutter is used for shearing at least one draw ring from plastic sheet and has sheared draw ring to form; With
The instrument that transports that can between the primary importance and the second place, move, wherein this transports instrument and picks up one immediately and sheared draw ring after shearing in primary importance, and this transports instrument and will shear draw ring and be press-fit in the plastic sheet one and cover in the second place.
23. device according to claim 22, the instrument that wherein transports directly moves between first and second positions, needs to store draw ring thereby eliminate before installing to a lid temporarily.
24. device according to claim 23, the instrument that wherein transports comprises aspirator, is used for picking up this draw ring when plastic sheet is sheared draw ring, and installs at draw ring and to keep this draw ring when covering.
Unload power apparatus (260) 25. device according to claim 24, the instrument that wherein transports comprise, be used for transporting the size of instrumental purpose draw ring being installed to the process control that covers in the power of covering.
26. device according to claim 25, the instrument that wherein transports comprises reciprocal arm, and aspirator is installed in the end of described reciprocal arm.
27. device according to claim 26, wherein aspirator is installed in the end of arm by unloading power apparatus.
28. device according to claim 27, wherein reciprocal arm moves back and forth between corresponding to the take-off location of primary importance and the rigging position corresponding to the second place.
29. device according to claim 28, wherein reciprocal arm moves back and forth between take-off location and rigging position along a direction, and this direction is parallel to or transverse to the travel direction of plastic sheet by the assembly work station.
30. device according to claim 29, wherein cutter comprises first cover drift and the punch die of using from plastic sheet shearing draw ring.
31. device according to claim 30, wherein punch die includes an inlet and an outlet, when plastic sheet is between drift and punch die, drift is contained in the inlet, so that shear draw ring from plastic sheet, and when reciprocal arm is positioned at take-off location, reciprocal arm extends in the outlet, to pick up draw ring.
32. device according to claim 31, wherein the assembly work station also comprises the treadmill that transports reciprocal arm, and should flat board can reciprocal arm in the punch die outlet primary importance and the second place of reciprocal arm outside punch die exports between move.
33. device according to claim 32 wherein is provided with a plurality of reciprocal arm, the another one arm is positioned at take-off location at least when an arm is positioned at rigging position.
34. device according to claim 33 also comprises second cutter, described second cutter has second cover drift and the punch die in order to draw ring that has assembled from the plastic sheet shearing and lid.
35. device according to claim 22 wherein has a plurality of instruments that transport, each transports instrument and picks up different draw rings and it is installed to different covering in primary importance.
36. device according to claim 22, wherein being pressed into is connected is the connection that is clasped.
37. device according to claim 22 is wherein by a plastics width of cloth sheet described plastic sheet that is shaped.
38. one kind will install to the hot formed method that covers and form the hot forming composite article automatically from hot formed draw ring on the plastic sheet, wherein said plastic sheet comprises a plurality of hot formed draw rings and a plurality of hot formed lid, and this method comprises:
Shear at least one draw ring from plastic sheet, to form the draw ring that at least one has been sheared;
The draw ring that to shear immediately after shearing is transported to corresponding lid; With
The draw ring of having sheared is press-fit to corresponding covering, forms the hot forming composite article.
39., wherein be pressed into cooperation and comprise that the draw ring that will shear snaps fit onto corresponding covering according to the described method of claim 38.
40., wherein transport the draw ring of having sheared and comprise by suction and pick up the draw ring of having sheared according to the described method of claim 38.
41., wherein transport the draw ring of having sheared and also be included in to finish and stop suction when the draw ring that will shear installs to corresponding lid according to the described method of claim 40.
42., also be included in the draw ring that to have sheared and install to corresponding draw ring and the corresponding power that covers that the time limit making is used for having sheared that covers according to the described method of claim 40.
43. according to the described method of claim 38, wherein shear step and comprise and shear a plurality of draw rings, forming a plurality of draw rings of having sheared, comprise in a plurality of draw rings each is installed to corresponding covering and be pressed into matching step, to form a plurality of hot forming composite articles.
44. according to the described method of claim 43, wherein the shearing of a plurality of draw rings comprises a part of shearing the draw ring sum from plastic sheet.
45. according to the described method of claim 44, the draw ring that wherein forms the part of described draw ring sum is all sheared from plastic sheet simultaneously.
46. according to the described method of claim 45, the draw ring that wherein forms the part of described draw ring sum all is assembled to corresponding covering simultaneously.
47., also comprise repeat pattern hot forming draw ring and lid with predetermined unit according to the described method of claim 44.
48. according to the described method of claim 47, the part of wherein said draw ring sum is the integral multiple of this predetermined unit.
49. according to the described method of claim 48, wherein predetermined unit is delegation or row.
50. according to the described method of claim 49, wherein draw ring and lid are arranged by staggered row or column.
51., wherein shear draw ring and install to covering of adjacent row or column by the mode of a staggered row or column according to the described method of claim 50.
52., also comprise shear heat formed composite goods from the plastic sheet according to the described method of claim 51.
53. according to the described method of claim 44, wherein the hot forming of draw ring comprises and makes the sealing draw ring hot forming with first and second projectioies that link to each other with soft band, the hot forming of lid comprises makes the lid hot forming with lid depression and beverage port, wherein first projection is inserted in the lid depression and with second protruding the insertion in the beverage port to be clasped so that form.
