CN100472509C - Support apparatus, method and system for real time operations and maintenance - Google Patents

Support apparatus, method and system for real time operations and maintenance Download PDF

Info

Publication number
CN100472509C
CN100472509C CNB2004800089081A CN200480008908A CN100472509C CN 100472509 C CN100472509 C CN 100472509C CN B2004800089081 A CNB2004800089081 A CN B2004800089081A CN 200480008908 A CN200480008908 A CN 200480008908A CN 100472509 C CN100472509 C CN 100472509C
Authority
CN
China
Prior art keywords
report
instrument
data
expert
assets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004800089081A
Other languages
Chinese (zh)
Other versions
CN1864156A (en
Inventor
J·G·巴肯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kellogg Brown and Root LLC
Landmark Graphics Corp
Original Assignee
Kellogg Brown and Root LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kellogg Brown and Root LLC filed Critical Kellogg Brown and Root LLC
Publication of CN1864156A publication Critical patent/CN1864156A/en
Application granted granted Critical
Publication of CN100472509C publication Critical patent/CN100472509C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

An apparatus, system and method for facilitating decision-making in connection with management of enterprise assets are disclosed. A real time expert decision support module is interfaced with an access portal including a navigation table for asset management, and with an historical parameter database associated with a distributed control system of plant end sensors and actuated control elements of a production process. The access portal and navigation table provide access to tools in the support module that facilitate real time decision making information delivery to the functional teams that 10 support an asset, line of sight management performance models of team performance, practical performance analysis tools that extract information in real time from the process control system and other sources of asset data for translation into actionable information, and a real time interactive schematic environment.

