CN100423864C - Processing equipment and processing method for long U-shaped metal pipe - Google Patents
Processing equipment and processing method for long U-shaped metal pipe Download PDFInfo
- Publication number
- CN100423864C CN100423864C CNB2005101018821A CN200510101882A CN100423864C CN 100423864 C CN100423864 C CN 100423864C CN B2005101018821 A CNB2005101018821 A CN B2005101018821A CN 200510101882 A CN200510101882 A CN 200510101882A CN 100423864 C CN100423864 C CN 100423864C
- Authority
- CN
- China
- Prior art keywords
- pipe
- cylinder
- copper
- root
- shape metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002184 metal Substances 0.000 title claims abstract description 39
- 229910052751 metal Inorganic materials 0.000 title claims abstract description 39
- 238000003672 processing method Methods 0.000 title claims abstract description 13
- 230000007246 mechanism Effects 0.000 claims abstract description 208
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims abstract description 100
- 229910052802 copper Inorganic materials 0.000 claims abstract description 100
- 239000010949 copper Substances 0.000 claims abstract description 100
- 238000005452 bending Methods 0.000 claims abstract description 64
- 238000013519 translation Methods 0.000 claims abstract description 39
- 238000010008 shearing Methods 0.000 claims abstract description 12
- 238000007599 discharging Methods 0.000 claims abstract description 11
- 238000005520 cutting process Methods 0.000 claims description 57
- 238000000034 method Methods 0.000 claims description 31
- 230000008569 process Effects 0.000 claims description 29
- 230000009471 action Effects 0.000 claims description 10
- 230000001360 synchronised effect Effects 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 230000001174 ascending effect Effects 0.000 claims description 2
- 230000006837 decompression Effects 0.000 claims description 2
- 239000010729 system oil Substances 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 19
- 230000014616 translation Effects 0.000 description 23
- 239000000463 material Substances 0.000 description 14
- 239000003921 oil Substances 0.000 description 7
- 238000000465 moulding Methods 0.000 description 6
- 239000010720 hydraulic oil Substances 0.000 description 4
- 239000007921 spray Substances 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 239000004698 Polyethylene Substances 0.000 description 1
- 241000220317 Rosa Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010622 cold drawing Methods 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 239000003595 mist Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000005693 optoelectronics Effects 0.000 description 1
- -1 polyethylene Polymers 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 231100000241 scar Toxicity 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Bending Of Plates, Rods, And Pipes (AREA)
Abstract
A processing device for a long U-shaped metal pipe comprises a controller, a rack, a driving part, a straightening mechanism, a feeding mechanism, a shearing mechanism, a pipe bending mechanism and a discharging mechanism, wherein the number of copper pipes fed in at one time is X, and X is an integer greater than one; a translation mechanism is further arranged above the rack and can swing left and right; the straightening mechanism, the feeding mechanism and the shearing mechanism swing left and right together with the translation mechanism, and stop when swinging to a left limit position or a right limit position, wherein the left limit position or the right limit position is two working positions of the straightening mechanism, the feeding mechanism and the shearing mechanism. By implementing the processing method of the long U-shaped pipe and the bending forming equipment thereof, the production mode of feeding twice and bending once is adopted to replace the existing production mode of feeding once and bending once, so that the processing time of each step is more reasonably distributed, and the production efficiency is greatly improved.
Description
Technical field
The present invention relates to a kind of process equipment and processing method thereof of improved U-shape metal pipe, be applicable to the processing of employed long U type copper pipe in the production process of products such as air-conditioner, refrigerator, refrigerator, be applicable to that also other fine steel tubes of processing or other metal tubes need the occasion of bending growth U type.
Background technology
In the production process of products such as air-conditioner, refrigerator, refrigerator, need to use the chief component of long U type copper pipe as the heat exchanger internal pipeline, according to the difference of product type size, it is long that long U type copper pipe cuts into the copper pipe of rolling 0.4-5 rice often, and Bending Processing forms again.Because production-scale requirement, the present production capacity of domestic electric type manufacturing enterprise is badly in need of improving constantly, and reduces production costs with this.The simple quantity that expands production site and increase streamline that relies on has not only strengthened cost, could realize but also need time enough.How being implemented on the existing basis, by the improvement to equipment, reaching the purpose of effectively utilizing production site, reducing labor strength, thereby improve the whole production efficiency and the convenience of operation, is the problem that producer presses for solution.In the prior art, generally all adopt the method for bending machine moulding to add section chief U type copper pipe, bending machine in the market can both once be sent many pipes of bending to, supposes that the pipe radical that can once send to is X, and X can be 6,7,8 ...Steps such as the process of long U type copper pipe generally will put in place through aligning, feeding, shearing, bending and molding in whole one action cyclic process, include only a feeding, a bending and molding.Concrete steps are as follows:
1) the copper mouth piece section of the X root being pulled out from the copper pipe volume by straightening mechanism is aligned simultaneously;
2) the long straight copper tube head of the X root section that will have been aligned by feed mechanism is sent in the equipment;
3) cut out the long straight copper tube of X root by cutting mechanism by Len req;
4) by the long straight copper tube growth of the described X root of pipe bending mechanism bending U type copper pipe;
5) by the shedding mechanism discharging;
6) each mechanism of equipment resets.
