CN100453876C - Glass fibre reinforced plastic sand inclusion push-pipe - Google Patents

Glass fibre reinforced plastic sand inclusion push-pipe Download PDF

Info

Publication number
CN100453876C
CN100453876C CNB2005101378329A CN200510137832A CN100453876C CN 100453876 C CN100453876 C CN 100453876C CN B2005101378329 A CNB2005101378329 A CN B2005101378329A CN 200510137832 A CN200510137832 A CN 200510137832A CN 100453876 C CN100453876 C CN 100453876C
Authority
CN
China
Prior art keywords
pipe
tube head
sand
glass fiber
pipe tail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005101378329A
Other languages
Chinese (zh)
Other versions
CN1991224A (en
Inventor
司金峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI JINGYE GLASS FIBER REINFORCED PLASTICS CO Ltd
Original Assignee
SHANXI JINGYE GLASS FIBER REINFORCED PLASTICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI JINGYE GLASS FIBER REINFORCED PLASTICS CO Ltd filed Critical SHANXI JINGYE GLASS FIBER REINFORCED PLASTICS CO Ltd
Priority to CNB2005101378329A priority Critical patent/CN100453876C/en
Publication of CN1991224A publication Critical patent/CN1991224A/en
Application granted granted Critical
Publication of CN100453876C publication Critical patent/CN100453876C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a grp sand jacking pipe, comprising pipe head, pipe body and pipe trail. Concave platforms are set on outer walls of pipe head and pipe trail. The pipe heat is connected with the pipe trail by the sleeve ring on the concave platform. Basic bodies of pipe head, pipe body and pipe trail are resin and the reinforced material layer is glass fiber. The filling layer is quartz sand or calcium carbonate. Reinforced parts are set at ends of said pipe head and pipe trail. Said reinforced part comprises an annular sleeve and annular cover combined with the annular sleeve together. Annular sleeve is set on segments of pipe head and pipe trail. The annular cover is set at ends of pipe head and pipe trail, and covers end sections of pipe head and pipe trail. In optical scheme of invention, reinforced layers, which can be in or out of pipe wall, are set on pipe head and pipe trail. As the invention is designed with the structure of reinforced layer and part, the bearing ability for jacking force of grp jacking pipe is improved greatly and the cost of grp jacking pipe is decreased at the maximum extent.