Description

Support device, the method and system of true-time operation and maintenance
Technical field
The present invention relates to promote device, the method and system of the decision-making relevant, relate in particular to the true-time operation relevant and safeguard decision, described assets such as oil and/or petrochemical iy produced equipment with assets with asset management.
Background technology
U.S. Patent No. 5,566,092 has described the present situation of this area, comprises the Machine Fault Diagnosis system, assists in ensuring that effective plant maintenance.Hypothesis test process and fault diagnosis network (FDN) based on fuzzy logic and physical carrier model move together, are used to detect the fault that can't be discerned by FDN, and are used for the machine condition of Analysis of Complex.
The foreign patent application WO05/101555A2 that has announced has described the present situation of this area, comprise the self-adaptation Knowledge Management System, come the assisted user decision-making by following operation being provided real-time on-line automatic suggestion: the fault eliminating of the measurement of being monitored, performance trend monitoring, health control and diagnosis of preferential maintenance area and early warning.This system creation a structurized knowledge base, by model, historical data and how organize models's domain knowledge heuristic content and constitute.
Go up in being entitled as of showing in January, 1994 " expert system of the generating plant control that MODI-provide is reliable, economic " (MODI-anexpert system supporting reliable at " ABB Review " by Dirk Neupert, Michael Schlee, Ewald Simon, economical power plant control) present situation of this area described in article, comprises a kind of by parameter and arithmetic reference model being compared and analyze any expert system that becomes thereby monitor the state of generating plant processing that departs from the routine work behavior.In addition, U.S. Patent No. 4,461,172 have described the present situation of this area, comprise a kind of equipment, are used for collection monitoring data from the one or more selected well of one group of producing well, and reduce monitor data to the form that can be used for analyzing with real-time mode.In addition, U.S. Patent No. 5,706,896 have described the present situation of this area, comprise a kind ofly being used in Long-distance Control and/or monitoring the system of a plurality of producing wells.Multizone and/or many well sites control system are made of a plurality of down-holes electronic controller electricity equipment and a plurality of computer based ground system from a plurality of ground point operation.The important function of these systems comprises: the flow rate profile of predicting the future of a plurality of wells, supervision and liquid or the gas flow of control from the stratum to the well or from the well to ground.
U.S. Patent No. 6,112,126 have described the present situation of this area, comprise a kind of processing controls optimization system, utilize the adaptive optimization software systems, comprise goal seeking intelligence software object.This goal seeking intelligence software object also comprises the in house software object, comprises expert system object, adaptive modeling object, optimizer object, fallout predictor object, detecting device object and communication translation object.This goal seeking intelligence software object can be configured to hierarchical relational, and thus, the goal seeking behavior of each intelligence software object can be revised by hierarchy goal seeking intelligence software object at the middle and upper levels.
Summary of the invention
The present invention has disclosed the device that is used for real-time production run asset management, the system based on access entrance that is used to promote the decision-making relevant with enterprise asset management, the method for real-time process asset management and the method for real-time performance management.The present invention allows: real-time decision information is passed to the function team that supports assets; Vision management of performance model line is to promote observability and the definition to team's performance; From the actual performance analysis tool of Process Control System and the information extraction of other assets data source, be used to convert to executable information in real time; And real-time, interactive signal environment.
In one embodiment, the invention provides the device that is used for the real-time process asset management.Described device comprise a dcs and with the mutual procedure parameter data history database of dcs, described dcs is used to receive from the sense data of device senses apparatus and to driven element and transmits control signal so that monitor procedure.Expert system and historical data base are mutual so that generate expert's state and trend report to uptime, production status, production loss, equipment loss, equipment performance or their arbitrary combination.Provide such as access entrances such as the Internet or based on network inlets to show expert's trend report to the user.Working routine that Work management system proofreaies and correct with scheduling equipment or system to production run are provided, have been used to respond request from the solution production loss of access entrance.Expert system can comprise logic rules or the algorithm that is used to generate such as expert reports such as alarms.Described device can comprise the knowledge trap tool, is used for upgrading the fault logic rule of expert system.Telecommunication apparatus can be linked to expert system, is used for expert's alarm or other reports are sent to the long-distance user.Access entrance can comprise graphical user interface, is used to show that expert report and input request are to solve expert's alarm or other reports.
An alternative embodiment of the invention is the device that is used for the real-time process asset management.Described device comprise a dcs and with the procedure parameter data history database of dcs interface, described dcs is used to receive from the sense data of device senses device equipment and to driving element and transmits control signal so that monitor procedure.Expert system and historical data base to generate expert's status report and via access entrance expert's status report to be sent to user interface facilities, send to the user with expert's trend report alternately.Provide working routine that Work management system proofreaies and correct with scheduling to process equipment or system, be used for request via access entrance response solution production loss.Expert system can comprise computations and logical algorithm, is used for reporting the statistics of selecting from the group of being made up of uptime, production status, production loss, equipment loss, equipment performance or the like or their combination.User interface facilities can comprise telecommunication apparatus.Expectation is linked to the real time data that one or more input equipments are used to be selected from the group of being made up of engineering analysis, operational losses, process capacity or the like and their combination in any with expert system.The engineering analysis data can comprise equipment and system performance information.The processing realistic model can be linked to expert system and be used for the process capacity data.The storage emulation model can be linked to expert system, is used to provide the memory capacity data.Access entrance can comprise graphic user interface, is used to show that expert's trend report and input are to solving the request of production loss.
An alternative embodiment of the invention comprises the device that is used for the real-time process asset management.Device comprise dcs and with the mutual procedure parameter data history database of dcs, described dcs is used to receive from the sense data of device senses device equipment and sends control signals to driving element with monitor procedure.Expert system and historical data bank interface change report and process variation report are sent to user interface facilities with generative process, and the report of optimization chance is sent to access entrance.Provide Work management system so that optimum procedure is dispatched to process device or system, be used to respond the request of the adjustment operating parameter that sends via access entrance.Expert system can comprise and be used for process or produce logic rules or the algorithm of optimizing.The process simulation model can with the expert system interface so that upgrade expert system with emulated data.Device can comprise the input equipment that is used for process engineering model data and configuration information, and process simulation model, production optimization logic rules or algorithm that is used for adjusting expert system or the like reaches their combination in any.Device can also comprise the input equipment that is used for process engineering model data and configuration information, is used for adjusting the logic rules and the algorithm of expert system.User interface facilities can comprise telecommunication apparatus.
Another embodiment provides the system that is used to promote the decision-making relevant with enterprise asset management.System comprise Real Time Expert decision support module, the decision support of user capture Real Time Expert access entrance, can provide Clear Line Of Sigh via the navigational table of access entrance visit by enterprise.Navigational table can comprise first dimension: tieed up by the packet characteristic and second that plan, action and result form: by the packet characteristic that personnel, equipment and cost are formed, be used for the instrument that the branch group access is associated with support module.The plan group can provide the visit to maintenance strategy and policy tool, and the action group can provide to be eliminated and loss prevents the visit of instrument, group can provide visit to equipment, maintenance and production performance instrument or the like as a result defective.Navigational table can comprise the visit to the operative knowledge trap tool.Operative knowledge seizure table can be included in the information of putting in order on the process device project and the database of register system defective separately, has comprised the reason of system defect and the engineering and the operating experience of effect.The operative knowledge trap tool can comprise the database filtrator based on the selectivity combination of two or more systems, manufacturer, subsystem and defective.The register system defective data can comprise symptom, seriousness, consequence, testing mechanism or the like and their combination in any.Desired is that the register system defective data also comprises selected data from the group of being made up of defective occurrence frequency, logic rules frequency, rule, recommendation corrective action, report recipient, various comments or the like and their combination in any.The data padding data storehouse that the operative knowledge trap tool can be associated and select from the group of being made up of shut down event report data, supplier data, expertise or the like and their combination in any to use with new tool more.
Navigational table also can be included in the visit of shut down event report registration tool, comprise the visit to the information of reporting from shut down event, described shut down event report is selected from by report number, time retreats, responsibility, date takes place, product is lost, find fault, the loss classification, cost, corrective action, send target, the reason classification, the assets focus, the source position, the loss of stand-alone service contractor, significantly action, the maintenance work request, time out, the responsibility assets, the review process, problem definition, Event Description, stop or the like and group that their combination in any is formed.Shut down event report registration tool can be alternatively or is provided visit to instrument, described instrument to be selected from group by management, shut down event report generation, root cause analysis, maintenance strategy, schedule maintenance routine, technology change, Report Builder or the like and their combination in any are formed in addition.Can define the shut down event report template via management tool.Shut down event report Core Generator can be used to generate and comprise that the shut down event that is selected from the data that the group be made up of personnel's generations, transmission personnel, loss classification, the loss of stand-alone service contractor, reason classification, responsibility assets, Event Description, source position, time out or the like and their combination in any selects reports.The root cause analysis instrument can be used for generating comprise by being selected from date, key personnel, the preventative corrective maintenance of execution root cause analysis (RCA-PCM) data take place, recommend corrective action, action target date, cost-benefit analysis, audit by or the shut down event of the data selected of the group formed of refusal date, planning execution details, implementation date, the date of stopping or the like and their combination in any report.The maintenance strategy instrument can be used to generate comprise by be selected from by the date takes place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the implementation date of execution, the shut down event that stops the data that group that date or the like and their combination in any form selects reports.Safeguard the routine instrument can be used to generate by comprise that the date freely takes place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the shut down event of carrying out the data that group that realization date, the date of stopping or the like and their combination in any form selects reports.Technology change instrument can be used to generate by comprise that the date freely takes place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the shut down event of carrying out the data of the group that realization date, the date of stopping or the like and their combination in any form reports.The report Core Generator can be used to generate by comprising from the performance of being shut down by total assets, shut-down period according to causality classification is used for the source position date range, according to the shut-down period of being willing to the position date range, shut-down period according to the loss classification is used for responsibility asset data scope, production loss according to function responsibility data area, reappear the time data scope, shut down event report data scope, the report of the data of selecting in the group that distribution report data scope or the like and their combination in any are formed.
Personnel's grouping can comprise the instrument of selecting from organize, described group of man-hour by preventive maintenance working load, history and plan, the ratio of safeguarding Supply and Demand, crucial action registration, idea database, action daily record, preventive maintenance consistance, preventive maintenance relative correction maintenance work, yield-power, correcting feature, expansion, total safeguard finishing of reserve, defective elimination action or the like and their combination in any are formed.Device packets can comprise the instrument selected from group, described group by operative knowledge catch, influence in real time chart, hazard level assessment, RAM emulation current potential, equipment strategy matrix, device databases, equipment performance, key equipment state, jacking equipment state, shut down event Register, shut down event report, assets performance metric, according to maximum faults of reason, form according to the maximum faults of position or the like and their combination in any.Cost grouping can comprise the instrument of selecting from group, and described group by safeguarding budget, safeguard the main performance identifier, safeguard the budget control process, total maintenance cost, safeguarding budget tracking, corrective maintenance cost, safeguard that the main performance identifier is followed the tracks of or the like and their combination in any is formed.
The access entrance of system can comprise the homepage of the inlet that has instrument, and described instrument is selected from the group that assets performance metric, leader team, maintenance, supply chain management, plan, good operation, human resources, emergency response, on-the-spot team, equipment, engineering and structure or the like and their combination in any are formed.Access entrance can comprise the geographical expression of the demonstration of production run, also can comprise the assets performance tool.The assets performance tool can be used to provide real-time assets statistics, and described data are selected from the group of being made up of throughput rate, extension, uptime, availability or the like and their combination in any.The assets performance tool can be used to access tool, described instrument be selected from by basis instrument general introduction, chokes model, state, traffic signal lamp system, production performance, expert system, satellite combine look at, group that shut down event report, compressor envelope, uptime and availability, loss summary or the like and their combination in any are formed.Infrastructure general introduction instrument can generate the diagram general introduction of assets separately for selected production run assets field.Chokes modeling tool can be reported production procedure along supply chain.Tool state can be reported the real-time status of assets.Traffic signal lamp system can show the availability and the validity of assets.The production performance instrument can show the potential of selected association and actual production performance.Expert system tool can display defect warning and the action recommended.Satellite general introduction instrument can show the production flow rate that changes along with the time.
The shut down event Reporting Tools of system can provide the visit to instrument, and described instrument is selected from the group of being made up of management, shut down event report generation, root cause analysis, maintenance strategy, schedule maintenance routine, technique variation, Report Builder or the like and their combination in any.Compressor envelope instrument can show the envelope map of the current operating point on compressor state performance and the displayed map.Uptime and availability instrument can show the uptime and the availability of assets, are expressed as the number percent of the time period of relative user's selection.The detailed loss that loss summary instrument can be used to selected assets and the time-delay that is attributable to stand-alone service contractor and these assets to produce generates the summary about the shut down event report information of production loss.
An alternative embodiment of the invention is the method for real-time process asset management.Said method comprising the steps of: (a) operate production run, be used to receive from the sense data of device senses device equipment and send control signals to actuation element so that monitoring industrial processes with dcs; (b) with procedure parameter data history database and dcs interface; (c) the exchange process data are used to notify user's alarm condition so that generate expert's warning between historical data and expert system; (d) send instructions to dcs, be used to begin automatic corrective action to respond one or more expert's warnings; (e) the fault logic rule in the renewal expert system; (f) send the corrective action request to Work management system, to respond one or more expert's warnings; (g) process device or system are carried out the correction work program with response corrections action request; And (h) in real time repeating step (a) to (g).Expert system can comprise logic rules and the algorithm that is used to generate expert's warning.Upgrade the fault logic rule and can comprise the knowledge of seizure from fault analysis.One or more expert's warnings can comprise the long-distance user's notice via telecommunication apparatus.One or more expert's warnings can comprise the notice via the access entrance graphic user interface.Transmission to the corrective action request of Work management system can comprise that the request of generation is to solve one or more experts' warnings via access entrance.
In another embodiment, the invention provides the method for real-time process asset management, may further comprise the steps: (a) operate production run, be used to receive from the sense data of device senses device equipment and send control signals to actuation element so that monitoring industrial processes with dcs; (b) with procedure parameter data history database and dcs interface; (c) between historical data and expert system the exchange process data so that generate expert's state and trend report about uptime, production status, production loss, equipment loss, equipment performance or the like and their combination in any; (d) equipment, system, operational losses and the process capacity data in the renewal expert system; (e) send the corrective action request to Work management system to respond one or more expert reports; (f) process device or system are carried out the correction work program with response corrections action request; And (g) in real time repeating step (a) to (f).Expert system can comprise computations and the logical algorithm that is used to generate expert report.Data updated can comprise engineering analysis, production loss report, realistic model output or the like and their combination in the expert system.Method can comprise that expert report is sent to the long-distance user via telecommunication apparatus to be located.Method also can comprise via the access entrance graphic user interface and shows one or more expert reports with the form of sight line.Method can also comprise that sending the request that solves production loss via access entrance is used for root cause analysis, issue-resolution or the like and their combination in any to workflow engine, so that generate the corrective action request to Work management system.