There are following several big drawbacks in the processing method of existing long U type copper pipe: production efficiency of equipment is not high, a working cycles can only be produced the long U pipe of X root (such as 6), hold facility a large amount of plant areas, when more massive production, raise the efficiency the radical that will increase bend pipe, need more equipment, the product of producing like that influences the quality of product because the difference of equipment causes consistency of product and stability not to be guaranteed.Because in the process of long U type copper pipe, the time ratio that bending is used is more, the time less that feeding is used, institute thinks and addresses the above problem, need equipment and processing method are improved, the time of each step processing is carried out rational allocation, reach the purpose of enhancing productivity.
Summary of the invention
In order to overcome deficiency of the prior art, the purpose of this invention is to provide a kind of process equipment of improved U-shape metal pipe, in the working cycles, the U-shape metal pipe of energy production twice radical does not need to increase equipment volume, can enhance productivity.
Another object of the present invention provides a kind of processing method of U-shape metal pipe, will carry out rational allocation the process time of each step, guarantees the uniformity and the stability of institute's converted products, has shortened the process time of unit product.
The object of the present invention is achieved like this: a kind of process equipment of U-shape metal pipe, include the controller that to control the action of each parts, be positioned at the below and play the frame of support fixation effect, be installed on a plurality of driver parts on the frame, drive respectively and be positioned at straightening mechanism above the frame, can send the feed mechanism and the cutting mechanism of many copper pipes simultaneously to by described a plurality of driver parts, the described copper pipe radical of once sending to is X, and then X is the integer greater than; Described frame top also is provided with pipe bending mechanism and shedding mechanism; Wherein, described frame top also is provided with translation mechanism, and described translation mechanism includes translation cylinder, translation slide rail and pan carriage, and described translation mechanism can swing; Described straightening mechanism, feed mechanism and cutting mechanism are installed on the described pan carriage, described straightening mechanism, feed mechanism and cutting mechanism and described translation mechanism together swing, stop when being rocked to a left side or limit on the right-right-hand limit position, a described left side or limit on the right-right-hand limit position are two operating positions of described straightening mechanism, feed mechanism and cutting mechanism.
A kind of processing method of U-shape metal pipe,
1) the straightening mechanism copper mouth piece section of the X root being pulled out from copper pipe volume in first operating position is aligned simultaneously;
2) the long straight copper tube head of the X root section that will have been aligned in first operating position by feed mechanism is sent in the equipment;
3) cut out X root long straight copper tube in first operating position by Len req by cutting mechanism;
4) described straightening mechanism, feed mechanism and cutting mechanism and described translation mechanism together move to second operating position;
5) straightening mechanism is aligned the copper mouth piece section that the X root is pulled out for the second time simultaneously in second operating position from the copper pipe volume;
6) the long straight copper tube head of the X root section that will have been aligned in second operating position by feed mechanism is sent in the equipment;
7) cut out X root long straight copper tube in second operating position by Len req by cutting mechanism;
8) by the long straight copper tube growth of the described 2X root of bending forming mechanism bending U type copper pipe;
9) by the shedding mechanism discharging;
10) each mechanism of equipment resets.
Implement the processing method and the bending and molding equipment thereof of long U pipe of the present invention, owing to adopt the mode of production of a bending of twice feeding to replace the mode of production of a bending of a feeding of present main flow, make distribute more rationally the process time of each step, therefore production efficiency improves greatly, the assurance of the unanimity row of product and stability is relatively good in large-scale production, the quality of product improves greatly, and has saved plant area, has saved production cost greatly.Simultaneously simple and reasonable, can cut down finished cost.Can vigorously promote the use in manufacturing enterprises such as household electrical appliance.
Description of drawings
Accompanying drawing 1 is the structural representation of the process equipment of U-shape metal pipe of the present invention;
Accompanying drawing 2 is the plan structure schematic diagram of the process equipment of U-shape metal pipe of the present invention.
