CN100466812C - 一种空口承载的建立方法和系统 - Google Patents
一种空口承载的建立方法和系统 Download PDFInfo
- Publication number
- CN100466812C CN100466812C CNB038222108A CN200610000910A CN100466812C CN 100466812 C CN100466812 C CN 100466812C CN B038222108 A CNB038222108 A CN B038222108A CN 200610000910 A CN200610000910 A CN 200610000910A CN 100466812 C CN100466812 C CN 100466812C
- Authority
- CN
- China
- Prior art keywords
- message
- user terminal
- point
- immediately
- radio bearer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
本发明公开了一种空口承载的建立方法,包括:用户终端向无线网络控制器发送无线资源控制连接请求消息;无线网络控制器根据无线资源控制连接请求消息在网络侧建立点到点承载,在公共控制信道上发送无线承载建立消息;用户终端根据无线承载建立消息获得点到点承载配置信息。根据本发明,通过讲者UE在RACH信道上发起RRC连接请求之后,RNC即获得了当前UE的接入目的地址和接入的PTT组,直接给该UE建立讲者UE的P-T-P承载,因此,本发明仅用较少的步骤就可建立P-T-P承载,从而实现讲者UE的P-T-P承载的快速建立。
Description
技术领域
本发明涉及一种通信技术,尤其涉及一种空口承载的建立方法和系统。
背景技术
在WCDMA(宽带码分多址接入)技术中,由于MBMS业务(多播广播多媒体业务)与PTT(即按即通)业务具有许多共同之处,对MBMS技术进行较少改动,就可实现PTT业务,因此,可节省劳动时间。
如图1所示,下面描述MBMS业务中建立空口承载的过程,所述的空口承载也称为MBMS的P-T-P(点到点)承载。用户发起呼叫,触发P-T-P承载建立流程。
步骤1、UE向RNC发送RRC连接请求(RRC CONNECTION REQUEST)消息。
步骤2、RNC收到RRC连接请求消息后,在网络侧建立无线链路。
步骤3、RNC向UE发送RRC连接建立(RRC CONNECTION SETUP)消息。
步骤4、UE在RRC连接建立完成后,向RNC发送RRC连接建立完成(RRCCONNECT SETUP CMP)消息。
步骤5、UE通过已经建成的RRC连接,向SGSN(服务GPRS服务节点)发送业务请求(SERVICE REQUEST)消息,表示需要请求MBMS业务。
步骤6、SGSN收到该消息后,判断该UE是否激活了MBMS业务。如果已经激活MBMS业务,向RNC发送UE链接请求(UE-LINK REQUEST)消息,通知RNC该UE激活了MBMS业务。
步骤7、RNC收到UE链接请求消息后,向SGSN发送UE链接响应(UE-LINKRESPONSE)消息,指示RNC已经知道该UE激活了MBMS业务。
步骤8、RNC在网络侧重配置无线链路。
步骤9、RNC向UE发送无线承载建立(RADIO BEARER SETUP)消息,通知UE相关P-T-P承载的配置信息。
步骤10、UE在配置好P-T-P承载后,向RNC发送无线承载建立完成(RADIOBEARER SETUP CMP)消息。
然而,在上述的空口承载的建立流程中,由于需要经过较多的步骤,使得整个流程需要大约3秒钟,时间比较长,影响了PTT业务质量。
发明内容
本发明的目的是提供一种空口承载的建立方法,可缩短建立空口承载的时延,从而满足PTT业务的需要。
本发明公开了一种空口承载的建立方法,包括:
A、用户终端向无线网络控制器发送无线资源控制连接请求消息;
B、无线网络控制器根据无线资源控制连接请求消息在网络侧建立点到点承载,在公共控制信道上发送无线承载建立消息;
C、用户终端根据无线承载建立消息获得点到点承载配置信息。
所述的无线资源控制连接请求消息包括:建立原因值;国际移动用户标识;该即按即通业务的IP组播地址;以及用户终端的即按即通优先级。
所述的建立原因值为即按即通讲者请求。
所述的步骤B还包括:
无线网络控制器接收无线资源控制连接请求消息;并从无线资源控制连接请求消息中获得用户终端的即按即通优先级;
如果当前该即按即通组没有讲者,无线网络控制器在公共控制信道上发送无线承载建立消息;
如果当前该即按即通组有讲者用户终端在进行PTT业务通信,且无线网络控制器获得的用户终端的即按即通优先级高于当前讲者用户终端的即按即通优先级,在公共控制信道上发送无线承载建立消息,否则向用户终端发送拒绝消息。
在步骤步骤A之前还执行:用户终端加入一个即按即通业务组,并获得该即按即通业务组的IP组播地址、本用户终端的即按即通优先级。
所述的无线承载建立消息包括:初始用户终端标识和该即按即通业务的讲者点到点承载的配置信息。
所述的步骤C具体包括:
