CN100419264C - Method for deciding key characteristic of compressor by consumed time of timing exhaust volume - Google Patents
Method for deciding key characteristic of compressor by consumed time of timing exhaust volume Download PDFInfo
- Publication number
- CN100419264C CN100419264C CNB2005100493620A CN200510049362A CN100419264C CN 100419264 C CN100419264 C CN 100419264C CN B2005100493620 A CNB2005100493620 A CN B2005100493620A CN 200510049362 A CN200510049362 A CN 200510049362A CN 100419264 C CN100419264 C CN 100419264C
- Authority
- CN
- China
- Prior art keywords
- compressor
- piston
- work
- unit time
- inflator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Positive-Displacement Pumps (AREA)
- Compressor (AREA)
Abstract
The present invention relates to a method for judging whether the key characteristic of a compressor is qualified or not by limiting the consumption time of gas exhaust volume. The present invention is characterized in that: a, a gas cylinder (1) in which a piston (3) is arranged is used as a test instrument and test equipment; in the preparation work, the height (h) of the piston (3) jacked by gas in unit time t is determined by the starting work of a standard compressor; in the test steps and the judgment method, the condition that the piston (3) is jacked by gas in the gas cylinder (1) in the unit time t after the compressor (6) is started is observed, when the piston (3) exceeds the height (h) in the time period which is less than or equal to the unit time t, the work compression ratio or the refrigerating capacity of the measured compressor (6) is qualified; when the piston (3) reaches the height (h) in the time period more than the unit time t, the work compression ratio or the refrigerating capacity of the measured compressor (6) is unqualified.
Description
Technical field
The present invention relates to compressor characteristics quality inspection technology.
Background technique
Compressor is modal mechanical classification, and its work compression ratio is high more, and so, its compression property is just good more.Yet, whether the quality that the method that the actual conditions that the service behaviour detection of compressor was often adopted 1: 1 detects is differentiated it is qualified, for example: the compressor of refrigeration purposes, be the refrigeration system that it is placed actual applying working condition, by the test result of its refrigerating capacity being judged whether it is up-to-standard.GB GB9098---the compressor that the refrigerator purposes has been decided in restraining in 88 is tested the standard of judging that whether qualified it is by it forms refrigerating capacity in refrigeration system size.
If whether the compressor of producing in factory mass all adopts national standard method to differentiate compressor as its essential items for inspection embodiment qualified, obviously is difficult.If can adopt and GB GB9098---the embodiment of formulating in 88 has the simple and direct embodiment of equivalent relation, it is examined the project implementation scheme as compressor function character, so, the quality inspection project of reflection compressor cooling flow characteristic has been created condition with regard to the essential items for inspection that can be used as every compressor.
Summary of the invention
The present invention's purpose: propose a kind of simple and direct embodiment that can reflect compressor key function characteristic quality inspection project fast, for its essential items for inspection that become every compressor create conditions.
In order to realize goal of the invention, intend adopting following technology:
A. the test instrument equipment of Cai Yonging:
Inside is provided with the inflator of piston, and this inflator adopts transparent toughened glass to make;
B. preparatory work of the present invention:
Start work by the standard compression machine is determined: unit time t inner carrier is by the height of gas jack-up;
C. testing procedure and determination methods:
A, with the outlet pipe of tested compressor by pneumatic tube, link to each other with the bottom of inflator, allow the suction tude of tested compressor be exposed to airspace;
B, energising start tested compressor;
C, observe piston in inflator by the situation of gas jack-up:
When piston had been less than or equal to have crossed described height in time period of unit time t, then: the work compression ratio or the refrigerating capacity of tested compressor were qualified;
When piston just arrives described height in more than the time period of unit time t, then: the work compression ratio or the refrigerating capacity of tested compressor are defective.
Characteristics of the present invention:
Because the present invention can require to set up equivalent relation with GB, these essential items for inspection that just make it possible to reflect that the quality inspection project of key characteristic of compressor (work compression ratio or refrigerating capacity) can become every compressor product have been created condition.
Description of drawings
Figure has illustrated one embodiment of the present of invention.
1: inflator; 2: the gas overflow hole; 3: piston; 4: pneumatic tube (flexibility); 5: outlet pipe; 6: tested compressor; 7: suction tude; H: piston is by the height of gas jack-up (position in gas overflow hole).
Embodiment
A. the test instrument equipment that adopts of the present invention:
Inside is provided with the inflator 1 of piston 3, and this inflator 1 adopts transparent toughened glass 2 (being convenient to observe piston 3 positions) to make.
B. preparatory work of the present invention:
Start work by standard compression machine (work compression ratio or refrigerating capacity just reach the requirement of relevant GB) is determined: unit time t inner carrier 3 is by the height h of gas jack-up, after this, because the existence in gas overflow hole 2, piston 3 can not continue to be risen by gas.
C. testing procedure of the present invention and determination methods:
A, with the outlet pipe 5 of tested compressor 6 by pneumatic tube 4, link to each other with the bottom of inflator 1, allow the suction tude 7 of tested compressor 5 be exposed to airspace.
B, energising start tested compressor 6.
C, observe in inflator 1 by the situation of gas jack-up: when piston 3 had been less than or equal to have crossed height h in time period of unit time t, then: the work compression ratio or the refrigerating capacity of tested compressor 6 were qualified; When piston 3 just arrived height h in more than the time period of unit time t, then: the work compression ratio or the refrigerating capacity of tested compressor 6 were defective.
Obviously, key of the present invention is:
Allow work compression ratio or refrigerating capacity just reach relevant GB required standard compressor, and be critical data to discharge the needed time of certain gas volume, whether the relevant key characteristic of judging other tested compressor fast is qualified, promptly whether reaches the requirement of GB.