In the accompanying drawing: 1-frame, 2-translation cylinder, 3-translation slide rail, the 4-pan carriage, 5--straightening mechanism, 6-feed mechanism, 7-shears advance and retreat cylinder, 8-cutting mechanism, 9-metal pipe material, the 10-pipe bending mechanism, 11-rackwork, 12-bend pipe cylinder, the 13-shedding mechanism, 14-guide-bar mechanism, 15-dumping cylinder, 16-shears slide rail, 17-passage.
The specific embodiment
The process equipment of a kind of U type metal tube of the present invention, but be a kind of secondary or the bending machine equipment of bending and molding again after the feeding repeatedly.As shown in Figure 1, 2, include the controller 20 that to control the action of each parts, be positioned at the below and play the frame 1 of support fixation effect, be installed on a plurality of driver parts on the frame, drive respectively and be positioned at straightening mechanism 5, the feed mechanism 6 that can send many copper pipes simultaneously to and cutting mechanism 8 above the frame by described a plurality of driver parts, the described copper pipe radical of once sending to is X, and then X is the integer greater than; Described frame top also is provided with pipe bending mechanism 10 and shedding mechanism 13; Wherein, described frame top also is provided with translation mechanism, and described translation mechanism includes translation cylinder 2, translation slide rail 3 and pan carriage 4, and described translation mechanism can swing; Described straightening mechanism 5, feed mechanism 6 and cutting mechanism 8 are installed on the described pan carriage 4, described straightening mechanism 5, feed mechanism 6 and cutting mechanism 8 together swing with described translation mechanism, stop when being rocked to a left side or limit on the right-right-hand limit position, a described left side or limit on the right-right-hand limit position are two operating positions of described straightening mechanism 5, feed mechanism 6 and cutting mechanism 8.
The described controller of controlling each parts action is a kind of PLC Programmable Logic Controller 20.
As shown in Figure 1, 2, frame 1 is a basic part, and described frame 1 top is provided with the workbench of being made by thick flat board.
The flexible of bend pipe cylinder 12 can make the tooth bar in the rackwork 11 slide; Tooth bar in the rackwork 11 slides the gear in the pipe bending mechanism 10 is rotated, and can make the copper pipe in the pipe bending mechanism 10 curve the U type like this in the semicircle die cavity of mould; Described equipment also comprises the guide-bar mechanism 14 that is installed on the frame 1, and the guide rod in the guide-bar mechanism 14 is corresponding to the fixed position of pipe bending mechanism 10.Reliable clamping when guaranteeing bending, copper pipe be with a curved mould, total 2X curved mould, and each curved mould disposes a clamping cylinder.Crooked slewing equipment is promoted by the hydraulic oil cylinder driving tooth bar that is arranged in two sides and bends the gear that mould links, drive crooked slewing equipment rotation, rotary speed is by proportional valve control, crooked holder mould is contained on the fixed head by two hydraulic oil cylinder driving, but charging or discharging when the holder mould descends, auxiliary curved mould was finished bend pipe when template rose.
Described equipment also includes 2X root passage 17, the X root passage of the X root copper pipe correspondence of sending to for the first time and the corresponding X root passage space of sending to for the second time of X root copper pipe, described passage 17 is between cutting mechanism 8 and pipe bending mechanism 10, described passage 17 links to each other with pipe bending mechanism 10, metal pipe material 9 guiding can be entered pipe bending mechanism 10, for the ease of docking with metal pipe material 9, the entry design of passage 17 is horn-like.
The bending and molding equipment that adds section chief U pipe also comprises gantry bin, has expected checkout gear, feeding fast change slow with put in place all with inductive switch detection, core-pulling device, mandrel oil spray device, long U length of tube adjusting device, safe light curtain, Hydraulic Station etc.
Gantry bin can vertically be pulled out material from no axle center coiled material (traverse), and each flat copper tube material is led the position by polyethylene pipe.
Expected that checkout gear adopts optoelectronic switch to detect, and is arranged in the full circle coalignment.
Feeding is changeed slow soon and is put in place and all detect with inductive switch.
Discharging, loose core, mandrel oil spray device: after the copper pipe bending was finished, under the bending die clamped condition, movable mandrel withdrawed from position, crooked point of contact by hydraulic oil cylinder driving, discharging then, leading screw drives the discharging seat fast forward by oil motor, unloads long U pipe.What link with movable mandrel is the connecting rod that a usefulness heavy wall cold-drawing seamless pipe is made, and oil mist lubricator and distributor are housed on the machine, and through the aperture on the connecting rod, inwall oil spray behind the mold cramping copper pipe and when crooked is to guarantee bending quality by distributor.