54. according to the described method of claim 38, wherein by a plastics width of cloth sheet described plastic sheet that is shaped.
55., also be included in hot forming draw ring and lid on the plastic plate according to the described method of claim 38, make one of draw ring and lid have projection, and another has depression, and is pressed into to cooperate and comprises projection is inserted in the depression.
56., wherein be pressed into to be combined together and comprise projection is snapped fit onto in the depression according to the described method of claim 55.
57. according to the described method of claim 56, its protrusions has than the bigger part of a part of size of depression, is clasped with realization.
58., many projection and depressions to correspondence are arranged wherein according to the described method of claim 57.
59. according to the described method of claim 58, wherein the hot forming of draw ring comprises and makes sealing draw ring (32, the 332) hot forming with first and second projectioies that link to each other with soft band, the hot forming of lid comprises makes the lid hot forming with lid depression and beverage port, wherein first projection is inserted in the lid depression and with second protruding the insertion in the beverage port to be clasped so that form.
60. according to the described method of claim 38, wherein hot forming comprises by a plastics width of cloth sheet described plastic sheet that is shaped.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US31956002P | 2002-09-18 | 2002-09-18 | |
US60/319,560 | 2002-09-18 | ||
US60/319,655 | 2002-10-29 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1688431A CN1688431A (en) | 2005-10-26 |
CN100478159C true CN100478159C (en) | 2009-04-15 |
Family
ID=35306272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB038245639A Expired - Lifetime CN100478159C (en) | 2002-09-18 | 2003-09-17 | Method and apparatus for assembling a closure tab to a lid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100478159C (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2939710B1 (en) * | 2008-12-12 | 2013-07-05 | Moulindustrie | MOLDING AND EMBOITEMENT SYSTEM. |
CN102825790B (en) * | 2012-08-28 | 2015-01-14 | 无锡市铁民印刷机械有限公司 | Automatic feeding and welding device for ring handles of carry bags |
AT16356U1 (en) * | 2018-01-30 | 2019-07-15 | Amede Stoeckl | Covering device for a drinking vessel |
CN109130228B (en) * | 2018-08-15 | 2021-06-11 | 张仁贵 | Manufacturing process of easy-to-open cover and easy-to-open cover |
CN109352330B (en) * | 2018-11-22 | 2024-04-12 | 重庆大学 | Drinking cup production line |
CN114733955A (en) * | 2022-03-01 | 2022-07-12 | 郑州领胜科技有限公司 | Manufacturing method for automatic die cutting assembly of product |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2613982A1 (en) * | 1987-04-15 | 1988-10-21 | Monoplast Sa | Method of manufacturing composite containers by thermoforming a sheet of plastic, and containers obtained |
-
2003
- 2003-09-17 CN CNB038245639A patent/CN100478159C/en not_active Expired - Lifetime
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2613982A1 (en) * | 1987-04-15 | 1988-10-21 | Monoplast Sa | Method of manufacturing composite containers by thermoforming a sheet of plastic, and containers obtained |
Also Published As
Publication number | Publication date |
---|---|
CN1688431A (en) | 2005-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7353582B2 (en) | Method for assembling a closure tab to a lid | |
US3958394A (en) | Continuous movement packaging machine | |
CN1777832B (en) | Adhesive chuck device | |
CN100478159C (en) | Method and apparatus for assembling a closure tab to a lid | |
US20150203223A1 (en) | Thermoforming packaging machine with a top film forming station | |
US20030155685A1 (en) | Molding method and apparatus with plural cooperating mold tools for forming interior trim components for motor vehicles | |
US4341498A (en) | Method and apparatus for blanking, folding and inserting membrane into container covercap | |
US20130075423A1 (en) | Fluid material dispensing kit including a pouch and a dispensing case | |
CN104178937A (en) | Full-automatic template sewing machine | |
CS204979B2 (en) | Machine for making the packaging vessels | |
CN105252748A (en) | Die inner cutting forming device of forming machine | |
CN101663151B (en) | Moulding device for making vessels of a thermoplastic material | |
JP2012528009A (en) | Embossing method and apparatus | |
JP3608815B2 (en) | Liquid container transfer processing equipment | |
US4394115A (en) | Forming arrangement for machines making receptacles out of thermoplastic material | |
US20160101560A1 (en) | Tool, tool station, thermoforming system and method for operating a thermoforming system | |
JPH08132520A (en) | Manufacture of in-mold label container made of thermoplastic resin and device therefor | |
US20030234084A1 (en) | Set-down box | |
CN201346820Y (en) | Fully automatic cup cover forming machine | |
KR102686231B1 (en) | Blister packaging machine and blister pack manufacturing method | |
US20210002012A1 (en) | Tool System for A Packaging Device | |
JPS62248522A (en) | Press device | |
AU686758B2 (en) | Process and device for producing a flowable product package via a shell | |
US20030122287A1 (en) | Method of manufacturing packaging articles, and a corresponding manufacturing machine | |
KR20200093240A (en) | Mixing bottle manufacturing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20090415 |