Claims (1)
1. the consumption time by the qualification exhaust volume is judged the whether qualified method of key characteristic of compressor, it is characterized in that:
A. the test instrument equipment of Cai Yonging:
Inside is provided with the inflator (1) of piston (3), and this inflator (1) adopts transparent toughened glass to make;
B. preparatory work of the present invention:
Start work by the standard compression machine is determined: unit time t inner carrier (3) is by the height of gas jack-up (h);
C. testing procedure and determination methods:
A, with the outlet pipe (5) of tested compressor (6) by pneumatic tube (4), link to each other with the bottom of inflator (1), allow the suction tude (7) of tested compressor (6) be exposed to airspace;
B, energising start tested compressor (6);
C, observe piston (3) in inflator (1) by the situation of gas jack-up:
When piston (3) had been less than or equal to have crossed described height (h) in time period of unit time t, then: the work compression ratio or the refrigerating capacity of tested compressor (6) were qualified;
When piston (3) just arrives described height (h) in more than the time period of unit time t, then: the work compression ratio or the refrigerating capacity of tested compressor (6) are defective.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100493620A CN100419264C (en) | 2005-03-13 | 2005-03-13 | Method for deciding key characteristic of compressor by consumed time of timing exhaust volume |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100493620A CN100419264C (en) | 2005-03-13 | 2005-03-13 | Method for deciding key characteristic of compressor by consumed time of timing exhaust volume |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1657780A CN1657780A (en) | 2005-08-24 |
CN100419264C true CN100419264C (en) | 2008-09-17 |
Family
ID=35007450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100493620A Expired - Fee Related CN100419264C (en) | 2005-03-13 | 2005-03-13 | Method for deciding key characteristic of compressor by consumed time of timing exhaust volume |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100419264C (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2970474A (en) * | 1957-08-29 | 1961-02-07 | Westinghouse Air Brake Co | Compressor efficiency determining apparatus |
JPS63289277A (en) * | 1987-05-20 | 1988-11-25 | Toshiba Corp | Tester for refrigeration compressor |
WO2004083801A1 (en) * | 2003-03-21 | 2004-09-30 | Volvo Lastvagnar Ab | Method and device for control of the capacity of a compressor |
CN1558186A (en) * | 2004-02-12 | 2004-12-29 | 梁嘉麟 | Establishment method of simple testing scheme for compressor refrigerating capacity equivalent to national standard requirements |
CN1584526A (en) * | 2004-06-11 | 2005-02-23 | 梁嘉麟 | Refrigerator refrigerating performance item on-line testing facilities and determination of equivalent testing method |
-
2005
- 2005-03-13 CN CNB2005100493620A patent/CN100419264C/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2970474A (en) * | 1957-08-29 | 1961-02-07 | Westinghouse Air Brake Co | Compressor efficiency determining apparatus |
JPS63289277A (en) * | 1987-05-20 | 1988-11-25 | Toshiba Corp | Tester for refrigeration compressor |
WO2004083801A1 (en) * | 2003-03-21 | 2004-09-30 | Volvo Lastvagnar Ab | Method and device for control of the capacity of a compressor |
CN1558186A (en) * | 2004-02-12 | 2004-12-29 | 梁嘉麟 | Establishment method of simple testing scheme for compressor refrigerating capacity equivalent to national standard requirements |
CN1584526A (en) * | 2004-06-11 | 2005-02-23 | 梁嘉麟 | Refrigerator refrigerating performance item on-line testing facilities and determination of equivalent testing method |
Also Published As
Publication number | Publication date |
---|---|
CN1657780A (en) | 2005-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204740107U (en) | O type sealing washer leak rate detection device | |
CN205808649U (en) | Bottled water leak tester | |
CN108548657A (en) | Testing load of photovoltaic module method | |
CN100419264C (en) | Method for deciding key characteristic of compressor by consumed time of timing exhaust volume | |
CN104697726A (en) | Workpiece leak detection device | |
CN108644988B (en) | Air conditioner outdoor unit detection system | |
CN109916568A (en) | Electric machine controller sealing propertytest system, device and method | |
CN1332133C (en) | Method for deciding key characteristic of compressor qualified or not by timing exhaust volume | |
WO2004046675A3 (en) | Method for testing the tightness of air conditioners in motor vehicles | |
CN201331419Y (en) | Leakage detector for rubber-based membrane used for pressure regulator | |
CN106525353B (en) | High-pressure aerated connecting tube defect inspection method | |
CN103822762A (en) | Heavy-duty diesel engine cylinder body water jacket leakage detection process | |
CN103604572A (en) | Leakage detection method for central air conditioner copper tube | |
CN205317167U (en) | Be used for detecting smooth device of engine part surface | |
CN204269301U (en) | A kind of automobile altitude valve leak-testing apparatus | |
CN115523130A (en) | Method for evaluating reliability of compressor | |
CN2879154Y (en) | Pneumatic type porcelain bottle leakage testing machine | |
CN102749177B (en) | Submerged air leakage test device for bicycle front fork casts | |
CN215414800U (en) | Device for testing strength of handle of small steel cylinder | |
CN206056890U (en) | Air tightness detection machine | |
CN100344875C (en) | Method for judging whether key characteristics of a compressor are qualified or not by exhaust pressure comparison | |
CN202886078U (en) | Water and gas tester for braided tubes | |
CN207215073U (en) | Refrigeration compressor cylinder head clearance amount detection systems | |
CN219178846U (en) | Relay tightness detection device | |
CN206208475U (en) | A kind of device for detecting aluminum alloy die casting air-tightness |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C57 | Notification of unclear or unknown address | ||
DD01 | Delivery of document by public notice |
Addressee: Zheng Shangzhun Document name: Notification to Pay the Fees |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080917 |