CN100458181C - Installation method of vertical bittern transfer pump - Google Patents

Installation method of vertical bittern transfer pump Download PDF

Info

Publication number
CN100458181C
CN100458181C CNB2007100198135A CN200710019813A CN100458181C CN 100458181 C CN100458181 C CN 100458181C CN B2007100198135 A CNB2007100198135 A CN B2007100198135A CN 200710019813 A CN200710019813 A CN 200710019813A CN 100458181 C CN100458181 C CN 100458181C
Authority
CN
China
Prior art keywords
pump
casing
bittern
box
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007100198135A
Other languages
Chinese (zh)
Other versions
CN101008404A (en
Inventor
王春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG ZHENGHAN PUMP CO Ltd
Original Assignee
ZHENJIANG ZHENGHAN PUMP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG ZHENGHAN PUMP CO Ltd filed Critical ZHENJIANG ZHENGHAN PUMP CO Ltd
Priority to CNB2007100198135A priority Critical patent/CN100458181C/en
Publication of CN101008404A publication Critical patent/CN101008404A/en
Application granted granted Critical
Publication of CN100458181C publication Critical patent/CN100458181C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The invention relates to a method for mounting the upright bittern pump which can clean the bittern of crystal easily. The inventive method comprises that the bittern pump is mounted in one opened box, whose bottom has a round hole matched with the liquid inlet tube of pump; the pump is connected with the round hole via the flange to integrate the pump and the box, while the connection is sealed by rubber gasket, to avoid external bittern leaking into the box; the outlet of pump is arranged with a flexible connector and a flexible liquid outlet tube; the upper opening of box is arranged with symmetry necked suspending stop openings; in addition, the box is arranged with 4-6 posts around vertically fixed on the concrete base; the upper part of post is arranged with multilayer supports at different heights, while the box via the necked suspending stop openings is suspended on the support. Since the box is mounted on the support at different heights, the box and pump above the base can be adjusted to meet the demand of liquid adsorbed depth.

Description

Installation method of vertical bittern transfer pump
Technical field
The present invention is a kind of simple, effective, reliable installation method of being convenient to remove the bittern crystal of used vertical halogen transmission pump in the bittern development of resources industry, and a kind of installation method of vertical bittern transfer pump in the industry is developed in especially a kind of western salt lake of China that is applied to.
Background technique
At present, area, the western salt lake of China is when gathering and carry bittern, because bittern is than great, the concentration height, so in course of conveying, have separating out of crystalline particle, and be adsorbed on impeller blade surface, pump runner, conveying pipeline inner wall etc. and locate, can produce blocking phenomenon at short notice, and crystalline particle can be deposited on imbibition pond bottom equally, raises gradually at the bottom of making the pond.When cleaning and removal crystal, the way that people use always is: the fluid pipeline of at first dismantling motor and pump, also to dismantle pump foundation, give perfusion fresh water in the pump again, so that dissolve crystal, some place also will manually be struck pounds, so removing the haveing suffered in the process of crystal, operate very inconvenient.
Summary of the invention
Technical problem to be solved by this invention: be the installation method of vertical bittern transfer pump that a kind of simple and reliable, easy cleaning will be provided, raise the efficiency, be convenient to remove the bittern crystal to bittern transfer pump.
Technical solution of the present invention is as follows: bittern transfer pump is installed in the casing of an opening, bottom half has the circular hole that is complementary with the bittern transfer pump feed liquor mouth of pipe, pump is connected with stud by flange with the circular hole of bottom half, get so that bittern transfer pump becomes as a whole with casing, adopt rubber seal during connection, to prevent that outside bittern is penetrated in the casing, bittern transfer pump is linked to each other with casing and fixing by strut, delivery side of pump is equipped with and deflects joint and elasticity drain pipe, and the elasticity drain pipe is fixed on the casing with fixing clamp, the casing suspension seam that turns up that is provided with symmetry suitable for reading, in addition, 4~6 pillars are set in the casing periphery and are vertically fixed on the concrete pump basis, pillar top is provided with the multilayer support by different heights, turning up of casing hung seam be suspended on the support, and be fixed by bolts on the support.Because casing can be installed on the support of different floor heights, thus pump and the height of casing above pump foundation can be regulated as required, to adapt to the needs of the imbibition degree of depth.
Because adopt above technological scheme, its effect is conspicuous:
1, this method is simple and reliable, when the crystallization obstruction appears in pump inside, as long as pump and casing integral body are hung out, puts into fresh-water pool and soaks, and the crystallization attachment in the pump runner is dissolved, and then lift on the pillar, and whole process is simple to operation.
2, when bottom, imbibition pond crystallization deposition is serious, can regulate the setting height(from bottom) of pump by the whole hanging method of pump and casing, prolonged the continuous operating time of equipment widely, apparatus for automatically lifting if can be set on pillar, and the setting height(from bottom) of then regulating pump and casing will become simple more and light.
3, adopt the elasticity drain pipe, can realize the bittern crystallization attachment of online purge tube road inwall, prolonged the continuous operating time of equipment, improved productivity, saved user's cost.
4, be convenient to cleaning at the bottom of the pond at the bottom of the pump.
Description of drawings
Fig. 1 is that tectonic maps cuts open in office of the present invention.
Among the figure: 1, casing 2, flange 3, rubber pad 4, stud 5, bittern transfer pump 6, strut 7, motor 8, deflect joint 9, elasticity drain pipe 10, fixing clamp 11, turn up hang to end 12, pillar 13, support
Embodiment
With reference to Fig. 1, at first make the casing (1) of opening according to the size of various bittern transfer pump bodies, bittern transfer pump (5) is installed in the casing (1), bottom half has the circular hole that is complementary with the bittern transfer pump feed liquor mouth of pipe, pump is connected with stud (4) by flange (2) with the circular hole of bottom half, get so that bittern transfer pump becomes as a whole with casing, during connection, adopt rubber pad (3) sealing, to prevent that outside bittern is penetrated in the casing, bittern transfer pump (5) is linked to each other with casing (1) and fixing by strut (6), delivery side of pump is equipped with and deflects joint (8) and elasticity drain pipe (9), and the elasticity drain pipe is fixed on the casing with fixing clamp (10), the casing suspension seam (11) that turns up that is provided with symmetry suitable for reading, 4~6 pillars (12) are set in the casing periphery, and be vertically fixed on the concrete pump basis, pillar top is provided with multilayer support (13) by different heights, casing (1) is hung seam (11) by turning up to be suspended on the support (13), and be fixed by bolts on the support, because casing (1) can be installed on the support (13) of different floor heights, so can regulate pump and the height of casing above pump foundation as required, to adapt to the needs of the imbibition degree of depth.
This method when the bottom deposit of imbibition pond is serious, can improve the hoisting height of casing in application process, apparatus for automatically lifting if can be set on pillar, and the setting height(from bottom) of then regulating pump and casing will be simple more and light.In addition, adopt the elasticity drain pipe, can under non-stop-machine situation, knock the drain pipe outer wall, inwall crystallization attachment is come off, and discharge with liquid stream by external force.