An alternative embodiment of the invention is the method for real-time process asset management, may further comprise the steps: (a) operate production run, be used to receive from the sense data of device senses device equipment and send control signals to actuation element so that monitoring industrial processes with dcs; (b) with procedure parameter data history database and dcs interface; (c) between historical data and expert system the exchange process data so that generate expert report so that notify the user about report condition; (d) send instructions to dcs, be used to begin automatic corrective action to respond one or more expert reports; (e) logic rules of upgrading in the expert system are used for process optimizing; (f) send the optimization action and ask Work management system, to respond one or more expert reports; (g) production run equipment or system are carried out optimum procedure with response optimization action request; And (h) in real time repeating step (a) to (g).Expert system can comprise and be used for process and produce optimized logic rules or algorithm.Method also can be included between expert system and the process simulation model and exchange emulated data.In addition, method can comprise the processing parameter between adjustment process realistic model and the process engineering model data.Method also can comprise the most optimized parameter of adjusting between expert system and the process engineering model data.One or more expert reports can comprise the production delta data.Produce delta data and can send to the long-distance user via telecommunication apparatus.One or more expert reports can comprise the optimization chance.The optimization chance can send to the user via the access entrance graphic user interface.Transmission to the optimization action request of Work management system can comprise that the request of generation is to adjust the operating parameter via access entrance.
The embodiment that also has is the method for real-time performance management, may further comprise the steps: (a) make business system database and one or more functional form system database and user interface; (b) swap data between company's system database and expert system is used to calculate the performance metric of enterprise feature; (c) swap data between expert system and one or more functional database; (d) setting up function group performance model uses for expert system; (e) act on one's own the in the future status report of tame system sends to the user; (f) via sight line access entrance graphical user interface displays trend report; (g) be that separately function group send to solve the request of function group performance issue to workflow engine via access entrance; (h) send the corrective action request to Work management system from workflow engine; And repeat (a) in real time and arrive (h).
Expert system can comprise logic rules and the algorithm that is used to generate expert report.The logic rules step of updating can comprise from function group performance catches knowledge.One or more expert reports can comprise via the long-distance user of telecommunication apparatus notice and via other or optional notice of access entrance graphic user interface.
Access entrance can comprise by first dimension: the packet characteristic of being made up of plan, action and result and second dimension: by the packet characteristic that personnel, equipment and cost are formed, be used for the navigational table of the instrument composition that the branch group access is associated with support model.The plan group can provide the visit to maintenance strategy and policy tool, and the action group can provide to be eliminated and loss prevents the visit of instrument, group can provide the visit to equipment, maintenance and production performance instrument as a result defective.
Navigational table can comprise the visit to the operative knowledge trap tool, described operative knowledge seizure table can be included in the information of putting in order on the process device project and the database of register system defective separately, has comprised the engineering of the reason of system defect and effect and operating experience or the like.The operative knowledge trap tool can comprise the database filtrator based on the selectivity combination of two or more systems, manufacturer, subsystem and defective.The register system defective data can comprise symptom, intensity, result, testing mechanism or the like and their combination in any, and can be in addition or comprise selected data from the group of being made up of defective occurrence frequency, logic rules frequency, rule, recommendation corrective action, report recipient, various comment and their combination in any alternatively.Method can also comprise uses the more new tool that is associated with the operative knowledge trap tool to use the data of selecting from the group of being made up of shut down event report data, dealer's data, expertise or the like and their combination in any to increase enterprise database.
Navigational table in the method also can be included in the inlet of shut down event report registration tool.Shut down event report registration tool can be included in the inlet from the information of shut down event report, described shut down event report be selected from by report number, time retreat, fault, loss classification, cost, corrective action, transmission target, reason classification, assets focus, source position, the loss of stand-alone service contractor, remarkable action, maintenance work request, time out, responsibility assets, review process, problem definition, Event Description are lost, are found to responsibility, generation date, product, stop or the like and group that their combination in any is formed.Shut down event report registration tool can be provided to the inlet of instrument, and described instrument is selected from the group of being made up of management, shut down event report generation, root cause analysis, maintenance strategy, schedule maintenance routine, technology change, Report Builder or the like and their combination in any.Method also can comprise the step via management tool definition shut down event report template.Method can comprise that operation shut down event report Core Generator comprises the shut down event report that is selected from the data of being selected by the group that personnel generate, personnel select and recommend, lose classification, the loss of stand-alone service contractor, causality classification, responsibility assets, Event Description, source position, time out or the like and their combination in any is formed with generation.Method can comprise operation root cause analysis instrument with generation comprise by be selected from corrective action that date, key personnel, the preventative corrective maintenance of execution root cause analysis (RCA-PCM) data, recommendation take place, action target date, cost-benefit analysis, audit by or the shut down event of the data selected of the group formed of refusal date, planning execution details, implementation date, the date of stopping or the like and their combination in any report.Method can also comprise the operation maintenance policy tool with generation comprise by be selected from by the date takes place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the implementation date of execution, the shut down event that stops the data that group that their combination in any of date or the like machine forms selects reports.Method can comprise operation maintenance routine instrument with generate by comprise that the date freely takes place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the shut down event of carrying out the data of the group that realization date, the date of stopping or the like and their combination in any form reports.Method also can comprise running technology change instrument with generate by comprise that the date freely takes place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the shut down event of carrying out the data of the group that realization date, the date of stopping or the like and their combination in any form reports.
Method can comprise that also the operational report Core Generator is to generate by comprising from the performance of being shut down by total assets, shut-down period according to causality classification is used for the source position date range, according to the shut-down period of source position date range, shut-down period according to the loss classification is used for responsibility asset data scope, production loss according to function responsibility data area, reappear the event data scope, shut down event report data scope, the report of the data of selecting in the group that distribution report data scope or the like and their combination in any are formed.
Personnel's grouping can comprise the instrument of selecting from organize, described group of man-hour by preventive maintenance workload, history and plan, the ratio of safeguarding Supply and Demand, crucial action registration, idea database, action daily record, preventive maintenance consistance, preventive maintenance relative correction maintenance work, yield-power, correcting feature, expansion, total safeguard finishing of reserve, defective elimination action or the like and their combination in any are formed.Device packets can comprise the instrument selected from group, described group by operative knowledge catch, influence in real time chart, hazard level assessment, RAM emulation current potential, equipment strategy matrix, device databases, equipment performance, key equipment state, jacking equipment state, shut down event Register, shut down event report, assets performance metric, according to maximum faults of reason, form according to the maximum faults of position or the like and their combination in any.Cost grouping can comprise the instrument of selecting from group, and described group by safeguarding budget, safeguard the main performance identifier, safeguard the budget control process, total maintenance cost, safeguarding budget tracking, corrective maintenance cost, safeguard that the main performance identifier is followed the tracks of or the like and their combination in any is formed.
Method also can comprise the homepage access tool via access entrance, and described instrument is selected from the group that assets performance metric, leader team, maintenance, supply chain management, plan, good operation, human resources, emergency response, on-the-spot team, equipment, engineering and structure or the like and their combination in any are formed.Method can be included on the access entrance geography of procedure for displaying and represent.
Access entrance can comprise the assets performance tool.Method also can comprise provides real-time assets statistics, and described data are selected from the group of being made up of throughput rate, extension, uptime, validity or the like and their combination in any.Method also can comprise operation assets performance tool with access tool, and described instrument is selected from the group of being made up of basis instrument general introduction, chokes model, state, traffic signal lamp system, production performance, expert system, satellite general introduction, shut down event report, compressor envelope, uptime and availability, loss summary or the like and their combination in any.
Method can comprise operation infrastructure general introduction instrument so that be that selected production run zone generates the diagram general introduction of assets separately, operation chokes modeling tool is to generate production procedure along supply chain, the running status instrument is to generate the real-time status of assets, the operation traffic signal lamp system is to generate the availability and the validity of assets, and operation production performance instrument is summarized the production flow that instrument changes along with the time with report with the potential and actual production performance and/or the operation satellite that generate selected production run zone.Method can comprise that generating defective via expert's instrument warns and recommended behavior.The shut down event Reporting Tools of system can be provided to the inlet of instrument, and described instrument is selected from the group of being made up of management, shut down event report generation, root cause analysis, maintenance strategy, schedule maintenance routine, technique variation, Report Builder or the like and their combination in any.Method can comprise that operation compressor envelope instrument is to generate the envelope map of the current operating point on compressor state performance and the displayed map, operation uptime and availability instrument are to generate the uptime and the availability of assets, be expressed as the number percent of the time period of relative user's selection, and/or running losses summary instrument thinks that selected assets and the detailed loss that is attributable to stand-alone service contractor and the time-delay production of assets separately generate the summary about the shut down event report information of production loss.Can comprise via access entrance to the transmission of the corrective action request of Work management system and to generate the request that solves one or more experts' warnings.
Description of drawings
Fig. 1 is the synoptic diagram that is illustrated in a relation between the transmission in source and value under the environment of the present invention.
Fig. 2 is according to one embodiment of the invention, the chart of the use of typical source and data.
Fig. 3 is the primary element of one embodiment of the invention and the synoptic diagram of framework.
Fig. 4 has schematically described and has used one embodiment of the present of invention to eliminate defective and improve the uptime performance of assets.
Fig. 5 is according to one embodiment of the invention, is used for an example of the display screen of explicit knowledge's trap tool.
Fig. 6 catches an example that shows according to the knowledge of one embodiment of the invention.
Fig. 7 is according to one embodiment of the invention, is used for the display screen in conjunction with the example of the operation decision support inlet of the operation of support function and process.
Fig. 8 is according to one embodiment of the present of invention, is used for the display screen of the example of sight line model.
Fig. 9 is based on the real-time information from the Process Control System that is associated with assets, is applied to the display screen of example of the production efficacy models of adverse current oil and gasoline assets.
Figure 10 is an example that suppresses modeling tool according to one embodiment of the present of invention.
Figure 11 is the display screen of example of system that is used for manually reporting by the shut down event reporting process network startup of loss cause.
Figure 12 is the assignment algorithm that illustrates by automatic transmission loss reason and equipment shut-down information, the display screen of the example that real time data is extracted and handled.
Figure 13 is the display screen that illustrates according to the example of the compression performance of the relative squeeze operation envelope of real-time process data.
Figure 14 is the display screen that the example of getting in touch between business process and real-time analysis instrument and the assets foundation structure is shown with foundation structure general introduction form.
Figure 15 is used for the primary element of embodiment of real-time expert system and the synoptic diagram of framework.
Figure 16 is used for producing in real time the primary element of embodiment of optimizer and the synoptic diagram of framework.
Figure 17 is used for the primary element of embodiment of real-time manufacturing monitoring system and the synoptic diagram of framework.
Figure 18 is used for the primary element of real-time performance supervisory system embodiment and the synoptic diagram of framework.
Figure 19 is the example that is used to illustrate the traffic light systems of the validity of platform and availability according to one embodiment of the present of invention.
Figure 20 is schematically illustrated operation and maintenance supporting process according to one embodiment of the present of invention.
Figure 21 is the display screen according to the beginning page of one embodiment of the present of invention.
Embodiment
The true-time operation support that provides in one embodiment comprises based on decision support process, information management and the assets performance monitoring system of inlet, is used for valid function and safeguards assets.The convenient sight line of system by tissue, in the scope of organization with different levels and by various functions from the assets performance objective to their action of transmission.Desired is that level and function are in fact or in essence comprehensive.System provides and analyzes and display performance tolerance and support the individual play of the visit overview that use is suitable, provides the production run of operation thus so that check easily and manage.
In one embodiment, system comprises integrated assets operation and maintenance management process, and this can transmit by access entrance technology medium in real time.The unrestricted example of access entrance medium can comprise: " web net " inlet, such as using the Internet or Intranet; The wired or wireless communication technology; Public, private or PCS Personal Communications System or the like.In the present invention, term " Web inlet " can refer among the present invention or the scope of the invention in access entrance, rather than only limit to the access entrance of internet-type, unless specify.
" assets " comprise any production, processing, transmission or manufacturing equipment in the selected industry: oil and gasoline, petrochemical industry and refining, power utility, paper pulp and paper, commerce and expert's chemicals or the like.Assets have data source, are used for describing effectively according to cost, output, uptime, efficiency, product quality, service condition etc. the performance of assets.The unrestricted tabulation of data source can comprise the database that control system, operating parameters read (manually, electronics, pneumatic or the like) or be associated in enterprise management system.In the prior art, the function group of a general system or system grouping to observe, to monitor and/or estimate the assets performance and support assets always independently used and do not bring into to these data sources.
In one embodiment, the invention provides the true-time operation of supporting analytical algorithm and data extraction procedure, be used for influencing the storage of the data that exist in production equipment supervisory control system and client business connection system.These application programs can be extracted critical nature information, comprise production loss or postponement, loss cause information and equipment uptime performance.The extraction of these performance metrics and demonstration have promoted the improvement decision-making of operation and maintenance support team.Can be sent to the sight line management system together from the real-time assets performance information of control system and the gathering of other information sources, described sight line management system can be designed to operation and maintenance and support control panel or instrument panel.The access entrance technology allows the real time access medium to produce and safeguard relation information to obtain.The invention provides benefit to supporting tissue comprises and makes the effort of support team concentrate on based on the ability of the decision-making that is worth and use the assets target to measure their coordination.Can observe the assets performance from the workstation of any granted access, make thus and take charge that the part expert can support to operate and no matter their physical location.
The present invention can provide significant values to operation, especially to the combination of local operation and the maintenance group that is associated with assets.In some cases, embodiments of the invention can provide similar 30% cost reduction by operation and maintenance personnel needs that reduce and the maintenance of equipment expense that reduces.According to the reliability of operation, can reach for example 3% to 8% uptime improvement.
Another aspect of the present invention comprises basis based on real-time uptime, availability and cost, spreading all over whole tissue and passing through " Clear Line Of Sigh " of various functions to operating performance from top management to front workplace level.Within the scope of the present invention, term " Clear Line Of Sigh " should refer to that in-house all kinds of personnel use suitable visit and authorize the ability check operation and maintenance data, status report and other information relevant with assets.Can use in the supporting tissue each can Real Time Observation and the function of their performances of tolerance realize importance value.The coordination of tissue and the rank that Clear Line Of Sigh can reduce the required resource of the function that provides support and simultaneously can the improvement achievement of spreading all over provided by the present invention.The tissue of Xie Tiaoing is to use correct resource and have high efficiency tissue in the orthochronous of needs operation fully.
The present invention can provide to illustrate and support the interleaving function and the foundation of assets to organize the obvious benefit that how can coordinate actions with the relation between the clear picture that reaches target.The sight line model allows each support function group to measure its performance to be fit to whole business goal also with important accurate introducing process.
The invention provides the ability of improving the operating equipment performance by the performance information of the effective equipment improvement of visit driving significantly.Information can be pushed away to the user with respect to pulled infosystem by the user, the time that makes so can not be wasted on the required information of searching decisions.Disabled traditionally display format can promote effective asset optimization.