用户终端在公共控制信道上接收到无线承载建立消息后,从无线承载建立消息中获得初始用户终端标识,用户终端判断所获得的初始用户终端标识与其自身的国际移动用户标识是否相符,若相符,从公共控制信道上获得点到点承载配置信息,并根据点到点承载配置信息配置点到点承载。
所述的步骤C还包括:用户终端在伴随的专用信令信道上向无线网络控制器发送无线承载建立完成消息。
本发明还公开了一种空口承载的建立系统,包括:
用户终端,用于向无线网络控制器发送无线资源控制连接请求消息,接收无线网络控制器的无线承载建立消息,并根据无线承载建立消息获得点到点承载配置信息;
无线网络控制器,用于接收来自用户终端的无线资源控制连接请求消息,根据无线资源控制连接请求消息在网络侧建立点到点承载,在公共控制信道上发送无线承载建立消息。
根据本发明,通过讲者UE在RACH信道上发起RRC连接请求之后,RNC即获得了当前UE的接入目的地址和接入的PTT组,直接给该UE建立讲者UE的P-T-P承载,因此,本发明仅用较少的步骤就可建立P-T-P承载,从而实现讲者UE的P-T-P承载的快速建立。
附图说明
图1示出了现有技术的P-T-P承载的建立流程;
图2示出了本发明实施例的讲者UE触发的P-T-P承载的建立流程。
具体实施方式
为了便于本领域一般技术人员理解和实现本发明,现结合附图描绘本发明的实施例。
本发明空口承载的建立方法包括讲者UE到RNC之间的P-T-P承载,下面参照图2对其进行详细描述。
初始时,UE加入了一个PTT业务组,并获得该PTT业务组的IP组播地址、本UE的PTT优先级。当用户需要向组内其他用户讲话时,按动讲话键,触发讲者P-T-P承载的建立流程。
步骤1、讲者UE在RACH(反向接入信道)上向RNC发送RRC连接请求(RRCCONNECTION REQUEST)消息,然后开始监听下行CCCH(公共控制信道);所述的RRC连接请求消息包括:建立原因值(Establishment cause值),其为PTT讲者请求(PTT talker request);IMSI(国际移动用户标识),其为UE IMSI;该PTT业务的IP组播地址;以及本UE的PTT优先级。
步骤2a-2b、RNC收到该RRC连接请求消息后,如果其PTT优先级高于当前讲者UE的PTT优先级,或当前该PTT组没有讲者UE进行PTT业务通信,在CCCH上发送无线承载建立(RADIO BEARER SETUP)消息。如果PTT优先级低于当前讲者UE,向该讲者UE发送拒绝消息。所述的无线承载建立消息包括:初始UE标识(Initial UE identity),其值为UE IMSI;该PTT业务的讲者P-T-P承载的配置信息,其包括两条P-T-P承载的配置信息,一条承载用于传输UE与PTT服务器之间的双向PTT控制消息,一条承载用于传输讲者话音数据,采用不同的NSAPI(Network Service Access Point Identifier,网络业务接入点标识符)进行区分,如NSAPI为0表示第一条承载,NSAPI为1表示第二条承载。RNC同时还配置网络侧P-T-P承载相关的各用户面实体。
步骤3、UE在CCCH上接收到无线承载建立消息后,如果消息中的初始UE标识与UE自身的IMSI相符,便从CCCH上获得P-T-P承载配置信息,然后根据P-T-P承载配置信息配置P-T-P承载,并在伴随的专用信令信道上反馈无线承载建立完成(RB SETUP COMPLETE)消息。
本发明还公开了一种空口承载的建立系统,包括:用户终端,用于向无线网络控制器发送无线资源控制连接请求消息,接收无线网络控制器的无线承载建立消息,并根据无线承载建立消息获得点到点承载配置信息;无线网络控制器,用于接收来自用户终端的无线资源控制连接请求消息,根据无线资源控制连接请求消息在网络侧建立点到点承载,在公共控制信道上发送无线承载建立消息。
根据本发明,通过讲者UE在RACH信道上发起RRC连接请求之后,RNC即获得了当前UE的接入目的地址和接入的PTT组,直接给该UE建立讲者UE的P-T-P承载,因此,本发明仅用较少的步骤就可建立P-T-P承载,从而实现讲者UE的P-T-P承载的快速建立。
下面对本发明的时延分析如下:用户按下说话键到讲者UE发出RRC连接请求消息约需要50ms时间,RNC收到RRC连接请求消息到UE收到无线承载建立消息的时延约为100ms,UE收到无线承载建立消息到RNC收到无线承载建立完成消息的时延为200ms。这样讲者UE到RNC的空口P-T-P承载建立大概要350ms的时间。而现有的建立流程大概要3秒钟时间。因此,本发明的空口承载建立过程时延较小,可较好地满足PTT业务的需求。
虽然通过实施例描绘了本发明,但本领域普通技术人员知道,在不脱离本发明的精神和实质的情况下,就可使本发明有许多变形和变化,本发明的范围由所附的权利要求来限定。
Claims (9)
1、一种空口承载的建立方法,其特征在于,包括:
A、用户终端向无线网络控制器发送无线资源控制连接请求消息;
B、无线网络控制器根据无线资源控制连接请求消息在网络侧建立点到点承载,在公共控制信道上发送无线承载建立消息;
C、用户终端根据无线承载建立消息获得点到点承载配置信息。