Long U length of tube adjusting device: when the length of tube specification changes, should adjust by length adjuster, length adjuster has following a few part:
1. position length adjusting device: be used for adjusting the length of crooked back workpiece, it uses the handwheel adjustment, changes the type pipe that copper pipe discharging cover position bends different length by rack-and-pinion.
2. the adjusting device of copper pipe Cutting Length: in order to realize the adjustment of copper pipe Cutting Length, this equipment is arranged into cutting machine and bending machine respectively on two frames, cutting machine maintains static in the longitudinal direction, bending machine is placed on the track of base, motor-driven leading screw by Frequency Converter Control is regulated length, and leading screw one end connects rotary encoder control length, when needs change the Cutting Length of copper pipe, can regulate automatically according to preseting length, but also crawl carries out accurate sizing at a slow speed.
3. guide frame, material receiver adjusting device: according to the pipe different length, equipment is furnished with the guide frame of different length.Material receiver is by hydraulic oil cylinder driving, and the arm that connects material is contained on the major axis, and the arm that connects material can slide along major axis, changes the distance between the arm that connects material, or the number that increases the arm that connects material can satisfy connecting material of different length workpiece.
Safe light curtain is equipped with in the equipment both sides.
Hydraulic Station is arranged in the cutting frame of frame-type, and complete machine length obtains certain shortening.
The processing method of a kind of U-shape metal pipe provided by the invention is:
1) the straight mechanism copper mouth piece section of the X root being pulled out from the copper pipe volume in first operating position is aligned simultaneously;
2) the long straight copper tube head of the X root section that will have been aligned in first operating position by feed mechanism is sent in the equipment;
3) cut out X root long straight copper tube in first operating position by Len req by cutting mechanism;
4) described straightening mechanism, feed mechanism and cutting mechanism and described translation mechanism together move to second operating position;
5) straightening mechanism is aligned the copper mouth piece section that the X root is pulled out for the second time simultaneously in second operating position from the copper pipe volume;
6) the long straight copper tube head of the X root section that will have been aligned in second operating position by feed mechanism is sent in the equipment;
7) cut out X root long straight copper tube in second operating position by Len req by cutting mechanism;
8) by the long straight copper tube growth of the described 2X root of pipe bending mechanism bending U type copper pipe;
9) by the shedding mechanism discharging;
10) each mechanism of equipment resets.
The above-mentioned the 3rd) and the 1st) before the step, need compress copper pipe to be sheared.
The concrete course of work is as follows:
The first step: when needs add man-hour, at first copper pipe is penetrated straightening mechanism 5, pass feed mechanism 6 again, pass cutting mechanism 8 again;
Second step: the PLC Programmable Logic Controller sends signal, and feed mechanism is started working, and makes copper pipe pass pipe bending mechanism 10, and pierces on the guide rod in the guide-bar mechanism 14, and behind assigned address, feed mechanism 6 stops;
The 3rd step: shear 7 actions of advance and retreat cylinder simultaneously, the extreme position that cutting mechanism 8 is arrived away from feed mechanism 6, copper pipe is sheared in cutting mechanism 8 work; Shear back shearing advance and retreat cylinder 7 and reset, cutting mechanism 8 is return;
The 4th step: feed mechanism 6 counter-rotatings simultaneously make copper pipe return certain size;
The 5th step: translation cylinder 2 action, make pan carriage 4 move on to another extreme position both on second operating position, straightening mechanism 5, feed mechanism 6, cutting mechanism 8 are also driven on second operating position;
The 6th step: feed mechanism 6 work, the process of copper pipe was sent in repetition last time to;
The 7th step: after delivering to the position, cutting mechanism 8 work;
The 8th step: copper pipe is stepped back;
The 9th step: 12 work of bend pipe cylinder, drive rackwork 11 and move, thereby the gear in the pipe bending mechanism 10 is rotated, pipe bending mechanism 10 beginning bending copper pipes, after bend pipe cylinder 12 was gone to extreme position, bend pipe was finished;
The tenth step: dumping cylinder 15 work, shedding mechanism 13 is moved, take the copper pipe of rolling well out of;
The 11 step: dumping cylinder 15 resets, and bend pipe cylinder 12 resets simultaneously, thereby pipe bending mechanism 10 is resetted, and a work period finishes.