Use the present invention, the operation and maintenance personnel are to the maintenance that can promote enterprise's operative knowledge of obtaining of assets operation knowledge.The value that can transmit like this is many-sided and can comprises the chance that can reduce operating personnel's quantity, because personnel and system's operation and maintenance Knowledge Base for whole tissue are addressable, such as expert in the specific area and embedded " expert " of operating system.Another value is with the understanding of incipient fault and slows down tolerance and be complementary and take place preventing again.Situation for the maintenance and operation relevant knowledge is especially true, and the knowledge that the method that enterprise or operating personnel use prior art is relevant with described maintenance and operation remains in the storer and more for good and all do not obtain so that for using in the future.
Adopt the expert system of obtaining knowledge and the technical specialist's knowledge that is embedded in the control system by using, the present invention can provide more uniform operation.Obtain knowledge by operator and equipment personnel from maturation, then it is combined with process technology knowledge, the present invention has promoted in life of assets the maintenance to the consistent application program of operation and assets procedural knowledge.
The invention provides defective and eliminate process and the cost of instrument to reduce correction maintenance work activity and to be associated.The preventive maintenance decision device that the present invention promotes can concentration techniques and operating resource to reduce production loss and delay.These can be reflected in the income from improved output.Also can realize that cost improves by improved equipment life and lower maintenance needs.Use loss in real time and cost information can prove more effectively that usually assets are improved and the raising performance.
The present invention can be the maintenance optimization maintenance activity of active and plan.Expert system provides intelligent equipment and system condition, except the maintenance activity based on schedule of any strictness, also generates maintenance activity according to condition.Use can reduce equipment inspection cost, equipment failure time and the commerce that is associated and personnel's danger based on the mechanical integrated analysis of condition.
The present invention has promoted following realization mechanism and returned: it can be different from (1) other and be used for the asset management system based on the heavy construction and the maintenance support project of long-term assets performance; (2) being used to improve son checks the movable and concept learning of the important front end that is associated with engineering of enterprise's operation and can strengthen by use supervisory control system information; (3) its better business in can transitive set is to support the function in enterprise's operation; (4) it provides and can have been served and improved system by the maintenance expert; (5) it provides the process of equipment dependability and performance knowledge being supplied with the ability of new equipment and being designed to transmit more reliable engineering; (6) it can be used as part engineering, buying and structure project and is included for new assets, and perhaps it can be used as remodeling for existing assets; And (7) its benchmark database that equipment performance knowledge can be provided be used in to propose, the request of bid for a project or used by the third party.
Important data storage is that business assets exist and facilitate at industry-by-industry, comprises for example oil and vapour, petrochemical industry and refining, power utility, paper pulp and paper, commerce and expert's chemicals or the like.These industries are called as " handling industry " or " production department's science and engineering industry " hereinafter, and business assets and equipment are called as " processing assets " or " produce and handle assets ".Main target of one embodiment of the present of invention and focus comprise from the information extraction of several complete different sources based on knowledge, and convert the information that can take action to by the function group of supporting assets, processing or manufacturing plant or equipment, as shown in Figure 1.
Fig. 2 shows according to the typical data source available in the embodiments of the invention operation and the potential use of this data information transfer.For every type data, data message from all kinds, have different values and application.Making the required requirement of each decision-making about one piece of data also has nothing in common with each other.According to type and the value and the application of data, true-time operation also has nothing in common with each other.
Fig. 3 has described primary element and the framework of the embodiment of system architecture of the present invention.Be the major component of abnormal operation time transmission solution, the device parameter deviation of for example from the failure of pump to the process, living, can comprise: performance monitoring and diagnostic system model for example comprise expert system; Decision support template comprises expert system; Intelligent scheduling and work management/Task Distribution module; The supply chain management module; Information exchange module and supervision ruleset manager.This has provided the general introduction of very high-level main element.According to particular system, be used for the operation of the various aspects of managing assets and enterprise, the realization of each element can require Several Methods and Software tool.Yet Admin Events can obtain by the access entrance technology that is used to support and manage the function operation group of special assets until the required information of solution.Described access entrance technology implementation language can include but not limited to JAVA, C/C++, PERL, XML, HTML, HTMLS, Flash, ASP and other language based on the internet.Access entrance can be used as hardware and realizes finishing or finish with other access means.
About the information of assets can exist in multiple source and system, described source and system comprise Process Control System, enterprise management system, computerized maintenance management system (CMMS), technology and Engineering Document Control system, supplier data (comprising buying and technology supply quotient data), equipment monitoring system, logistic track system, office worker's application programs etc. individually.This information can be about time frame, and described time frame can be to be short to very much 1 year or longer on the duration.Illustrative example is: for some on-line vibration watch-dog for being less than one second; In the internal check to container between the plant maintenance turn(a)round is 5 years or more.Time frame that these are different and compiling, analysis, manipulation and can under environment of the present invention, be thought " in real time " according to information designed time of taking action.In the prior art, information in these full allos is not to be brought to a position, but present to tissue in the mode that overall picture and cross functional perspective are shown, similarly art methods can cause a large amount of poor efficiency, thus to improving the tissue performance and understanding the asset management process and cause obstacle.
According to embodiments of the invention, supporting process and system provide the capacitance type mutually of carrying out the asset management process and measure their effectiveness on real-time yardstick such as the coordination and the adjustment that have promoted that by network technology interleaving function is supported in real time.Such process (pith of operation) is to be called the maintenance process that defective is eliminated, and it has solved maintenance and technology groups and how has eliminated processing factory or make plant issue in the assets in system.The reliability that the purpose of eliminating defective is to introduce and establishment equipment continues, and in making assets, give maximum production and handle the uptime to guarantee maximum income.This only is the example of an asset management process in the operation in the maintenance function scope of tissue, and this example is provided is in order to illustrate but not be intended to limit the scope of the invention to the other assets management function.
Fig. 4 has described the part of the process of the uptime performance of eliminating defective in one embodiment of the invention and improving assets.It has illustrated and can be used for successfully implementing improved original plan of reliability performance and policy definition.By obtaining from the information of scene or factory and this information translation being become significant chart, defective is eliminated team can have better understanding to what problem has taken place, can carry out the basic reason fault analysis look back, can the examination of executive control system optimizer and can carry out the design that breaks away from fault.In the prior art, most these steps are manual.On the contrary, true-time operation support of the present invention can be transmitted the consistent performance report of extracting from a plurality of data sources in real time in decision process.The present invention so provides the required information of making a strategic decision, so that shorten the time between anomalous event and the solution transmission.The present invention also can promote the unified of the suitable information that provides by several different operations to transmit, so that make unanimity, quality decision and to the analysis of anomalous event.
The synoptic diagram of Fig. 4 has illustrated the example in the front end place fail-safe analysis of the process of the right of priority of determining to be associated with crucial factory component and system.These right of priority can determine that assembly and system are to the relative influence of the transmission of product and be used to concentrate on the abatement apparatus defective and produce with influence.The validity that the defective that has the maintenance group to bear is eliminated process is quickened and improved to the ability of real-time production loss (sometimes being called as " extension ") and shut down time of measuring.Execution analysis data in real time are with the process of determining the concentrated area and be that action provides the result now.
Traditionally, the analysis operation data are manual procedure to transmit uptime and loss cause information, yet the true-time operation support that provides among this embodiment of the present invention provides in real time the analysis from the proper data source.It also allows the analytic process standardization so that for several operations provide consistent method, and provides the foundation for reference device and system performance.
In description of the invention, be important to the definition of " in real time ", because the type of employed decision support system (DSS) depends on the character of decision-making and makes the required speed of decision-making that relevant system supports.According to the character and the specific function supported of decision-making of decision-making, some operation decision-making falls into widely the time frame with broad sense.For some aspect of operation, such as the rotating speed (rpm) of operation transmitter or turbine, correlation time, framework can be less than one second on length.The time frame of hour, day, month can be about other aspects of operation, for example in-site measurement or corrosion monitoring in every month weekly.High can import the inspection of an equipment about needs to 1 year or more time framework, this may be only just possible when equipment is stopped work fully.In environment of the present invention, each of the framework of these times can be regarded as " in real time ".Human expert and/or machine experts can be used to transformation of data is become executable information and makes suitable decision-making.The time that relates to gathering, compiling, analysis, operation and response data can be regarded as within the scope of the invention " in real time " process scope.
In the present invention, can make relevant decision-making of producing in real time.The general relevant decision-making with production control of real decision-making in real time is associated in the production operation.These can be by the monitor procedure control system or by using the operator by the information that control system provided to make.Decision-making on adjustment and automatic control hierarchy can be determined by the operator, depends on operator's ability and plant processes stability on bigger degree.The scope that makes decisions can be from several seconds to 24 hour or more, with the response process parameter shift or when process is chaotic when taking place abnormal conditions.Current true-time operation support concentrates on by using so-called machine experts or expert system to improve the integrated of quality and production decision in this environment.Use expert system technology being known in the art, and be applied in process industrial and the more various application for example medical part.Yet one embodiment of the present of invention provide and have made technical support and maintainer and operating personnel participate in knowledge capture-process wherein.This process allows the structure of the anomaly trend of process device, system and equipment and incipient fault mechanism is caught, to be used for the expert system of use control system.Fig. 5 shows the exemplary demonstration of knowledge capture-process, and this comprises that the user selects to catch the choice of the combination of which system, manufacturer, subsystem and defective.This process also allows the user to search for data about special assets fast and effectively.
Fig. 6 catches an example that shows according to the knowledge of one embodiment of the present of invention.Demonstration is made up of three primary clusterings: general introduction, defect symptom and other information.It is whom that the general introduction assembly illustrates the manufacturer that relates to which system, assets, the reason of parts damaged structure (or Asset Type), assets target and the defective that write down.The symptom of defective component show the shown symptom of assets, defective the order of severity, defective consequence and be used to find the testing mechanism of defective.Other information assemblies show defective occurrence frequency, logic rules applying frequency, applied logic rules, the recipient who takes what action, defect report or warning and other comments.
Because under little skew and abnormal conditions, the response of plant processes is normally predictable, may use the control of expert system and the manual intervention that logical capability replaces the operator.Machine experts also have the ability of response abnormality situation more as one man, and wherein operator's ability is depended in response up to now usually.These also are the restrictions that the operator can form process performance, this based under some operating conditions in management process operator's assurance degree.Monitoring control system also has control and manages the ability of a plurality of process variable, but has higher consistance and wider technical limitation than human operator, to allow best procedures system performance.
The benefit that allows machine experts to act on behalf of some operator's function comprises: (1) improves operational integrity by guaranteeing the unanimity decision-making under abnormal conditions and optimizing process skew and chaotic response.(2) process operation approaches the technical limitation level of plant processes, and production increase that is associated and efficiency; And (3) come development stability by using the multivariable Control technology process of managing production, and production run is changeful in essence and be difficult to use human the interference to be optimized.
According to embodiments of the invention, also can use real-time information to make operation and support relevant decision-making based on decision-making.In the prior art, the great majority decision-making of making in the operation and maintenance support is what to finish by personnel in the Operation and Maintenance team of factory and operative technique support office worker.Decision-making is associated with response apparatus fault or the not good required action of taking of equipment performance usually.These decision-makings are normally made in real time, for operation of equipment framework correlation time be less than one second to one day or several days, be to belong to 1 to 90 day and engineering decision generally occurs in 3 to 6 months in real time, the storage decision-making is from 6 months to 1 year or more under the situation of Petroleum Production assets for the attended operation time frame.Here focus on providing real-time information, described real-time information promote correct decisions and corresponding function support team based on the action that is worth.In one embodiment, the invention provides real-time sight line management process, described sight line management process coordinated manipulation support function is also created on support function and is adjusted.
Fig. 7 shows the example of the operation decision support inlet of integrated operation support function and process.In this example, the report of available shutdown event by stop time scope, loss catalogue, reason catalogue, stand-alone service contractor's loss, this subject under discussion by who cause, responsibility assets, shutdown event report condition and shutdown event report number filtering.In case data are filtered, it can illustrate with certain form, such as allowing the user to check the form of shut down event report.
In the asset management model, each support operation assets or factory the function group can with the sight line inlet illustrate and for whole organize visual.Illustrate with this mode, it shows to tissue needs several function groups to support operation, and each group has the role of definition to play the part of in its performance.Each function has the sight line management process with influence and transfer function to the Operating Guideline function.This is that maintenance function is described as exemplary in the sight line model.Yet, recognize that importantly each support function can have different and unique sight line model and realize, this is because the character of their asset management processes.
Support the exemplary functions of running factory or assets to comprise plant engineering and structure, maintenance, plan and scheduling, health, safety and environmental services, human resources, production operation, manufacturing, supply chain service, for example buying, material, logistics or the like, operation and engineering or the like under execute-in-place, operation leader, the surface.Some functions can specific to an industry and can so that administrative model for different industry differences.
As mentioned above, one embodiment of the present of invention are sight line (LOS) models.Inlet shown in Figure 8 provides factory window of operating and the access point that shows about the real-time performance information of each support group function, for example, and maintenance, operation, supply chain or the like.Support these plan, real-time performance result and action to be included in the clear coordination that is used for support team in the sight line administrative model.It is different with the management mode of prior art, and the prior art management mode concentrates on the Continual Improvement of plan, execution, detection and monitoring period usually.
For each LOS model, the function group that can use the promotion process to develop perhaps to be associated in the suitable LOS.This can be the pith of the overall process of this embodiment of the present invention, because it has controlled the quality and the focus of function.Determined this moment the LOS of commercial function group validity, stated assets or factory clear target, challenge identifying performance measurement clearly to the function group, but described performance measurement can be used to follow the tracks of the achievement of the target of each application function.
In the example of Fig. 8, maintenance group LOS has been described.It has three main elements, and plan, action and result mark in every row.The strategy of the management equipment maintenance that the maintenance group that comprises the plan element is adopted and the performance of factory system.It can comprise describes relevant office worker's work of method, principle and the plan of management equipment performance to any threshold analysis of equipment and system, maintenance strategy, year budget requirement, reliability modeling effort with other.
Action element comprises the specific action of maintenance function, uses the correct relative real-time results that reach of step and improves performance.If cost or schedule maintenance consistance, or any other Maintenance Measurement changes from target, should have one or more specific actions to make tolerance meet objective result so.
Element has formed the last branch road (leg) of LOS and has been connected to the real-time information of measuring the performance that is associated with maintenance function as a result.Typical real-time performance information comprises uptime and equipment, maintenance support cost and the Maintenance Measurements such as ratio of safeguarding relative preventive maintenance such as corrective.These all are the gauges in safeguarding, show the achievement of the unanimity and suitable maintenance strategy and the principle that are applied to assets.The mode that the result shows can be the part of asset management process and to measure in the commerce of the cost of the performance that maintenance team is set and associated device and system can be important.