2、根据权利要求1所述的空口承载的建立方法,其特征在于,所述的无线资源控制连接请求消息包括:建立原因值;国际移动用户标识;即按即通业务的IP组播地址;以及用户终端的即按即通优先级。
3、根据权利要求2所述的空口承载的建立方法,其特征在于,所述的建立原因值为即按即通讲者请求。
4、根据权利要求2所述的空口承载的建立方法,其特征在于,所述的步骤B还包括:
无线网络控制器接收无线资源控制连接请求消息;并从无线资源控制连接请求消息中获得用户终端的即按即通优先级;
如果当前即按即通组没有讲者,无线网络控制器在公共控制信道上发送无线承载建立消息;
如果当前该即按即通组有讲者用户终端在进行PTT业务通信,且无线网络控制器获得的用户终端的即按即通优先级高于当前讲者用户终端的即按即通优先级,在公共控制信道上发送无线承载建立消息,否则向用户终端发送拒绝消息。
5、根据权利要求1至4其中之一所述的空口承载的建立方法,其特征在于,在步骤A之前还执行:用户终端加入一个即按即通业务组,并获得即按即通业务组的IP组播地址、本用户终端的即按即通优先级。
6、根据权利要求1至4其中之一所述的空口承载的建立方法,其特征在于,所述的无线承载建立消息包括:初始用户终端标识和即按即通业务的讲者点到点承载的配置信息。
7、根据权利要求6所述的空口承载的建立方法,其特征在于,所述的步骤C具体包括:
用户终端在公共控制信道上接收到无线承载建立消息后,从无线承载建立消息中获得初始用户终端标识,用户终端判断所获得的初始用户终端标识与其自身的国际移动用户标识是否相符,若相符,从公共控制信道上获得点到点承载配置信息,并根据点到点承载配置信息配置点到点承载。
8、根据权利要求7所述的空口承载的建立方法,其特征在于,所述的步骤C还包括:用户终端在伴随的专用信令信道上向无线网络控制器发送无线承载建立完成消息。
9、一种空口承载的建立系统,其特征在于,包括:
用户终端,用于向无线网络控制器发送无线资源控制连接请求消息,接收无线网络控制器的无线承载建立消息,并根据无线承载建立消息获得点到点承载配置信息;
无线网络控制器,用于接收来自用户终端的无线资源控制连接请求消息,根据无线资源控制连接请求消息在网络侧建立点到点承载,在公共控制信道上发送无线承载建立消息。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB038222108A CN100466812C (zh) | 2006-01-12 | 2006-01-12 | 一种空口承载的建立方法和系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB038222108A CN100466812C (zh) | 2006-01-12 | 2006-01-12 | 一种空口承载的建立方法和系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1852610A CN1852610A (zh) | 2006-10-25 |
CN100466812C true CN100466812C (zh) | 2009-03-04 |
Family
ID=37134073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB038222108A Expired - Fee Related CN100466812C (zh) | 2006-01-12 | 2006-01-12 | 一种空口承载的建立方法和系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100466812C (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012044439A1 (en) * | 2010-09-30 | 2012-04-05 | Motorola Solutions, Inc. | Methods for reducing set-up time for communications among multiple user equipment in a long term evolution system |
US9237483B2 (en) | 2010-12-30 | 2016-01-12 | Motorola Solutions, Inc. | Methods for managing resource utilization in a long term evolution communication system |
US9473994B2 (en) | 2010-12-30 | 2016-10-18 | Motorola Solutions, Inc. | Method and system for selecting a target cell for handover of user equipment in a long term evolution system |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101364934B (zh) * | 2007-08-10 | 2011-06-01 | 华为技术有限公司 | 非接入层消息在切换中的处理方法和装置 |