Description

Glass fiber reinforced steel push pipe with sand
Technical field
The present invention relates to a kind of glass fiber reinforced steel push pipe with sand, particularly a kind of outstanding glass fiber reinforced steel push pipe with sand that bears top power ability of having of reinforcing member and reinforced layer structure that has.
Background technique
In the municipal pipeline laying project, dual mode is generally arranged now: a kind of is open heavy excavation, ground can be excavated comprehensively, the mutual sheathed connection of pipe is placed down, again backfill gets final product again, the pipe that this mode needs is prefabricated, does not bear pressure or top power when connection and laying, and it is comparatively simple and convenient to construct; Another kind of mode is when being subjected to concrete environmental limit, such as building etc., and can not adopt heavy excavation mode tubing, can only dig working pit in advance, when the working pit operation, with one section one section on pipe underground certain depth location forward jacking pass, this operating environment needs the end of pipe to be provided with the push pipe part, the connection between the pipe is tightly connected by the collar.
Glass fiber reinforced steel push pipe with sand is as a kind of novel composite material pipeline, has light weight, high-strength, corrosion-resistant, characteristics such as the life-span is long, now is widely used in the pipe-jacking project.The glass fiber reinforced steel push pipe with sand of prior art generally is made up of tube head, pipe shaft and pipe tail, and wherein tube head, pipe tail connect by the collar when construction, and pipe shaft adopts layer of fibers and silica sand or calcium carbonate layer structure, and tube head and pipe tail adopt fiber layer structure.In said structure, the layer of fibers of pipe shaft and silica sand or calcium carbonate layer structure are mainly used in the hoop rigidity that provides required, and reduce production costs, and the fiber layer structure that tube head and pipe tail adopt is mainly used in axial strength required when jacking is provided.
Because tube head and pipe tail are stressed very big in the construction jacking, so the tube head of prior art and pipe tail all adopt the fiber layer structure of resin matrix.For reaching tube head and the required wall thickness of pipe tail, the number of plies of fibre cloth is more, causes cost to increase.
In addition, the tube head of prior art glass fiber reinforced steel push pipe with sand, pipe tail outer surface are the layer of fibers of resin matrix, because of conventional machining process institute extremely, can not guarantee caliber size and surface smoothness, there are irrational matching gap in tube head, pipe tail during construction when being connected with sleeve pipe, make glass fiber reinforced steel push pipe with sand the relative changing of the relative positions of two pipe ends in jack-in process, may occur, sleeve pipe is tilted, cause the jacking resistance to increase sharply.The lighter causes sealing effect to lose efficacy, and weight person causes tube head, pipe tail to tear, and jacking construction pauses.
Summary of the invention
The objective of the invention is provides a kind of glass fiber reinforced steel push pipe with sand at the defective of prior art, has advantages such as cost is low, intensity is high, easy processing, and can guarantee the reasonable clearance that pipeline cooperates.
In order to achieve the above object, the invention provides a kind of glass fiber reinforced steel push pipe with sand, comprise tube head, pipe shaft and pipe tail, described tube head, pipe tail outer wall are provided with concave station, tube head, pipe tail connect by the collar that is arranged on the described concave station, described tube head, pipe shaft and pipe tail are matrix with the resin, with the glass fibre is layers of reinforcement, with silica sand or calcium carbonate is packing layer, described tube head and pipe tail end are provided with reinforcing member, described reinforcing member is an annular end cap, and annular end cap is fastened on tube head and pipe tail end, covers the cross section of tube head and pipe tail end; The tube wall of described tube head and pipe tail also is provided with the reinforced layer of metal or non-metallic material.
In technique scheme, the burning into sand layer total thickness of described tube head, pipe tail pipe wall is less than the burning into sand layer total thickness of pipe shaft tube wall.Described reinforced layer can be arranged in the tube wall for stiffener or stiffening ring.Described reinforced layer is a fabricated metals, can be arranged in the tube wall of tube head and pipe tail, can also be arranged on the outer surface of tube head and pipe tail.
In technique scheme, described annular end cap can also be that inner side surface is provided with the protruding part that inserts in the tube wall.
The invention provides a kind of glass fiber reinforced steel push pipe with sand of new structure; improved glass fiber reinforced steel push pipe with sand and born top power ability by reinforcing member being set at tube head and pipe tail; reinforcing member has played the effect of protection tube head and pipe tail well, and the jacking pressure that simultaneously it is born passes equably.Because the effect of reinforcing member is guaranteeing under body integral rigidity, the intensity prerequisite the present invention, can in the tube wall of tube head and pipe tail the burning into sand layer be set, and has reduced the cost of glass fiber reinforced steel push pipe with sand to greatest extent.
Preferred version of the present invention provides a kind of glass fiber reinforced steel push pipe with sand with reinforced layer, reinforced layer can be provided with one or more layers according to the force-bearing situation of construction jacking, can only be arranged in the tube wall of tube head and pipe tail, also can be arranged on the interior tube structure that forms of tube wall of whole pipe continuously, further improve glass fiber reinforced steel push pipe with sand and bear top power ability.Simultaneously, preferred version of the present invention also provides a kind of glass fiber reinforced steel push pipe with sand with outer reinforced layer, because the outer surface of tube head and pipe tail is a metal, can accurately guarantee the external diameter precision of tube head and pipe tail, when being connected cooperation with sleeve pipe, have reasonable supporting clearance, the pipe end changing of the relative positions can not occur in the jack-in process, significantly reduced the jacking resistance.