Show that by this way LOS is clearly arranged from the maintenance function to the business goal.The office worker of assets or plant manager, maintenance manager and other mandates can see commerce, relevant functional objective and the clearly relation between the actual real-time results.This has created by the visual of the height of commerce and has shown the clear action that improves performance.
System of the present invention in one embodiment also comprises real-time production efficiency model.The production efficiency model is an example of factory's performance metric.Example shown in Fig. 9 is the model that is applied to upstream oil and vapour assets, and wherein the real-time information from Process Control System is used to make up the production efficiency model.For the critical aspects of assets has shown potential performance and actual real-time performance: depots, producing well, processing plant, efferent duct are led and the production marketing point.This can be in real time for the production scene in the complicated assets foundation structure provides, and along with product through the key element in production run or the value chain, what provide that team that relevant operation supports lost value wherein knows picture and understanding.
Can measure bottleneck in the production run or narrow point and loss can be provided in real time or produce the valuation that postpones.Overall product loss or produce postpone valuation given support team lose what be worth and loss occurrence where know information.This importance is for realizing maintenance process and being basic for resource in the guiding other assets support group and the defective elimination process in the effort." loss " in this environment is defined as changing along with the time product loss amount of (or sometimes, delay), and can be expressed as output and/or income equivalent.In one embodiment of the invention, it is and so on vision and/or data output that bottleneck modeling tool provides the state that " bottleneck " in system point is shown, as shown in figure 10.Bottleneck can for example be shown as green, and this indicates this point is running and working properly, or red, this has indicated problem.The example of the reason of red bottleneck can comprise that the unit condition or the not every production equipment of process or emergency stop, limit production handling capacity can use.Bottleneck modeling tool can illustrate the problem that various zones in the process or equipment, the overall point of view of taking production run into account and sign occur in bottleneck simultaneously.
In case known the loss of overall factory, the next most important parts of taking the required decision information of relevant action in the LOS model is to determine loss cause.Loss cause may have the basic reason of growing from various factory systems and equipment or their combination.This information can arrive from two or more feasible paths, such as: the manual daily record of unused time and the loss cause that writes down by operator or maintainer; Or in real time from control system.Every kind of method in use has validity and complementary source that can loss cause information.
In one embodiment, the present invention also provides the loss cause evaluation process of network activation.May come the recording loss reason by the shut down event reporting process, this manually carries out by the network activation system, shown in an example among Figure 11.Shut down event report (SIR) process can have several functions: management allows to change the shut down event report template; New SIR allows to create new SIR clauses and subclauses; Root cause analysis; Maintenance strategy upgrades, and allows enterprise to change its strategy based on the knowledge of catching; The preventive maintenance correction; Technology changes; And report generates.Figure 11 also shows and can filter SIR by several different methods, SIR and separately data can in reader, be shown to the user such as friendly forms such as forms.
Usually record is from each incidents that causes production loss of assets with pull-in time, extended period, shutdown reason, position, product loss, revenue losses and other for information about for operating personnel.Then analyze this unused time storehouse and the action of being made in eliminating loss cause in the future by the operation and maintenance personnel to support is shown with several forms.The action that any great loss can need the specific root basis to hinder investigation for some reason and deal with problems and taked.The management that these LOS models that are connected to maintenance function are eliminated with display defect.The unused time registration provides details, includes but not limited to the date that the unused time takes place; imputable loss catalogue; send the staff list of unused time report; the source position of assets; the time that assets are shut down; assets are returned the online time; production loss; cost; the reason classification; whether it is independently to serve contractor's loss; which assets is responsible and which complexity loss will belong to; the explanation of problem comprises the factor that causes problem; which department is responsible for assets on function; the fault of after root cause analysis, finding; the correction action of taking; the title of assets focus; the any outstanding action that need take; the review state; halted state or the like.
In this mode, the maintenance management process is connected back the reason of product loss with the committed step in the plant engineering process.The process that is connected to the loss event source comprises that basic reason fault analysis (RCFA), maintenance strategy correction conduct prevent that result, the maintenance task of the maintenance change of loss in the future from changing and actual plant design is arrived in technology/engineering change.Whole process offers tissue and has auditable complete change management process fully.
Operation support group also can increase the degree that they understand amplitude, source and the character of production loss, and improves the efficient of organizing in the management Business Performance thus.
For perfect (compliment) loss cause process, can generate similar information from the data the plant processes control system, as shown in Figure 12.The figure shows the figure of shutdown possible cause of user definition time period and the production loss of response.Real time data can be extracted and handle with automatic transmission loss reason and factory and close machine information by special algorithm.
In one embodiment, the invention provides the real-time device performance evaluation.Further real-time performance monitoring can be finished at mechanical floor in the process.The understanding of the key project critical level of equipment or system during this is based on the uptime transmitted is such as the compression in the situation therapeutic method to keep the adverse qi flowing downward of oil or vapour.In the example shown in Figure 13, the operation envelope of the compressibility that the engineering knowledge of design is gentle combines with the real-time process data to transmit the real-time description of compression performance.Typical chart shows for particular compressor suction pressure of being selected by the interface that provides by the user and the relation between the air-flow.Also show compressor efficiency raw data behind.Any skew of leaving normal running or maximum performance point can be registered in the production efficiency model as the loss in the product.The importance of this monitor procedure has been to identify aberrations in property to the relative influence of production loss with relevant income.
In one embodiment, the present invention also provides the integrated management process.The one side of true-time operation and maintenance support is that commercial supporting process and the decision information that is associated are connected in the integrated business prototype, with operational issue in response and guidance system that normal running is changed.For example, the connection of making from the product loss that is identified at equipment or factory level to product loss reason or the source again to dealing with problems and the required follow-up action of definite basic reason fault mechanism.Can be in process and information/action link and integrated the integrated of business process of making that is arranged in the support function personnel of remote location on the geography.Figure 14 shows demonstration business process and the real-time performance analysis tool overall display screen to the link of assets basic structure.The user in can selection course basic facilities and use this instrument to check it.In this expression, the assets in oil field have been shown.Then can select each assets to check further data.
Provide illustrative example that application of the present invention is shown.In oil or vapour assets, as shown in figure 14, may experience the growth of aquatic products amount from the production of a producing well, increased the content of water and salinity in the fluid that enters total system thus.Can identify the growth of aquatic products amount such as various devices such as pit shaft detector or surface water container handlings.The salt branch that is included in the produced fluid is deposited in process vessel and the production line.The precipitation of salinity can be disturbed the reading such as flow metering in the container or liquid level gauge.Salt residue branch along with steam flow is brought to oily vapour collection channel, may be oily vapour treatment facility, dryer and the oily vapour disposal system of a plurality of producing wells services such as compressor etc., enter oily vapour sales line and arrive distribution system or the final user place, such as the generating plant.
In this example, the depots slip-stick artist who evaluates situation in a conventional manner can determine that the aquatic products thing whether can structural damage or reduce the recovery of final hydrocarbon.If having production loss, depots slip-stick artist will appreciate that, expection not need not to correct action.The operator of production platform can notice the growth of water, if but equipment can be handled the fluid of increase, and he understands same geography and separates to no problem.The technician can notice that the salinity that generates fluid increases, and can take local action to prevent the instrument salting up, perhaps may query such as the validity that increases readings such as Fluid Volume in the separator.The Fluid Volume that increases can increase along with the salinity that generates the air-flow transfer and the amount of fluid, and this can assemble in the pipeline between one of production platform and universal compressed/processing platform.The production engineer can notice gas compressor on compression/processing platform with the RPM running that reduces and compare the desired higher load that has, but but owing to still in range of receiving, can not handle it.The operator who monitors the gas sales line can notice that handling capacity is lower than expectation value but in the warning compass, he can not worry thus.In order to make operation overhead minimum, the operator of gas sales line can not increase any additional compression.The vapour that the final user can receive minimum is used for its equipment, and may complain in his tissue, but seems can not obtain more flow from other gas sales lines, and just wishes to finish him uninterruptedly in shifts.
Occurrence is the result that single well increases the aquatic products amount in this example, the aquatic products amount that is increased be transferred and the pipeline between production platform and universal compressed/processing platform in assemble.Yet the salt content of increase is coated in the inside of compressor unknownly.The water slug of the pipeline between production platform and the universal compressed/processing platform, or the accumulation of the interior salinity of compressor, or both combinations can cause the shutdown and/or the equipment failure of universal compressed/processing platform.The loss of compression/processing platform can cause the sudden turn of events of flow, and may close marketing channel and final user's equipment, may cause further equipment failure.Because the system throughput quantitative limitation, producing well, compression/processing platform or other assets can need to be cut down or close.Can cause the increase of the great economic loss incident relevant with safety such as such equipment failure and production interruption.
As be applied to this routine the present invention and look that various irrelevant subject under discussion is pulled in the general-purpose system that monitors whole process.Can be together but not analyze dividually such as the water that increases and salinity, higher liquid level and the data such as compressor efficiency of reduction.Will consider historical data and logic rules and, cause less relatively maintenance action thus, such as washing compressor inside etc. because the operating conditions of its variation may be warned possible salt accumulation in the compressor.By the aspects such as analysis such as bottleneck analysis and a plurality of variablees of design, the present invention can warn possible potential Domino effect of user and caution from the potential operation disruption of one or more Single Point of Faliures.
Schematically illustrated real-time process asset management example among Figure 15.The data of use from collecting such as the assets such as equipment factory or the production run, and explain historical data with expert system, can send warning to the personnel that are responsible for those assets in the enterprise.Expert system is by based on forming from the rule set of those knowledge of obtaining in enterprises work or such as supplier's external source.Use this system, those personnel that are responsible for assets understand notified problem or potential problems, can take thus to correct or prevention action.
Figure 16 schematically shows an example of real-time asset management.This example uses from the data of collecting such as the assets such as equipment factory or the production run and uses expert system explanation historical data to come monitoring industrial processes, to generate and to send the personnel that are responsible for those assets in the enterprise that report to.Expert system by based on from those in enterprises work or form such as the rule set that supplier's external source obtains such as equipment and system performance curve, operational losses data and knowledge such as storage and plant capacity.Use this system, those personnel that are responsible for assets understand notified problem or potential problems, can take thus to correct or prevention action.
Figure 17 schematically shows an example of real-time asset optimization.This example of optimization plant processes uses from the data of collecting such as the assets such as equipment factory or the production run and uses expert system to explain historical data, reports to the personnel that are responsible for those assets in the enterprise with generation and transmission.Expert system by based on from those in enterprises work or form such as the rule set that supplier's external source obtains such as knowledge such as process simulation model data (dynamically or static), process engineering model datas.Use this system, those personnel that are responsible for assets understand notified production variation and produce the optimization chance.In case notified deviation, just can take suitable optimization action.
Figure 18 schematically shows an example of real-time asset optimization.This example uses from the data of obtaining such as assets such as personnel, the course of work, costs and uses the expert system decryption, to generate and to send the personnel that are responsible for those assets in the enterprise that report to.Expert system by based on from those enterprises work or such as supplier's external source obtain such as by the business system database of group function renewal, form about the rule set of the function system database of group software application and knowledge such as function group performance model and plan.Use this system, those personnel that are responsible for assets understand notified performance change, trend, state etc.In case notified, just can take suitable performance solution action.
Figure 19 shows exemplary traffic light systems definition.Can customize each traffic lights color (red, yellow and green) to satisfy the specific needs of factory.In this drawing, the availability and the efficient that begin gasoline day have been defined.The true-time operation process can comprise highlighted because the product loss of plant efficiency problem or guidance or the homing capability whether model change takes place.Process can comprise the traffic lights indication of plant states, wherein green indication normal running, yellow indicating equipment performance decrease and the serious decline and/or the shutdown of red indicating equipment performance.This allows authorized operation support staff, particularly technical team and leader, pays close attention to the important factory performance event that is taken place.This character of information usually only by the plant processes control system to operating personnel can with rather than to whole organize addressable.The important goal of processes such as traffic is to cause tissue but not the front-end operations personnel note plant downtime time and efficiency, to generate correct response and to support effort.
Where making decision and where can visiting support is key character of the present invention.The critical function of true-time operation and maintenance support be from continue Anywhere 24 hours/day of the world and 7 days/transmit technology and business industry ﹠ solution ability to Action Events and anomalous event allly.Desired is to have with economic way, for limited expert and subject matter expert's suggestion in the ad-hoc location used in the assets support of any position in the world.The best use of Expert Resources can be used any operational issue thus and be need not to call or transport rare personnel.
Figure 20 shows according to an embodiment and supports the exemplary overall process of operating.It has covered realization, work management and the plan of the maintenance and operation commercial plan of system and mechanical floor, technology and operation support resource expert and has comprised and factory's performance monitoring and information for supporting some decision backfeed loop.Can be from data in real time via being received by technical support centre and remote location such as access entrances such as the Internet links such as assets such as pipeline, compressors.The data from remote location also can be seen in technical support centre and other positions, allow the complete sight line of whole tissue.
In one embodiment, provide the true-time operation interface signal environment that uses with inlet.This comprises that the permission user is via drag and drop intelligent graphic object interface ground constructive process synoptic diagram.Program can be to be simple and easy to, menu/guide that drive and training that need minimum to create a synoptic diagram.
Can be by selecting intelligent icon (SGI) from template or they be placed on such as drawing such as Microsoft Visio to develop the process that schematically shows factory or equipment.When drag and drop SGI in drawing, can provide the user that SGI is linked to and comprise relevant special object database of information.In case set up this link, program can be dynamically from database retrieval information and show it, such as moving through and/or the click map subject by simple mouse.The expectation template has a plurality of predefined intelligent icons, such as pump, container, compressor, cylinder, pipeline, buildings etc.
Each SGI has a series of tie points that can be connected to other objects via the pipeline object.These pipeline objects show the connectedness between the object and have indicated the direction of stream.The pipeline object also can be connected to database object.Desired several special SGI is arranged in template, make the user can linked object specific or expectation attribute in the database, such as stream, temperature or pressure, and in drawing display properties.
In case created drawing, it can be saved and the date afterwards is retrieved.Drawing also can be preserved in addressable mode, such as with network activation form and being published on the webserver.So drawing can check that described web browser is such as Microsoft Internet Explorer by web browser.This allows other users to check that drawing also dynamically will be visual from the real-time information of database.In this example, discussed the network activation system, the present invention is not limited to such access system and can links with other modes, such as using hardwire, wireless, microwave, satellite or other communication systems.
In one embodiment of the invention, the final user has the beginning Web portal screen or the homepage of appointment, allow user's various functions of access system apace, include but not limited to assets performance metric, leader team, maintenance, supply chain management, plan, well operation, human resources, emergency response, on-the-spot team, equipment, engineering and structure or the like, as shown in figure 21.In this example, show representative oil field at the center that shows.Can further survey each assets in oil field.
Above-described the present invention uses a plurality of production platforms, compressor, pipeline etc. to combine with the offshore oil production operations.This example can be used as illustrative and unrestricted.
With reference to specific examples and embodiment the present invention has been described above.Boundary of the present invention and scope can not limited by above-mentioned announcement (above-mentioned announcement is full of illustrative), and should determine according to the complete scope and spirit of claims.