Wherein, to start working and adopt friction feeding style, its version be that cylinder is pressed band feeding synchronously to feed mechanism.Every group has an independently cylinder synchronously, cylinder compresses synchronous band during feeding, the tight copper pipe friction of upper and lower two synchronous strap clamps feeding, feeding is when the position, feeding speed is slow by fast commentaries on classics, is with clamping cylinder to forward low pressure to by high pressure synchronously, and which root copper pipe puts in place fully, the cylinder decompression of pressing this group is to avoid copper pipe friction bending.Hydraulic system is the speed of proportional valve control oil motor, easily realize feeding by the work tempo of (starting) at a slow speed → fast → (put in place) at a slow speed to guarantee the quality of high efficiency and workpiece.
Above-mentioned listed specific implementation is nonrestrictive, concerning the person skilled in the art of this area, is not departing from the scope of the invention, can carry out various improvement and variation.For example, the specific implementation of each mechanism and the type of drive of each mechanism all can be selected for use in existing mechanical equipment.
Claims (17)
1. the process equipment of a U-shape metal pipe, include the controller that to control the action of each parts, be positioned at the below and play the frame of support fixation effect, be installed on a plurality of driver parts on the frame, drive respectively and be positioned at straightening mechanism above the frame, can send the feed mechanism and the cutting mechanism of many copper pipes simultaneously to by described a plurality of driver parts, the described copper pipe radical of once sending to is X, and then X is the integer greater than; Described frame top also is provided with pipe bending mechanism and shedding mechanism; It is characterized in that described frame top also is provided with translation mechanism, described translation mechanism includes translation cylinder, translation slide rail and pan carriage, and described translation mechanism can swing; Described straightening mechanism, feed mechanism and cutting mechanism are installed on the described pan carriage, described straightening mechanism, feed mechanism and cutting mechanism and described translation mechanism together swing, stop when being rocked to a left side or limit on the right-right-hand limit position, a described left side or limit on the right-right-hand limit position are two operating positions of described straightening mechanism, feed mechanism and cutting mechanism.
2. the process equipment of U-shape metal pipe according to claim 1 is characterized in that, described frame (1) top is provided with the workbench of being made by thick flat board.
3. the process equipment of U-shape metal pipe according to claim 1, it is characterized in that, described translation slide rail (3) includes slide block and chute is formed, described slide block is fixedly mounted on the frame (1), the chute of translation slide rail (3) is a movable part, be installed on the pan carriage (4), described chute is stuck on the slide block and horizontally slips; Translation cylinder (2) is a cylinder, and described translation cylinder (2) links to each other with carrying compressed-air actuated pipeline.
4. the process equipment of U-shape metal pipe according to claim 1, it is characterized in that, described straightening mechanism (5) is installed on the pan carriage (4), and described straightening mechanism (5) includes X cover aligning wheel component, and the described aligning wheel component of every cover includes 2 rounding wheels and 8 alignment wheels; Alignment wheel arranged crosswise is on two inclined-planes with horizontal plane angle at 45.
5. the process equipment of U-shape metal pipe according to claim 1 is characterized in that, described feed mechanism (6) is installed on the pan carriage (4); Described feed mechanism (6) is equipped with for every copper pipe: separate cylinders and upper and lower synchronous band.
6. the process equipment of U-shape metal pipe according to claim 1, it is characterized in that, described cutting mechanism (8) includes and shears slide rail (16), shears advance and retreat cylinder (7), X cover blade part and cutter head drive motors, the slide block of shearing slide rail (16) is installed on the pan carriage (4), the chute of shearing slide rail (16) is installed on the cutting mechanism (8), an end of shearing advance and retreat cylinders (7) is installed on the frame (1), and the other end is installed on the cutting mechanism (8); Described blade part includes outer hobboing cutter, angular contact ball bearing, push broach seat and is with synchronously, and described push broach seat is provided with eccentric shaft.
7. the process equipment of U-shape metal pipe according to claim 6 is characterized in that, described cutting mechanism (8) includes the frequency converter that can control the cutter head drive motors.
8. the process equipment of U-shape metal pipe according to claim 1 is characterized in that, described pipe bending mechanism (10) is fixed on the frame (1); Described pipe bending mechanism (10) includes bend pipe cylinder (12), rackwork (11), gear and bend pipe mould; Described rackwork (11) is installed on the frame (1); One end of described bend pipe cylinder (12) is fixed on the rackwork (11), and the other end is fixed on the frame (1).
9. the process equipment of U-shape metal pipe according to claim 8 is characterized in that, described bend pipe mould is made up of crooked clamping device, crooked slewing equipment, several parts of crooked holder mould ascending, descending; The crooked clamping device leading-in end of bend pipe mould is provided with 2 times of X quantity through holes, 2X root copper pipe stretches in the described through hole, X through hole of the X root copper pipe correspondence of sending to for the first time and X the corresponding through hole space of sending to the second time of X root copper pipe, the crooked slewing equipment of described bend pipe mould also is provided with and the consistent semicircle die cavity of U type pipe bending shape.