Below in conjunction with accompanying drawing the present invention is done explanation in further detail.
Description of drawings
Fig. 1 is a glass fiber reinforced steel push pipe with sand structural representation of the present invention;
Fig. 2 is the structural representation of annular end cap of the present invention;
Fig. 3 is the structural representation of the annular end cap of band projection of the present invention;
Fig. 4 is the structural representation of the present invention's annular cover;
Fig. 5 is another structural representation of the present invention's annular cover;
Fig. 6 is the structural representation of stiffening ring of the present invention;
Fig. 7 is the structural representation of stiffener of the present invention;
Fig. 8 is the structural representation of outer annular-stiffer of the present invention.
Description of reference numerals:
The 1-pipe shaft; The 2-tube head; 3-manages tail;
The 4-concave station; The 5-reinforcing member; The 51-annular end cap;
52-annular cover; The 6-collar; The 7-reinforced layer;
The 71-stiffening ring; The 72-stiffener.
Embodiment
Fig. 1 is the structural representation of glass fiber reinforced steel push pipe with sand of the present invention, comprise pipe shaft 1, tube head 2 and pipe tail 3, all be matrix with the resin, be layers of reinforcement with the glass fibre, be that packing layer constitutes tube wall with silica sand or calcium carbonate, the external diameter of tube head 2 and pipe tail 3 is less than the external diameter of pipe shaft 1, form concave station 4 structures, the end of tube head 2 and pipe tail 3 also is provided with reinforcing member 5 simultaneously.When the construction jacking, the tube head 2 of adjacent two push pipes is connected by the collar 6 with pipe tail 3, and reinforcing member 5 directly contacts.
Technological scheme of the present invention is the composite structure that end that a kind of tube head and pipe tail constitute tube wall, tube head and pipe tail by layer of fibers and burning into sand layer also is provided with reinforcing member.Reinforcing member 5 of the present invention has improved glass fiber reinforced steel push pipe with sand and has born top power ability, has played the effect of protection tube head and pipe tail well, and the jacking pressure that simultaneously it is born passes equably.Because the effect of reinforcing member 5 is guaranteeing under body integral rigidity, the intensity prerequisite the present invention, can in the tube wall of tube head and pipe tail the burning into sand layer be set, and has reduced the cost of glass fiber reinforced steel push pipe with sand to greatest extent.Both made long in single jacking length, about top power different or when operation such as rectifying a deviation, glass fiber reinforced steel push pipe with sand of the present invention also can guarantee the good mechanical performance.
Under the design philosophy of technique scheme, glass fiber reinforced steel push pipe with sand of the present invention can have multiple structural type, is illustrated below by specific embodiment.
Embodiment one
Fig. 2 is the structural representation of annular end cap of the present invention.Reinforcing member 5 is an annular end cap in present embodiment as shown in Figure 2, is fastened on the end of tube head and pipe tail, covers the cross section of end.Studies show that glass fiber reinforced steel push pipe with sand tube head in the construction jacking damage occurs with the pipe tail and even the destruction situation largely is because bear top power scarce capacity.The technological scheme of present embodiment adopts reinforcing member 5 that tube head and pipe tail are coated effectively, bears top power ability and can improve 4~7 times, has improved glass fiber reinforced steel push pipe with sand and has born top power ability.In the present embodiment, reinforcing member 5 can be fabricated metals, also can adopt cellulon.
Embodiment two
Fig. 3 is the structural representation of the annular end cap of band projection of the present invention.On embodiment one technological scheme basis, the annular end cap of present embodiment has projection, is arranged on a side that is connected with the pipe breech face with tube head.The end face of tube head and pipe tail is provided with and the suitable groove of described projection simultaneously, and projection closely cooperates with groove.In the embodiment shown in fig. 3, the width of projection is greater than the width of tube head and pipe tail burning into sand layer, and is fabricated metals.This technological scheme is except that effect with embodiment one and effect, and it is reliable and stable to have guaranteed that further annular end cap 5 and tube head are connected with the pipe breech face, guarantees that simultaneously annular end cap gives tube head with propagation of pressure and manage the layer of fibers of tail.Certainly, annular end cap also can groove, and tube head and pipe breech face are protruding structure.
Embodiment three
Fig. 4 is the structural representation of the present invention's annular cover.As shown in Figure 4, the reinforcing member 5 of present embodiment is formed for annular cover 52 and the annular end cap 51 that is wholely set with it, wherein annular cover 52 is set on tube head, the pipe rear, and annular end cap 51 is fastened on tube head and pipe tail end, covers the cross section of tube head and pipe tail end.Reinforcing member 5 can be fabricated metals, also can adopt cellulon.
Present embodiment has mainly been brought into play its humidification to greatest extent by the reinforcing member 5 that annular end cap 51 and annular cover 52 are formed, annular end cap 51 covers the end face of tube head and pipe tail, when jacking construction, it is tube head and pipe 4~7 times of tail that annular end cap 51 bears top power ability.The annular cover 52 into a single integrated structure with annular end cap 51 is coated on the outer surface of tube head and pipe rear, can further bring into play the humidification of annular end cap 51.