CN103313424B (zh) * | 2012-03-07 | 2016-03-23 | 电信科学技术研究院 | 一种ue的接入控制方法和设备 |
CN103687043B (zh) * | 2012-09-11 | 2016-12-21 | 普天信息技术研究院有限公司 | 一种建立无线资源控制协议连接的方法 |
CN103139718B (zh) * | 2013-03-25 | 2015-11-18 | 中国人民解放军重庆通信学院 | 一种PoC时延优化处理的方法及装置 |
CN104093216A (zh) * | 2014-06-16 | 2014-10-08 | 小米科技有限责任公司 | 一种无线数据传输的方法和装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1536795A (zh) * | 2003-04-04 | 2004-10-13 | 北京三星通信技术研究有限公司 | 用户选择mbms业务的方法 |
EP1475984A1 (en) * | 2003-05-09 | 2004-11-10 | Motorola, Inc. | Method and apparatus for controlling access to a multimedia broadcast multicast service in a packet data communication system |
CN1567776A (zh) * | 2003-07-10 | 2005-01-19 | 华为技术有限公司 | 无线资源控制连接请求消息的处理方法 |
WO2005022812A1 (en) * | 2003-08-21 | 2005-03-10 | Qualcomm Incorporated | Methods for forward error correction coding above a radio link control layer and related apparatus |
CN1694379A (zh) * | 2004-05-07 | 2005-11-09 | 日本电气株式会社 | 移动通信系统和mbms服务相关信息传送方法 |
-
2006
- 2006-01-12 CN CNB038222108A patent/CN100466812C/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1536795A (zh) * | 2003-04-04 | 2004-10-13 | 北京三星通信技术研究有限公司 | 用户选择mbms业务的方法 |
EP1475984A1 (en) * | 2003-05-09 | 2004-11-10 | Motorola, Inc. | Method and apparatus for controlling access to a multimedia broadcast multicast service in a packet data communication system |
CN1567776A (zh) * | 2003-07-10 | 2005-01-19 | 华为技术有限公司 | 无线资源控制连接请求消息的处理方法 |
WO2005022812A1 (en) * | 2003-08-21 | 2005-03-10 | Qualcomm Incorporated | Methods for forward error correction coding above a radio link control layer and related apparatus |
CN1694379A (zh) * | 2004-05-07 | 2005-11-09 | 日本电气株式会社 | 移动通信系统和mbms服务相关信息传送方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012044439A1 (en) * | 2010-09-30 | 2012-04-05 | Motorola Solutions, Inc. | Methods for reducing set-up time for communications among multiple user equipment in a long term evolution system |
US8553631B2 (en) | 2010-09-30 | 2013-10-08 | Motorola Solutions, Inc. | Methods for reducing set up time for communications among multiple user equipment in a long term evolution system |
US9237483B2 (en) | 2010-12-30 | 2016-01-12 | Motorola Solutions, Inc. | Methods for managing resource utilization in a long term evolution communication system |
US9473994B2 (en) | 2010-12-30 | 2016-10-18 | Motorola Solutions, Inc. | Method and system for selecting a target cell for handover of user equipment in a long term evolution system |
Also Published As
Publication number | Publication date |
---|---|
CN1852610A (zh) | 2006-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100466812C (zh) | 一种空口承载的建立方法和系统 | |
CN1748386B (zh) | 在多媒体广播/多播业务中管理用于寻呼用户设备的业务环境的方法 | |
US8014772B2 (en) | Provision of a multimedia broadcast/multicast service (MBMS) for a user equipment moving along cells in a cellular mobile communication system | |
CN101019346B (zh) | 在多媒体广播/多播服务系统中当停止会话时用于指示小区选择的方法与装置 | |
DK2599326T3 (en) | Predictive wake-up call for optimizing POC (push-to-talk-over-cellular) call setup | |
CN100438654C (zh) | 一种即按即通系统及实现即按即通业务的方法 | |
KR100689477B1 (ko) | 무선 통신시스템에서 신속한 호 셋업 방법 및 시스템 | |
EP3005617A1 (en) | Method for efficiently supporting multiple simultaneous group ptt calls requiring low call setup latency | |
CN100417295C (zh) | 通过资源预留实现呼叫快速建立及小区快速切换的方法 | |
MXPA06013790A (es) | Establecimiento de sesion de datos de paquete concurrente para pulsar para hablar sobre celular. | |
CN103634746A (zh) | 一种保持PoC持续连接处理能力的方法和装置 | |
CN110167026A (zh) | 一种网络切换方法和装置、专网应用服务器及存储介质 | |
EP1625762B1 (en) | Method and system for implementing a push-to-talk service in a mobile radio communication network of the gsm-type | |
CN100584081C (zh) | 移动通信系统中减小呼叫建立时延的方法 | |
CN102395110B (zh) | Lte系统中支持mbms业务传输的方法 | |
CN100456885C (zh) | 一种被叫用户连接建立方法及系统 | |
WO2008025206A1 (fr) | Procédé et réseau pour créer le tunnel de plan de contrôle dans le service de multidiffusion du système de communication mobile | |
CN101141787B (zh) | 宽带接入系统中实现多播通道建立、预注册、释放的方法 | |
CN101656918B (zh) | 一种ptt会话中群组通话状态实时呈现的方法和系统 | |
CN101064954B (zh) | 信道配置方法 | |
CN1984438B (zh) | 一种连接建立方法及系统 | |
KR20040093802A (ko) | 이동 통신 시스템에서의 그룹 호 서비스를 위한 무선 링크관리 방법 | |
KR20050100859A (ko) | 멀티캐스트 멀티미디어 방송 서비스에서 회선 서비스 중인사용자 단말기를 호출하기 위한 서비스 컨텍스트 관리 방법 | |
CN100440967C (zh) | Mbms用户主动发起上行信令的方法 | |
CN102355727B (zh) | 信道配置方法和系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090304 Termination date: 20130112 |
|
CF01 | Termination of patent right due to non-payment of annual fee |