Claims (1)

1, a kind of installation method of vertical bittern transfer pump, it is characterized in that: bittern transfer pump (5) is installed in the opening casing (1), bottom half has the circular hole that is complementary with the bittern transfer pump feed liquor mouth of pipe, pump is connected with stud (4) by flange (2) with the circular hole of bottom half, get so that bittern transfer pump becomes as a whole with casing, during connection, adopt rubber pad (3) sealing, to prevent that outside bittern is penetrated in the casing, bittern transfer pump (5) is linked to each other with casing (1) and fixing by strut (6), delivery side of pump is equipped with and deflects joint (8) and elasticity drain pipe (9), and the elasticity drain pipe is fixed on the casing with fixing clamp (10), the casing suspension seam (11) that turns up that is provided with symmetry suitable for reading, in addition, 4~6 pillars (12) are set in the casing periphery, and be vertically fixed on the concrete pump basis, pillar top is provided with multilayer support (13) by different heights, casing (1) is hung seam (11) by turning up to be suspended on the support (13), and be fixed by bolts on the support, because casing (1) can be installed on the support (13) of different floor heights, so can regulate pump and the height of casing above pump foundation as required, to adapt to the needs of the imbibition degree of depth.
CNB2007100198135A 2007-01-30 2007-01-30 Installation method of vertical bittern transfer pump Expired - Fee Related CN100458181C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100198135A CN100458181C (en) 2007-01-30 2007-01-30 Installation method of vertical bittern transfer pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100198135A CN100458181C (en) 2007-01-30 2007-01-30 Installation method of vertical bittern transfer pump

Publications (2)

Publication Number Publication Date
CN101008404A CN101008404A (en) 2007-08-01
CN100458181C true CN100458181C (en) 2009-02-04

Family

ID=38696991

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100198135A Expired - Fee Related CN100458181C (en) 2007-01-30 2007-01-30 Installation method of vertical bittern transfer pump

Country Status (1)