Claims (123)

1. device that is used for the real-time process asset management comprises:
(a) dcs is used to receive from the reading of device senses apparatus and sends control signals to executive component to monitor described process;
(b) historical data base comprises the procedure parameter data mutual with described dcs;
(c) expert system, mutual with described historical data base, to generate expert's state and trend report about uptime, production status, production loss, equipment loss, equipment performance and their combination;
(d) access entrance is used for showing expert's state and trend report to the user;
(e) Work management system is in response to the request from the solution production loss of described access entrance, to equipment or the system call work for correction process handled.
2. device as claimed in claim 1 is characterized in that described expert system comprises logic rules and the algorithm that is used to generate described expert's state and trend report.
3. device as claimed in claim 1 is characterized in that comprising the knowledge trap tool of the fault logic rule that is used for upgrading described expert system.
4. device as claimed in claim 1 is characterized in that comprising the telecommunication apparatus that is connected to described expert system, is used to send described expert's state and trend report to the long-distance user.
5. device as claimed in claim 1 is characterized in that described access entrance comprises graphic user interface, is used to show that the expert warns and import request to solve described expert's warning.
6. device that is used for real-time production run asset management comprises:
(a) dcs is used to receive from the reading of device senses apparatus and sends control signals to factory's executive component to monitor described production run;
(b) historical data base comprises the procedure parameter data mutual with described dcs;
(c) expert system, mutual with described historical data base, generating expert's status report and to send to user interface facilities, and generate expert's trend report and send to the user via access entrance;
(d) Work management system is in response to the request via the solution production loss of described access entrance, to equipment or the system call work for correction process handled.
7. device as claimed in claim 6, it is characterized in that described expert system comprises computations and logical algorithm, to report the statistics of from the group of forming by uptime, production status, production loss, equipment loss, equipment performance and their combination in any, selecting.
8. device as claimed in claim 6 is characterized in that described user interface facilities comprises telecommunication apparatus.
9. device as claimed in claim 6 is characterized in that described expert system is connected to one or more real time data input equipments, and described real time data is selected from the group of being made up of engineering analysis, operational losses, process capacity and their combination.
10. device as claimed in claim 9 is characterized in that described engineering analysis data comprise equipment and system performance information.
11. device as claimed in claim 9 is characterized in that also comprising the process simulation model that is linked to the expert system that is used for described process capacity data.
12. device as claimed in claim 11 is characterized in that also comprising the depots realistic model that it is connected to expert system, in order to the depots capacity data to be provided.
13. device as claimed in claim 6 is characterized in that described access entrance comprises graphic user interface, the request that is used to show described expert's trend report and imports described solution production loss.
14. a device that is used for real-time production run asset management comprises:
(a) dcs is used to receive from the reading of device senses apparatus and sends control signals to executive component to monitor described production run;
(b) historical data base comprises the procedure parameter data mutual with described dcs;
(c) expert system with described historical data bank interface, changes report and sends to user interface facilities to generate, and generate the report of optimization chance and send to access entrance;
(d) Work management system is in response to the request of the adjustment operating parameter that sends via described access entrance, to equipment or the system call optimizing process handled.
15. device as claimed in claim 14 is characterized in that described expert system comprises logic rules and the algorithm that is used for process or produces optimization.
16. device as claimed in claim 14 is characterized in that process simulation model and described expert system interface are so that upgrade described expert system with emulated data.
17. device as claimed in claim 16 is characterized in that also comprising the input equipment that is used for process engineering model data, configuration information so that adjust process simulation model, the production of expert system and optimizes logic rules or algorithm or their combination.
18. device as claimed in claim 14 is characterized in that also comprising the input equipment that is used for process engineering model data and configuration information so that adjust the logic rules or the algorithm of described expert system.
19. device as claimed in claim 14 is characterized in that described user interface facilities comprises telecommunication installation.
20. device as claimed in claim 14 is characterized in that described access entrance comprises graphic user interface.
21. a real-time process assets management method comprises:
(a) use dcs to come operating process, be used to receive from the reading of device senses apparatus and send control signals to executive component to monitor described process;
(b) with described dcs with comprise that the historical data base of procedure parameter data carries out interface;
(c) exchange process data between historical data base and expert system are so that generate the subscriber-related alarm condition of expert's warning notice;
(d) in response to one or more described expert's warnings, send instructions to described dcs, be used to begin correct automatically action;
(e) the fault logic rule in the described expert system of renewal;
(f) in response to one or more described expert's warnings, send the correction action and ask Work management system;
(g) in response to described correction action request, to equipment or system's execution work for correction process of described process;
(h) repeat (a) to (g) in real time.
22. method as claimed in claim 21 is characterized in that described expert system comprises logic rules or the algorithm that is used to generate described expert's warning.
23. method as claimed in claim 21 is characterized in that upgrading described fault logic rule and comprises from fault analysis seizure knowledge.
24. method as claimed in claim 21 is characterized in that one or more described expert's warnings comprise the long-distance user's notice via telecommunication apparatus.
25. method as claimed in claim 21 is characterized in that one or more described expert's warnings comprise the notice via the access entrance graphic user interface.
26. method as claimed in claim 25 is characterized in that described correction action request is transferred to described Work management system comprises that generating request via described access entrance warns to solve one or more described experts.
27. a real-time process assets management method comprises:
(a) use dcs to operate production run, be used to receive from the reading of device senses apparatus and send control signals to executive component to monitor described process;
(b) with described dcs with comprise that the historical data base of procedure parameter data carries out interface;
(c) exchange process data between historical data base and expert system are so that generation is about the expert's state and the trend report of uptime, production status, production loss, equipment loss, equipment performance and their combination in any;
(d) equipment, system, operational losses and the process capacity data in the described expert system of renewal;
(e), send the correction action and ask Work management system in response to one or more described expert's states and trend report;
(f) in response to described correction action request, to equipment or system's execution work for correction process of described production run;
(g) repeat (a) to (f) in real time.
28. method as claimed in claim 27 is characterized in that described expert system comprises computations and the logical algorithm that is used to generate described expert's state and trend report.
29. method as claimed in claim 27 is characterized in that the more new data packets in the described expert system is drawn together engineering analysis, production loss report, realistic model output or their combination.
30. method as claimed in claim 27 is characterized in that comprising via telecommunication apparatus and transmits described expert's state and trend report to the long-distance user.
31. method as claimed in claim 27 is characterized in that comprising via the access entrance graphic user interface showing one or more described expert's states and trend report with the sight line form.
32. method as claimed in claim 31, it is characterized in that also comprising that sending the request that solves production loss via described access entrance is used for root cause analysis, subject under discussion solution or their combination to workflow engine, to be generated to the correction action request of described Work management system.
33. a real-time process assets management method comprises:
(a) use dcs to come operating process, be used to receive from the reading of device senses apparatus and send control signals to executive component to monitor described process;
(b) with described dcs with comprise that the historical data base of procedure parameter data carries out interface;
(c) exchange process data between historical data base and expert system are so that generate expert's state and trend report with to the user notification report condition;
(d) in response to one or more described expert's states and trend report, send instructions to described dcs, be used to begin correct automatically action;
(e) upgrade the logic rules that are used for process optimization in the described expert system;
(f), send the optimization action and ask Work management system in response to one or more described expert's states and trend report;
(g) in response to described optimization action request, to equipment or system's execution optimizer of described process;
(h) repeat (a) to (g) in real time.
34. method as claimed in claim 33 is characterized in that described expert system comprises logic rules or the algorithm that is used for process or produces optimization.
35. method as claimed in claim 33 is characterized in that also being included between described expert system and the process simulation model and exchanges emulated data.
36. method as claimed in claim 35 is characterized in that also comprising the procedure parameter of adjusting between described process simulation model and the process engineering model data.
37. method as claimed in claim 36 is characterized in that also comprising the parameters optimization of adjusting between described expert system and the described process engineering model data.
38. method as claimed in claim 33 is characterized in that one or more described expert's states and trend report comprise the production delta data.
39. method as claimed in claim 38 is characterized in that described production delta data sends to the long-distance user via telecommunication apparatus.
40. method as claimed in claim 33 is characterized in that one or more described expert's states and trend report comprise the report of optimization chance.
41. method as claimed in claim 40 is characterized in that described optimization chance report is sent to the user via the access entrance graphic user interface.
42. method as claimed in claim 41 is characterized in that described optimization action request is transferred to described Work management system to be comprised via access entrance generation request to adjust operating parameter.
43. a method that is used for the real-time performance management enterprise assets comprises:
(a) make the business system database that comprises the combined information relevant and one or more function system database and user interface that comprises the information relevant with enterprise various aspects with enterprise;
(b) at described business system database be used to calculate swap data between the expert system of performance metric of enterprise feature;
(c) swap data between described expert system and described one or more functional database;
(d) setting up function group performance model uses for described expert system;
(e) send from expert's state of described expert system and trend report and give the user;
(f) show trend report by sight line access entrance graphic user interface;
(g) be that the corresponding work group sends the request of solution function group performance subject under discussion to workflow engine via described access entrance;
(h) send the correction action from described workflow engine and ask Work management system;
(i) repeat (a) to (h) in real time.
44. method as claimed in claim 43 is characterized in that described expert system comprises logic rules and the algorithm that is used to generate described expert's state and trend report.
45. method as claimed in claim 44 is characterized in that also comprising and upgrades described logic rules, upgrades described logic rules and comprises the knowledge of seizure from function group performance.
46. method as claimed in claim 43 is characterized in that one or more described expert's states and trend report comprise the long-distance user's notice via telecommunication apparatus.
47. method as claimed in claim 44 is characterized in that one or more described expert's states and trend report comprise the notice via the access entrance graphic user interface.
48. method as claimed in claim 47, it is characterized in that described access entrance comprises navigational table, described navigational table comprises the first dimension packet characteristic: comprise plan, action and result, with second the dimension packet characteristic: comprise personnel, equipment and cost, be used for the instrument that the branch group access is associated with support module.
49. method as claimed in claim 48, it is characterized in that described plan grouping provides the visit to maintenance strategy and policy tool, described action group provides defective to eliminate and the loss prevention instrument, and described group as a result provides equipment, maintenance and production performance instrument.
50. method as claimed in claim 48 is characterized in that described navigational table comprises the visit to the operative knowledge trap tool.
51. method as claimed in claim 50 is characterized in that described operative knowledge trap tool is according to the information database of the system defect classification of process device project and respective record, comprises the reason of system defect and the engineering and the operating experience of effect.
52. method as claimed in claim 51 is characterized in that described operative knowledge trap tool comprises the database filtrator based on the selectivity combination of two or more systems, manufacturer, subsystem and defective.
53. method as claimed in claim 51 is characterized in that the system defect data that write down comprise symptom, seriousness, consequence, testing mechanism or their combination in any.
54. method as claimed in claim 53 is characterized in that the system defect data that write down comprise the data of selecting from the group of being made up of remedial action, report recipient, various comment and their any combination of defective occurrence frequency, logic rules applying frequency, applied logic rules, recommendation.
55. method as claimed in claim 50 is characterized in that also comprising the more new tool that use is associated with described operative knowledge trap tool and using from forming the data of selecting the group by shut down event report data, dealer's data, expertise and their combination and fill described business system database.
56. method as claimed in claim 48 is characterized in that described navigational table comprises the visit to shut down event report registration tool.
57. method as claimed in claim 56 is characterized in that wherein said shut down event report registration tool comprises that visit is by report number, time is returned, the function responsibility, date takes place, product loss, fault discovery, the loss classification, cost, correct action, send target, the reason classification, the assets focus, the source position, the loss of stand-alone service contractor, outstanding action, the maintenance work request, unused time, the responsibility assets, the review process, problem interpretation, incident is explained, stop and group that their any combination is formed in the information of the shut down event report selected.
58. method as claimed in claim 56 is characterized in that the instrument that described shut down event report registration tool provides visit to select from the group of being made of management, shut down event report generation, root cause analysis, maintenance strategy, schedule maintenance routine, technology change, Report Builder and their combination in any.
59. method as claimed in claim 58 is characterized in that comprising via described management tool definition shut down event report template.
60. method as claimed in claim 58, it is characterized in that comprising the described shut down event report of operation Core Generator to generate the shut down event report, described shut down event report comprises the data of selecting from the group of being made up of personnel's generation, transmission personnel, loss classification, the loss of stand-alone service contractor, reason classification, responsibility assets, Event Description, source position, time out and their combination in any.
61. method as claimed in claim 58, it is characterized in that comprising and operate the root cause analysis instrument to generate the shut down event report, described shut down event report comprises the data of selecting from the group of being made up of generation date, key personnel, the preventative corrective maintenance data of execution root cause analysis, recommendation corrective action, action target date, cost-benefit analysis, approval or refusal date, planning execution details, implementation date, the date of stopping and their combination in any.
62. method as claimed in claim 58, it is characterized in that comprising the Operation and Maintenance policy tool generating the shut down event report, described shut down event report comprises from by the date taking place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the implementation date of execution, stopping the data to select the group that date and their combination in any form.
63. method as claimed in claim 58, it is characterized in that comprising Operation and Maintenance routine instrument to generate the shut down event report, described shut down event report comprises the data of selecting from the group of being made up of generation date, execution root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, execution realization date, the date of stopping and their combination in any.
64. method as claimed in claim 58, it is characterized in that comprising operative technique change instrument to generate the shut down event report, the report of described shut down event comprises the data of the group of phase spontaneous birthday, execution root cause analysis and prophylactic administration maintenance dates, tactful numbering, action target date, cost-benefit analysis, executive plan date, execution realization date, the date of stopping and their combination in any composition always.