10. the process equipment of U-shape metal pipe according to claim 8 is characterized in that, described equipment also comprises the guide-bar mechanism (14) that is installed on the frame (1), and the guide rod in the described guide-bar mechanism (14) is corresponding to the fixed position of pipe bending mechanism (10).
11. the process equipment of U-shape metal pipe according to claim 1, it is characterized in that, described equipment also includes 2X root passage (17), the X root passage of the X root copper pipe correspondence of sending to for the first time and the corresponding X root passage space of sending to for the second time of X root copper pipe, described passage (17) is positioned between cutting mechanism (8) and the pipe bending mechanism (10), described passage (17) links to each other with pipe bending mechanism (10), and the inlet of described passage (17) is horn-like.
12. the process equipment of U-shape metal pipe according to claim 10 is characterized in that, described shedding mechanism (13) is installed on the frame, includes: dumping cylinder (15) and push pedal.
13. the process equipment of U-shape metal pipe according to claim 12 is characterized in that, the described controller of controlling each parts action is a kind of PLC Programmable Logic Controller.
14. one kind is used the method for the process equipment processing U-shape metal pipe of U-shape metal pipe as claimed in claim 13 to be:
1) the copper mouth piece section of in first operating position X root being pulled out from the copper pipe volume by described straightening mechanism is aligned simultaneously;
2) the long straight copper tube head of the X root section that will have been aligned in first operating position by described feed mechanism is sent in the described equipment;
3) cut out X root long straight copper tube in first operating position by Len req by described cutting mechanism;
4) described straightening mechanism, feed mechanism and cutting mechanism and described translation mechanism together move to second operating position;
5) described straightening mechanism is aligned the copper mouth piece section that the X root is pulled out for the second time simultaneously in second operating position from the copper pipe volume;
6) the long straight copper tube head of the X root section that will have been aligned in second operating position by described feed mechanism is sent in the equipment;
7) cut out X root long straight copper tube in second operating position by Len req by described cutting mechanism;
8) by the long straight copper tube growth of the described 2X root of described pipe bending mechanism bending U type copper pipe;
9) by described shedding mechanism discharging;
10) each mechanism of equipment resets.
15. the processing method of U-shape metal pipe according to claim 14 is characterized in that, the concrete course of work comprises the steps:
The first step: when needs add man-hour, at first copper pipe is penetrated described straightening mechanism (5), pass described feed mechanism (6) again, pass described cutting mechanism (8) again;
Second step: the PLC Programmable Logic Controller sends signal, and described feed mechanism is started working, and makes copper pipe pass described pipe bending mechanism (10), and pierces on the guide rod in the described guide-bar mechanism (14), and behind assigned address, described feed mechanism (6) stops;
The 3rd step: shear advance and retreat cylinders (7) action simultaneously, make the extreme position of described cutting mechanism (8) arrival away from feed mechanism (6), copper pipe is sheared in cutting mechanism (8) work; Shear back shearing advance and retreat cylinders (7) and reset, cutting mechanism (8) is return;
The 4th step: described feed mechanism (6) counter-rotating simultaneously makes copper pipe return certain size;
The 5th step: described translation cylinder (2) action, making pan carriage (4) move on to another extreme position is on second operating position, straightening mechanism (5), feed mechanism (6), cutting mechanism (8) is also driven on second operating position;
The 6th step: described feed mechanism (6) work, the process of copper pipe was sent in repetition last time to;
The 7th step: after delivering to the position, described cutting mechanism (8) work;
The 8th step: copper pipe is stepped back;
The 9th step: described bend pipe cylinder (12) work, drive rackwork (11) and move, thereby the gear in the pipe bending mechanism (10) is rotated, pipe bending mechanism (10) beginning bending copper pipe, after bend pipe cylinder (12) was gone to extreme position, bend pipe was finished;
The tenth step: described dumping cylinder (15) work, shedding mechanism (13) is moved, take the copper pipe of rolling well out of;
The 11 step: described dumping cylinder (15) resets, and bend pipe cylinder (12) resets simultaneously, thereby pipe bending mechanism (10) is resetted, and a work period finishes.
16. the processing method of U-shape metal pipe according to claim 15 is characterized in that, described feed mechanism is started working and adopted friction feeding style, its version is that cylinder is pressed band feeding synchronously; Every group has an independently cylinder synchronously, cylinder compresses synchronous band during feeding, the tight copper pipe friction of upper and lower two synchronous strap clamps feeding, feeding is when the position, feeding speed is slow by fast commentaries on classics, be with clamping cylinder to forward low pressure to synchronously, when copper pipe puts in place fully, press the cylinder decompression of this group by high pressure; Adopting the speed of proportional valve control hydraulic system oil motor, the work tempo of feeding serves as reasons at a slow speed → fast → at a slow speed.