Country Link
CN (1) CN100458181C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103025973A (en) * 2010-06-09 2013-04-03 赛乐姆知识产权控股有限责任公司 Suction connection for connecting a suction pipe to a dry installed centrifugal pump

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106784447B (en) * 2015-09-08 2019-09-20 北京宝沃汽车有限公司 A kind of fixed pad of sealing, battery case compartment, power battery pack and electric vehicle

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5017104A (en) * 1988-12-12 1991-05-21 Baker Marvin B Stabilizer for vertically driven pumps
CN2241241Y (en) * 1995-09-01 1996-11-27 大庆电泵公司采油配套设备中试厂 Ground high-pressure water filling device for electric submergible pump
US5666724A (en) * 1995-05-03 1997-09-16 The United States Of America As Represented By The United States Department Of Energy Installation and assembly device and method of using
CN2303117Y (en) * 1997-01-24 1999-01-06 广东美的集团股份有限公司 Mechanism for adjusting height of vertical pole of electric fan
CN2342139Y (en) * 1998-06-22 1999-10-06 王岩 Water injection pump for oil field ground
CN2477876Y (en) * 2001-05-08 2002-02-20 张占峰 Single support hanging rack one-stage centrifugal pump
US20030012642A1 (en) * 2001-07-03 2003-01-16 Soja Marc S. C. Adjustable pump wear plate positioning assembly
CN2714856Y (en) * 2004-07-06 2005-08-03 江苏大学 Inlet valve gear of bittern transfer pump

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5017104A (en) * 1988-12-12 1991-05-21 Baker Marvin B Stabilizer for vertically driven pumps
US5666724A (en) * 1995-05-03 1997-09-16 The United States Of America As Represented By The United States Department Of Energy Installation and assembly device and method of using
CN2241241Y (en) * 1995-09-01 1996-11-27 大庆电泵公司采油配套设备中试厂 Ground high-pressure water filling device for electric submergible pump
CN2303117Y (en) * 1997-01-24 1999-01-06 广东美的集团股份有限公司 Mechanism for adjusting height of vertical pole of electric fan
CN2342139Y (en) * 1998-06-22 1999-10-06 王岩 Water injection pump for oil field ground
CN2477876Y (en) * 2001-05-08 2002-02-20 张占峰 Single support hanging rack one-stage centrifugal pump
US20030012642A1 (en) * 2001-07-03 2003-01-16 Soja Marc S. C. Adjustable pump wear plate positioning assembly
CN2714856Y (en) * 2004-07-06 2005-08-03 江苏大学 Inlet valve gear of bittern transfer pump

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103025973A (en) * 2010-06-09 2013-04-03 赛乐姆知识产权控股有限责任公司 Suction connection for connecting a suction pipe to a dry installed centrifugal pump
CN103025973B (en) * 2010-06-09 2014-09-10 赛乐姆知识产权控股有限责任公司 Suction connection for connecting a suction pipe to a dry installed centrifugal pump

Also Published As

Publication number Publication date
CN101008404A (en) 2007-08-01

Similar Documents

Publication Publication Date Title
CN104912146B (en) Intelligence is drawn water jet douche device and its control method
CN213253157U (en) Sedimentation tank
CN100458181C (en) Installation method of vertical bittern transfer pump
CN203769012U (en) Solid-liquid separation water tank
CN205711959U (en) Novel pipeline for irrigation
CN111039389A (en) Rotary water decanter
CN208003507U (en) Single tube scraping and sucking machine
CN205975925U (en) Novel clean floor drain
CN207874513U (en) A kind of bell jar slip shower
CN205586626U (en) Novel vertical flow type gunbarrel
CN209537124U (en) A kind of integrated pump station suitable for domestic sewage in rural areas
CN209714392U (en) A kind of deep basal pit Yield rainfall relation reuse means
CN105465031A (en) Floating device for water pump connection
CN208097487U (en) A kind of automatic coupling device of sand sucker
CN206995949U (en) A kind of single tube inhales mud scraper
CN207786060U (en) A kind of coating wastewater filter device
CN210100336U (en) Device for fixing mud pump suction inlet in mud bucket and homogenizing mud concentration
RU162738U1 (en) INSTALLATION FOR CLEANING WATER WELLS
CN211561977U (en) Gravity type valveless filter
CN202237556U (en) Filter device in tank
CN211523455U (en) Prefabricated pump station of integration
CN213192850U (en) Sewage tank
CN212451099U (en) Sludge collecting device
CN210825739U (en) Integrated sewage treatment device
CN219701323U (en) Mud-water separation device is used in production of antifouling gentle smooth marble

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090204

Termination date: 20140130