65. method as claimed in claim 58, it is characterized in that comprising the operationral report Core Generator with generation-report, described report comprise come free total assets shutdown performance, according to shut-down period of causality classification be used for the source position date range, according to shut-down period of source position date range, according to shut-down period of loss classification be used for responsibility asset data scope, according to the production loss of function responsibility data area, reappear the data of the group that event data scope, shut down event report data scope, subject under discussion report data scope and their combination in any form.
66. method as claimed in claim 48 is characterized in that described personnel grouping comprises the instrument of selecting from following group: by man-hour of preventive maintenance working load, history and plan, the ratio of safeguarding Supply and Demand, crucial action registration, idea database, action daily record, preventive maintenance consistance, preventive maintenance relative correction maintenance work, yield-power, correcting feature, expansion, total finishing and group that their combination in any is formed of safeguarding that reserve, defective elimination take action.
67. method as claimed in claim 48 is characterized in that described device packets comprises the instrument of selecting from following group: the group of catching, influencing in real time icon, hazard level assessment, RAM emulation current potential, equipment strategy matrix, device databases, equipment performance, key equipment state, jacking equipment state, shut down event Register, shut down event report, assets performance metric, form by operative knowledge according to maximum faults of reason, according to the maximum faults and their combination in any of position.
68. method as claimed in claim 58 is characterized in that the grouping of described cost can comprise the instrument of selecting from following group: by safeguarding budget, safeguard the main performance identifier, safeguard the budget control process, total maintenance cost, safeguarding budget tracking, corrective maintenance cost, safeguard the group that the main performance identifier is followed the tracks of and their combination in any is formed.
69. method as claimed in claim 43 is characterized in that also comprising the instrument of selecting via the homepage visit of access entrance from following group: the group of forming by assets performance metric, leader team, maintenance, supply chain management, plan, good operation, human resources, emergency response, on-the-spot team, equipment, engineering and structure and their combination in any.
70. method as claimed in claim 43 is characterized in that also being included in the geography that shows plant processes on the access entrance and represents.
71. method as claimed in claim 43 is characterized in that described access entrance comprises the assets performance tool.
72. as the described method of claim 71, it is characterized in that also comprising via described assets performance tool real-time assets statistics is provided that described real-time assets statistics is selected from the group of being made up of throughput rate, extension, uptime, validity and their combination in any.
73. as the described method of claim 71, it is characterized in that the instrument that comprises that also operation assets performance tool is selected from following group with visit: summarize the group that instrument, shut down event Reporting Tools, compressor envelope instrument, uptime and availability instrument, loss summary instrument and their combination in any are formed by basis instrument general introduction instrument, chokes modeling tool, tool state, traffic signal lamp system instrument, production performance instrument, expert's instrument, satellite.
74., it is characterized in that also comprising that operating infrastructure general introduction instrument thinks that selected process area corresponding assets generates the diagram general introduction as the described method of claim 73.
75., it is characterized in that also comprising that the described chokes modeling tool of operation is to generate the stream that shows along supply chain as the described method of claim 73.
76., it is characterized in that also comprising that the described tool state of operation is to generate the real-time status of assets as the described method of claim 73.
77., it is characterized in that also comprising that the described traffic signal lamp system instrument of operation is with the availability of generation assets and the demonstration of validity as the described method of claim 73.
78., it is characterized in that also comprising that the described production performance instrument of operation is to generate the demonstration of the potential of selected production process data and actual production performance as the described method of claim 73.
79., it is characterized in that also comprising via described expert's instrument generating defective warning and recommended behavior as the described method of claim 73.
80., it is characterized in that the process flow rate that comprises that also operation satellite general introduction instrument changes along with the time with report as the described method of claim 73.
81., it is characterized in that described shut down event Reporting Tools provide the inlet to the instrument of selecting from following group: report the group that generation, root cause analysis, maintenance strategy, schedule maintenance routine, technique variation, Report Builder and their combination in any are formed by management, shut down event as the described method of claim 73.
82., it is characterized in that also comprising of the demonstration of operate compressor envelope instrument with the envelope map of the current operating point on generation compressor state performance and the displayed map as the described method of claim 73.
83., it is characterized in that also comprising that operation uptime and availability instrument with the uptime of generation assets and the demonstration of availability, are expressed as the number percent of the time period of relative user's selection as the described method of claim 73.
84., it is characterized in that losing the summary instrument and be operated to generate about the production loss of selected assets with owing to of the summary of stand-alone service contractor with the shut down event report information of the detailed loss of the assets separately of delaying to produce as the described method of claim 73.
85. as the described method of claim 73, it is characterized in that described transmission corrects action and ask Work management system to comprise the request of generation so that solve one or more described experts' warnings via described access entrance, wherein said expert's warning is generated by described expert system, is used for to the user notification alarm condition.
86. a system that is used to promote the decision-making relevant with enterprise asset management comprises:
(a) historical data base comprises the procedure parameter data;
(b) Real Time Expert decision support module with described historical data bank interface, generates expert's state and trend report;
(c) access entrance is so that the described Real Time Expert decision support module of user capture;
(d) navigational table comprises packet characteristic, is used for the instrument that the branch group access is associated with described Real Time Expert decision support module, and described navigational table can provide the sight line that spreads all over described enterprise to be used to provide the assets relevant information via described access entrance visit.
87. as the described system of claim 86, it is characterized in that described packet characteristic comprises the first dimension packet characteristic: comprise plan, action and result, with second the dimension packet characteristic: comprise personnel, equipment and cost, be used for the instrument that the branch group access is associated with support module.
88. as the described system of claim 87, it is characterized in that described plan group provides the visit to maintenance strategy and policy tool, the action group provides the visit of defective being eliminated and losing the instrument that prevents, group provides the visit to equipment, maintenance and production performance instrument as a result.
89., it is characterized in that described navigational table comprises the visit to the operative knowledge trap tool as the described system of claim 86.
90., it is characterized in that described operative knowledge trap tool is according to the information database of the system defect classification of process device project and respective record, comprises the reason of system defect and the engineering and the operating experience of effect as the described system of claim 89.
91., it is characterized in that described operative knowledge trap tool comprises the database filtrator based on the selectivity combination of two or more systems, manufacturer, subsystem and defective as the described system of claim 90.
92., it is characterized in that the system defect data that write down comprise symptom, seriousness, consequence, testing mechanism or their combination in any as the described system of claim 90.
93., it is characterized in that the system defect data that write down also comprise the data of selecting from the group of being made of remedial action, report recipient, various comment and their any combination of defective occurrence frequency, logic rules applying frequency, applied logic rules, recommendation as the described system of claim 92.
94. as the described system of claim 89, it is characterized in that also comprising the business system database, described operative knowledge trap tool is associated with new tool more, fills described business system database to use from forming the data of selecting the group by shut down event report data, dealer's data, expertise and their combination.
95., it is characterized in that described navigational table comprises the visit to shut down event report registration tool as the described system of claim 86.
96., it is characterized in that described shut down event report registration tool comprises that visit is by report number, time are returned, function responsibility, the Admin Events that date, product loss, fault discovery, loss classification, cost, correction action take place, sends target, select in reason classification, assets focus, source position, the loss of stand-alone service contractor, outstanding action, maintenance work request, unused time, responsibility assets, review process, problem interpretation, incident are explained, stopped and their any combination is formed the group are reported information as the described system of claim 95.
97., it is characterized in that described shut down event report registration tool provides the visit to the instrument of selecting from the group of being made up of management tool, shut down event report Core Generator, root cause analysis instrument, maintenance strategy instrument, schedule maintenance routine instrument, technology change instrument, report Core Generator and their combination in any as the described system of claim 95.
98., it is characterized in that via described management tool definition shut down event report template as the described system of claim 97.
99. as the described system of claim 97, it is characterized in that described shut down event report Core Generator is used to generate the shut down event report, described shut down event report comprises the data of selecting from the group that the personnel that generated, sent by personnel, loss classification, the loss of stand-alone service contractor, reason classification, responsibility assets, incident explanation, source position, time out and their combination in any are formed.
100. as the described system of claim 97, it is characterized in that described root cause analysis instrument is used to generate the shut down event report, described shut down event report comprises the data of selecting from the group of being made up of the corrective action that date, key personnel, the preventative corrective maintenance data of execution root cause analysis, recommendation take place, action target date, cost-benefit analysis, approval or refusal date, planning execution details, implementation date, the date of stopping and their combination in any.
As the described system of claim 97, it is characterized in that described maintenance strategy instrument is used to generate shut down event report, described shut down event report comprises from by the date taking place, carry out root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, the implementation date of execution, stopping the data to select the group that date and their combination in any form.
As the described system of claim 97, it is characterized in that described schedule maintenance routine instrument is used to generate the shut down event report, described shut down event report comprises the data of selecting from the group of being made up of generation date, execution root cause analysis and prophylactic administration maintenance dates, strategy numbering, action target date, cost-benefit analysis, executive plan date, execution realization date, the date of stopping and their combination in any.
As the described system of claim 97, it is characterized in that described technology change instrument is used to generate the shut down event report, the report of described shut down event comprises the data of the group of phase spontaneous birthday, execution root cause analysis and prophylactic administration maintenance dates, tactful numbering, action target date, cost-benefit analysis, executive plan date, execution realization date, the date of stopping and their combination in any composition always.
As the described system of claim 97, it is characterized in that described report Core Generator is used to generate a report, described report comprise from by total assets shutdown performance, according to shut-down period of causality classification be used for the source position date range, according to shut-down period of source position date range, according to shut-down period of loss classification be used for responsibility asset data scope, according to the production loss of function responsibility data area, reappear the data that group that event data scope, shut down event report data scope, subject under discussion report data scope and their combination in any form is selected.
As the described system of claim 87, it is characterized in that described personnel grouping comprises the instrument of selecting from following group: by man-hour of preventive maintenance working load, history and plan, the ratio of safeguarding Supply and Demand, crucial action registration, idea database, action daily record, preventive maintenance consistance, preventive maintenance relative correction maintenance work, yield-power, correcting feature, expansion, total finishing and group that their combination in any is formed of safeguarding that reserve, defective elimination take action.
As the described system of claim 87, it is characterized in that described device packets comprises the instrument of selecting from following group: the group of catching, influencing in real time chart, key assessment, RAM emulation current potential, equipment strategy matrix, device databases, equipment performance, key equipment state, jacking equipment state, shut down event Register, shut down event report, assets performance metric, form by operative knowledge according to maximum faults of reason, according to the maximum faults and their combination in any of position.
As the described system of claim 87, it is characterized in that the grouping of described cost comprises the instrument of selecting from following group: by safeguarding budget, safeguard the main performance designator, safeguard the budget control process, total maintenance cost, safeguarding budget tracking, corrective maintenance cost, safeguard the group that main performance indicator track and their combination in any are formed.
As the described system of claim 86, it is characterized in that described access entrance also comprises the homepage that has the visit of the instrument selected from following group: the group of forming by assets performance metric, leader team, maintenance, supply chain management, plan, good operation, human resources, emergency response, on-the-spot team, equipment, engineering and structure and their combination in any.
As the described system of claim 86, it is characterized in that described access entrance comprises the demonstration that the geography of production run is represented.
110., it is characterized in that described access entrance comprises the assets performance tool as the described system of claim 86.
111. as the described system of claim 110, it is characterized in that described assets performance tool is used to provide real-time assets statistics, described real-time assets statistics is selected from the group of being made up of throughput rate, extension, uptime, availability and their combination in any.
112., it is characterized in that described assets performance tool is used to visit following group the instrument that is selected from: summarize the group that instrument, shut down event Reporting Tools, compressor envelope instrument, uptime and availability instrument, loss summary instrument and their combination in any are formed by basis instrument general introduction instrument, chokes modeling tool, tool state, traffic signal lamp system instrument, production performance instrument, expert system tool, satellite as the described system of claim 110.
113., it is characterized in that described infrastructure general introduction instrument is used to the assets separately at selected production run assets scene to generate the diagram general introduction as the described system of claim 112.
114., it is characterized in that described chokes modeling tool is used to report the stream along supply chain as the described system of claim 112.
115., it is characterized in that described tool state is used to report the real-time status of assets as the described system of claim 112.
116., it is characterized in that described traffic signal lamp system is used to show the availability and the validity of assets as the described system of claim 112.
117., it is characterized in that described production performance instrument is used to show the potential of selected association and actual production performance as the described system of claim 112.
118., it is characterized in that described expert system tool is used for display defect warning and recommended behavior as the described system of claim 112.
119., it is characterized in that described satellite general introduction instrument is used to show the production flow rate that changes along with the time as the described system of claim 112.
120., it is characterized in that described shut down event Reporting Tools provide the inlet to the instrument of selecting from following group: report the group that generation, root cause analysis, maintenance strategy, schedule maintenance routine, technique variation, Report Builder and their combination in any are formed by management, shut down event as the described system of claim 112.
121., it is characterized in that described compressor envelope instrument is used to show the envelope map of the current operating point on compressor state performance and the displayed map as the described system of claim 112.
122. as the described system of claim 112, it is characterized in that described uptime and availability instrument are used to show the uptime and the availability of assets, be expressed as the number percent of the time period of relative user's selection.
123., it is characterized in that described loss summary instrument is used to generate about the production loss of selected assets with owing to stand-alone service contractor and the assets of delaying the to produce summary of the shut down event report information of loss in detail as the described system of claim 112.
CNB2004800089081A 2003-01-30 2004-01-21 Support apparatus, method and system for real time operations and maintenance Expired - Fee Related CN100472509C (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US44372503P 2003-01-30 2003-01-30
US60/443,725 2003-01-30
US10/753,190 2003-12-31