Embodiment four
Fig. 5 is another structural representation of the present invention's annular cover.As shown in Figure 5, the annular of present embodiment cover 52 is set in tube head, manages tail and pipe shaft and tube head, manages on the linkage section of tail, and annular end cap 51 is fastened on tube head and pipe tail end, covers tube head and the cross section of managing tail end.Reinforcing member 5 can be fabricated metals, also can adopt cellulon.Present embodiment can further improve the top power ability of bearing of tube head and pipe tail.
Embodiment five
Fig. 6 is the structural representation of stiffening ring of the present invention.The tube wall of the tube head of present embodiment and pipe tail is provided with reinforced layer 7, and reinforced layer 7 is a stiffening ring 71, along the coaxial setting of tube wall.Reinforcing member 5 is an annular end cap 51, and the end face of the surface of annular end cap 51 and tube head and pipe tail is fitted.In the present embodiment technological scheme, annular end cap 51 can be a fabricated metals, also can be cellulon, and embodiment is described as described above for its effect and effect.Stiffening ring can be provided with one or more layers according to the force-bearing situation of construction jacking, and in addition, stiffening ring 71 can only be arranged in the tube wall of tube head and pipe tail, also can be arranged on continuously in the tube wall of whole pipe.Stiffening ring 71 forms tube structure in the tube wall of tube head and pipe tail, be included in the layer of fibers, can improve glass fiber reinforced steel push pipe with sand on the whole and bear top power ability.
As shown in Figure 6, two layers of stiffening ring 71 of present embodiment are fabricated metals, are separately positioned on the both sides of burning into sand layer.Annular end cap 51 also adopts fabricated metals, is fixed together with stiffening ring 71.Stiffening ring 71 is separately positioned on the both sides of burning into sand layer, and the jacking pressure that it can be born passes equably, guarantees that damaging can not appear in tube head or pipe tail.
Embodiment six
Fig. 7 is the structural representation of stiffener of the present invention.The tube wall of the tube head of present embodiment and pipe tail is provided with reinforced layer 7, and reinforced layer 7 is a stiffener 72, is provided with at interval along the tube wall hoop.Stiffener 72 can be along tubular axis in the layer of fibers that is arranged on tube head, pipe shaft and pipe tail continuously, also can only be arranged in the layer of fibers of tube head and pipe tail, bearing top power ability to have improved glass fiber reinforced steel push pipe with sand, can be fabricated metals, also can be cellulon.Can only be arranged circumferentially along tube wall, also can be along tube wall hoop and radially two dimension setting.
As shown in Figure 7, the stiffener 72 of present embodiment is a kind of fibre plate of thin type, and therefore the parallel to an axis of its fiber direction and glass fiber reinforced steel push pipe with sand has axially and strengthen the property, and has greatly improved the ability that tube head and pipe tail bear top power.
Embodiment seven
Fig. 8 is the structural representation of outer annular-stiffer of the present invention.As shown in Figure 8, the outer surface of tube wall of present embodiment tube head and pipe tail is provided with stiffening ring 71, and reinforcing member 5 is annular end cap 51 structures, and the end face of the surface of annular end cap 51 and tube head 2 and pipe tail 3 is fitted.In the present embodiment technological scheme, annular end cap 51 can be a fabricated metals, also can be cellulon, and embodiment is described as described above for its effect and effect.Stiffening ring 71 can also be provided with one or more layers according to the force-bearing situation of construction jacking in layer of fibers except that the outer surface of tube wall that is arranged on tube head and pipe tail.In addition, stiffening ring 71 can only be arranged on tube head and pipe tail, also can be arranged on whole pipe shaft continuously.
In the technological scheme of present embodiment,, reasonably designed the structure of stiffening ring 71 according to the unreasonable loading characteristic that causes resistance to increase of tube head and pipe tail and sleeve pipe matching gap in the construction jacking.Owing to tube head is a stiffening ring 71 with the outer surface of managing tail, can accurately guarantee the external diameter of tube head and pipe tail, when being connected cooperation with the collar 6, has reasonable supporting clearance, the pipe end changing of the relative positions can not occur in the jack-in process, significantly reduce the jacking resistance, and easy processing.Other effects and the effect of stiffening ring 71 and reinforcing member 5 are ditto described.
Prior art is owing to tube head in the construction jacking and pipe tail is stressed, and the collar 6 is fabricated metals, has further strengthened construction cost virtually.Present embodiment because tube head and the pipe tail outer surface be stiffening ring 71, so sleeve pipe 6 can be metal, also can be for nonmetal.
Obviously, embodiment one both can individualism to embodiment seven technological scheme, also can be combined into new technological scheme mutually, repeated no more here.Glass fiber reinforced steel push pipe with sand of the present invention is by the structural design of reinforced layer and reinforcing member, reduced cost having on the outstanding mechanical property basis, easy processing, and can guarantee that the pipeline binding site installs the reasonable clearance that cooperates.
Should be noted that at last above embodiment is only in order to illustrate that technological scheme of the present invention is not intended to limit; Although with reference to preferred embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or the part technical characteristics is equal to replacement the specific embodiment of the present invention; And not breaking away from the spirit of technical solution of the present invention, it all should be encompassed in the middle of the technological scheme scope that the present invention asks for protection.