17. the processing method of U-shape metal pipe according to claim 15, it is characterized in that, stretching of described bend pipe cylinder (12), the tooth bar that orders about in the described rackwork (11) slides, the gear that orders about in the described pipe bending mechanism (10) rotates, and the copper pipe in the described pipe bending mechanism (10) curves the U type in the semicircle die cavity of mould.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101018821A CN100423864C (en) | 2005-11-29 | 2005-11-29 | Processing equipment and processing method for long U-shaped metal pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005101018821A CN100423864C (en) | 2005-11-29 | 2005-11-29 | Processing equipment and processing method for long U-shaped metal pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1978087A CN1978087A (en) | 2007-06-13 |
CN100423864C true CN100423864C (en) | 2008-10-08 |
Family
ID=38129488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005101018821A Active CN100423864C (en) | 2005-11-29 | 2005-11-29 | Processing equipment and processing method for long U-shaped metal pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100423864C (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012075888A1 (en) * | 2010-12-09 | 2012-06-14 | 中山市奥美森工业有限公司 | Long u-shape pipe bending machine |
CN104815886A (en) * | 2014-12-16 | 2015-08-05 | 芜湖美威包装品有限公司 | Condenser copper tube processing and forming assembly |
CN107952905A (en) * | 2017-11-22 | 2018-04-24 | 奥美森智能装备股份有限公司 | A kind of method of long U bending machines bend pipe |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011125190A1 (en) * | 2010-04-07 | 2011-10-13 | 株式会社太洋 | Fully automatic pipe bender |
CN103599965A (en) * | 2013-10-23 | 2014-02-26 | 南通皋液液压机有限公司 | Shaping hydraulic machine for high-speed rail tail hooking frame |
CN104668957A (en) * | 2014-12-16 | 2015-06-03 | 芜湖美威包装品有限公司 | Copper tube forming machine for condenser |
CN109317972A (en) * | 2017-07-31 | 2019-02-12 | 宁波精达成形装备股份有限公司 | A kind of bend pipe lantern ring all-in-one machine of pipe fitting |
CN107442621A (en) * | 2017-07-31 | 2017-12-08 | 宁波精达成形装备股份有限公司 | Pipe bending mechanism |
CN107639421B (en) * | 2017-11-04 | 2023-11-24 | 台州市通力制冷元件有限公司 | Gas collecting tube processing equipment and processing technology thereof |
CN107971375A (en) * | 2017-11-16 | 2018-05-01 | 浙江工业大学奉化智慧经济研究院 | A kind of bending mechanism of aluminium section bar automatic bending machine |
CN107971422B (en) * | 2017-11-22 | 2023-12-01 | 奥美森智能装备股份有限公司 | Long U pipe bending machine |
CN112318243B (en) * | 2018-01-15 | 2022-04-01 | 青岛祥银传动设备有限公司 | High-efficient guide rail special purpose grinder |
CN108672589A (en) * | 2018-07-18 | 2018-10-19 | 中山精达特克机械有限公司 | A kind of long U tube bending machines and its operating method |
CN108620505B (en) * | 2018-07-19 | 2024-05-28 | 珠海格力智能装备有限公司 | Length adjusting mechanism |
CN108626560B (en) * | 2018-07-19 | 2024-04-16 | 珠海格力智能装备有限公司 | Lubricating mechanism and pipe bending equipment with same |
CN110238300B (en) * | 2019-06-25 | 2021-04-27 | 珠海格力智能装备有限公司 | Feeding control method of long U-shaped pipe bender and long U-shaped pipe bender |
CN110355231A (en) * | 2019-08-20 | 2019-10-22 | 肇庆市端州区一创机电设备有限公司 | Annealing bend pipe punching press all-in-one machine |
CN111496027A (en) * | 2020-04-02 | 2020-08-07 | 格力电器(郑州)有限公司 | Copper pipe is automatic bending device side by side |
CN111940572B (en) * | 2020-08-11 | 2021-10-26 | 刘颂 | Automatic bending equipment for four-station long U pipe |
CN111940573B (en) * | 2020-08-11 | 2021-11-02 | 刘颂 | Automatic bending process for four-station long U-shaped pipe |
CN112355077B (en) * | 2020-10-16 | 2022-08-09 | 广东博智林机器人有限公司 | Bar production line |
CN112808822A (en) * | 2021-02-18 | 2021-05-18 | 珠海格力智能装备有限公司 | Pipe bending device |
CN113210519B (en) * | 2021-05-11 | 2023-04-07 | 常州赛凯电器设备有限公司 | Automatic processing equipment for ice making evaporating pipe |