Publications (2)

Publication Number Publication Date
CN1864156A CN1864156A (en) 2006-11-15
CN100472509C true CN100472509C (en) 2009-03-25

Family

ID=37390861

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004800089081A Expired - Fee Related CN100472509C (en) 2003-01-30 2004-01-21 Support apparatus, method and system for real time operations and maintenance

Country Status (1)

Country Link
CN (1) CN100472509C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104412247A (en) * 2012-07-24 2015-03-11 通用电气公司 Systems and methods for improving control system reliability
CN106054827A (en) * 2015-03-20 2016-10-26 因文西斯系统公司 Asset management in a process control system
US9665090B2 (en) 2012-07-24 2017-05-30 General Electric Company Systems and methods for rule-based control system reliability
US9912733B2 (en) 2014-07-31 2018-03-06 General Electric Company System and method for maintaining the health of a control system

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010040141A2 (en) * 2008-10-03 2010-04-08 Invensys Systems, Inc. Retrieving and navigating through manufacturing data from relational and time-series systems by abstracting the source systems into a set of named entities
CN101419680B (en) * 2008-12-04 2013-03-13 复旦大学 Noumenon synergistic construct method in increment iterative field
DE102010021382A1 (en) * 2010-05-25 2011-12-01 Abb Ag Method and system for generating an integration model
US10678225B2 (en) 2013-03-04 2020-06-09 Fisher-Rosemount Systems, Inc. Data analytic services for distributed industrial performance monitoring
US10223327B2 (en) 2013-03-14 2019-03-05 Fisher-Rosemount Systems, Inc. Collecting and delivering data to a big data machine in a process control system
US10649424B2 (en) 2013-03-04 2020-05-12 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics
US9558220B2 (en) 2013-03-04 2017-01-31 Fisher-Rosemount Systems, Inc. Big data in process control systems
US9665088B2 (en) 2014-01-31 2017-05-30 Fisher-Rosemount Systems, Inc. Managing big data in process control systems
US10866952B2 (en) 2013-03-04 2020-12-15 Fisher-Rosemount Systems, Inc. Source-independent queries in distributed industrial system
US10386827B2 (en) 2013-03-04 2019-08-20 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics platform
US10909137B2 (en) 2014-10-06 2021-02-02 Fisher-Rosemount Systems, Inc. Streaming data for analytics in process control systems
US10282676B2 (en) 2014-10-06 2019-05-07 Fisher-Rosemount Systems, Inc. Automatic signal processing-based learning in a process plant
US10649449B2 (en) 2013-03-04 2020-05-12 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics
GB2513709B (en) * 2013-03-15 2021-06-16 Fisher Rosemount Systems Inc Method and apparatus for managing a work flow in a process plant
US10691281B2 (en) 2013-03-15 2020-06-23 Fisher-Rosemount Systems, Inc. Method and apparatus for controlling a process plant with location aware mobile control devices
EP3304221B1 (en) * 2015-06-05 2020-10-07 Shell International Research Maatschappij B.V. System and method for handling equipment service for model predictive controllers and estimators
EP3133451A1 (en) * 2015-08-20 2017-02-22 Siemens Aktiengesellschaft System for controlling, monitoring and regulating a method for operating such a system
JP6304274B2 (en) * 2016-02-05 2018-04-04 横河電機株式会社 Plant performance evaluation apparatus, plant performance evaluation system, and plant performance evaluation method
US10503483B2 (en) 2016-02-12 2019-12-10 Fisher-Rosemount Systems, Inc. Rule builder in a process control network
CN105868487B (en) * 2016-04-11 2019-04-16 中国建筑科学研究院 A kind of energy saving expert system based on energy consumption equipment model
CN113168608A (en) * 2019-01-25 2021-07-23 贝克曼库尔特有限公司 Laboratory instrument maintenance management system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104412247A (en) * 2012-07-24 2015-03-11 通用电气公司 Systems and methods for improving control system reliability
US9665090B2 (en) 2012-07-24 2017-05-30 General Electric Company Systems and methods for rule-based control system reliability
CN104412247B (en) * 2012-07-24 2017-10-27 通用电气公司 System and method for improving reliability control system
US9912733B2 (en) 2014-07-31 2018-03-06 General Electric Company System and method for maintaining the health of a control system
CN106054827A (en) * 2015-03-20 2016-10-26 因文西斯系统公司 Asset management in a process control system

Also Published As

Publication number Publication date
CN1864156A (en) 2006-11-15

Similar Documents

Publication Publication Date Title
CN100472509C (en) Support apparatus, method and system for real time operations and maintenance
AU2004209846B2 (en) Support apparatus, method and system for real time operations and maintenance
CN104254810B (en) Method and system for the condition monitoring of one group of factory
US8688405B2 (en) Remote monitoring systems and methods
JP5124374B2 (en) Integration into process performance monitoring and process equipment monitoring and control
CN102736620B (en) For the method for the entity in operating process factory
Starr et al. Control loop performance monitoring–ABB’s experience over two decades
Wang et al. Modeling tunnel construction risk dynamics: Addressing the production versus protection problem
He et al. Cyber-Physical systems for maintenance in Industry 4.0
Bore Analysis of management methods and application to maintenance of geothermal power plants
Van Blerk A web-based multilevel framework for condition monitoring of industrial equipment
Kattar Use of Machine Learning to Optimize Drilling Equipment Performance and Life Cycle Focus: Predictive Maintenance
Levaniuk Application of digital twins for maintenance in the gas and oil sector
CN112685488B (en) Data management and control system for drainage basin power station equipment
Friedemann et al. Subsea condition monitoring: A path to increased availability and increased recovery
Johnson IoT technologies for asset modeling, monitoring and analytics that yield maintenance and operations optimization.
Puig Ramírez Asset optimization and predictive maintenance in discrete manufacturing industry
Kange et al. Evaluation of the potential for predictive maintenance
Abraha Optimization of maintenance performance for offshore production facilities
Hernowo et al. My HSSE&AI-A Novel Approach in Combining Safety Leader Program with Machine Learning Capability
Al-Khelaiwi et al. Assessment of Production Engineering Workflows for Saudi Aramco Production Operations Surveillance Hub (POSH)
Budeli Artificial intelligence system to improve asset management program in industry 4.0: Manufacturing case study1
Erkki et al. Quality Data Management in the Next Industrial Revolution: A Study of Prerequisites for Industry 4.0 at GKN Aerospace Sweden
Soleh et al. Development Of Predictive Maintenance Methodology Utilizing Machine Learning Technology To Support Plant Health Management
Erstad Present and future technical integrity management practices for integrated operations

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LANDMARK GRAPHICS CORP.

Free format text: FORMER OWNER: KELLOGG BROWN + ROOT LLC

Effective date: 20120830

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120830

Address after: Texas, USA

Patentee after: LANDMARK GRAPHICS Corp.

Address before: Texas, USA

Patentee before: Kellogg Brown & Root LLC

Effective date of registration: 20120830

Address after: Texas, USA

Patentee after: KELLOGG BROWN & ROOT LLC

Address before: Texas, USA

Patentee before: Kellogg Brown & Root LLC

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090325

Termination date: 20180121

CF01 Termination of patent right due to non-payment of annual fee