Claims (7)

1, a kind of glass fiber reinforced steel push pipe with sand, comprise tube head, pipe shaft and pipe tail, described tube head, pipe tail outer wall is provided with concave station, tube head, the pipe tail connects by the collar that is arranged on the described concave station, it is characterized in that, described tube head, pipe shaft and pipe tail are matrix with the resin, with the glass fibre is layers of reinforcement, with silica sand or calcium carbonate is packing layer, described tube head and pipe tail end are provided with reinforcing member, and described reinforcing member is an annular end cap, and annular end cap is fastened on tube head and pipe tail end, cover the cross section of tube head and pipe tail end, the tube wall of described tube head and pipe tail also is provided with the reinforced layer of metal or non-metallic material.
2, glass fiber reinforced steel push pipe with sand according to claim 1 is characterized in that, the burning into sand layer total thickness of described tube head, pipe tail pipe wall is less than the burning into sand layer total thickness of pipe shaft tube wall.
3, glass fiber reinforced steel push pipe with sand according to claim 1 is characterized in that, described reinforced layer is a stiffener, is arranged in the tube wall.
4, glass fiber reinforced steel push pipe with sand according to claim 1 is characterized in that, described reinforced layer is a stiffening ring, is arranged in the tube wall.
5, glass fiber reinforced steel push pipe with sand according to claim 1 is characterized in that, described reinforced layer is a fabricated metals, is arranged in the tube wall of tube head and pipe tail.
6, glass fiber reinforced steel push pipe with sand according to claim 1 is characterized in that, described reinforced layer is a fabricated metals, is arranged on the outer surface of tube head and pipe tail.
According to the arbitrary described glass fiber reinforced steel push pipe with sand of claim 1-6, it is characterized in that 7, described annular end cap inner side surface is provided with the protruding part that inserts in the tube wall.
CNB2005101378329A 2005-12-31 2005-12-31 Glass fibre reinforced plastic sand inclusion push-pipe Expired - Fee Related CN100453876C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005101378329A CN100453876C (en) 2005-12-31 2005-12-31 Glass fibre reinforced plastic sand inclusion push-pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005101378329A CN100453876C (en) 2005-12-31 2005-12-31 Glass fibre reinforced plastic sand inclusion push-pipe

Publications (2)

Publication Number Publication Date
CN1991224A CN1991224A (en) 2007-07-04
CN100453876C true CN100453876C (en) 2009-01-21

Family

ID=38213661

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005101378329A Expired - Fee Related CN100453876C (en) 2005-12-31 2005-12-31 Glass fibre reinforced plastic sand inclusion push-pipe

Country Status (1)

Country Link
CN (1) CN100453876C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107339505A (en) * 2017-05-26 2017-11-10 成都金玉雄辉建筑工程有限公司 A kind of water proof type push pipe
CN107575659A (en) * 2017-09-30 2018-01-12 镇江市星耀智能装备有限公司 A kind of tubing with high-intensity performance

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2202020A (en) * 1987-03-13 1988-09-14 Hepworth Iron Co Ltd Pipe joints
JPH10252382A (en) * 1997-03-12 1998-09-22 Osaka Gas Co Ltd Installation method of protection plate for thrusting pipe and thrusting pipe with protection pipe
CN2872035Y (en) * 2005-12-31 2007-02-21 陕西竞业玻璃钢有限公司 Glass fibre reinforced plastic sanding top tube

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2202020A (en) * 1987-03-13 1988-09-14 Hepworth Iron Co Ltd Pipe joints
JPH10252382A (en) * 1997-03-12 1998-09-22 Osaka Gas Co Ltd Installation method of protection plate for thrusting pipe and thrusting pipe with protection pipe
CN2872035Y (en) * 2005-12-31 2007-02-21 陕西竞业玻璃钢有限公司 Glass fibre reinforced plastic sanding top tube

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
耐腐蚀的夹砂玻璃钢管. 王塘.腐蚀与防护,第6期. 2001
耐腐蚀的夹砂玻璃钢管. 王塘.腐蚀与防护,第6期. 2001 *

Also Published As

Publication number Publication date
CN1991224A (en) 2007-07-04

Similar Documents

Publication Publication Date Title
CN102072359B (en) Curved-jacked steel pipe section and jacking method
CN101027454B (en) Composite pipe having at least one metal end piece and method of manufacturing such a pipe
CN210396803U (en) Special light escape pipeline for tunnel
CN100453876C (en) Glass fibre reinforced plastic sand inclusion push-pipe
CN207989887U (en) Inner lining steel tubular type RC pipejacking
CN108679358A (en) A kind of gas pipeline no-dig technique liner repairing construction technique
KR20070008814A (en) Composite-metal lightweight boom assembly
CN101182895A (en) Fiberglass sand inclusion pipe and manufacturing method with axial direction fibre
CN102620090A (en) Connecting structure of three-layer steel-plastic glass fiber composite pipe and connecting method thereof
CN2872035Y (en) Glass fibre reinforced plastic sanding top tube
US6920900B2 (en) Sewer pipe section
CN208058252U (en) Ring orientation prestress repairing and reinforcing system in a kind of pipe
CN101660635A (en) Conveying pipe, concrete conveying machine and method for manufacturing conveying pipe
CN2872034Y (en) Glass fibre reinforced plastic sanding top tube
CN100473884C (en) Glass fibre reinforced plastic sand inclusion push-pipe
CN200975561Y (en) Push bench of glass-fiber reinforced plastic sandwiched with sand
CN217130683U (en) Material conveying elbow pipe
CN2872033Y (en) Glass fibre reinforced plastic sanding top tube
CN214579623U (en) External anti-seepage reinforcing structure for butt joint of glass fiber reinforced plastic pipeline
CN214272133U (en) Retarded-bonding prestressed FRP bundle steel cylinder concrete pipeline
CN220566760U (en) Seamless double-high-cavity reinforced drain pipe
CN201028217Y (en) Top pipe ringer
CN2864284Y (en) Push bench of glass-fiber reinforced plastic sandwiched with sand
CN208535450U (en) A kind of cast tube and the knockdown wear-resisting straight tube of pressed bend
CN114215970B (en) Connection adapter for reinforced and toughened composite pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090121

Termination date: 20131231