CN115055973B (en) * | 2022-05-27 | 2024-04-05 | 无锡市通合机械有限公司 | Conveying, shearing and machining integrated device for guardrail plate production |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4563802A (en) * | 1979-07-12 | 1986-01-14 | Benteler-Werke Ag | Method and apparatus for the production of exhaust pipes for automotive vehicles |
JPH08290216A (en) * | 1995-04-20 | 1996-11-05 | Jgc Corp | Automatic straightening/bending device for long size tube |
JPH105878A (en) * | 1996-06-14 | 1998-01-13 | Chiyoda Kogyo Kk | Full automatic tube bending equipment |
CN2691729Y (en) * | 2004-04-20 | 2005-04-13 | 孙波涛 | U shape pipe bending machine |
JP2005186126A (en) * | 2003-12-26 | 2005-07-14 | Sango Co Ltd | Processing method and system for pipe |
CN1649683A (en) * | 2002-03-28 | 2005-08-03 | 帕利玛·W·卢德维希公司 | Bending machine for profiles and circular pipes |
-
2005
- 2005-11-29 CN CNB2005101018821A patent/CN100423864C/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4563802A (en) * | 1979-07-12 | 1986-01-14 | Benteler-Werke Ag | Method and apparatus for the production of exhaust pipes for automotive vehicles |
JPH08290216A (en) * | 1995-04-20 | 1996-11-05 | Jgc Corp | Automatic straightening/bending device for long size tube |
JPH105878A (en) * | 1996-06-14 | 1998-01-13 | Chiyoda Kogyo Kk | Full automatic tube bending equipment |
CN1649683A (en) * | 2002-03-28 | 2005-08-03 | 帕利玛·W·卢德维希公司 | Bending machine for profiles and circular pipes |
JP2005186126A (en) * | 2003-12-26 | 2005-07-14 | Sango Co Ltd | Processing method and system for pipe |
CN2691729Y (en) * | 2004-04-20 | 2005-04-13 | 孙波涛 | U shape pipe bending machine |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012075888A1 (en) * | 2010-12-09 | 2012-06-14 | 中山市奥美森工业有限公司 | Long u-shape pipe bending machine |
CN104815886A (en) * | 2014-12-16 | 2015-08-05 | 芜湖美威包装品有限公司 | Condenser copper tube processing and forming assembly |
CN107952905A (en) * | 2017-11-22 | 2018-04-24 | 奥美森智能装备股份有限公司 | A kind of method of long U bending machines bend pipe |
Also Published As
Publication number | Publication date |
---|---|
CN1978087A (en) | 2007-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100423864C (en) | Processing equipment and processing method for long U-shaped metal pipe | |
CN207026610U (en) | A kind of fully-automatic metal round bar cutting machine | |
CN106734781B (en) | A kind of automatic folding type space split heads bender | |
CN106984863A (en) | A kind of fully-automatic metal round bar cutting machine | |
CN102248368B (en) | KB section rolling forming method | |
CN210703587U (en) | Automatic pipe cutting and punching integrated machine | |
CN2912860Y (en) | Building stirrup forming machine | |
CN213618550U (en) | Die fixing structure for press | |
CN107252836A (en) | A kind of augomatic syphon device | |
CN219274343U (en) | Steel wire cutting device for spring production | |
CN105479182A (en) | Forming equipment for hairpin pipes and operation method thereof | |
CN2863445Y (en) | Full automatic plastic uptake forming machine | |
CN208019320U (en) | Numerical control bending integrally forming machine | |
CN202803997U (en) | Automation feeding and blanking mechanical arm | |
CN102211335B (en) | Numerically-controlled herbal medicine slicing machine | |
CN205928803U (en) | Double blade fixed length PE manages cutting device | |
CN208466930U (en) | A kind of pipe end forming machine | |
CN211707796U (en) | Automatic pipe bender | |
CN203610767U (en) | High-speed high-precision specified length online cutting machine | |
CN2910411Y (en) | Full automatic foil making machine having computer controlled program preselection | |
CN213591620U (en) | Automatic wire bending machine | |
CN106311931B (en) | Hydraulic control reinforcing bar automatic moulding machine | |
CN2850750Y (en) | Horizontal type automatic spinning forming machine tool | |
CN102581373A (en) | Wide stainless steel product cut-off device | |
CN202527544U (en) | Novel numerical control bending machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |